AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE-
MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF
AVENUE "B"
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE
CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR BEARING TO THE
OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING
THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE
CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE
CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING
THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE
CITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the
hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im-
proved by raising, grading and filling same and by constructing thereon the following, to-wit:
UNIT 1: AVENUE "B" From Ash Crescent to Poly Freeway, known and designated
as Project No. 104-24000-243, Unit 1, a six-inch thick
hot-mix asphaltic concrete pavement on a six-inch thick
lime' stabilized subgrade with seven-inch high concrete
curb and eighteen-inch wide concrete gutter on a thirty
foot roadway. Six-inch thick concrete driveways will
be constructed where specified.
UNIT 2: EAST CANTEY STREET From Bryan Avenue to Stuart Drive, known and designated
as Project No. 104-24000-243, Unit 2; a six-inch thick
hot-mix asphaltic concrete pavement on an eight-inch
thick lime stabilized subgrade with seven-inch high
concrete curb and eighteen-inch wide concrete gutter on
a thirty foot roadway. Six-inch thick concrete drive-
ways will be constructed where specified.
UNIT 3: BRYAN AVENUE From Shaw Street to Bewick Street, known and designated
as Project No. 104-24000-243, Unit 3, a six-inch thick
hot-mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade with seven-inch high concrete
curb and eighteen-inch wide concrete gutter on a thirty
foot roadway. . Six-inch thick concrete driveways will
be constructed where specified.
UNIT 4: OLD BURLESON RO:4D From Highway 81 to Thornhill Drive, known and design-
ated as Project No. 104-24000-243, Unit 4, a six-inch
thick hot-mix asphaltic concrete pavement on an eight-
inch thick lime stabilized subgrade with seven-inch high
concrete curb and eighteen-inch wide concrete gutter on
a thirty-six foot roadway. Six-inch thick concrete
driveways will be constructed where specified.
UNIT 4-A: [NEST SERVICE ROAD OF From 220' north of Felix Street to old Burleson Road,,
NORTH-SOUTH FREE14AY known and designated as Project No. 104-24000-243,
Unit 4-A, a ten and one-half foot widening with seven-
inch reinforced concrete pavement on a four-inch thick
crushed limestone base with- seven-inch high superimpos-
ed concrete curb. Six-inch thick concrete driveways
will be constructed where specified.
UNIT 5: RYAN AVENUE From Boyce Street to Spurgeon Street, known and desig-
nated as Project No. 104-24000-243, Unit 5, a five-inch
thick hot-mix asphaltic concrete pavement on a six-inch
thick lime stabilized subgrade with seven-inch high con-
crete curb and eighteen-inch wide concrete gutter on a
thirty foot roadway. Six-inch thick concrete driveways
will be constructed where specified.
r
together with concrete curbs, gutters, driveways and incidentals to such improvements
on proper grade and line where same are not already so constructed, together with storm
sewers/ and drains and other necessary incidentals and appurtenances; all of said im-
provements to be constructed as and where shown on the Plans and in strict accordance
with the Plans and Specifications therefor; contract therefore has been made and
entered into with R. W. Gibbins, Inc. ;
and
WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public
Works Director to prepare and file estimates of the cost of such improvements and
estimates of the amount per front foot proposed to be assessed against abutting property
and the owners thereof, and such estimates have been examined, NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT;
I.
Such estimates be, and they are hereby adopted and approved.
II.
It is hereby found and determined that the cost of improvements on each portion of
streets, avenues, and public places hereinafter described, with the amount or amounts
per front foot proposed to be assessed for such improvements against abutting pro-
perty and the owners thereof, are as follows, to-wit:
UNIT 1: AVENUE "B" From Ash Crescent to Poly Freeway, known and
designated as Project No. 104-24000-243, Unit 1.
The estimated cost of improvements is $ 26.130.72 ; the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 3.56 ; the estimated amount per front foot to
be assessed against abutting property and the owners thereof for pavement is $ 8.88
the estimated amount per front foot to be assessed against abutting property and the
owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated
amount per square foot to be assessed against abutting property and the owners thereof for
six-inch thick concrete driveway is $ 1.54 per square foot; the total
estimated amount per front foot to be as against abutting property and the owners
thereof is $_x_44 , plus the cost incurred for concrete driveway construction
where specified.
IIIe
A hearing be given and held by and before the City Council of the City
of Fort Worth, Texas, to all owning or claiming any property abutting upon said
portions of highways, streets, avenues and public places, as well as to all
owning or .claiming any interest in any such property. Such hearing shall be
given and held on the 21st day of April , 19_7,5_, at 9!30 A.M,,
in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and
the City Secretary is hereby directed to give or cause to be given notice ,of the
time and place of such hearing and of,-,other 'matters and facts in accordance with
the terms and provisions of an Act pased at the First Called Session.of the
Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts
of said Session,. now being known as Article 1105b of Vernons Texas Civil Statutes
as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1,
emergency effective May- 12, 1967. Such notice shall be.by advertisement inserted
at least three (3) times in a newspaper published in the -City of Fort Worth,
Texas, the first publication to be made at least twenty-one (21) days before -
the date of said hearing; Said notice shall comply with and be in accordance with
. the terms and provisions of said Act as amended. The City Secretary is further
directed to give or cause to be given personal notice of the time and place of
such hearing to all owning or claiming any property abutting ori said portions of
highways, streets, avenues and public places, as well as to all owning or claiming
any interest in any such property. Such personal notice shall be in writing and
shall be given or caused to be given by the City Secretary by depositing such
written notice in the United-States Mail at least fourteen (14) days before the
. date of the hearing, postage prepaid, in envelopes addressed to all persons
owning or claiming any interest in the respective properties abutting the high-
ways, streets, avenues and public places or portions thereof to be improved, as
the names bf such persons are shown on the current rendered tax rolls of the City
of Fort Worth and at the addresses so shown, or if the name of such respective
owners do .not appear on such rendered tax rolls, then address to .such owners as
their names are shown on the current unrendered tax rolls of the City of Fort Worth
at the addresses shown thereon. In those cases in which an owner of property
abutting a highway, street, avenue or public place or portion or portions there-
of which is to be ,improved is listed as "unknown" on the then. current City of
Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth
tax rolls but no address for such owner is shown,' no notice need be mailed. In
those cases where the owner is shown to be an estate, the mailed notice may be
addressed to such estate. In this connection, the City Secretary shall prepare
and file or cause to be prepared and filed with these proceedings a list of the-
properties to be assessed,, the names of those .,pers:ons owning or claiming any
interest in saidproperties to whom the notice was mailed,: together with the last
known addresses determined as aforesaid of the respective owners and those' per�
sons owning or claiming any interest in said property,
The City Secretary shall certify that each of the parties in said list whose
address is shown on the then current rendered or unrendered tax rolls of the City
of Fort Worth was mailed a copy .of the notice of hearing and shall further certify
the date or dates . on which said notice was mailed. A copy of each notice shall be
attached to such' certificate. The certificate of the City Secretary will be con-
clusive evidence of the facts therein recited.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance
by copying the caption of same in the Minute Book of the City Council and by
filing the complete ordinance in the appropriate Ordinance Records of this City.
