HomeMy WebLinkAboutContract 46416-FP1 Departe t of TPW Const. Services
DOE# _ �yDa ECRSAW l Q
Project Managei< I Itic.�uJCi"af°� 1 1
Risk Management J. Barksdale IT W0RTH@) �OwPACT No-
Ria g
D.O.E. Brotherton
CFA Weste an/Scanned
i
The roceeding p ople have been Contacted concerning the request ATION AND PUBLIC WORKS CC) 1OV4(0
for final payment&have released this project for such payment. F PROJECT COMPLETION ✓ I lQ 11
Clearance Conducted By Etta Bacy D.O.E.Ns: 6781
Regarding contract 116781 for EAGLE MOUNTAIN-SAGINAW ELEMENTARY SCHOOL NO.19 as required
by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the
WATER DEPARTMENT upon the recorwke�datiop_gLt e ssistant Director of the Transportation&Public Works
Department has accepted the project as coet -
t' �
Original Contract Prices: t+i
U� JL 2 2 2016 J11
$173,890.00
Amount of Approved Change Orders: Ns 1
a
Revised Contract Amount: $173,890.00
Total Cost Work Completed: $173,890.00
Less Deductions:
Liquidated Damages: Days®$210.00/Day
Pavement Deficiencies:
Total Deduction Amount: $0.00
Total Cost Work Completed: $173,890.00
Less Previous Payments:
F' me t Due $173,890.00
07- -16
Reco me ded for Acceptance Date
Asst Dire o . - Infrastructure Design and Construction
Accepted VDate
pfd-Asst. Director, WATER DEPARTMENT
11 i .-- 6�zz� 2— /_Z/2
Z
As . City Man er Date
As
OFFICIAL RECORD
BMA. ZZZ) CITY SECRETARY
JUL 2 2 2016 FT. WORTH,TX -P .7O I � O
4U �Sv � u }jit
2016
!U�
1 � JUL 2 2 � 01 810
City Project Numbers 01840 I DOE Number 6781
Contract Name EAGLE MOUNT �OOL NO.IS Estimate Number 1
Contract Limits (REDEAGLE CREEK DR) Payment Number 1
Project Type WATER&SEWER For Period Ending 6123/2016
Project Funding
Project Manager Ehia City Secretary Contract Number 116781
Inspectors RODGERS / HABTE Contract Date
Contractor STABILE&WINN,INC. Contract Time 220 CD
P.O.BOX 79380 Days Charged to Date 206 CD
SAGINAW, TX 76179-0380 Contract is .000000 Complete
CITY OF FORT WORTH
SUN 4ARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $173,890.00
Less %Retained $0.00
Net Earned $173,890.00
Earned This Period 5173,890.00
Retainage This Period 50.00
Less Liquidated Damages
0 Days @ 50.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $173,890.00
Wednesday,July 13,2016 Page 4 of 4
Pa(CY O1 nb
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name EAGLE MOUNTAIN-SAGINAW ELEMENTARY SCHOOL NO.15
Contract Limits (REDEAGLE CREEK DR)
Project Type WATER&SEWER
City Project Numbers 01840
DOE Number 6781
Estimate Number 1 Payment Number 1 For Period Ending 6232016
CD
City Secretary Contract Number 116781 Contract Time 22CD
Contract Date Days Charged to Date 206
Project Manager Ehia Contract is 100.00 Complete
Contractor STABILE&WINN,INC.
