HomeMy WebLinkAboutContract 47936 Developer and Project Information Cover Sheet:
Developer Company Name: TopGolf USA Ft. Worth, LLC
Address, State, Zip Code: 8750 N Central Expy#1200, Dallas TX 75231
Phone & Email: 866-867-4653, Dallas, TX 75231
Authorized Signatory, Title: Dale Mauch , Project Manager
Project Name and Brief Topgolf Fort Worth
Description:
Project Location: 2241 E 411, St, Fort Worth TX 76102
Plat Case Number: FS-15-252 Plat Name: Trinity Bend Addition
Mapsco: 63T and Council District: 8 City Project Number: 100329
63U
CFA Number: 2016-052 DOE Number: None
To be completed by staff
Received by: Date:
s�
RECEIVED
OFFICIAL RECORD JUN 30 2016
City of Fort Worth, Texas CITY SECRETARY C►TYOFFORTWORTH
Standard Community Facilities Agreement FT. WORTHY TX C"SECRETARY
CFA Official Release Date: 10.07.2015
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. � - 1
WHEREAS, TopGolf USA Ft. Worth, LLC, ("Developer"), desires to make certain
specific improvements as described below and on the exhibits attached hereto ("Improvements")
related to a project generally described as Topgolf Fort Worth (`"Project") within the City or the
extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process re per's contractor(s)
City of Fort Worth, Texas OFFICIAL RECORD
Standard Community Facilities Agreement CITY SECRETARY
CFA Official Release Date: 10.07.2015
Page 2 of 11 FT. WORTH'TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A) M. Sewer(A-1) ®, Paving (B) N. Storm Drain(B-1)':,u. Street Lights& Signs
(C) ❑.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified,insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure,and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2)years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 3 of 11
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces, to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
1. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character,whether real or asserted, brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
offIcers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with,the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further, Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 5of11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
Ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2) years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 6 of l l
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 7of11
Cost Summary Sheet
Project Name: Topgolf Fort Worth
CFA No.: 2016-052 DOE No.: <DOE#>
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developers Cost
A. Water and Sewer Construction
1. Water Construction $ 114,919.50
2.Sewer Construction $ 37,508.40
Water and Sewer Construction Total $ 152,427.90
B. TPW Construction
1.Street $ 34,847.00
2.Storm Drain $ -
3.Street Lights Installed by Developer $ -
4. Signals $ -
TPW Construction Cost Total $ 34,847.00
Total Construction Cost(excluding the fees): $ 187,274.90
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 3,048.56
D. Water/Sewer Material Testing Fee(2%) $ 3,048.56
Sub-Total for Water Construction Fees $ 6,097.12
E. TPW Inspection Fee(4%) $ 1,393.88
F. TPW Material Testing(2%) $ 696.94
G. Street Light Inspsection Cost $ -
H. Signals Inspection Cost $
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 2,090.82
Total Construction Fees: $ 8,187.94
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 187,274.90 x
Completion Agreement=100%/Holds Plat $ 187,274.90
Cash Escrow Water/Sanitary Sewer=125% $ 190,534.88
Cash Escrow Paving/Storm Drain=125% $ 43,558.75
Letter of Credit=125%w/2yr expiration period $ 234,093.63
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 8 of 11
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
TopGolf USA Ft. Worth, LLC
Jesus J. Chapa -�2;d A��111--L
Assistant City Manager Name: Dale Mauch
Title: Project Manager
Date: (Q •3c P lr6
Date:
Recommended by:
ATTEST: (Only if required by Developer)
Wendy Chi- abulal, EMBA, P.E.
Development Engineering Manager Signature
Water Department Name:
Douglas' . Wiersig, P.E.
Director
Transportation & Public Works Department
Approved as to Form & Legality: ATTEST:
Richard A. McCracken 'Mary J. s
Assistant City Attorney City Secretary 1
S
M&C No.
Date:
1 z s: 0014--
City of Fort Worth, Texas OFFICIAL RECORD
Standard Community Facilities Agreement CITY SECRETARY
CFA Official Release Date: 10.07.2015 FT.WORTH, TX
Page 9 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 - Changes to Standard Community Facilities Agreement
Location Map
® Exhibit A: Water Improvments
Water Cost Estimate
® Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
f$ Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit 13-1: Storm Drain Improvements
.�i Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 10 of 11
ATTACHMENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100329
None
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 11 of 11
LP
v,
n G)
Southwe ernational , i
Trucks,l
Pittsburg PI
e�� Greenway
►i�t Air_pLort�F..wy
121 r e09
.4 ( y
�a '? -Rouse-St
ntal�, cc
2
E UtSt-
PROJECT
�``� 7 '2' ' 7, LOCATION
Chenault Si
S�
Martin House
wing Company
® �3' E 4th St y
GO
t
Galvez Ave
gt
( <
r
c�
BROCKETTE/DAVIS/DRAKE, INC. VICINITY MAP DATE: 05/26/16
consulting engineers SCALE: N.T.S.