V.
This ordinance shall take effect and be in full force and effect from and
after the date of its passage.Passed and approved thisay of � .�.,/. 19
APPROVED AS TO FORM AND LEGALITY:
f
ity ttorney
UNIT 2: E, CANTEY STREET From Bryan Avenue to Stuart Drive, known and
designated as Project No. 104-24000-243, Unit 2.
The estimated cost of improvements is $ 10,857 99 the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 3.60 ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ 99-13 ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for -0- wide concrete sidewalk is $__O_ the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $1.54 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 12.73 plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 3: BRYAN AVENUE From Shaw Street to Bewick Street, known and
designated as Project No. 104-24000-243, Unit 3.
The estimated cost of improvements is $ 20.762.66the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 3.56 ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ 8.88 ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for -0- _ wide concrete sidewalk is $_-_0- ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $-1.54— per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 12.44 plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 4: OLD BURLESON ROAD From Highway 81 to Thornhill Drive, known and
designated as Project No. 104-24000-243, Unit 4.
The estimated cost of improvements is $ 81,678.55 the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 3,60 _; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ 10.10 ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $.1 54 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $13 43 _, plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 4-A: W. SERVICE ROAD OF From 220' north of Felix Street to Old Burleson
N-S FREEWAY Road, known and designated as Project No. 104-
24000-243, Unit 4-A.
The estimated cost of improvements is $ 6,239.36 the estimated amount
per front foot to be assessed against abutting property and the owners thereof forsuper-
imposed concrete curb is $ 1.43 the estimated amount per. front .f000t to be
wi e�h `.49 ;
assessed against abutting property and the owners thereof for pavement is
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for -0- - wide concrete sidewalk is $ -0- ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ 1_ 94 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 7,92 plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 5: RYAN AVENUE From Boyce Street to Spurgeon Street, known and
designated as Project No. 104-24000-243, Unit 5.
The estimated cost of improvements is $ 10,251.73_ _; the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 3.56 ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ 8.54 ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for -0- _ wide concrete sidewalk is $ -0- ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ 1.54 _ per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 12.10 plus the cost incurred for concrete driveway con-
struction where specified.
The estimated cost of improvements is $ the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ _; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for wide concrete sidewalk is $ ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ _ per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $—___, plus the cost incurred for concrete driveway con-
struction where specified.
LINE
BAILIFF City of Fort Worth, Texas
ORAWn ' Mayor and Council Communication
DATE REFERENCE SUBJECT: Contract Award - Assessment Pav- PAGE
NUMBER ing At 5 Locations On The South Side
X24/75 C-3050i of 3_
And Hammond Street Storm Drain
City Council action is requested on Project No. 104-24000-243, as discribed
below:
Unit Street Limits Roadway R.O.W.
Width Ft. Width Ft.
1 Avenue B Ash Crescent to Poly Freeway 30 60
2 East Cantey Street Byran Avenue to Stuart Drive 30 60
3 Bryan Avenue East Shaw to Bewick 30 60
4 Old Bruleson Road West Service Road U.S. 81 to 36 50-56
Thornhill Drive
4A West Service Road 200' N. of Felix to Old Burleson Widen 10.5 Ft.
U.S. 81 South Road
5 Ryan Avenue Boyce to Spurgeon 30 -60
6 Hammond Street Storm Old Burleson Road to Timothy In existing
Drain and South to Spurgeon Street
Initiation of Project
Units 1, 2, 3 and 5 were initiated by paving petitions from adjacent property
owners. Unit 4 was initiated by Community Facilities Contract No. 6791, M&C
C-1954, dated 4/5/71, whereas Unit 4A is City initiated in order to correct
an existing paving skip. Unit 6, Hammond Street Storm Drai_r, is necessitated
by the improvement of Old Burleson Road end to correct drainage complaints
in the general area.
Improvements
All Units, with the exception of Unit 4A, will be improved with residential
grade hot-mix asphaltic concrete pavement, with concrete curb, gutter and
driveway approaches and required drainage appurtenances. Unit 4A will be
widened 10.5 feet with 7" concrete pavement, 7" superimposed concrete curb
and concrete driveway approaches to match the existing roadway and "'exas
Highway Department specifications. Hammond Street Storm Drain will consist
of 18" to 33" R.C.P. from Old Burleson Road, west to Timothy Street and south
to Spurgeon Street.
Receipt of Bids
The following bids have been received:
Bidder Amount
W. R. Gibbins, Inc. $253,562.96
DATE REFERENCE SUBJECT: Contract Award - Assessment Pav PAGE
NUMBER ing at 5 Locations On the South Side
3/24/75 C-3050 2 of 3
And Hamond Street Storm Drain -
L. Grimes & Company, Inc. $ 254,254.18
Austin Road Company 259,723.63
Texas Bitulithic Company 263,996.58
James W. Jackson 284,780.70
Bids Received: February 27, 1975
Working Days Allotted: 143
The following contractors took plans and specifications, but did not submit
a bid:
S. R. 0. Asphalt, Inc.
Lewis & Lewis
Rambo Construction Company
Deletion of Unit and Bid Item
Unit 2, East Cantey Street, was initiated by a paving petition in May, 1973,
in that the owner of 50% of the abutting property signed and forwarded a
paving petition to the Public Works Department. However, the owner defaulted
in his purchase contract and the property reverted to Tarrant Savings and
Loan Association on March 3, 1975. Tarrant Savings Association has request-
ed the street not be improved at this time. In addition, the two remaining
owners who did not sign the original petition, have joined in the request to
not pave the street at this time. Consequently, it is recommended that
Unit 2, East Cantey Street, be deleted from the project.