P.O.BOX 79380
SAGINAW, TX 76179.0380
Inspectors RODGERS / HABTE
Wednesday,July 13,2016 Page 1 of 4
City Project Numbers 01840 DOE Number 6781
Contract Name EAGLE MOUNTAIN-SAGINAW ELEMENTARY SCHOOL NO.15 Estimate Number 1
Contract Limits (REDEAGLE CREEK DR) Payment Number 1
Project Type WATER&SEWER For Period Ending 6/23/2016
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 REMOVE SIDEWALK 99 SF $5.00 $495.00 99 $495.00
2 REMOVE 8"WATER LINE 38 LF $52.00 $1,976.00 38 $1,976.00
3 5'WIDE ASPHALT PVMT REPAIR 21 LF $241.00 $5,061.00 21 $5,061.00
4 TRENCH SAFETY 1436 LF $1.00 $1,436.00 1436 $1,436.00
5 DUCTILE IRON WATER FITTINGS 2.7 TN $6,000.00 $16,200.00 2.7 $16,200.00
W/RESTRAINT
6 4"PVC WATER PIPE 67 LF $49.00 $3,283.00 67 $3,283.00
7 6"PVC WATER PIPE 150 LF $51.00 $7,650.00 150 $7,650.00
8 8"DIP WATER 119 LF $72.00 $8,568.00 119 $8,568.00
9 8"DIP WATER,CLSM BACKFILL 12 LF $300.00 $3,600.00 12 $3,600.00
10 8"DIP WATER,CSS BACKFILL 15 LF $300.00 $4,500.00 15 $4,500.00
11 8"PVC WATER PIPE 1073 LF $37.00 $39,701.00 1073 $39,701.00
12 FIRE HYDRANT 3 EA $5,000.00 $15,000.00 3 $15,000.00
13 CONNECTION TO EXISTING 4"-12"WATER 2 EA $4,500.00 $9,000.00 2 $9,000.00
MAIN
14 2"WATER SERVICE 2 EA 53,800.00 $7,600.00 2 $7,600.00
15 4"WATER METER&VAULT 1 EA 522,000.00 $22,000.00 1 $22,000.00
16 4"GATE VALVE I EA $1,100.00 $1,100.00 1 $1,100.00
17 6"GATE VALVE 7 EA $1,300.00 $9,100.00 7 $9,100.00
18 8"GATE VALVE 8 EA $1,700.00 $13,600.00 8 $13,600.00
Sub-Total of Previous Unit $169,870.00 $169,870.00
SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
I POST CCTV INSPECTION 12 LF $49.00 $588.00 12 5588.00
2 TRENCH SAFETY 12 LF $1.00 $12.00 12 $12.00
3 8"SEWER PIPE 12 LF $285.00 $3,420.00 12 $3,420.00
Sub-Total of Previous Unit $4,020.00 $4,020.00
Wednesday,July 13,2016 Page 2 of 4
City Project Numbers 01840 DOE Number 6781
Contract Name EAGLE MOUNTAINSAGINAW ELEMENTARY SCHOOL NO.15 Estimate Number 1
Contract Limits (REDEAGLE CREEK DR) Payment Number I
Project Type WATER&SEWER For Period Ending 6/23/2016
Project Funding
Contract Information Summary
Original Contract Amount $173,890.00
Chante Orders
Total Contract Price $173,890.00
Date'411lihold, Total Cost of Work Completed $173,890.00
Less %Retained $0.00
Date
Z��� Net Earned $173,890.00
it
�pervi i6-5""-Date
Earned This Period $173,890.00
'" Retainage This Period $0.00
/2� 0 7l Less Liquidated Damages
Project MdgWr
Days @ /Day $0.00
rl* Date LessPavement Deficiency $0.00
M-ri
nfrastru sign and Construction Less Penalty $0.00
Date?77/ Less Previous Payment $0.00
ing Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $173,890.00
Wednesday,July l3,2016 Page 3 of 4
Stabile & Winn , Inc* .
et a
Concrete Paving,and Construction
'April 28, 2016
Philip Varughese, P.E.
Teague, Nail,.& Perkins
1100 Macon Street
Fort Worth, Texas 76102
RE: Eagle Mountain-Saginaw Elementary School#15 (Redeagle Creek Drive)
Dear Mr. Varughese,
This letter is to inform you that as of April 13, 2016 the above referenced project was substantially
complete. We currently have a preliminary final walk through scheduled with the City of Fort Worth on
May 3, 2016 at 9:00 AM. Depending upon the outcome of the preliminary walk, it is our intent to have
the project ready for a final walk through by May 9, 2016.
If you have any questions, please call. Thank you.