CW d&Structural Engineering•Sins
Texas Regetered Emig Fin F-a41 TOP GOLF
4144 North Central Exprem—tv.Suite 1100
°U;'824-3"7-,d 2`,82470, FORT WORTH, TEXAS
NORTH
1
4 1 CONNECT TO EX 12' WATER
/ 1 ,LINE (CUT AN REMOVE EX 12'
r►S SHOWN)
1 INNSTALL:
12' 45' HORIZ BENDS
�1 �1 12' VALVE
/ 1
:1 1
/ 11
CONNECT' TO EX 12" WATER
LINE'(C(JT AN REMOVE EX 12' 12 II
AS SHOWN)
12' 45' HORIL BENDS
117112 VALVE 1I II I
INSTALL: x I - INSTALL•
1-120 TEE ( II 1-12*X60
TEE
1-12 PLUG / ! II 1-6 VALVE
1—FIRE HYDRANT
INSTALL-
1—1 r
NSTALL:1-1Y TEE
Q 1-12' PLUG
INS T - _ ? I I
1-12'X ' ANCHOR TEE a
1-6' V VE I -
1-6' D DETECTOR
CHECK VE W/ VAULT
(FIRE) EAST Ah ' f
1-12'X4'
1-4' VALVE
1-3' METER W VAULT
INSTALL
1-120X6' ANCHOR TEE
Ex 1-6' VALVE
Ex '' \ 1-12' VALVE
1—FIRE HYDRANT
1-2' SERVICE
(IRRIGATION)
EXHIBIT A
BROCKRAKE, INC.
DATE: 05/26/16
tng engineers WATER IMPROVEMENTS
Civil
&Structural ;ng.Surveying SCALE: 1"=200
TmaRe�tered ErgmwfFvm F-0l TOP GOLF
4141 North Central Exoressway,Suke'100
ON)ar.ra l r.�Tex" 'SZ°' FORT WORTH, TEXAS
ON)r.r Mrw024-70" NORTH
ue i
� A
1
/ REMOVE EX SAN[T Y
SEWER MANHOLE i 1
/ SII
\ 1
OEX SS MH {{
EX Ss CONST. STD 4'
113
FL So ou
FULL DEPTH SAWCUT; —
REMOVE & REPLACE o
CONC. PAVEMENT
o S.{ so
CONNECT TO EX SS MH -
BEGIN 8' SS LINE
EX RIM-521.42 EIST.4th,
FL EX 8'=514.34* -
FL 8'=514.50 I ��
I
/ CONT. STD 4' DIA SS MH
\ %/ CONST. 8' SANITARY RIM-521.01
EX SS MH_ / SEWER LINE FL 80.^515.20
v ZAJ�EX SS MH FL 8" W*R515.10
EXHIBIT A-1
BROCKDAMS/DRAKE, INC. SEWER IMPROVEMENTS DATE: 05/26/16
conautting ng engineers
gineere SCALE: 1"=200'
Civil&51TUC[ural Engineering•Surveying
Tens Registered B*iieming Fern F841 TOP GOLF
4144 North Central Expressway,Suite 1100
Dallas,Texas> .es(ZW)8xrobr FORT WORTH, TEXAS
NORTH
1►'� 1� � � 1 11
1 1
1 1 1
1 1
1 1
1
1 1
1 1
� I
II
N I
B RRIER
I I � EER P
I
CONST. 5' CONC
— — — SIDEWALK
CON FR R> o z
CONST. 5 C
SIDEWALK =
I
CONST. BARRIER
FREE RAMPS I
o
CONST. 5' CONC
SIDEWALK REMOVE EX. CURB do GUTTER
AND CONST, STD CONC. DRIVE
CONNECT TO APPROACH PER CITY OF FT.
EXISTING CONC, WORTH STD DETAILS &
SIDEWALK SPECIFICATIONS
MOVE EX CURB do GUTTER
AND CONST. STD CONC. DRIVE
APPROACH PER CITY OF FT.