Included in the bid items for Unit 6, Hammond Street Storm Drain is the
relocation of 80 linear feet of 8 inch water main. The overall low bidder
is not qualified with the City Water Department to accomplish water and
sanitary sewer adjustments. As a result, the Water Department has recommend-
ed that the item be deleted from the contract and the adjustment be accomp-
lished by City Water Department forces.
The above two items are included in Change Order No. 1.
Project Cost and Financing
Based on the low bid and standard policy, not including Unit 2, approximately
$61,837.26 is proposed to be assessed against abutting property owners, which
will be provided for by a bond fund transfer from the Revolving Fund
Unspecified. The cost to the City for construction, inspection engineering,
administration and miscellaneous expenses is estimated to be approximately
$187,077.13 which $108,320.30 is for the Hammond Street Storm Drain. A
bond fund transfer of $179,000 from the Assessment Paving Unspecified Account
is required to supplement the approximately $8,500 in the Project Account
No. 104-24000-243.
DATE REFERENCE SUBJECT: Contract Award - Assessment Pav- PAGE
NUMBER
3/24/75 UMBERC-30ing at 5 Locations On the South Side 3 or 3
And Hammond Street Storm Drain
Recommendations
It is recommended that:
1) The following Bond Fund Transfers be approved:
Amount From To Reason
$61,837.26 Unspecified Revolv- 5 Loc. on South To provide funds for
ing Fund 042-09724- Side (4 Units) the property owners '
901 042-10424-243 share of construction
costs.
$179,000 Assessment Paving 5 Loc. on South To supplement the exist-
Unspecified Side (4 Units) ing $8,500 in the pro-
104-24000-901 104-24000-243 ject account by provid-
ing additional funds
for the City's share
of construction,
inspection and miscell-
aneous costs.
2) An ordinance be adopted:
a. Declaring the necessity for the ordering of the improvements;
b. Making provisions for levying assessments:
C. Directing the Public Works Department to prepare estimates of
costs and amounts to be assessed:
d. Awarding the contract to R. W. Gibbins, Inc. , in the amount of
$253,562.96 and approving Change Order No. 1, reducing the con-
tract amount to $241,222.21 by deleting Unit 2, East Cantey
Street and Bid Item 7073 under Unit 6, Hammond Street Storm
Drain; and
e. Making appropriations to cover the indebtedness thereby incurred
for improvements of the project named above.
3) Ar_ ordinance be adopted:
a. Approving the estimates of costs and amounts proposed to be
assessed; and
b. Setting April 21, 1975, as the date for the Benefit Hearing.
RNL:1g
attachment
SUBMITTED BY: DISPOSITION BY COUNCIL: PROCESSED BY
9APPROVED ❑ OTHER (DESCRIBE)
/ 1
ITY SECf2 ARY
ATE
CITY MANAGER
5 LOCATIONS ON THE SOUTH SIDE
MU KEV
Bcr
ROAD Y o I ROBERT
y w , z;y MONIN�
T COLVIN_
• ��� o VALKUS w. ST SIDE MORNING
CAMILLA ;
C TE•Y CANTEY
z Q
LEN
m®Lf•. m ST LOV IEN ST
T w �z G1RSE:+' `�® = BA ER ST
TE RELL AVE `` J u. IE L
HUM '=
w
V o' ::.` ��`S BOWIE
I..,. �,.,. ..
x ,f �' 1 �: VICKI LA
ti GCEPdW ®bi AVE C
500 50 U) 1000
DEV TT
T
_ Z
C� STOLM
Z Q J O
KEE
®0% of { }"• \ j ti p \..
I DIS S AKS
w = LAM NT > �f
- Q
B T >
MA A AVE a '+' 'Ou > >
z SEMINARY J MA TA i P co, � o
INS P. FL NT ST SOUTH
ANTHON SHOPPING m RI.Tu^ .�}
2000 CENTER
0S Ae NT',-: z o 1 0 R'.IC 4i
500 Q1000
ROSEMONT
- Jr.HIGH BRO DUS" HORN ILL AV C. 1 e`
w
BED ELL - z G pUS
GAM REEL
11
SEMINARY w o �' z AFL "eRL'.
Q
p r LAAAAA n ST -j
P
V_
BOYCE '- AVE
c SPURG w Q.. ��5 L 1(^ ¢ ' C.2
FELIX \�R" o B YCE I
o' FO W TH EN RAL DEOTr
> AVE
vtij
I,
AR�ti nel F 'tc;,
CIVY OF FORT WORTH.
PUBLIC WORKS DEP&RP�TIENT
E',NG INEER ING DIVISTON
PRO EC'?: NOv 104-24000-243, 5 LOC ATtONS ON THE SOUTH SI'VE
On Monday, March 10, 1975, a Neighborhood Meeting was held by the Engineering,
Division of the Public Works Department at the Worth Heights Elementary School,
for the Assessment Paving at 5 Locations oa the South Side, Project No, 104-
24000-243,
Odell Schmidt explained the procedures concerning the proposed improvements.,
owner participation in cost and methods of payment to the twenty-seven property
owners that were present,
After this explanation the meeting was opened for discussion,
Unit 1, Avenue "B",� No objections.
Unit 2, Cantey Street.- Mre W� E, Plumb of the Tarrant Savings Association,
representing Lots 12 and 13, Block 3, stated that he felt the present paving
was adequate for the area served and that the proposed improvements were un-
necessary, Mr. Ravos Ford, owner of Lot 24, Block 10, also objected to the
improvements. Mr. Robert Shaw, owner of Lot 1, Block 10, said that Cantey
Street was adequate to serve his business and that he objected to further
improvements
Unit 3, Bryan Avenue, No objections,
Unit 4, Old Burleson Road,, Mr. Cecil Fries, owner of Lot 10, Block 1, said
he objected to the improvements, He said that he felt the street would be
of no benefit to his property, Mrs, Fries said that she had been authorized
to speak for four other property owners who were unable to attend the meet-
ingr Mrs, Fries said that: all four objected to the improvements. Mr® Louis
Dressier, owner of Lot 6, Block 2, said that if the street was improved that
it would be nothing but a speedway,, He said that he objected to the noise
and litter that would be created by improving this street® Several other
property owners stated that since they had no access to this street they
should not be assessed,
Unit 4--A9 Service Roads Both property owners requested wider driveways,
Unit 5, Ryan Avenue,,, No objections.
