Loading...
HomeMy WebLinkAboutContract 26153 CITY SECRETARY CONTRACT NO. �c1SP� STATE OF TEXAS § § KNOW ALL PERSONS BY THESE PRESENTS COUNTY OF TARRANT § USE AGREEMENT TO INSTALL AND MONITOR A MONITORING WELL This agreement is entered by and between the City of Fort Worth, Texas, a home-rule municipal corporation situated in Tarrant and Denton Counties, Texas, hereinafter called "City," acting herein through Charles Boswell, its duly authorized Assistant City Manager, and Leigh Engineering, Inc. on behalf of the Texas Natural Resource Conservation Commission, hereinafter referred to as,"User", actin herein by and through idea! Lel' , its duly authorized Vf c,2e. en , pursuant to the requirements of Chapter 2.5, Division 4, of the City Code of the City of Fort Worth. NOW THEREFORE, it is agreed as follows: 1. GRANT OF USE A, City agrees to permit User to conduct environmental sampling on the City property or City's easements, as shown on the map which is part of Exhibit "A." Exhibit "A" shows that the environmental sampling will be conducted on the city easement next to the street. User hereby acknowledges that this agreement only permits the User to install the Monitoring Well in the City's easement and that the City's property and easement includes only the fifty feet on either side of the center of Rendon Road. If User determines that the Monitoring well must be located outside of the city's property or easement, User must obtain the property owner's permission and User acknowledges that this agreement in no way purports to give User permission to place the well outside of the city's right- of-way, property or easement. B. User shall have no property rights to any City property or right-of-way in which environmental sampling is conducted, and access to the property shall be nonexclusive at the City's discretion. 2. REGULATION OF CONSTRUCTION A. User shall conduct environmental sampling in accordance with federal, state and local law and regulations. B. User shall follow the scope and details of the construction of the well that is included in User's Informal Request for Monitoring Well and in User's Formal Request for Monitoring Use Agreement for Environmental Poria Sampling with Leigh Engineering, Inc. in OG,`� E��rUU'D 12255 Rendon Road L�f CG:bw 1 ��'�fr. Ir,�rG��5II7�GMu tl L'a VU�JI�.r��� UulJ�e Well dated May 22, 2000 prepared and signed by Jason Longbine and Sonja Williams and is hereby attached as Exhibit "B" and incorporated herein fully by reference. C. User shall ensure that the person who performs any drilling of the monitoring well in conjunction with the environmental sampling, is properly licensed and bonded under Chapter 32 of the Texas Water Code to perform work on City property and public right- of-way. D. User agrees that it shall require any Contractor that performs any aspect of the construction, operation, or maintenance of the Monitoring Well to have all federal, state and local licenses to perform such work. E. User agrees to use the equipment that it listed in Exhibits "B" in the construction, operation and maintenance of the well. F. User has indicated in Exhibit "B" that it will use Rone Engineering, a state licensed environmental drilling firm, to install the monitoring well. If User determines that it will be necessary to Contract with another company, User agrees to obtain written acceptance by City. G. User shall maintain and operate the well. If User determines that it will be necessary to contract with someone to maintain and operate the well, User agrees to obtain written acceptance by City. H. When User performs or causes the performance of any work in the right-of-way or other public property, or so closely adjacent to such places as to create hazards for the public, User, its employees, or contractor shall provide construction and maintenance signs and sufficient barricades at work sites to protect the public, equipment, and workmen. The application of such traffic control devices shall be consistent with the standards and provisions of the latest addition to the Texas Manual on Uniform Traffic Control devices. Appropriate warning lights shall be used at all construction, maintenance, and monitoring/sampling areas where one or more traffic lanes are being obstructed during nighttime conditions. I. User shall ensure that Contractor contacts the City's Department of Engineering at least forty-eight (48) hours before the construction of the Monitoring Well work commences, and that Contractor complies with all requirements of the City's utility inspectors. J. User shall obtain certification of utility clearance prior to drilling. 