WORTH STD DETAILS &
SPECIFICATIONS
EXHIBIT B
BRO Caine ngineeS/DRAKE, INC. PAVING IMPROVEMENTS DATE' 05/26/16
conautting engineers SCALE: 1'=�00`
Civil&sm,tcural e77g m F-"l TOP GOLF
Texu Reguend Finn F-841
4744 North CenuW Exo,es y,Suke 7700
T-" n'°'
c:w 7&24-3W.w(M)el+goes FORT WORTH, TEXAS
NORTH
00 42 43
DAP-Bm PROPOSAL
Page 1 of 2
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Description Specification Unit of Bid Unit Price Bid Value
Item No. I I Section No. Measure Quantity
UNIT 1:OFFSITE WATER IMPROVEMENTS
1 3311.0441 12"Water Pipe 3311 10 LF
331112 1,380 $ 29.00 $ 40020.00
2 3312.3005 12"Gate Valve 33 12 20 EA 3 $ 2,250.00 $ 6,750.00
3 3312.3002 6"Gate Valve 33 12 20 EA 2 $ 850.00 $ 1,700.00
4 3312.0001 Fire Hydrant 33 12 40 EA 2 $ 3,600.00 $ 7,200.00
5 3305.0109 Trench Safety 33 05 10 LF 1,380 $ 1.00 $ 1 380.00
6 13311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 2 $ 4,500.00 $ 9,000.00
7 0241.1118 4"-12"Pressure Plug 0241 14 EA 2 $ 500.00 $ 1,000.00
8 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 1 $ 1,000.00 $ 1 000.00
9 0241.1015 Remove 12"Water Line 0241 14 LF 680 $ 8.00 $ 5,440.00
10 3311.0106 Imported Embedment/Backfill,Crushed 3311 10 LF
331112 1,380 $ 7.00 $ 9,660.00
11 .0100 Mobilization 01 7000 LS 1 $ 1,480.00 $ 1,480.00
12 13312.0001 3"Water Meter and Vault DOM 3312 11 EA 1 $ 12,500.00 $ 12 500.00
13 3312.0001 2"Water Service IRR 33 12 10 EA 1 $ 11500-00 $ 1,500.00
14 3311.0039 6"Water Pipe(Fire Line) 33 11 10 LF
3311 12 25 $ 25.00 $ 625.00
15 3305.0116 Concrete Encasement for Utility Pipes 3305 10 CY 5 $ 135.00 $ 675.00
Subtotal $ 99,930.00
15%Contingency $ 14 989.50
TOTAL UNIT I:OFFSITE WATER IMPROVEMENTS $ 114,919.50
UNIT It:SANITARY SEWER IMPROVEMENTS
1 0241.1000 Remove Conc Pvmt 0241 15 SY 12 $ 40.00 $ 480.00
2 3201.0616 Conc Pvmt Repair,Arterial/Industrial 3201 29 SY 12 $ 40.00 $ 480.00
3 3305.0109 Trench Safety 33 05 10 LF 250 $ 2.00 $ 500.00
4 3471.0001 Traffic Control 3471 13 MO 1 $ 2,000.00 $ 2,000.00
5 3339.1001 4'Manhole 33 39 10 EA
33 39 20 1 2 $ 3,650.00 $ 7,300.00
6 13301.0101 Manhole Vacuum Testing 3301 30 EA 2 $ 100.00 $ 200.00
7 3331.5305 8"PVC Sewer Pipe,6'to 8'(Mist Only),CSS 33 05 10 LF
Backfill 225 $ 31.00 $ 6,975.00
8 3305.0202 Imported Embedment/Backfill Crushed Rock 3305 10 CY 50 $ 4.50 $ 225.00
3311.0225 8"Sewer Pipe,CSS Backfill 3311 10
9 LF
331112 225 $ 8.00 $ 1,800.00
10 0241.2013 Remove 8"Sewer Line 0241 14 LF 538 $ 20.00 $ 10,760.00
11 10241.2201 Remove 4'Sewer Manhole 0241 14 EA 1 $ 1,000.00 $ 1,000.00
12 3301.0002 Post-CCN Inspection 3301 31 LF 223 $ 2.00 $ 446.00
13 3331.0001 6"Sewer Service 3331 50 EA 1 $ 450.00 $ 450.00
Subtotal $ 32 616.00
Contingency $ 4.892.40
TOTAL UNIT It:SANITARY SEWER IMPROVEMENTS $ 37,508.40
UNIT IV:PAVING IMPROVEMENTS
1 0241.1300 Remove Conc CurbBGutter 0241 15 LF 240 3.00 $ 720.00
2 3213.0403 8"Concrete Driveway 32 13 20 SF 2,400 $ 5.50 $ 13 200.00
3 3213.0312 5"Conc Sidewalk Ad'acent to Curb 32 13 20 SF 3,006 4.50 $ 13 527.00
4 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 6 $ 650.00 $ 3,900.00
5 3417.0001 Traffic Control 3471 13 MO 13 500.00 $ 350000
TOTAL UNIT IV:OFFSITE PAVING IMPROVEMENTS $ 34,847.00
Bid Summary
UNIT I:OFFSITE WATER IMPROVEMENTS $ 114 919.50
UNIT II:SANITARY SEWER IMPROVEMENTS $ 37 508.40
UNIT IV:PAVING IMPROVEMENTS $ 34 847.00
Total Construction Bid $ 187,274.90