After a short general discussion, the meeting was adjourned,
FORT WORTH, TEXAS
March 24 _91975
TO TBE HONORABLE, CITY COUNCIL Cr T-0, CITY, OF, FORT WORTU, TIXAS,
Gentlemen and Mrs. Rimmer-
In accordance with the proceedings of your Honorable Body, I have prepared estimates
of the cost of street improvements as shown below.-
Estimates of the total cost of improvements on a portion of Avenue "B" and portions
of sundry other streets, avenues and public places in the City of Fort Worth Worth,
Texas, and estimated amounts per front foot to be assessed against abutting property
and the owners thereof, on each portion of street, avenue and public place are as
follows, to-wit:
PROJECT NO, 104-24000-243 UNIT 1: AVENUE "B" FROM ASH CRESCENT TO POLY FREEWAY to
be improved by—constructing a six-inch thick hot-mix asphaltic concrete pavement on
a six-inch thick time stabilized subgrade with seven-inch high concrete curb and eight-
een-inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete drive-
ways will be constructed where specified.
The following assessment rates have been established:
Six-inch hot-mix asphaltic concrete pavement
(Residential
Seven-inch curb and eighteen-inch gutter_ _ , . . . . _ _$3.56/LFa
Six-inch thick concrete driveways'. . . . . . . . . . .
The assessments result in the following division of cost-
Total cost to property 7,687.54
'Total cost to City of Fort Worth. _ _ _ _ . . . _ _$18,443.18
Total estimated construction cost. _ _ _ . . . . aa _ _$26,130,72
PROJECT NO, 104-24000-243 UNIT 2: EAST CANTEY STREET FROM BRYAN AVENUE TO STUART DRIVE.-
to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on
an eight-inch thick lime stabilized subgrade with seven-inch high concrete curb and
eighteen-inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete
driveways will be constructed where specified,
The following assessment rates have been established;
Six-inch hot-mix asphaltic concrete pavement
(Industrial zoning). . . , . , , , _ _ , . _ ,$ 9J3/LaFe
(Residential zoning). , _ _ _ , . . . _ ,$ 2M/L.F.
Seven-inch curb and eighteen-inch gutter 3.60/L F'
Six-inch thick concrete driveways— _ _ _ . . . . . , , . ,$ 1,54/s,F.
The assessments result in the following division of cost-,
Total cost to property owners. _ . . .. . . . . _ _ _ _$ 49826.72
Total cost to City of Fort 6,031m07
Total estimated construction
PROJECT NO, 104-24000-243 UNIT 3.- BRYAN AVENUE FROM SHAW STREET 'TO BEWICK STREET,, to be
improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-
inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch
wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be
constructed where specified,
The following assessment rates have been established-,
Six-inch hot-mix asphaltic concrete pavement
(Industrial . . .$8a88/LF
(Residential
Seven-inch curb and eighteen-inch gutter, , _.. . _ , ,$3,56/L.F,
Six-inch thick concrete
The assessments result in the following division of cost-,
Total cost to property owners. . . . . . . . . . . . . _ _$11,44MO
Total cost to City of Fort Worth. . _ , . , . , . . , , .$ 9,313.96
Total estimated construction cost. . . . . . . . . . . . . ,$20,762.66
PROJECT NO, 104-24000-243, UNIT 4- OLD BURLESON ROAD FROM HILT-114AY 81 TO THORMITLL DRIVE
to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on an
eight-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-
inch wide concrete gutter on a thirty-six foot roadway. Six-inch thick concrete driveways
will be constructed where specified.
The following assessment rates have been established-
Six-inch hot-mix asphaltic concrete pavement
(Commercial zoning less 27(: credit for existing pen.etration), ,.. , , , ,. ,$9,83/LSF.
(Residential zoning less rear lot credit less 27� credit for
existing penetration). . .
Seven-inch curb and eighteen-inch
Less rear lot credit, . . .
Six-inch thick concrete driveways. . . . .
The assessments result in the following division of cost,
Total cost to property owners, . . . . . _ _ _ _ _ _ _$369199,10
' otal cost to City of Fort Worth. . . .. . . , , , . , , , , . , . , .$45,479.45
Total estimated construction cost. . . - . - .- -$81,678,55
PROJECT NO, 104-24000 FREEWAY FRONT. 220' NORTH OF
FELIX STREET TO OLD BURLESON ROAD, to be improved by widening existing street, ten and one-
half feet on the west side with seven-inch reinforced concrete pavement on a four-inch
thick crushed limestone base with seven-inch high superimposed concrete curb, Six-inch
thick concrete driveways will be constructed where specified.
The following assessment rates have been established:
Ten and one-half foot widening
(Commercial zoning), ,, . , , . , , . . . . . . . . . . .$6.49/L.F,
Seven-inch superimposed concrete curb. . . . _ _ _ _ _$1.43/LF,
Six-inch thick concrete driveways. , . . . . . . , . . . . . . .$1,54/S,F,
The assessments result in the following division of cost-,
Total cost to property owners. . . . . . . . . . . .$3,356,76
Total cost to City of Fort Worth. . . . , . ® . . . . . . . . . . . . _$2,882.60
Total estimated construction cost, , , , , . . . . . . . . . .$6,239.36
PROJECT NOa 104-24000-243, UNIT 5.- RYAN AVENUE FROM BOYCE STREET TO SPURGEON STREET, to be
Improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a six-
inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch
wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be
constructed where specified.