3. REPORTING AND MITIGATION OF CONTAMINATION A. User agrees to provide City with appropriate documentation indicating the completion date of sampling, geological conditions, certification of proper completion, any findings regarding the presence or non-presence of contamination, test results generated as a result of said monitoring wells, and any other information submitted to the Texas Natural Resources Conservation Commission at the same time that such information is submitted to the Texas Natural Resource Conservation Commission. Use Agreement for Environmental Page 2 Sampling with Leigh Engineering, Inc. in 12255 Rendon Road CG:bw 1 B. If environmental sampling confirms contamination of soil or groundwater within the City's right-of-way, City property or other property, User shall notify the City's Department of Environmental Management of same in writing within ten (10) days after learning of the confirmation of contamination. User shall cooperate with the City in mitigating the contamination as necessary. User agrees that in the event contamination is attributable to and resulting from User's activities, such remediation shall be at User's sole cost and expense in accordance with the procedures and standards set forth by the Texas Natural Resource Conservation Commission and/or the United States Environmental Protection Agency. 4. INSPECTIONS User shall permit the City Traffic Engineer, the City's Environmental Manager, or their authorized representatives, to inspect User's operations at all reasonable times and to halt User's operations when necessary to protect the environment or the traveling public. User shall ensure that any Contractor used in the performance of this agreement complies with all orders to halt operations given pursuant to this paragraph. 5. RESTORATION OF PROPERTY A. User shall repair, clean up, and restore all rights-of-way and other City property disturbed during the construction, operation, and maintenance of the well and shall warrant the repairs and restoration of such property for a period of two years from the date of completion of same. Such repairs, clean up, and restoration shall return the disturbed property to substantially the same condition they were in before User's operations began. The determination that the property has been returned to substantially the same condition shall be made by the City's Director of Transportation and Public Works, or his designee. B. City shall have the right at any time to order and require User to remove or abate any spill, discharge, equipment, or other facility caused by User that is dangerous to life or property. In the event User fails or refuses to comply with the City's order, or if an emergency exists which precludes the City from giving notice to User prior to responding, City shall have the right to remove or abate same at reasonable cost and at the expense of User, all without compensation or liability for damages to User. C. If User fails to restore property as required within 15 days of written notice from City, City may cause the property to be restored without further notice to User. User agrees to pay City for all costs incurred by City in said restoration. Use Agreement for Environmental Sampling with Leigh Engineering, Inc. in fQ) 1 C0GjD 12255 Rendon Road CG bw �8UG 6. TERM This agreement shall be valid upon its execution by both parties, and shall run for a period not to exceed two years, or until the satisfaction of the Texas Natural Resource Conservation Commission and the City, whichever occurs first. If additional environmental sampling is needed after the two-year period, User must request an amendment from City to extend the term. 7. INDEMNIFICATION A. Definitions. In this paragraph, the following works and phrases shall be defined as follows: 1. Environmental Damages shall mean all claims, judgments, damages, losses, penalties, fines, liabilities (including