Sincerely,
Jerry Henderson, P_E_
Vice President
CC: Rudy Medellin, Inspector VRX
Stabile&Winn, Inc.*P.O.Box 79380*Saginaw,Texas 76179-0380*Office 817.8472086* Fax 817.8472098
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Eagle Mountain Ehxnentary School No. 15
PROJECT NUMBER: 1840
DOE NUMBER: 6781
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Water 8" PVC 1073
Water 8" DPI J4*— ISf(e LF
Water 6" Pyr, 150
Water 4" PVC 67
FIRE HYDRANTS: 3 VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES: 2" C22M 2
SEWER
PIPE LAID SIZIE TYPE OF PEPE LF
Sanitary Sewer 8" PVC 12
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES:
_ TRANSPORTATION XND PUBLIC WORKS
The City of Fort Worth• i000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Jerry Henderson,
Vice President Of Stabile& Winn, Inc., known to me to be a credible
person,who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
EAGLE MOUNTAIN-SAGINAW ELEMENTARY SCHOOL# 15
(REDEAGLE CREEK DRIVE) - DOE#6781
BY
J rry Henderson, Vice President
Subscribed and 1swrn before me on this date 29 of June, 2016
o Publ'
Tarrant, exas
2otY YESENIA SALAZAR
NolmyPublkStamcfTum
Na ' Cams E*-12-16-2019
QF� Notary ID 130.47082-7
CONSENT OF
SURETY COMPANY
TO FINAL PAYMENT Bond #CA 4011346
Project: Water, Sewer,Paving,Drainage and Street Light Improvements to Serve
Eagle Mountain-Saginaw Elementary School No. 15 (Redeagle Creek Drive)
To(Owner):
City of Fort Worth, Texas and
Eagle Mountain-Saginaw ISD
1000 Throckmorton St. Contract For: See above
Ft Worth, TX 76102
Contract Date:
Contractor:
Stabile& Winn, Inc.
P O Box 79380
Saginaw, TX 76179-0380
In accordance with the provision of the Contract between the Owner and the Contractor as
defined above,the Great American Insurance Company of New York
301 E Fourth Street
Cincinnati,OH 45202
,Surety Company,
on bond of Stabile& Winn,Inc.
P O Box 79380
Saginaw, TX 76179-0380
,Contractor
hereby approves of the final payment to the contractor and agrees that final payment to the
contractor shall not relieve the Surety Companies of any of their obligations to the
City of Fort Worth,Texas and Eagle Mountain-Saginaw ISD
1000 Throckmorton St.
Ft Worth,TX 76102
,Owner
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Companies have hereunto set their hand this 28th day of June, 2016.
Great American Insurance Company of
New York
Witness: Surety Co ny
racy Tucke Attorney-in-Fact
GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
New York
Administrative Office:301 E 4TH STREET • CINCINNATI,OHIO 45202 • 51369-5000 • FAX 513-723-2740
The number of persons authorized by
this power of attorney is not more than FIVE No.0 14893
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS:That the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK,a corporation
organized and existing under and by virtue of the laws of the State of New York,does hereby nominate,constitute and appoint the
person or persons named below its true and lawful attorney-in-fact,for it and in its name, place and stead to execute on behalf of
the said Company,as surety,any and all bonds,undertakings and contracts of suretyship,or other written obligations in the nature
thereof;provided that the liability of the said Company on any such bond,undertaking or contract of suretyship executed under this
authority shall not exceed the limit stated below.
Name Address Limit of Power
TRACY TUCKER STEVEN TUCKER ALL OF ALL
W.LAWRENCE BROWN BENNETT BROWN FORT WORTH, $100,000,000.00
KEVIN J.DUNN TEXAS
This Power of Attorney revokes all previous powers issued on behalf of the attorney(s)-in-fact flamed above.
IN WITNESS WHEREOF,the GREAT AMERICAN INSURANCE COMPANY OF NEW YORK has caused these presents to be signed
and attested by its appropriate officers and its corporate seal hereunto affixed this 25TH day of JUNE , 2015
Attest GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
SEAL � � � I��/��•��� �,�'���'`!
Assistant Secretary Divisional Sentor Yte President
DAVID C.MCHIN(877-377-2405)
STATE OF OHIO,COUNTY OF HAMILTON-ss:
On this 25TH day of JUNE 2015 ,before me personally appeared DAVID C.KITCHIN,to me known,
being duly sworn,deposes and says that he resides in Cincinnati,Ohio,that he is a Divisional Senior Vice President of the Bond
Division of Great American Insurance Company of New York,the Company described in and which executed the above instrument;
that he knows the seal;that it was so affixed by authority of his office under the By-Laws of said Company, and that he signed
his name thereto by like authority.
&aanA KoNol>It
ll1 /4�
om�►�sdrora>lo
*10m, A mili0aWt><M
This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great
American Insurance Company of New York by unanimous written consent dated May 14,2009.