The following assessment rates have been established-
Five-inch hot-mix asphaltic concrete pavement
(Residential zoning) . , , . , , . , , . . . . . . . . _ _ .$2,94/1,,F,
Seven-inch curb and eighteen-inch gutter. . . . . . . . . . . . . .$3,56/L,F�
Six-inch thick concrete driveways, . . . . . . . . . . _ . . . _ _$L54/S,F,
The assessments result in the following division of cost.-
Total cost to property owners. . . ,.., 39145A6
Total cost to City of Fort Worth. . . ., . . . . . . — o$ 79106.57
Total estimated construction cost. . . _ o . . ._ —$10925L73
ALL UNITS:
Total cost to property owners 669663x98
Total cost to City of Fort Worth for paving. . . . . . , , — . , , . . _$ 899256A3
Total cost to City of Fort Worth for Storm Drain. . . . . . . . . . . e .$110,320AO
Total estimated construction cost. . . . . . ej _ _$266,241.11
)LjAr-CAY,—M. GRAHAM, F.-=E
CITY .
I
, TY E
CENGINEER
PROJECT NO. 104-24000-243 UNIT 1-. AVEXI-l' "B" FROM ASH CRESCENT' TO POLY FREEWAY. to be lm-
proved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick lime stabilized- subgrade with seven-inch high concrete curb and eighteen-inch wide con-
crete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed
where specified,
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE HIGHLANDS TO GLENWOOD ADDITION
Beginning at the southeast corner of Ash Crescent and Avenue "E'®
H. P. Grizzle 9,10 & 62 104' Pavement $2.94 $305076
' —
1901 Ave. "B" W17 of 8 Res. 104' Curb & Gutter 3,56 370024
76104 $676,00
Howard Daughtery W27 of 7 & 62 60' Pavement $2,94 $I76,40
7425 Hightower E33 of 8 'Res. 60' Curb & Gutter 3.56 213060
76112 $390.00
A, M. Forest W35.6 of 6 & 62 58.8' Pavement $2094 $172A7
951 Elmwood E23 of 9 Res. 58.8' Curb & Gutter 3.56 209033
76104 $382,20
Ends Whitaker 5 & W14.2 of 62 64.2' Pavement $2,94 $IM75
1921 Ave, "B" ' 6 'Res—, 64.29 Curb & Gutter 3.56 225,55
76104 $417°30
Belzise Terrace intersects
Lester Mae Webb 7 & 8 63 100' Pavement $2,94 $294,00
2005 Ave. "B" Res, 1000 Curb & Gutter 3.56 356,00
76104 118 Sqa Ft. Driveway 1,54 181,72
$831,72
PROJECT NO, 104-24000-2439 UNIT I: AVENUE "E", Con- tinuedg
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE HIGHT—kNDS TO GLENWOOD ADDITION
Mrs. J.C. Reynolds 6 63 50' Pavement $2094 $147.00
2007 Avenue "B" Ke's. 50' Curb & Gutter 3,56 178.00
76104 118 Sq, Ft. Driveway 1.54 181,72
$506,72
Rev. Luther Allen 5 63 50' Pavement $2,94 $147,00
722 Woodrow �Res, 50' curb & Gutter 3.56 178.00
76105 $325A0
Ann Street intersects
Mrs. Wm. S. Montgomery 8 69 50' Pavement $2094 $147,00
3129 Spanish Oak Rd, Res. 50' Curb & Gutter 3.56 178.00
76109 118 Sq, Ft. Driveway 1054 181.72
$506,72
Poly Freeway intersects
S OUTH S IDE
Sam Polk 1 68 50' Pavement $2.94 $147000
2100 Avenue "13" Res, 50' Curb & Gutter 3.56 178,00
76104 $325,00
Ann Street intersects
2.
PROJECT NO, 104-24000-243L UNIT I.- AVENUE, "B-, Continued-.
BLOCK
OWNER LOT ZONING FRONTAGE RATE, AMOUNT ASSESSMENT
SOUTH SIDE HIGHLANDS TO GLENWOOD ADDITION
Roy W. Blain 3 & 4 64 100' Pavement $2094 $294x00
P.O. Box 15021 Te_s7 100' Curb & Gutter 3e56 356000
76119 $650A0
B.B. Selman 1 & 2 64 100' Pavement $2094 $294.00
2004 Avenue "B" Te—s7 100' Curb & Gutter 3056 356,00
76104 118 Sqe Ft. Driveway 1.54 181072
$831072
Belzise Terrace intersects
City of Fort Worth 5 & 6 61 100, No Assessment
Roy Hutchins 4 61 50' Pavement $2x94 $14LOO
1908 Avenue "B" Res. 50' Curb & Gutter 3056 178e00
76104 118 Sqe Ft. Driveway 1054 181072
$506072
Jimmy C. Jackson 3 61 50' Pavement $2x94 $147A0
1906 Avenue "B" Res. 50' Curb & Gutter 3.56 178,00
76104 118 Sq. Ft® Driveway 1.54 181072
$506072
L
PROJECT NO® 104-24000-243. UNIT 1: AVENUE "B". Continued-.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SQUIT SIDE HIGHLANDS TO GLENWOOD ADDITION
112' Side lot adjusted tog
Willie W. White N62.5 of 61 100' Pavement $2,94 $294.00
901 Ash Crescent 1 & 2 "Re's. 100' Curb & Gutter 3,56 356,00
76104 118 Sq, Ft, Driveway 1,54 181.72
$831072
UNIT 10
Total Cost to Property 7,687.54
Total Cost to City of Fort
Total Estimated Construction
4a
PROJECT NO, 104-24000®2 N AVENUE TO STUART DRIVE 9) to
be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on an eight-
inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide
concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be con-
structed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESS NT
