Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 47969
Developer and Project Information Cover Sheet: Developer Company Name: LQ Development LLC Address, State,Zip Code: P O Box 93898, Southlake , TX 76092 Phone& Email: 817-791-7301, wes(r�wilson-stonaker.com Authorized Signatory, Title: William E Stonaker, President Project Name and Brief Landmark Quebec Addition Lot 1 Block 2 Description: Project Location: North Loop 820 between Royalty Lane and Strawn Lane Plat Case Number: FP-16-008 Plat Name: Landmark Quebec Addition Mapsco: 60 A/B Council District: 7 City Project Number: 100382 CFA Number: 2016-062 DOE Number: None To be cJy: by staff Received _ �1 Ci ty of Fort Worth,Texas RECEIVED Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 OFFICIAL RECORD JUL 12 2016 Page 1 of 11 ,CITY SECRETARY( CIIYOFFORTwoRTH CITY SECRETARY FT.WORTH,TX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 4'7 WHEREAS, L_Development LLC , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Landmark Quebec Addition Lot 1 Block 2 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) Z, Paving (B) ©, Storm Drain (B-1) ®, Street Lights & Signs (C) ®. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. Ili. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V, To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the strectlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Landmark Quebec Addittion Lot 1 Block 2 CFA No.: 2016-0620 DOE No.: None An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 157,256.00 2.Sewer Construction $ 123,500.00 Water and Sewer Construction Total $ 280,756.00 B. TPW Construction 1.Street $ - 2.Storm Drain $ 225,521.00 3.Street Lights Installed by Developer $ - 4. Signals $ TPW Construction Cost Total $ 225,521.00 Total Construction Cost(excluding the fees): $ 506.277.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 5,615.12 D. Water/Sewer Material Testing Fee(2%) $ 5.615.12 Sub-Total for Water Construction Fees $ 11,230.24 E. TPW Inspection Fee(4%) $ 9,020.84 F. TPW Material Testing(2%) $ 4,510.42 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost $ H. Street Signs Installation Cost Sub-Total for TPW Construction Fees $ 13,531.26 Total Construction Fees: $ 24.761.50 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% 506 277.00 Completion Agreement=100%/Holds Plat 506 277.00 Cash Escrow Water/Sanitary Sewer=125% 350 945.00 Cash Escrow Paving/Storm Drain=125% 281 901.25 Letter of Credit=125%w12 r expiration period 632 846.25 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 Cost Summary Sheet Project Name: Landmark Quebec Addittion Lot 1 Block 2 CFA No.: 2016-0620 DOE No.: None An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 157,256.00 2.Sewer Construction $ 123,500.00 Water and Sewer Construction Total $ 280,756.00 B. TPW Construction 1.Street $ - 2.Storm Drain $ 225,521.00 3.Street Lights Installed by Developer $ - 4. Signals $ - TPW Construction Cost Total $ 225,521.00 Total Construction Cost(excluding the fees): $ 506,277.