Loading...
HomeMy WebLinkAboutContract 26147 AGREEMENT FOR THE INSTALLATION OF CROSSING SURFACE MATERIAL AND SIGNAL RELOCATION ON THE BURLINGTON NORTHERN AND SANTA FE RAILWAY COMPANY ON SCHWARTZ AVENUE, DOT # 275 244U CITY SECRETARY AT FORT WORTH, TEXAS LS: 48.5, MP: 4.3�ONTRACT NO. 0? 19 This is a letter agreement wherein The Burlington Northern and Santa Fe Railway Company, hereinafter called Company,agrees that the existing crossing surface at Schwartz Avenue is to be removed and new concrete crossing surface is to be installed to a crossing surface width of 64 feet on the one track. The Company also agrees that the existing flashing light and gate crossing signal system shall be modified to accommodate the proposed widened roadway. To accomplish this work,the City of Fort Worth, Texas,hereafter called Agency,and the Company, agree as follows: 1)The work will be performed by the Company at the expense of the Agency. Said work will consist of the installation of concrete crossing surface material including upgrades to the track to accommodate new concrete crossing surface material,to adequately include all vehicular driving lanes,based on a width of 64 feet from the end of crossing to end of crossing,including walkways. Said work will also consist of the relocating and modifying the existing flashing light and gate crossing signal system, or other work as necessary during construction of the grade crossing.The roadway improvements shall be as shown on the drawing marked Exhibit"A"attached hereto and made a part hereof.. 2)The Agency agrees to reimburse the Company on the basis of actual costs for all railroad work. Such railroad work and the estimated cost thereof being shown in Exhibit`B"attached hereto and made a part hereof. 3)The Company, at its own cost and expense, will maintain the crossing surface in a satisfactory manner and will make ample provisions for such maintenance,provided,however,that the Company shall he entitled to receive any contribution toward the cost of such maintenance as may be now or hereafter made available by reason of any law,ordinance,regulation,order,grant,or by other means or sources. 5)The Agency will provide all barricades, lights,and traffic control devices necessary for detouring vehicular traffic at the crossing, during construction of the crossing involved. This work will he performed at the expense of the Agency. 6)The Agency farther agrees to allow the Company to drain the crossing area into existing Agency storm sewers,if available, near the crossing.The drain pipes and filter fabric will be furnished and installed by the Company. 7)The Agency, at its own cost and expense,will furnish and place the appropriate roadway material on the approaches to the improved crossing. 8)Both parties agree to the requirements of Title VI of the Civil Rights Act of 1964,which by reference is made a part of this agreement. 9)Agency agrees to incorporate in each contract for construction of the Project, or specifications therefor,the provisions set forth in Exhibits"C"and"C-1", attached hereto and by reference made a part hereof. 10)Agency shall require its contractor to indemnify and save harmless Company, its agents and employees, in accordance with Exhibit"C-1". The work proposed above is agreeable to the Company under the terms and consideration stated herein. If this is satisfactory and agreeable to the Agency,please indicate concurrence in the space provided. City of Fort Wo The Burlington Northern to Fe Railway Compan By: By: CAWya—'Atant M ger / /- Manager Publi cts City SecreAttestContract Authorization Approv stoForm 5-l� C c' By: Date: P)- U—on Date BNSF Law Department APROVEsD AS TO FORM AND LEGALITY. Date: FORKNAL HCrinD NICESnY C y Attorney Want T& EXHIBIT "B" Track Work Estimate THE B. N. S. F. RAILWAY COMPANY FHPM ESTIMATE FOR CITY OF FT. WORTH ---------------------------------------------------------------------------------------------------------------------------- LOCATION - NORTH YARD DETAILS OF ESTIMATE ---------------------------------------------------------------------------------------------------------------------------- PURPOSE, JUSTIFICATION AND DESCRIPTION NORTH YARD, TX: RESURFACE SCHWARTZ AVENUE RESURFACE CROSSING ON SCHWARTZ AVENUE., D.O.T. NO. 275-244-U\ M.P. 4.35 ON WICHITA FALLS SUBDIVISION\ TEXAS DIVISION. PROJECT WILL INVOLVE REMOVAL OF EXISTING 132#40' CONCRETE CROSSING SURFACE AND PLACING NEW 64'-136# OMNI IMPROVED CONCRETE CROSSING. SURFACE THROUGH CROSSING. SIGNAL WORK WILL BE COVERED BY SEPARATE ESTIMATE ROADMASTER MARLON GAUNT REVISED 02-11-00 TO YEAR 2000 COSTING. DESCRIPTION QUANTITY U/M COST TOTAL S --------------------------------------------- -------- ----- ------ ----------- ----------- •••••••••• LABOR REPLACE PUBLIC CROSSING 158.40 MH 2,769 WORK TRAIN - BALLAST 2.25 MH 44 PAYROLL ASSOCIATED COSTS 1,737 EQUIPMENT EXPENSES 1,166 SUPERVISION EXPENSES 1,909 INSURANCE EXPENSES 421 ----------- ----------- TOTAL LABOR COST 8,046 8,046 •••••••••• MATERIAL BALLAST, FROM MILL CREEK, OK. 50.00 NT 408 WORK TRAIN FUEL - BALLAST 56.25 GAL 41 SPIKE, TIMBER SCREW, 5/8X12 IN, F/ROAD XING 96.00 EA 94 TIE, TRK,10',PRE-PLATED,PANDROL,6-,SQ HOLE 16.00 EA 1,109 CONC 136 08-SEC WITH FILLER FOR WOOD 64.00 TF 8,900 STORE EXPENSES 258 ONLINE TRANSPORTATION 494 OFFLINE TRANSPORTATION 113 ----------- ----------- TOTAL MATERIAL COST 11,417 11,417 OTHER •••••••••• LEASED BACKHOE 3.00 DAY 6,000 ----------- ----------- TOTAL OTHER ITEMS COST 6,000 6,000 PROJECT SUBTOTAL 25,463 CONTINGENCIES 0 BILL PREPARATION FEE 128 GROSS PROJECT COST 25,591 LESS COST PAID BY BNSF 0 TOTAL BILLABLE COST 25,591 c� CR� EXHIBIT "Brr Signal Pork Estimate THE B. N. S. F. RAILWAY COMPANY FHPM ESTIMATE FOR CITY OF FT. WORTH ---------------------------------------------------------------------------------------------------------------------------- LOCATION - HODGE JUNCTION DETAILS OF ESTIMATE ---------------------------------------------------------------------------------------------------------------------------- PURPOSE, JUSTIFICATION AND DESCRIPTION MOVE HIGHWAY CROSSING GATE FOR WIDENING OF ROAD AT SCHWARTZ RD. FT. WORTH, TX. DOT 275-244U L.S. 485 M.P. 4.4. MATERIAL NEEDED: ONE GATE FOUNDATION,TWO 28' GATE ARMS, 50' OF 3- PIPE, AND CABLE. THE ATTATCHED MATERIAL LIST REFLECTS TYPICAL, REPRESENTIVE PACKAGES USED FOR ESTIMATING PURPOSE. THEY CAN BE EXPECTED TO CHANGE AFTER ENGINEERING PROCESS, DETAIL AND ACCURATE MATERIAL LIST WILL BE FURNISHED WHEN ENGINEERING IS COMPLETED. CONTINUING CONTRACTS HAVE BEEN ESTABLISHED FOR PORTIONS OF SIGNAL WORK ON THE BNSF RAILROAD. THIS ESTIMATE GOOD FOR 90 DAYS, THEREAFTER THE ESTIMATE IS SUBJECT TO CHANGE DUE TO COST FOR MATERIAL, LABOR, AND OVERHEADS. •,t,t,t,tt,t,tr,t,t,t,t,t,t**,t,tt,t+*****t*+• SIGNAL WORK ONLY •,t,t,t*,t++*+,t,t**t,ttrt,tttt++++t,t,t• CITY OF FT. WORTH TO PAY 100%. DESCRIPTION QUANTITY U/M COST TOTAL f --------------------------------------------- -------- ----- ------ ----------- ----------- LABOR SIGNAL FIELD LABOR 280.00 MH 6,142 PAYROLL ASSOCIATED COSTS 3,795 EQUIPMENT EXPENSES 1,117 SUPERVISION EXPENSES 4,171 PERDIEM EXPENSES 2,450 INSURANCE EXPENSES 921 ----------- ----------- TOTAL LABOR COST 18,596 18,596 MATERIAL #6 TRACK WIRE 200.00 FT 200 12C#14 UG CABLE 150.00 FT 338 3' PIPE 50.00 FT 175 7C#6 UG CABLE 150.00 FT 600 1 GATE ARMS 2.00 EA 11100 GATE FOUNDATION 1.00 EA 175 STORE EXPENSES 61 OFFLINE TRANSPORTATION 30 ----------- ----------- TOTAL MATERIAL COST 2,679 2,679 OTHER CONTRACT ENGR. 1.00 EA 1,500 DIRECT SHIPPING 550.00 MI 1,513 EQUIPMENT RENTAL 1.00 EA 2,500 ----------- ----------- TOTAL OTHER ITEMS COST 5,513 5,513 PROJECT SUBTOTAL 26,788 CONTINGENCIES 0 BILL PREPARATION FEE 134 GROSS PROJECT COST 26,922 LESS COST PAID BY BNSF 0 TOTAL BILLABLE COST ;26,922 M Ely �I'e UVl`:%IJ���Illjp pSCMo EXHIBIT "C" CONTRACTOR REQUIREMENTS 1.01 General 1.01.01 The Contractor shall cooperate with THE BURLINGTON NORTHERN AND SANTA FE RAILWAY COMPANY,hereinafter referred to as "Railway", where work is over or under, on or adjacent to Railway property and/or right-of-way, hereafter referred to as "Railway Property", during the construction of: SCHWARTZ AVENUE(DOT No.275-244U)—WIDENING&IMPROVING GRADE CROSSING . 1.01.02 The Contractor shall plan, schedule and conduct all work activities so as not to interfere with the movement of any trains on Railway Property. 1.01.03 The Contractor's right to enter Railway Property is subject to the absolute right of Railway to cause the Contractor work on Railway Property to cease i1; in the opinion of Railway, Contractor activities create a hazard to Railway Property,employees,and/or operations. 1.01.04 The Contractor is responsible for determining and complying with all Federal, State and Local Governmental laws and regulations, including, but not limited to, environmental, health and safety. The Contractor shall be responsible for and indemnify and save Railway harmless from all fines or penalties imposed or assessed by Federal, State and Local Governmental Agencies against the Railway which arise out of Contractor work under this Agreement. 1.01.05 The Contractor shall notify the City of Fort Worth telephone number (817) 871-7800 and Railway's Manager Public Projects,telephone number(817)352-2902 at least thirty(30)working days before commencing any work on Railway Property. Contractor's notification to Railway,shall refer to Railway file: 275244. 1.01.06 For any falsework above any tracks or any excavations located,whichever is greater,within twenty-five (25) feet of the nearest track or intersecting a slope from the plane of the top of rail on a 1 1/2 horizontal to 1 vertical slope beginning at eleven(11)feet from center line of the nearest track, both measured perpendicular to center line of track, the Contractor shall furnish the Railway five sets of working drawings showing details of construction affecting Railway Property and tracks.The working drawings shall include the proposed method of installation and removal of falsework, shoring or cribbing not included in the contract plans and two sets of structural calculations of any falsework, shoring or cribbing. All calculations shall take into consideration railroad surcharge loading and shall be designed to meet American Railway Engineering and Maintenance-of- Way Association (previously known as American Railway Engineering Association)Coopers E-80 live loading standard. All drawings and calculations shall be stamped by a registered professional engineer licensed to practice in the state the project is located. The Contractor shall not begin work until notified by the Railway that plans have been approved. The Contractor shall be required to use lifting devices, such as manes and/or winches,to place or to remove any falsework over Railway tracks. In no case shall the Contractor be relieved of responsibility for results obtained by the implementation of said approved plans. 1.01.07 Subject to the movement of trains,Railway will cooperate with the Contractor such that the work may be handled and performed in an efficient manner.The Contractor shall have no claim whatsoever for any type of damages or for extra or additional compensation in the event his work is delayed by the Railway. 1.02 Agreement 1.02.01 No employee of the Contractor, its subcontractors, agents or invitees shall enter Railway Property without first having attended a BNSF Contractor Safety Orientation session. The Contractor shall ensure that at a minimum its on-site Project Supervisor(s) have attended a Safety Orientation conducted by the Railway,or its representative, and that each of its employees,subcontractors, agents or invitees have received the same Safety Orientation through sessions conducted by or through the Schwartz Avenue CrossingAgreement—EJB IMIT"C" Pae 1 Page CIN S���,�� !' °i Contractor before any work is performed on the Project. The Contractor shall contact BNSF Manager Public Projects at telephone (817) 352-2902 or fax (817) 352-2912 , at least thirty(30) calendar days in advance to arrange the necessary Safety Orientation session(s). 1.03 Railway Requirements 1.03.01 The Contractor shall take protective measures as are necessary to keep Railway facilities, including track ballast, free of sand, debris, and other foreign objects and materials resulting from his operations. Any damage to Railway facilities resulting from Contractor operations will be repaired or replaced by Railway and the cost of such repairs or replacement shall be paid for by the Agency. 