Beginning at the northeast corner of Bryan Avenue and East Cantey Street
NORTH SIDE RYAN PRUITT ADDITION
Tarrant Savings Ass'n. 12 3 125' Pavement $9.13 $1,141,25
Taylor at Fifth Ind. 1251 Curb & Gutter 3060 450,00
76102 $1,591025
Attn: W. E. Plumb
Tarrant Savings Ass'n. 13 3 125' Pavement $2090 $ 362.50
Taylor at Fifth 'Re—s. 125° Curb & Gutter 3060 450000
76102 $ 812050
Attng W. E. Plumb
Stuart Drive intersects
S OU'rff S IDE
Ravos Ford 125' Side lot adjusted tog
2211 Timberline Dr. 24 10 100' Pavement $2.90 $ 290.00
76119 Ke—s. 100' Curb & Gutter 3,60 360.00
118 Sq. Ft. Driveway 1.54 181.72
$ 831.72
PROJECT NO, 104-24000-243.2 UNIT 20 EAST CANIrEY STREET, Continuedg
BLOCK
OWNER LOT ZONING FRONT-AGE, RHE HE AMOVUr ASSESSMENT
SOUTH SIDE RYAN PRUITIV ADDITION
Robert Shaw Mfg, Co. 1 10 125' Pavement $9013 $19141,25
2820 Bryan Ind, 125' Curb & Gutter 3,60 450,00
76104 $19591,25
UNIT 2-
Total Cost to Property 49826,72
Total Cost to City of Fort 651031.07
TOTAL Estimated Construction Cost- - - - -$10,857.79
6,
PROJECT NO, 104-24000243 UNIT 3: BRYAN AVENIX FROM SHAW STREET TO BEWICK STREET, to be im-
proved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide con-
crete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed
where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
Beginning at the southeast corner of Shaw Street and Bryan Avenue
EAST SIDE RYAN PRUITT ADDITION
Jim Friddle I thru 5 52 250' Pavement $8 88 $2,220.00
811 Newell Dr. Ind. 2508 Curb & Gutter 3.56 890000
Weatherford, Texas 256 Sq, Ft. Driveway 1x54 394024
76086 $3,504024
Mrs. Bennie Goldstein 6 52 50' Pavement $2.94 $ 147000
3309 Rogers Res. 509 Curb & Gutter 3x56 178,00
76109 $ 325.00
Rashti Construction Co. 7 52 50' Pavement $2094 $ 14740
1159 E. Seminary Drive Reso 500 Curb & Gutter 3,56 178A0
76115 $ 325000
Joe P. Carr 8 52 50' Pavement $2094 $ 147000
3651 W. Biddison 'ie's. W Curb & Gutter 3056 178,00
76109 $ 325000
Lupe Renteria 9 52 50' Pavement $2x94 $ 147000
3620 S. Main Res. 50' Curb & Gutter 3056 MAO
76110 118 Sqo Ft. Driveway 1x54 181072
$ 506072
L
PROJECT NO, 104-24000-2432 WIT 3- BRYAN AVENUE, Continued
BLOCK
014NER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE RYAN PRUITT ADDITION
Grace E, Cockerham 10 52 50' Pavement $2.94 $147x00
3337 Bryan 'Re—so 500 Curb & Gutter 3,56 178,00
76110 118 Sq, Ft. Driveway 1.54 181,72
$ 5W72
Asberry Pleassy Marlow 11 52 50' Pavement $2.94 $147.00
3343 Bryan Res, 509 Curb & Gutter 3056 178,00
76110 118 Sqa Ft. Driveway 1.54 181,712
A
506,72
Jesus Pulido 12 52 50' Pavement $2094 $147x00
3345 Bryan W Curb & Gutter 3,56 I78000
76110 118 Sq. Ft, Driveway 1,54 181,72
506,72
East Bewick intersects
14EST SIDE
Bethel Temple Assembly 13 thru 51 200' Pavement $2.94 $588,00
of God 16 Ke—s7 2001 Curb & Gutter 3.56 712.00
6900 Alamo 205 Sq, Ft, Driveway 1.54 315,70
76107 $1,615,70
PROJECT NO. 104-24000-2439 UNIT 3o BRYAN AVENME
Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE RYAN PRUITT ADDITION
A. J. Ward 17 51 50' Pavement $2094 $147000
3320 Bryan K—esn 50' Curb & Gutter 3x56 I78000
76110 $325.00
Charles G. Kemble 18 & 19 51 100' Pavement $2094 $294,00
1805 Western Res, 100' Curb & Gutter 3.56 356,00
76107 118 Sq, Ft. Driveway 1x54 181.72
$831072
Lucy 0. Sullivan 20 51 50' Pavement $2,94 $147000
3316 Bryan Res, 50' Curb & Gutter 3056 I78000
76110 118 Sqo Ft. Driveway 1054 181.72
$506072
Lucy 0. Sullivan 21 51 50' Pavement $2x94 $147000
3316 Bryan Res. 50' Curb & Gutter 3.56 I78000
$325A0
Ralph Ojeda 22 & 23 51 100' Pavement $2.94 $294,00
3304 Bryan Res. 100' Curb & Gutter 3,56 356.00
76110 118 Sq, Ft. Driveway 1,54 181x72
$831072
9e
PROJECT NO, 104-24000-243, UNIT 3- BRYAN AVENUE., Continued-,
BLOCK
OWNER LOT ZONING FRONTAGE RATT AMOUNT ASSESSMENT
WEST SIDE RYAN PRUITT ADDITION
Raymond Ojeda 24 51 50' Pavement $2,94 $147,00
c/o Ralph Ojeda 'Reay 50° Curb & Gutter 3.56 I78,00
1650 Pine Apt, L14 118 Sq� Ft. Driveway 1,54 181,72
Concord, Calif. $506,72
94520
UNIT 3:
Total Cost to Property
Total Cost to City of Fort 9,313.96
Total Estimated Construction Cost. - . . — . , . . _ _$20,762.66
PROJECT NO, 104-24000-243. UNIT 4- OLD BURIESON ROAD FROM HIGHWAY 81 TO THORNHILL TIRTIMP to
be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on an eight-
inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide
concrete gutter on a thirty-six foot roadway, Six-inch thick concrete driveways will be con-
structed where specified.