RESOLVED. That the Divisional President the several Divisional Senior Vice Presidents,Divisional Vice Presidents and Divisional
Assistant Vice Presidents, or any one of them,be and hereby is authorized, from time to time, to appoint one or more Attorneys-in-Fact
to execute on behalf of the Company,as surety,any and all bonds,undertakings and contracts of suretyship,or other written obligations
in the nature thereof,*to prescribe their respective duties and the respective limits of their authority,•and to revoke any such appointment
at any time.
RESOLVED FURTHER.That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant
Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond,
undertaking, contract of suretyship, or other written obligation in the nature thereof,such signature and seal when so used being hereby
adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the
Company with the same force and effect as though manually affixed.
CERTIFICATION
I,STEPHEN C.BERAHA,Assistant Secretary of Great American Insurance Company of New York,do hereby certify that
the foregoing Power of Attorney and the Resolutions of the Board of Directors of May 14, 2009 have not been revoked and are
now in full force and effect.
Signed and sealed this 28th day of June 2016
Assistant Secretary
51185L(O6!'15)
FORTWORTH REV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Stable and Winn Inc. Eagle mountain Elementary School No.15
DOE Inspector DOE Number
Habte Taezaz 6781
DOE Inspector Project Manager
0 Water Q Waste Water ❑Storm Drainage ❑ Pavement Fred Ehia
Initial Contract Amount Project Difficulty
$173,890.00 O Simple QQ Routine Q Complex
Final Contract Amount Date
$173,890.00 6/30/2016
11)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WTIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 426
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 426
111)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS]*100%) 426 / 448 = 95%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector 1 Signature Contractor
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
_ TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Thcockmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTHREV:02=07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION _ Date: 6/30/2016
Name of Contractor rt tett 7m.? )
!Stabile and Winn, Inc Eagle Mountain Elementary School NO.15 Ij
DOB Inspector -roject Manager
Habte Taezaz
;DOE Number Prcr.
oject DIto,`Cvntract
6718 O _O Roua� O tromp x j rl yJ water 0 waste water ❑Storm Drainage ❑Pavement
;Initial Contract Amount _-- —� 1FtnalContract Amount
�S173,890.00 __ _._ -1173,890.00
It)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
(ELEMENT RATING .ELEMENT RATING
I (0-4) (0-4)
INSPECTION EVALUATION _ _ PLANS&SPECIFICATIONS l
1 Availability of Inspector —� I+Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 1 Clarity&Sufficiency of Details
3 Accuracy of Measured QuantitiesApplicability of S cifications
4Display Of Professionalism — 3 4 Accuracy of Plan Quantities
15 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs I? 1 Knowledge And/Or Problem Resolution 3 j
ADMINISTRATION __ ,2 Aro
Availability of P 'ect Manager I--,
1 Change Processmg Time �r 3_Com_munication �
42 Timliness of Contractor_Payments , 4 Resolution of Utility Conflicts
3 Bid Openinto Pie-Con Meeting Timefram
111)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector — -
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION ORTATION AND PUBLIC WORKS
; �' w The City of Fort Worth-1000 Thr,einorton Street-Fort Worth,TX 76012-6311
(817)392-7941 -Fax:(817)392-7845
FORTWORTH rev 03/05/07
TRANSPORTATION& PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:l
NAME OF PROJECT: Eagle Mountain-Sz,ginaw I Iumentary School No.i 5
PROJECT NO.: #01940 CONTRACTOR: Stabile&Winn.Inc.
DOE NO.: 6781
PERIOD FROM:07/15/15 TO: 04/26/16 FINAL INSPECTION DATE: 26-A r-16
WORK ORDER EFFECTIVE:7/15t2615 CONTRACT TIME: 220Q ym CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH •CHARGED CR EJTFP MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 13.
4. 19.
5. 20.
6. !1.
7.
�. 24...
10. 2F.
11. .6.
12. 2
13.
15.J 30.
SAT,SUN, RAIN,TOCP WET, UTILITIES DAYS TOTAL
& HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS
265
PERIOD
PREVIOUS
PERIOD I _ I
TOTALS
TO DATE 265
*REMARKS: ----- -------- --------------
O CUR DAt INSPECTOR bATE
FNGINEEiRING,DEPARTI MMNT
. ' The City of Fort Worth•1000 T uro orlon Stroet•Fort Worth,TX 76012-6311
(S.7)392-7941 •raz (8'7)392-7845