1.03.02 The Contractor shall notify the Railway's Division Superintendent at: 14100 John Day Road, Haslet, Texas 76052, Fax No. (817)224-7010, and provide blasting plans to the Railway for review seven (7)calendar days prior to conducting any blasting operations adjacent to or on Railway Property. 1.03.03 The Contractor shall abide by the following clearances during construction: 25'-0" Horizontally from center line of nearest track. 22'-6" Vertically above top of rail(Temporary Falsework Clearance may be reduced to 21'-6" Subject to Railway and Public Utilities Commission approval) 27'-0" Vertically above top of rail for electric wires carrying less than 750 volts 28'-0" Vertically above top of rail for electric wires carrying 750 volts to 15,000 volts 30'-0" Vertically above top of rail for electric wires carrying 15,000 volts to 20,000 volts 34'-0" Vertically above top of rail for electric wires carrying more than 20,000 volts 1.03.04 Any infringement within State statutory clearances due to the Contractor's operations shall be submitted to the Railway and to the City of Fort Worth and shall not be undertaken until approved in writing by the Railway, and until the City of Fort Worth has obtained any necessary authorization from the State Regulatory Authority for the infringement. No extra compensation will be allowed in the event the Contractor's work is delayed pending Railway approval,and/or the State Regulatory Authority's approval. 1.03.05 In the case of impaired vertical clearance above top of rail, Railway shall have the option of installing tell-tales or other protective devices Railway deems necessary for protection of Railway operations. The cost of tell-tales or protective devices shall be borne by the Contractor. 1.03.06 The details of construction affecting the Railway Property and tracks not included in the contract plans shall be submitted to the Railway by the City of Fort Worth for approval before work is undertaken and this work shall not be undertaken until approved by the Railway. 1.03.07 At other than public road crossings, the Contractor shall not move any equipment or materials across Railway's tracks until permission has been obtained from the Railway. The Contractor shall obtain a"Temporary Private Crossing Agreement"from the Railway prior to moving his equipment or materials across the Railway's tracks. The temporary crossing shall be gated and locked at all times when not required for use by the Contractor.The temporary crossing for use of the Contractor shall be at the expense of the Contractor. 1.03.08 Discharge, release or spill on the Railway Property of any hazardous substances in excess of a reportable quantity or any hazardous waste is prohibited and Contractor shall immediately notify the Railway's Resource Operations Center at (800) 832-5452, of any discharge, release or spills. Contractor shall not allow Railway Property to become a treatment or storage facility as those terms are defined in the Resource Conservation and Recovery Act or any state analogue. 1.03.09 The Contractor,upon completion of the work covered by this contract,shall promptly remove from the Railway Property all of Contractor's tools, equipment, implements and other materials, whether brought upon said property by said Contractor or any subcontractor,employee or agent of Contractor or of any subcontractor, Schwartz Avenue Crossing Agreement—EXHIBIT"C" Page 2 )FRicpkl EP,ruEM I�,`,'�('I�MG1 ,Id GtJ�>T VI f WOE ll Ye �l��Ne and shall cause Railway Property to be left in a condition acceptable to the Railway representative. 1.04 Contractor Safety Action Plan 1.04.01 Each Contractor shall develop and implement a Safety Action Plan which shall be made available to Railway prior to commencement of any work on Railway Property.During the performance of work, the Contractor shall audit its compliance with the Safety Action Plan. The Contractor shall designate an on-site Project Supervisor who shall serve as the contact person for the Railway and who shall maintain a copy of the Safety Action Plan and subsequent audits at the job site for inspection and review by the Railway at any time during the course of the project. The Safety Action Plan shall contain, but not be limited to,the following; Contractor's Employee Safety Safety Orientation(Sec 1.02.01) Job Briefings(Sec1.06.01&1.06.02) Personal Protective Equipment(Sec 1.06.08) Protection of Railway Facilities and Railway Flagger Services(Sec 1.03.05& 1.05) Protection of Contract Employees Working Nearer Than 25 Feet from any Track (sec 1.06.03) Work After Hours(Sec 1.06.04) Contractor Employee Training Personal Injury Reporting(Sec 1.09) Accident Investigation and Analysis High Risk Work Areas/Situations Notification of Damage to Railway Property or Hazards That Could Affect the Safe Operation of Trains(Sec 1.06.06) Falsework/Shoring Affecting the Integrity of Tracks(Sec 1.01.06) Clearances Affecting the Integrity of Train Operations(Sec 1.03.03) Moving Equipment and Materials across Railway's Tracks(Sec L03.07& 1.05.02e) Security of Machines,Equipment and Vehicles(Sec 1.06.10) : Powerline Safety(Sec 1.06.12) Excavation Safety(Sec 1.07) High Risk Employees Alcohol and Drug Use(Sec 1.06.05) Firearms or Deadly Weapons(Sec 1.06.07) Property Damage,Housekeeping and Clean-up(Sec 1.03.01& 1.03.09) Storage of Materials(Sec 1.06.09) Facility Auditing Compliance with Laws(Sec 1.01.04) Hazardous Substances and Materials Discharges,Releases and Spills(Sec 1.03.08) Hazardous Materials Encountered in Excavations(Sec 1.08) 1.05 Protection of Railway Facilities and Railway Flagger Services: 1.05.01 The Contractor shall give a minimum of 30 calendar days written notice to the Railway's Roadmaster at 4028 Deen Road,Fort Worth,Texas 76106-1411,Fax No.