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 5,615.12 D. Water/Sewer Material Testing Fee(2%) $ 5,615.12 Sub-Total for Water Construction Fees $ 11,230.24 E. TPW Inspection Fee(4%) $ 9,020.84 F. TPW Material Testing(2%) $ 4,510.42 G. Street Light inspsection Cost $ - H. Signals Inspection Cost $ H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 13,531.26 Total Construction Fees: $ 24,761.50 Choice Financial Guarantee O tions choose one Amount Mark one Bond=100% 506 277.00 Completion Agreement=100%/Holds Plat 506 277.00 Cash Escrow Water/Sanitary Sewer=125% 350 945.00 Cash Escrow Paving/Storm Drain=125% 281 901.25 Letter of Credit=125%w/2 r expiration period 632 846.25 ✓ City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER LQ Development,LLC 13ti 1-�-c+ l�i C—P'tt4-- Jesus J. Chapa -,Qa ems+ ..tt - Assistant City Manager Name: William E Stonaker 7� j� — / Title: -P-Fesidmt w�chatjrk- Date: ! (,,P Date: Recommended by: ATTEST: (Only if required by Developer) [,� I- �L- Wendy Chi-B ulal, EMBA,P.E. Development'Engineering Manager Signature Water Department Name: D4oug0 . Lj Dougla . Wiersig,P.E. la Director Transportation&Public Works Department Approved as to Form &Legality: ATTEST: ®�C FOR i Richard A. McCracken -t����4 Mary J. K e Assistant City Attorney City Secr ry �X�$ M&C No. a /4 Date: VO4w% City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 OFFICIAL RECORD Page 9 of 11 CITY SECRETARY FT. WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvments ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ❑ Exhibit B: Paving Improvements ❑ Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100382 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 ° C3 JQ a LONGHORN = O cl ��� = J BIG BEND RO KY L 0 � FZTF Q CIRCLE POINT z FOSTER v ¢ � FOSTER v Q MORRIS 2Q\' O ( D .r J m O DTELEPH N o m m m HAIR ON EAU Al COMANCHE " GRAHAM EAR OMANCH ACHE QUEBEC 9 MANOR 0 AGE Z ° 0 a = 3 a° a �rLO N 0 U IAWI IEE w E A IAJ S POND MOC�O�lO�� [�l°ap N.T.S. MAPSCO 46X COUNCIL DIST. #7 DENNIS SHINGLETON CFA VICINITY MAP ", A® �nrn � II>mffi LANDMARK QUEBEC LOTS 1-4. BLOCK 2 SHEET FORT WORTH, TARRANT COUNT TX CONSULTING CIVIL ENGINEERS . SURMORS JOSE MARIA BASQUIS SURVEY, ABSTRACT NO. 85 1 (972)490-7090 FAX(972)490-7099 CITY OF FORT WORTH TARRANT COUNTY TEXAS °F Scole : N.T.S. Dote :0612012016 L.Q. DEVELOPMENT Dwg. File : 47420 — CFA COV.DWG P.O. BOX 93898 Pro'ect No. : 47420.01 SOUTHLAKE. TEXAS Z6092 EX. 12" WA TER — Ho (80' right—of—wo I PROP. 12" ° a1 I I WATER LINE EX. 12" WATER LINE TO BE ABANDONED 1 Q I r o > WATER LINE I I / PROP. 12" �q WATER LINE / / l EX. 12" WA TER LINE N TO BE o0 3 ABANDONED III c m Z o a,+ I I l 0 1 q o ° PROP. 12 I I I 1 Z WATER LINE I LEGEND 1 ■■■■I PROPOSED WA TER LINE I a EXISTING WA TER LINE — EXISTING WA TER LINE L®_�� — — TO BE REMOVED APP. 12" II I PROPOSED FIRE HYDRANT r►'A ttR LINE I I � II ►� PROPOSED VAL VE III CFA EXHIBIT A — WATER WIRM11s®Il11m1d1IIi1m LANDMARK QUEBEC LOTS 1-4, BLOCK 2 SHEET A A0800fia tee, II>me. FORT WORTH, TARRANT COUNTY, TX CONSULTING CIVIL ENGINEERS . SURVEYORS JOSE MARIA BASQUIS SURVEY, ABSTRACT NO. 85 2 (972)490-7090 FAX(972)490-7099 CITY OF FORT WORTH of TARRANT COUNTY, TEXAS Scale 1"= 150' Date :0612012016 L.Q. DEVELOPMENT Dwg. File : 47420 — CFA WiR.DWG P.O. BOX 93898 4 Pro'ect No. : 47420.01 -SOUTHL6KF. TFXAS 760q9 I ROYALTY LANE (80'Ryne-of--Nar) O a .I - - l-oRwE iv \ PROP. • Q�z SEWER o MANHOLES o 0 � ♦ �1 (n a � 'l, PROP. 8" (3 SEWER LINE ' Q o4 EX. 8" ?