strict liability), encumbrances, liens, costs, and expenses of investigation and defense of any claim, whether or not such claim is ultimately defeated, and of any good faith settlement or judgment, of whatever kind or nature, contingent or otherwise, matured or unmatured, foreseeable or unforeseeable, including without limitation reasonable attorney's fees and disbursements and consultant's fees, any of which are incurred as a result of the existence of a violation by User of environmental requirements pertaining to remediation activities and sampling, and including without limitation: a. Damages for personal injury and death, or injury to property or natural resources; b. Fees incurred for the services of attorneys, consultants, contractors, experts, laboratories and investigation or remediation of any violation by User of environmental requirements including, but not limited to, the preparation of any feasibility studies or reports of the performance of any cleanup, remediation, removal, response, abatement, containment, closure, restoration or monitoring work required by any federal, state or local governmental agency or political subdivision, or otherwise expended in connection with the existence of violations of environmental requirements, and including without limitation any attorney's fees, costs and expenses incurred in enforcing this contract or collecting any sums due hereunder; and C. Liability to any third person or governmental agency to indemnify such person or agency for costs expended in connection with the items referenced in subparagraph (b) herein. 2. Environmental requirements shall mean all applicable statutes, regulations, rules, plans, authorizations, concessions, franchises, and similar items, of all governmental agencies, departments, commissions, boards, bureaus, or instrumentalities of the United States, states, and political subdivisions thereof and all applicable judicial, administrative, and regulatory decrees, judgments, and Use Agreement for Environmental p�p r ��n Page 4 Sampling with Leigh Engineering, Inc. in 12255 Rendon Road V p5�� SICf`f7 �U CG:bw r_U B v C lSr bells j�e ej rf FTcOIFJ p U la n orders relating to the protection of human health or the environment, including without limitation: a. All requirements, including, but not limited to, those pertaining to reporting, licensing, emissions, discharges, releases, or threatened releases of hazardous materials, pollutants, contaminants or hazardous or toxic substances, materials, or wastes whether solid, liquid, or gaseous in nature, into the air, surfacewater, groundwater, stormwater, or land, or relating to the manufacture, processing, distribution, use, treatment, storage, disposal, transport, or handling of pollutants, contaminants, or hazardous or toxic substances, materials, or wastes, whether solid, liquid, or gaseous in nature; and b. All requirements pertaining to the protection of the health and safety of employees or the public. B. General Indemnification. USER DOES HEREBY RELEASE, INDEMNIFY, REIMBURSE, DEFEND, AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS, AND EMPLOYEES, FROM AND AGAINST ANY AND ALL LIABILITY, CLAIMS, SUITS, DEMANDS, OR CAUSES OF ACTIONS WHICH MAY ARISE DUE TO ANY LOSS OR DAMAGE TO PERSONAL PROPERTY, OR PERSONAL INJURY, AND/OR DEATH OCCURRING AS A CONSEQUENCE OF THE USER'S OPERATIONS UNDER THIS AGREEMENT, WHEN SUCH INJURIES, DEATH, OR DAMAGES ARE CAUSED BY THE SOLE NEGLIGENCE OF USER, ITS OFFICERS, AGENTS, EMPLOYEES, OR CONTRACTORS, OR TO THE EXTENT CAUSED BY THE JOINT NEGLIGENCE OF USER, ITS OFFICERS, AGENTS, EMPLOYEES, OR CONTRACTORS AND ANY OTHER PERSON OR ENTITY, EXCLUDING THE CITY, ITS OFFICERS, AGENTS, AND EMPLOYEES. C. Environmental Indemnification: USER DOES HEREBY RELEASE, INDEMNIFY, DEFEND, REIMBURSE, AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS, AND EMPLOYEES, AGAINST ANY AND ALL ENVIRONMENTAL DAMAGES AND THE VIOLATION OF ANY AND ALL ENVIRONMENTAL REQUIREMENTS RESULTING FROM USER'S OPERATIONS UNDER THIS AGREEMENT WHEN SUCH ENVIRONMENTAL DAMAGES OR VIOLATION OF ENVIRONMENTAL REQUIREMENTS ARE CAUSED BY THE ACT OR OMISSION OF USER, ITS OFFICERS, AGENTS, EMPLOYEES, OR CONTRACTORS, OR TO THE EXTENT CAUSED BY THE JOINT ACT OR OMISSION OF USER, ITS