(8 17)740-7277,in advance of when flagging services will be required to bulletin flaggers position and shall provide five(5)working days notice to the Roadmaster to abolish the position per union requirements. Schiwartz Avenue Crossing Agreement—EXHIBIT"C" Page 3 U ffl CMIA G����1GJD CRY 1.08.02 Railway Dagger and protective services and devices will be required and furnished when Contractor's work activities are located over or under or within twenty-five(25)feet measured horizontally from center line of the nearest track and when cranes or similar equipment positioned outside of25-W horizontally from track center line that could foul the track in the event of tip over or other catastrophic occurrence, but not limited thereto for the following conditions: 1.05.02a When in the opinion of the Railway representative, it is necessary to safeguard Railway Property,employees,trains,engines and facilities. 1.05.02b When any excavation is performed below the bottom of tie elevation, i& in the opinion of Railway representative,track or other Railway facilities may be subject to movement or settlement. 1.05.02c When work in any way interferes with the safe operation of trains at timetable speeds. 1.05.02d When any hazard is presented to Railway track,communications,signal,electrical, or other facilities either due to persons,material,equipment or blasting in the vicinity. 1.05.02e Special permission must be obtained from the Railway before moving heavy or cumbersome objects or equipment which might result in making the track impassable. 1.05.03 Flagging services will be performed by qualified Railway flaggers. The base cost per hour for(1) dagger is $18.00 plus 1600/a for year of 1999 for vacation allowance, paid holidays, Railway and Unemployment: Insurance, Public Liability and Property Damage Insurance, health and welfare benefits, transportation,meals,lodging and supervision,for an eight(8)hour basic day with time and one-half or double time for overtime,rest days and holidays. These rates are subject to any increases which may result from Railway Employees-Railway Management negotiations or which may be authorized by Federal authorities. 1.0&03a A flagging crew generally consists of one employee. However,additional personnel may be required to protect Railway Property and operations, if deemed necessary by the Railway representative. 1.05.03b Each time a Dagger is called,the minimum period for billing shall be the eight(8)hour basic day. 1.05.03c The cost of Dagger services provided by the Railway,when deemed necessary by the Railway representative,will be borne by the Agency. 1.05.03d The average daily train traffic at the project location is 24 freight trains at a timetable speed of 20 MPH and 0 passenger train at a timetable speed of --- MPH and 0 switch engine movements. 1.06 Contractor General Safety Requirements 1.06.01 Work in the proxbWty of Railway track(s)is potentially hazardous where movement of trains and equipment can occur at any time and in any direction.All work performed by Contractors within 25 feet of center line of any track shall be in compliance with FRA Roadway Worker Protection Regulations. 1.06.02 Before beginning any task on Railway Property,a thorough job safety briefing shall be conducted with all personnel involved with the task and repeated when the personnel or task cbanges. If the task is within 25 feet of center line of any track,the job briefing must include the Railway's flagger and include the procedures the Contractor will use to protect its employees, subcontractors, agents or invitees from moving any equipment adjacent to or across any Railway track(s). Schwartz Avenue Crossing Agreement—EX EEIIT"C" Page 4 �(� fs�p [[kJ� I� D��D (ONFI IA PEN NS NUMPY 1.06.03 Workers shall not work nearer than 25 feet to the center line of any track without proper flag/work protection provided by the Railway,unless the track is protected by track bulletin and work has been authorized by the Railway. If flag/work protection is provided, every Contractor employee most know: (1)who the Railway flagger is and how to contact the flagger,(2)limits of the flag/work protection, (3) the method of communication to stop and resume work, and (4) entry into flag/work limits when designated. Men or equipment entering flag/work limits that were not previously job briefed must notify the flagger immediately and be given a job briefing if working at less than 25 feet from center line of track. 1.06.04 When Contractor employees are required to work on the Railway Property after normal working hours or on weekends,the Railway's representative in charge of the project must be notified. A minimum of two employees shall be present at all times. 1.06.05 Any Contractor employee, its subcontractors employee, agents or invitees under suspicion of being under the influence of drugs or alcohol,or in the possession of same,will be removed from the Railway Property and subsequently released to the custody of a representative of Contractor management. Future access to the Railway Property by that employee will be denied. 1.06.06 Any damage to Railway Property, or any hazard that is noticed on passing trains, shall be reported immediately to the Railway representative in charge of the project. Any vehicle or machine which may come in contact with a track, signal equipment, or structure (bridge) could result in a train derailment and shall be reported by the quickest means possible to the Railway representative in charge of the project and to the Railway's Resource Operations Center at 1(800) 832-5452. Local emergency numbers are to be obtained from the Railway representative in charge of the project prior to the start of any work and shall be posted at the job site. 1.06.07 All persons are prohibited from having pocket knives with blades in excess of three(3)inches,firearms or other deadly weapons in their possession while working on Railway Property. 1.06.08 All personnel protective equipment used on Railway Property shall meet applicable OSHA and ANSI specifications. Railway personnel protective equipment requirements are; a)safety glasses:permanently affixed sideshields; no yellow lenses, b) hard hats with high visibility orange cover, c) safety shoes: hardened toe, above-the-ankle lace-up with a defined heel and d)high visibility retro-reflective orange vests are required as specified by the Railway's representative in charge of the project. Hearing protection, fall protection and respirators will be worn as required by State and Federal regulations. 