� SEWERI��c— LINE I L® � - - � � I �M s I '\ qNF \ N, Qf` �J PROP. 8" I SEWER LINE LEGEND NESS PROPOSED SANITARY SEWER LINE I — EXISTING SANITARY SEWER LINE I EX. 8" • PROPOSED SANITARY SEWER MANHOLE SEWER O EXISTING SANITARY SEWER MANHOLE LINE J CFA EXHIBIT Al — SEWER 7jnr 1]s(&n mmmimffi LANDMARK QUEBEC LOTS 1-4, BLOCK 2 SHEET "' As Aoo®c$ait so, IIme. FORT WORTH, TARRANT COUNTY, TX CONSULTING CIVIL ENGINEERS . SURVEYORS JOSE MARIA BASQUIS SURVEY, ABSTRACT NO. 85 3 (972)490-7090 FAX(972)490-7099 CITY OF FORT WORTH OF TARRANT COUNTY, TEXAS Scale : 1"= 200 Dote :0612012016 L.Q. DEVELOPMENT Dwg. File : 47420 — CFA SWR.DWC P.O. BOX 93898 4 Pro'ect No._: 47420.01 SOUTHLAKF. TFXAS 7 OPENS Rib ' ■ rte �--- �U ■ i —8ss- i ■ ■ PROP. POND 2 ■ � ? i 4" CONC. FLUME \� ■ ■ I ' OUTLET STRUCTURE i 42" CLA S III RCP ■ W/HEADW(ALL ■ r ■ ■ 1,ou�9hB°O may) (geiss STONE RIPRAP CFA EXHIBIT 81 - STORM "' wIlffilisonm 51mim LANDMARK QUEBEC LOTS 1-4, BLOCK 2 SHEET A Anacci too, Rmee FORT WORTH, TARRANT COUNTY, TX rANSULTING CML ENGINEERS . SURVErORS JOSE MARIA BASQUIS SURVEY, ABSTRACT NO. 85 4 (972)490-7090 FAX(972)490-7099 CITY OF FORT WORTH TARRANT COUNTY TEXAS °F Scale : 1"= 200' Date :06/20/2016 L.Q. DEVELOPMENT Dwg. File : 47420 — CFA STM.DWG P.O. BOX 93898 4 Pro'ect No. : 47420.01 SOUTHLAKE. TEXAS 76092 Landmark Quebec Quantity Matrix EXHIBIT A -WATER ITEM UNIT ITEM TOTAL SHEET NO. TOTAL PRICE COST ITEM NO. BID ITEM UNIT 112131415 WATER 1 6"PVC Water Pipe LF 1XI 1 1 167 $32.00 $5,344.00 2 12"PVC Water Pipe LF 1XI 1 1 15671 $44.00 $68,948.00 3 Fire Hydrant/Assembly EA X1 1 1 4 $4,700.00 $18,800.00 4 2"Water Service EA X1 1 7 $1,120.00 $7,840.00 5 1.5"Water Service(IRR) EA X1 1 1 $1,100.00 $1,100.00 6 1"Water Service(IRR) EA X 6 $1,044.00 $6,264.00 7 6"Gate Valve EA X 7 $1,200.00 $8,400.00 8 12"Gate Valve EA X 9 $2,500.00 $22,500.00 9 Ductile Iron Water Fittings w/Restraint TON 1XI 1 1 3 $4,500.00 $13,500.00 10 Abandon/Plug Ex. 12"Water Line EA X 2 $2,280.00 $4,560.00 SUBTOTAL $157,256.00 Landmark Quebec Quantity Matrix EXHIBIT A-1 -SANITARY SEWER ITEM UNIT ITEM TOTAL SHEET NO. TOTAL PRICE COST ITEM NO. BID ITEM UNIT 1 213 415 SANITARY SEWER I Post-CCTV Inspection LF Ix 1 1 1665 $2.00 $3,330.00 2 Manhole Vacuum Testing EA X 10 $150.00 $1,500.00 3 6"Sewer Service EA X 9 $1,000.00 $9,000.00 4 8"Sewer Pipe LF X 1665 $38.00 $63,270.00 5 4'Manhole EA X 10 $4,000.00 $40,000.00 6 Trench Safety LF X 1665 $1.00 $1,665.00 7 4'Extra Depth Manhole VF 1XI 5 $185.00 $925.00 8 Concrete Collar EA Ix 3 $370.00 $1,110.00 9 Trench Water Stop EA X 9 $300.00 $2,700.00 SUBTOTAL $123,500.00 Landmark Quebec Quantity Matrix EXHIBIT B-1 -STORM SEWER ITEM UNIT ITEM TOTAL SHEET NO. TOTAL PRICE COST ITEM NO. BID ITEM UNIT 1 2131415 DRAINAGE I Outlet Structure,Sht.C-30.02 EA X 1 $14,500.00 $14,500.00 2 Stone Riprap,Sht.C-30.01 SY I IX 75 $75.00 $5,625.00 3 42"Class III RCP LF I ix 58 $105.00 $6,090.00 4 Parallel Headwall(42"RCP) EA I ix 1 $7,500.00 $7,500.00 5 Remove Ex.36"RCP LF I X 220 $20.00 $4,400.00 6 Unclassified Excavation CY X 12933 $12.00 $155,196.00 7 Seeding Hydromulch(Turf Reinforcement Mat) SY I IX , 12500 $2.10 $26,250.00 Sht.C-30.03/30.04 8 4"Concrete Flume,Sht.C-30.01 SF X 7451 $8.00 $5,960.00 SUBTOTAL $225,521.n n