OFFICERS, AGENTS, EMPLOYEES, OR CONTRACTORS AND ANY OTHER PERSON OR ENTITY, EXCLUDING THE CITY, IT S OFFICERS, AGENTS, AND EMPLOYEES. D. The obligations of the User under this section shall include, but not be limited to, the burden and expense of defending all claims, suits and administrative proceedings (with counsel reasonably approved by the City), even if such claims, suits or proceedings are groundless, false, or fraudulent, and conducting all negotiations of any description, and paying and discharging, when and as the same become due, any and all judgments, penalties or other sums due against such indemnified persons. E. Upon learning of a claim, lawsuit, or other liability that User is required hereunder to indemnify, City shall provide User with reasonable thimely notice of same. Use Agreement for Environmental i255ll G s e. Page 5 12255ng with RendonRoad Engineering, Inc. in CG:bw1'r'i`5 ,PJp �o F. The obligations of the User under Section 7 shall survive the expiration or termination of this agreement. 8. INSURANCE A. During the term of this agreement, User shall maintain the following insurance coverage and the respective policies thereof shall cover all risks related to the use and occupancy of the right-of-way and other City property and all other risks associated with this use agreement: Commercial General Liability Insurance: $1,000,000.00 per occurrence combined single limit for bodily injury and property damage B. User shall require its contractors to maintain the following insurance coverage: 1. Commercial General Liability Insurance: $1,000,000.00 per occurrence combined single limit for bodily injury and property damage 2. Automobile Liability Insurance: $1,000,000.00 each accident Coverage shall be on "any auto," including leased, hired, owned, non-owned and borrowed vehicles. 3. Workers' Compensation Insurance a. Statutory limits for Workers' Compensation; and b. Employer's Liability $1,000,000.00 in each of the following three categories: $1,000,000.00 each accident; $1,000,000.00 disease-policy limit; and $1,000,000.00 disease-each employee. C. All policies shall contain the following endorsements: 1. City shall be named as an additional insured on all policies in respect to the environmental sampling and the operations under this agreement; 2. City shall be notified a minimum of thirty (30) days prior to the cancellation or non-renewal of, or material changes to said policies; and Use Agreement for Environmental i;iz� �- e ��ie� 1 Pae 6 Sampling with Leigh Engineering, Inc. in ��Ow� �vrtL g 12255 Rendon Road CRY U" *1_110 CG:bw ! �,Y '��'�i") VB.t � J'.-�::��. fop 3. All policies shall be endorsed with waivers of subrogation in favor of City. D. The insurers for all policies must be approved to do business in the State of Texas and be currently rated in terms of financial strength and solvency to the satisfaction of the Director of Risk Management for the City of Fort Worth. E. Programs of self-insurance in lieu of commercial insurance policies shall be approved by the Director of Risk Management, and, as applicable, pre-approved by the Texas Department of Insurance. F. The deductibles or self insured retention (SIR) affecting the insurance coverage required shall be acceptable to the Risk Manager of the City of Fort Worth; and, in lieu of traditional insurance, alternative coverage maintained through insurance pools or risk relations groups must be also approved. G. User shall provide City with certificates of insurance documenting User's and User's contractor's coverage as outlined above prior to commencing any operations under this agreement. Certificates shall be submitted to the Director of Environmental Management. H. Failure on part of City to request documentation of insurance required herein shall not be construed as a waiver of the requirement for same. I. The City may revise insurance requirements specified herein, at its sole discretion, to protect its interest, giving ample prior notice to User. 9. FEES User agrees to pay a fee of$250.00 to City to offset the City's cost of regulating and monitoring use agreement activities. 