BLOCK
OWNER LOT ZONING -FRONTAGE RATE AMOUNT ASSESSMENT
.Beginning at the northwest corner of Highway 81 and Old Burleson Road
WE S T S IDE L. WIEDIORE SURVEY
W� P. Hudgins Tract 5®A 206.67' Pavement $9.83 $2,031,57
P,O, Box 407 Comm, 206.67' Curb & Gutter 3,60 744.01
76101 571 Sq, Ft. Driveway 1.54 879,34
$39654,92
Barbara Lee Gibbs 157.85' Adjusted to-
404 E, Spurgeon Tract 1-c-2 60' Pavement $9,83 $ 589.80
76116 Comm. 60' Curb & Gutter 3,60 216,00
$ 805,80
Spurgeon Street intersects
SOUTHWAYSIDE ADDITION
Winifred R. Chilcutt Rear lot
4617 Glacier 10 2 75' Pavement $1,32 $ 99,00
76115 R—es, 75 Curb & Gutter 1,80 135,00
$ 234,,00
Robert A. Herrera Rear lot
4613 Glacier 9 2 60' Pavement $1,32 $ 79,20
76115 -G—s. 60' Curb & Gutter 1180 108M
$187,20
11.
PROJECT NO, 104-24000-243, UNIT,A; OLD BURLESON ROAD, Continued;
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE SOU THWAYSIDE ADDITION
Terry Wayne Roe Rear lot
4609 Glacier 8 2 60' Pavement $1.32 $ 79.20
76115 Ke—s, 60' Curb & Gutter 1.80 108400
$187.20
Roy Lee Lewallen Rear lot
3522 Hemphill 7 2 60' Pavement $1.32 $ M20
76110 Ke—s, 60' Curb & Gutter L80 108.00
52 Sq. Ft. Driveway 1,54 80,08
$26728
Rear lot
Louis Dressler 6 2 60' Pavement $1.32 $ 79.20
4601 Glacier 5—s, 601 Curb & Gutter IAO 108.00
76115 $187020
Rear lot
P, H. Whiteaker 5 2 601 Pavement $1,32 $ 79 20
4567 Glacier Te—s. 609 Curb & Gutter 1,80 108A0
76115 52 Sq. Ft. Driveway 1,54 80.08
$267,28
Rear lot
John A. Efird 4 2 60' Pavement $1.32 $ 79.20
4563 Glacier Res. 600 Curb & Gutter 1.80 108.00
76115 $187020
12e
PROJECT No, 104-24000-243, UNIT 4; OLD BURLESON ROAD., Continued-
BLOCK
OWNER LOT ZONING FRONThGE RATE AMOURr ASSESSMENT
WEST SIDE S OUTHWAyS IDE ADDITION
Rear lot
Grover 0. Bass 3 2 60' Pavement $1032 $ 79020
4559 Glacier Res. 60' Curly & Gutter 1.80 I M 00
76115 10 Sq, Ft. Driveway 1054 15.40
$202,60
W. P. Shaw Rear lot
4555 Glacier 2 2 60' Pavement $1,32 $ 79020
76115 Res. 60' Curb & Gutter 1080 108.00
$187.20
C. H. Thompson Rear lot
6249 Wheaton 1 2 60' Pavement $1.32 $ 79.20
76133 Res. 60' Curb & Gutter 1x80 108.00
$187020
Hammond Street intersects
Rear lot
Thelma 0. Persinger 15 1 60' Pavement $1,32 $ 79.20
4517 Glacier Res. 50' Curb & Gutter 1.80 90.00
76115 52 Sqo Ft. Driveway 1.54 80,08
$24M8
28
Rear lot
Henry L. Poole 14 1 60' Pavement $1.32 $ 79.20
4513 Glacier Res, 60' Curb & Gutter 1.80 I M OO
76115 52 Sqe Ft. Driveway 1.54 80.08
$267028
13.
PROJECT NO. 104-24000-243, UNIT 4-, OLD BURLESON ROAD, Continuedg
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE SOUTWAYSIDE ADDITION
Rear lot
David H, Eakin 13 1 60' Pavement $1.32 $ 79.20
4509 Glacier Res, 60' Curb & Gutter 1180 MAO
76115 52 Sq, Ft, Driveway 1.54 80.08
$267,28
Charles R. Haugrud Rear lot
7808 Trimble Drive 12 1 60' Pavement $1.32 $ 79.20
76134 Te—s, 600 Curb & Gutter IAO 108,00
52 Sq. Ft. Driveway 1.54 80.08
$267.28
Rear lot
R. D. Campbell 11 1 60' Pavement $1.32 $ 79.20
4501 Glacier 'Re—s. 60' Curb & Gutter 1.80 108.00
76115 $187.20
Cecil E. Fries Rear lot
4467 Glacier 10 1 60' Pavement $1032 $ 79.20
76115 'R—es. 60' Curb & Gutter 1080 IMOO
$187.20
Rear lot
Sherley B. Smith, Jr. 9 1 60' Pavement $1,32 $ 79.20
4463 Glacier Ke—S, 60' Curb & Gutter 1080 108A0
76115 52 Sqo Ft. Driveway 1.54 80008
$267,28
14.
PROJECT NO, 704-24000-243, UNIT 4: OLD BURLESON ROAD, Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
,.A,�.,.....
WEST SIDE S OUTHWAYS IDE ADDITION
James R. Stephens Rear lot
4459 Glacier 8 1 60' Pavement $1.32 $ 79.20
76115 Res. 60' Curb & Gutter 1.80 108.00
52 Sq. Ft. Driveway 1.54 80.08
$267.28
Rear lot
Pauline T. Nichol 7 1 60' Pavement $1,32 $ 79.20
4445 Glacier Res. 60' Curb & Gutter 1.80 108.00
76115 $187.20
Rear lot
Lloyd Earl Gilliland 6 1 60' Pavement $1,32 $ 79.20
4451 Glacier Res. 60' Curb & Gutter 1.80 108.00
76115 52 Sq. Ft. Driveway 1.54 80.08
$267.28
Rear lot
Carl E. Hughes 5 1 60' Pavement $1.32 $ 79.20
4417 Glacier Res. 60' Curb & Gutter 1.80 108.00
76115 $187.20
Rear lot
James R. Fuller 4 1 60' Pavement $1.32 $ 79.20
4415 Glacier Res. 60' Curb & Gutter 1.80 108.80
76115 $187.20
Bobby Shropshire Rear lot
4409 Glacier 3 1 60' Pavement $1.32 $ 79.20
76115 Res. 60' Curb & Gutter 1.80 108.00
$187.20
15.