1.06.09 The Contractor shall not pile or store any materials, machinery or equipment closer than 25'-0" to the center line of the nearest Railway track. At highway/rail at-grade crossings,materials,machinery or equipment shall not be stored or left temporarily which interferes with the sight distances of motorists approaching the crossing.Prior to beginning work,the Contractor will establish a storage area with concurrence of the Railway's representative. 1.06.10 Machines or vehicles must not be left unattended with the engine running. Parked machines or equipment must be in gear with brakes set and, if equipped with blade, pan or bucket, they must be lowered to the ground. All machinery and equipment left unattended on Railway Property must be left inoperable and secured against movement. 1.06.11 Workers must not create and leave any conditions at the work site that would interfere with water drainage.Any work performed over water shall meet all Federal,State and Local regulations. 1.06.12 All power line wires must be considered dangerous and of high voltage unless Contractor has been informed to the contrary by proper authority. For all power lines the minimum clearance between the lines and any part of the equipment or load shall be,200 KV or below - 15 feet,200 to 350 KV-20 feet,350 to 500 KV- 25 feet, 500 to 750 KV- 35 feet, 750 to 1000 KV-45 feet and if capacity of the line is not known, minimum Schwartz Avenue Crossing Agreement—EXHIBIT"C" Page S !I �� n ��9 clearance of 45 feet must be maintained. A person shall be designated to observe clearance of the equipment and give a timely warning for all operations where it is difficult for an operator to maintain the desired clearance by visual means. 1.07 Excavation 1.07.01 Before excavating, it must be ascertained by the Contractor if there are any underground pipe lines, electric wires,or cables,including fiber optic cable systems,that either cross or run parallel with the track which are located within the project's work area. Excavating on Railway Property could result in damage to buried cables resulting in delay to Railway traffic, including disruption of service to users resulting in business interruptions involving loss of revenue and profits. Before any excavation commences, the Contractor must contact the Railway's Signal Supervisor and Roadmaster. All underground and overhead wires must be considered HIGH VOLTAGE and dangerous until verified with the company having ownership of the lime. It is also the Contractor's responsibility to notify any other companies that have underground utilities in the area and arrange for the location of all underground utilities before excavating. 1.07.02 The Contractor must cease all work and the Railway must be notified immediately before continuing excavation in the area if obstructions are encountered that do not appear on drawings. If the obstruction is a utility,and the owner of the utility can be identified,then the owner sbould also be notified immediately. If there is any doubt about the location of underground cables or lines of any kind,no work will be performed until the exact location has been determined. There will be no exceptions to these instructions. 1.07.03 All excavations shall be conducted in compliance with applicable OSHA regulations,and regardless of depth,shall be shored where there is any danger to tracks,structures or personneL 1.07.04 Any excavations, holes or trenches on Railway Property must be covered, guarded and/or protected when not being worked on. When leaving work site areas at night and over weekends,all areas must be secured and left in a condition that will ensure that Railway employees and other personnel who may be working or passing through the area are protected from all hazards.All excavations must be back filled as soon as possible. 1.08 Hazardous Waste, Substances and Material Reporting 1.08.01 If Contractor discovers any hazardous waste, hazardous substance, petroleum or other deleterious material,including but not limited to any non-containerized commodity or material, on or adjacent to Railway Property, in or near any surface water, swamp, wetlands or waterways,while performing any work under this Agreement, Contractor shall immediately: (a)notify the Railway's Resource Operations Center at ](800) 832- 5452,of such discovery: (b) take safeguards necessary to protect its employees, subcontractors, agents and/or third parties: and (c) exercise due care with respect to the release, including the taking of any appropriate measure to minimize the impact of such release. Schwartz Avenue Crossing Agreement—EXHIBIT K C" Page 6 py�u� i 711 �� IAQ 17,EZ 1.09 Personal Injury Reporting 1.09.01 The Railway is required to report certain injuries as a part of compliance with Federal Railroad Administration(FRA)reporting requirements.Any personal injury sustained by an employee of the Contractor, subcontractor or Contractor's invitees while on the Railway Property must be reported immediately(by phone mail if unable to contact in person)to the Railway representative in charge of the project. The Non-Employee Personal Injury Data Collection Farm contained herein is to be completed and sent by Fax to the Railway at (817)352-7595 and to the Railway representative no later than the close of shift on the date of the injury. Kindly acknowledge agreement to comply with these requirements by signing,and returning to the Railway's Manager Public Projects two original copies of this document along with the Railroad's Exhibit"C-1" Agreement(attached). (Name of Contractor) By Its: Date: Address City, State, Zip Schwartz Avenue Crossing Agreement—EXHIBIT"C" Page 7 'Gl ITu �[ U P :o NON-EMPLOYEE PERSONAL INJURY DATA COLLECITON INFORMATION REQUIRED TO BE COLLECTED PURSUANT TO FEDERAL REGULATION. IT SHOULD BE USED FOR COMPLIANCE WITH FEDERAL REGULATIONS ONLY AND IS NOT INTENDED TO PRESUME ACCEPTANCE OF RESPONSIBILITY OR LIABILITY. 1. Accident City/St 2. Date: 3.Time: 4. County. S.Temperature: 6. Weather (if non-BNSF location) 7. Social Security# 8. Name(last,fast,nn) 9. Address: Street: City: SL Zip: 10. Date of Birth: and/or Age 11.Gender. (if available) 12. (a) Injury: (b)Body Part: (Le.(a)Laceration(b)Hand) 13. Description of Accident(To include location,action,result,etc.): 14. Treatment: First Aid Only Required Medical Treatment ;Other Medical Treatment 15. Dr.Name 16.Date: 17. Dr.Address: Street City: St Zip: 18. Hospital Name: 19. Hospital Address: Street: City: St: Zip: 20. Diagnosis: FAX TO RAILWAY AT(817)352-7595 AND COPY TO RAILWAY REPRESENTATIVE Schwartz Avenue Crossing Agreement—E UMIT"C" Page 8 W" I EXHIBIT "C-1" Agreement Between THE BURLINGTON NORTHERN AND SANTA FE RAILWAY COMPANY and the CONTRACTOR THE BURLINGTON NORTHERN AND SANTA FE RAILWAY COMPANY 5800 North Main Street Fort Worth,Texas 76179 Attention: Manager Public Projects,(817)352-2902 Railway File: 275244 Agency Project: Schwartz Avenue(DOT No. 275-244U)—Widening&Improving Grade Crossing Gentlemen: The undersigned,hereinafter referred to as Contractor,has entered into a Contract dated with the City of Fort Worth for the performance of certain work in connection with the project: Schwartz Avenue— Widening&Improving Grade Crossing;in the performance of which work the Contractor will necessarily be required to conduct operations within THE BURLINGTON NORTHERN AND SANTA FE RAILWAY COMPANY("Railway"),right of way and property("Railway Property"). The Contract provides that no work shall be commenced within Railway Property until the Contractor employed in connection with said work for the City of Fort Worth shall have executed and delivered to Railway an Agreement,in the form hereof,and shall have provided insurance of the coverage and limits specified in said Contract and Section 2 of this Agreement.If this Agreement is executed by other than the Owner,General Partner,President or Vice President of Contractor,evidence is furnished to you herewith certifying that the signatory is empowered to execute this Agreement for the Contractor. .Accordingly,as one of the inducements to and as part of the consideration for Railway granting permission to Contractor to enter upon Railway Property,Contractor,effective on the date of said Contract,has agreed and does hereby agree with Railway as follows: Section 1. RELEASE OF LIABILITY AND INDEMNITY Contractor agrees to release Railway from any claims arising from the performance of this Agreement which Contractor or any of its employees,subcontractors,agents or invitees could otherwise assert against Railway, regardless of the negligence of Railway,except to the extent that such claims are proximately caused by the intentional misconduct or gross negligence of Railway. Contractor shall indemnify and hold harmless Railway for all judgments,awards,claims,demands,and expenses(including attorneys'fees),for injury or death to all persons,including Railway's and Contractor's officers and employees,and for loss and damage to property belonging to any person,arising in any manner from Contractor's or any of Contractor's subcontractors'acts or omissions or failure to perform any obligation hereunder. THE LIABILITY ASSUMED BY CONTRACTOR SHALL NOT BE AFFECTED BY THE FACT,IF IT IS A FACT,THAT THE DESTRUCTION,DAMAGE,DEATH,OR INJURY WAS OCCASIONED BY OR CONTRIBUTED TO BY THE NEGLIGENCE OF RAILWAY,ITS AGENTS,SERVANTS,EMPLOYEES OR OTHERWISE,EXCEPT TO THE EXTENT THAT SUCH CLAIMS ARE PROXIMATELY CAUSED BY THE INTENTIONAL MISCONDUCT OR GROSS NEGLIGENCE OF RAILWAY. THE INDEMNI•MCATION OBLIGATION ASSUMED BY CONTRACTOR SHALL INCLUDE ANY CLAIMS,SUITS OR JUDGMENTS BROUGHT AGAINST RAILWAY UNDER THE FEDERAL EMPLOYEE'S LIABILITY ACT,INCLUDING CLAIMS FOR STRICT LIABILITY UNDER THE SAFETY APPLIANCE ACT OR THE BOILER INSPECTION ACT,WHENEVER SO CLAIMED. Schwartz Avenue Crossing Agreement-EXHIBIT"C-1" Pagelrq Contractor further agrees,at its expense,in the name and on behalf of Railway,that it shall adjust and settle all claims made against Railway,and shall,at Railways discretion,appear and defend any suits or actions of law or in equity brought against Railway on any claim or cause of action arising or growing out of or in any manner connected with any liability assumed by Contractor under this Agreement for which Railway is liable or Is alleged to be liable.Railway shall give notice to Contractor,in writing,of the receipt or pendency of such claims and thereupon Contractor shall proceed to adjust and handle to a conclusion such claims,and in the event of a suit being brought against Railway,Railway may forward summons and complaint or other process in connection therewith to Contractor,and Contractor,at Railways discretion,shall defend,adjust,or settle such suits and protect,indemnify, and save harmless Railway from and against all damages,judgments,decrees,attorneys fees,costs,and expenses growing out of or resulting from or incident to any such claims or suits. It is mutually understood and agreed that the assumption of liabilities and indemnification provided for in this Agreement shall survive any termination of this Agreement. Section 2. INSURANCE. (a) Before commencing any work under this Agreement,Contractor must provide and maintain in effect throughout the term of this Agreement insurance,at Contractor's expense,covering all of the work and services to be performed hereunder by Contractor and each of its subcontractors,as described below. (1) Workers'Compensation coverage as is required by State law. THE CERTIFICATE MUST CONTAIN A SPECIFIC WAIVER OF THE INSURANCE COMPANY'S SUBROGATION RIGHTS AGAINST THE BURLINGTON NORTHERN AND SANTA FE RAILWAY COMPANY. (2) Commercial General Liability insurance covering liability,including but not limited to Public Liability,Personal Injury,Property Damage and Contractual Liability covering the obligations assumed by Contractor in Section 1,with coverage of at least$2,000,000 per occurrence and$6,000,000 in the aggregate.Where explosion,collapse,or underground harards are involved,the X,C,and U exclusions must be removed from the policy. (3) Automobile Liability insurance,including bodily injury and property damage,with coverage of at least 51,000,000 combined single limit or the equivalent covering any and all vehicles owned or hired by the Contractor and used in performing any of the