PROJECT NO, 104-24000-243, UNIT 4- OLD BURLESON ROAD, Continued-
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE S OUTHWAYS IDE ADDITION
Rear lot
Frederick Harrison 2 1 60' Pavement $1.32 $ 79.20
4405 Glacier Res. 60' Curb & Gutter 1.80 108.00
76115 52 Sq. Ft. Driveway 1,54 80.08
$267.28
Mattie Newman Rear lot
4401 Glacier 1 1 74.9' Pavement $1.32 $ 98.87
76115 Res. 74.9' Curb & Gutter 1.80 134.82
$233.69
Thornhill Drive intersects
EAST SIDE PUTT PUTT ADDITION
Denny's, Inc. 1-A 1 208.83' Pavement $9.83 $2,052.80
P.O. Box 5115 Comm. 208.83' Curb & Gutter 3,60 751.79
Arlington, Texas 347 Sq. Ft. Driveway 1.54 534.38
76011 $3,338.97
Ken D. Smith 1-B 1 171,17' Pavement $9.83 $1,682.60
5200 E. Lancaster Comm.m171,17' Curb & Gutter 3,60 616.21
76107 108 Sq. Ft. Driveway 1.54 166,32
$2,465.13
Ken D. Smith 2-A 1 134' Pavement $9.83 $1,317.22
5200 E. Lancaster Comm. 134' Curb & Gutter 3.60 482.40
76107 108 Sq. Ft. Driveway 1.54 166.32
$1,965.94
16,
PROJECT NO, 104-24000-243, UNIT 4: OLD BURLESON ROADS Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE PUTT PUTT ADDITION
Hill Enterprises 2-B 1 134' Pavement $9.83 $1,317.22
1008 Village Place Comm. 134' Curb & Gutter 3.60 482.40
76112 538 Sq, Ft. Driveway 1.54 828.52
$2,628,14
L, WETMORE SURVE Y
Chrysler Realty Corp. Tract 1-C-1 1149.53' Pavement $9.83 $11,299.88
P. O. Box.34551 Comm, 1139.53' Curb & Gutter 3.60 4,102.31
Attention: Guy Smith 238 Sq, Ft. Driveway 1.54 366.52
Dallas, Texas
75234 $15,768.71
UNIT 4:
Total cost to property owners. . . . . . . . . .. . . . . . . . . . .$36,199.10
Total cost to City of Fort Worth. . . . . . . . . . . . . . . . . .$45,479.45
Total estimated construction cost. . . . . . . . . . . . . . . . .$81,678.55
17.
PR SERVICE ROAD OF NORTH-SOUTH FREEWAY FROM 2201
NORTH OF FELIX STREET TO OLD BURLESON ROAD,, to be improved by widening existing street ten
and one-half feet on the west side with seven-inch reinforced concrete pavement on a four-
inch thick crushed limestone base with seven-inch high superimposed concrete curb, Six-inch
thick concrete driveways will be constructed where specified,
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE RUSSELL HENRY ADDITION
E. F, Russell 2,3 & 4 2 170' Pavement widening $6.49 $1,103.30
4700 S. Freeway comm. 1701 curb 1.43 243.10
76107 481 Sq. Ft. Driveway 1.54 740,74
$2,087.14
Dillingham oil Co. 1 2 80' Pavement widening $6.49 $ 519.20
7801 Regency Comm. 80' Curb 1,43 114.40
76134 413 Sq.Ft, Driveway 1.54 636.02
$1,269..62
UNIT 4-Ad.
Total Cost to Property Owners. . . . . . . . . . . ... . .. ..$3,356.76
Total Cost to City of Fort Worth. . . . . . . .— oo —$2,882.60
Total Estimated Construction Cost. . ... o . . ,, 00000$6j,239o36
18.
PROJECT NO,, 104-24000-243, UNIT 5.- RYAN AVENUE FROM BOYCE STREET TO SPURGEON STREET, to be
improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide
concrete gutter on a thirty foot roadway, Six-inch thick concrete driveways will be con-
structed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
Beginning at the southeast corner of Boyce Street and Ryan Avenue,
EAST SIDE HUBBARD HIGHLANDS ADDITION
Mrs. Phebie Moore 125' Side lot adjusted to:
1445 W. Boyce 1 21 100' Pavement $2,94 $294.00
76115 Res, 100' Curb & Gutter 3.56 356,00
118 Sq,Ft. Driveway 1.54 181.72
$831.72
James F. & Delia H. Newton 125' Side lot adjusted tog
1444 W. Spurgeon 24 21 100' Pavement $2.94 $294.00
76115 Res. 1001 Curb & Gutter 3.56 356.00
118 Sq.Ft. Driveway 1,54 181.72
$831,72
Spurgeon Street intersects
14EST SIDE
125' Side lot adjusted tog
Col. S.K. Kirk 13 20 100' Pavement $2.94 $294.00
8831 Sagebrush Lane Res. 1000 Curb & Gutter 3.56 356,00
San Antonio, Texas 118 Sq. Ft. Driveway 1.54 181.72
78217 $831.72
M
PROJECT NO. 104-24000-2431UNIT 5.- RYAN AVENUE FROM BOYCE STREET, Continuedo
BLOCK
014NER LOT ZONING FRONTAGE RAVE AMOUNT ASSESSMENT
EAST SIDE HUBBARD HIGHLANDS ADDITION
125' Side lot adjusted toe
Louis F. Wier 12 20 100' Pavement $2.94 $294,00
1501,W. Boyce Res, 100' Curb & Gutter 3.56 356x00
76115 $650.00
UNIT 5e
Total Cost to Property Owners.. . . . . . .. .. . 3,145.16
Total. Cost to City of Fort Worth. . . . . .. . . aa . . .. .aa .$ 7,106x57
Total Estimated Construction Cost.. . . . . . . . . . .. . . .. .$10,251.73
ALL UNITSS
TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS). .. . . .. . . . . . .. . . .. . .$ 66,663.98
TOTAL COST TO CITY OF FORT WORTH FOR PAVING. . .. .. . . . . . . . . . . . . . .$ 89,256.83
TOTAL COST TO CITY OF FORT WORTH FOR STORM DRAIN. . . . . . . . . . a. .. .$110,320.30
TOTAL ESTIMATED CONSTRUCTION COST— . .. . . . . . . . . . 1 .0d . . . . . . . . . .$266,241,11