services under this agreement. (4) Railroad Protective Liability insurance stating The Burlington Northern and Santa Fe Railway Company is the Named Insured covering all of the liability assumed by the Contractor under the provisions of this Agreement with coverage of at least$2,000,000 per occurrence and$6,000,000 in the aggregate. Coverage shall be issued on a standard ISO form CG 00 35 0196 and endorsed to include ISO form CG 28 31 10 93 and the Limited Seepage and Pollution Endorsement(see attached copy). The average daily train traffic at this project location is 24 freight trains at a timetable speed of 20 MPH and 0 passenger trains at a timetable speed of_MPH and 0 switch engine movements. All insurance shall be placed with insurance companies licensed to do business in the States in which the work is to be performed,and with a current Best's Insurance Guide Rating of A-and Class VII,or better. In all cases except Workers'Compensation and Railroad Protective Liability coverage the certificate must specifically state that THE BURLINGTON NORTHERN AND SANTA FE RAILWAY COMPANY IS AN ADDITIONAL INSURED. Schwartz Avenue Crossing Agreement-EXHIBIT"C-1" Page 205 Any coverage afforded Railway,the Certificate Holder,as an Additional Insured shall apply as primary and not excess to any coverage issued in the name of Railway. (b) Such insurance shall be approved by the Railway before any work is performed on Railways Property and shall be carried until all work required to be performed on or adjacent to Railways Property under the terms of the contract is satisfactorily completed as determined by the City of Fort Worth and thereafter until all tools,equipment and materials not belonging to the Railway,have been removed from Railway's Property and Railway Property is left in a clean and presentable condition. The insurance herein required shall be obtained by the Contractor and Contractor shall famish Railway with an original certificate of insurance,signed by the insurance company,or its authorized representative,evidencing the issuance of insurance coverage as prescribed in(a)1,2 and 3 above,plus the original Railroad Protective Liability insurance policy to: Attention: Leigh Wheeler The Burlington Northern and Santa Fe Railway Company 4515 Kansas Avenue Kansas City,Kansas 66106 (913)551-4035 Phone (913)551-4285 Fax The certificate of insurance shall guarantee that the policies will not be amended,altered,modified or canceled insofar as the coverage contemplated hereunder is concerned,without at least thirty(30)days notice mailed by registered mail to Railway. Full compensation for all premiums which the Contractor is required to pay on all the insurance described hereinafter shall be considered as included in the prices paid for the various items of work to be performed under the Contract,and no additional allowance will be made therefor or for additional premiums which may be required by extensions of the policies of insurance. (c) In lieu of providing a Railroad Protective Liability Insurance policy,Agency may participate in Railway's Blanket Railroad Protective Liability Insurance Policy available to Agency or its contractors or subcontractors.The limits of coverage are the same as above.Contact the Railway's representative specified in Section 2(b)for further information. It is further distinctly understood and agreed by the Contractor that its liability to the Railway herein under Section 1 will not in any way be limited to or affected by the amount of insurance obtained and carried by the Contractor in connection with said Contract. The Railway file reference and location information shown at the top of this Agreement,must appear on any original insurance policies or certificates of insurance sent to Railway by the Contractor. Section 3. The Contractor will observe and comply with all the provisions,obligations and limitations to be observed by Contractor which are contained in the subdivision of the specifications of said Contract,entitled EXHIBIT"C",CONTRACTOR REQUIREMENTS,and shall include,but not be limited to,payment of all costs incurred for any damages to Railway roadbed,tracks,and/or appurtenances thereto,resulting from use,occupancy, or presence of its employees,representatives,or agents or subcontractors on or about the construction site. Section 4. Contractor shall be responsible to Railway,including its affiliated railway companies,and its tenants for all damages for any unscheduled delay to a freight or passenger train that affects Railway's ability to fully utilize its equipment and to meet customer service and contract obligations. Contractor will be billed,as further provided below,for the economic losses arising from loss of use of equipment and train service employees,contractual loss of incentive pay and bonuses,and contractual penalties resulting from train delays,whether caused by Contractor,or subcontractors,or by the Railway performing Railway Work. Railway agrees that it will not perform any act to Schwartz Avenue Crossing Agreement-EXHIBIT"C-1" Page 3 ��� CAA""l G`_��'�'J '� unnecessarily cause train delay. For loss of use,Contractor will be billed per freight train hour at an average rate of($385.33 in 1997) with annual adjustments)per hour per train as determined from Railway's record. Any disruption to train traffic may cause delays to multiple trains at the same time for the same period. In addition to the above damages,passenger,U.S.mail trains and certain other grain,intermodal,coal and freight trains operate under incentive/penalty contracts between Railway and its customer. Under these arrangements,if Railway does not meet its contract service commitment,Railway may suffer loss ofperformance or incentive pay or be subject to a penalty payment. Contractor shall be responsible for any train performance and incentive penalties or other contractual economic losses actually incurred by Railway which are attributable to a train delay caused by Contractor,or subcontractors. As example,a train arrives 30 minutes after its contract service commitments and Railway is assessed damages per terms of the contract. Either Contractor,and/or subcontractors,caused a 29 minute delay to the train and therefore are not responsible for any train performance and incentive penalties or other contractual economic losses actually incurred by Railway. As example,a train arrives 30 minutes after its contract service commitments and Railway is assessed damages per terms of the contract. Either Contractor,and/or subcontractors,caused a 31 minute delay to the train and therefore are 100%responsible for any train performance and incentive penalties or other contractual economic losses actually incurred by Railway. The contractual relationship between Railway and its customers is proprietary and confidential. In the event of a train delay covered by this Agreement,Railway will share information relevant to any train delay to the maximum extent consistent with Railway confidentiality obligations. Damages for train delay for certain trains could be as high as$50,000.00 per incident. Contractor and subcontractors.shall plan,schedule,coordinate and conduct all Contractor's work so as to not cause any delays to any trains. Kindly acknowledge receipt of this letter by signing and returning to the Railway's Manager Public Projects two original copies of this letter,which,upon execution by Railway,shall constitute an Agreement between U& Yours truly, (Name of Contractor) The Burlington Northern and Santa Fe Railway Company By By Its: Its: Accepted this day of Address City, State, Zip Schwartz Avenue Crossing Agreement-EXHIBIT"C-1" Page 4 U���L� E L G=IE14110PD LIMITED SEEPAGE, POLLUTION AND CONTAMINATION COVERAGE ENDORSEMENT WORDING In consideration of the premium charged it is understood and agreed that Exclusion f. of Coverage A. of this Policy shall not apply to the liability of the Insured resulting from seepage and/or pollution and/or contamination caused solely by: a) unintended fire, lightning or explosion: or b) a collision or overturning of a road vehicle: or c) a collision or overturning or derailment of a train. Notwithstanding the foregoing it is agreed that the coverage provided by this Endorsement shall not apply to: 1. loss of damage to or loss of use of property directly or indirectly resulting from sub-surface operations of the Insured, and/or removal of, loss of or damage to sub-surface oil, gas or any other substance; 2. any site or location used in whole or in part for the handling,processing, treatment, storage,disposal or dumping of any waste materials o'r substances; 3. the cost of evaluating and/or monitoring and/or controlling seeping and/or polluting and/or contaminating substances; 4. the cost of removing and/or nullifying and/or cleaning up seeping and/or polluting and/or contaminating substances on property at any time owned and/or leased and/or rented by the insured and/or under the control of the Insured. Notwithstanding the foregoing, Item 1 does not apply to tunnels. Schwartz Avenue Crossing Agreement-EMMIT"C-1" Page 5 C-�I�r ��E CGn��M'�I Y Uo �il��1li lYQ C�G�o Hd dS �l®leSP7 V@1�C% I ------- — — ------ —M•U-1-- — �. ONI�Vd 1lV— V JN '-JNV�tld 1 `JA SIX I _ — rt v I � 1 � II11111�T 1111 I1, �y1� ��d 111111 1.1fit :1 I�Jy e✓ 7 OL'612pd�1 1�,1 2 •r �2 ��y . N -47CL �A r ,c z ='oCIS 0 w� CD 0-4 1 Nol o &m m Cfl ? m3 ry `o' �� I 'I Baa\ + roc LL N Ow\ • jam-(` 1v Jm ® a h x + �� :LM V 17 :i-d.,, —� 12L6L'R 09'9LOt' Y1S +� � n ~ ® 0 N / I z hat m � 1^ Q. OCk! + t 121 V 17 Td V 17 'O*d v �ml rn H` uapls OL 9S1DZfzrY1S 12(,£�D'lt Z[ VIS o �o <x a 2 w U z o! g U v CO M038 JV IMKd � 71LSli�J 1 oNCJO _J I8Y8+1r W1S 3 �e n la 41 17 "J d JI tSSOt!J �JY2l1 '2121 HLnOS AL 68 SL+I£' 'Y1S 1,ti q 111,1;. � w WZ•�O � 004 Cpl N T rT1 p / h 1n 1 1 i a ti W 1L� e..a 1 M N 1t� ?e 18i1a�' 11 1�1`Trl—r f�V�i'1 ' 1 1'1'1' �5�(10 It) O I 11 .1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 R I I P �'1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 + '1'm �H Q 111 1�:I 1111111111111111111111111 I 11 1111 _.y'Vt PC h� / O ►� ` I I ;I 1 1 1 1 1 1 1 1 1 1 1 1 1 P 17 CJ I y 111. 1 1 1 1 1 1 1 1yy1,r1 1'1'1'1'1' S O �� ^'� I �.. 1111'1 111 I 111111 IT 1 1 1 1 1 1 1 a� tiZ Iia (; I 1 I 1 1 1 1 1 1 1 �S1r PRpP 4 p PNpG �VD �W I Iti � Q / 1111 1 1 1 1� N 2 g I 0.Z yO ., lilil1 1� + T PSp69�k45^� r o- g 1►, E�`5 a:�? (raw QO Wig ' t UCiW� N local a, o cZn qvQ �} ' d w i I ~ p N CS City of Fort Worth, Texas qV01yor And council communication DATE REFERENCE NUMBER LOG NAME PAGE 5/16/00 **L-12793 20BN 1 of 1 SUBJECT AGREEMENT WITH BURLINGTON NORTHERN AND SANTA FE RAILWAY COMPANY FOR THE INSTALLATION OF SURFACE CROSSINGS AND SIGNAL SYSTEM ON SCHWARTZ AVENUE RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute an Agreement with Burlington Northern and Santa Fe Railway Company for the installation of concrete surface crossings and a signal system on Schwartz Avenue for a total cost to the City not to exceed $52,513. DISCUSSION: Schwartz Avenue from 28th to Long is being reconstructed and widened as part of the 1990 Capital Improvement Program. As a result of the reconstruction and widening of Schwartz, the railroad crossing signal and surface crossing must be replaced. The City has entered into a cost share agreement with Burlington Northern and Santa Fe Company to do this work. Under this cost share agreement, the railway company will remove and replace the existing crossing with 64-foot wide concrete crossing material and relocate and modify the existing flashing light and gate crossing signal system. The railway company will provide all the material, labor, equipment, supplies and incidentals necessary to complete this work. The City will reimburse the railway company for the cost of replacing the crossing surfaces ($25,591) and the crossing signal system ($26,922) and will provide all traffic control devices necessary during construction. This project is located in COUNCIL DISTRICT 2. FISCAL INFORMATION/CERTIFICATION: y The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvements Fund. MG:j Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) Mike Groomer 6140 APPROVED CIL CITY Y COUNCIL Originating Department Head: lJ N Hugo Malanga 7801 (from) MAY 16 2009 • GS 29 541200 020290402910 $52,513.00 Additidual Information Contact: cifyfty SKTftrr at f ib. th. George Behmanesh 7800