10. NOTICE Any notice or communication required in the administration of this agreement shall be sent as follows: If to City: If to User: Brian Boerner, Director Name: 50r7 10 w i//I CLmS Dept. of Environmental Mgt. Address: RLTO4J City of Fort Worth / Y 75 a y-7 1000 Throckmorton St. Fort Worth, TX 76102-6311 Use Agreement for Environmental � ��G�n ' ��Gj� Page 7 Sampling with Leigh Engineering, Inc. in 12255 Rendon Road �QTV` t`�"EIG41,1��P11 4 CG:bw R t7u'�0}`IR G iS �o 11. TERMINATION In the event User defaults in the performance of any of its obligations under this agreement or misrepresents to the City a material fact, the City shall have a right to terminate this agreement upon giving the User written notice describing the breach or omission in reasonable detail. The User shall have a ten (10) day period commencing upon the date of notice of default in which to effect a cure. If the User fails to effect a cure within the aforesaid ten (10) day period, the City may terrninate this agreement by written notice to User. Upon termination, the User shall be released from all contractual obligations to the City except that all of the User's duties, obligations and liabilities set forth in Section 5 and 7. Section 5, "Restoration of Property" shall survive for the later of a period of two years after the termination of this agreement or until the property is restored and such restoration complies with Section 5 of this agreement. The duties, obligations and liabilities set forth in Section 7, "Indemnification" shall survive the expiration or termination of this agreement. .12. GOVERNING LAWS It is mutually agreed and understood that this agreement is made and entered into by City and User with reference to the existing Charter and Ordinances of City and the laws of the State of Texas, and of the United States, which govern all matters affecting this agreement, and User agrees to comply fully with all the provisions of same. 13. ENTIRETY This agreement constitutes, the entire agreement by the parties hereunder, and any prior or contemporaneous oral or written agreements shall be void. This agreement may be amended or changed only by the written agreement signed by both parties. 14. SEVERABILITY In case any one or more of the provisions contained in the agreement shall for any reason be held to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provision of this agreement, and this agreement shall be construed as if such invalid, illegal, or unenforceable provisions had never been contained herein. Use Agreement for Environmental U ��HCOXR'r Page 8 Sampling with Leigh Engineering, Inc. in e� ia bf 12255 Rendon Road v,r, HI� � tila CG:bw 15. VENUE Venue of any suit or cause of action under this contract shall lie in Tarrant County, Texas. IN WITNESS THEREOF, the parties hereto have executed this agreement in triplicate originals in Tarrant County, Texas. LEIGH E I , I C. CITY OF FORT WORTH n By: oar,, By: Charles Boswell Title Assistant City Manager CORPORATE SEAL: AFOL REQU S FOR MONITORING PPRO Brian Boer er Director, Environmental Management WITNESS: APPROVED AS TO FORM t, sa- (Signature) Assista t City Attorney 4� Print Name: -h�n1.j EST: Q Gloria Pe son, City Secretary Contract Authorization Date Use Agreement for Environmental Page 9 Sampling with Leigh Engineering, Inc. in 12255 Rendon Road X71 I� U�;15 � CG:bw Irr�U� MCCE� II Uo �'l i`�1�U U9 li LSr is P_ 02 Jul - 14-00 04: 43P _ ___ ............. _'-_'_ _. -..........__...........-. ................ ... DATE CERTIFICATE OF LIABILITY INSURANCE 07/��ZO0V |�p��6i���-'- McLaughlin Brunson �roum.p'|n----------'' -.---' -- - - -- - - surance Agency ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE \o9Z5Estate Lm`e HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED SY THE POLICIES BELOW,� Suite240 Dallas TX 75238 INSURERS AFFORDING COVERAGE INSURED [.ci�hEo�o�rr luc� uud o� �u«/ / � AoneEooiocem. Inc. o. 8Y00Anobas«1nfRow '==�=��=--�=°----'---``=--'Insurance``'`'`' ......--- '- -�'-INSURER I) Dallas TX 75247 | -- ....... -----'---'----'--- ----� --'---' -�-� - .............. __............. -..............___..........._........ ............... coveR4GEo . --- THE 1`0LICIES OF INSURANCf 1.1$1 ED EIFLOW HAVE BEEN PSSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PE.RIO1)INvIGATED,NOTWITHSTANOING3 ANY REQUIREMENT,TFRM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS 1��ERTIHCATE MAY BE ISSUED OR MAY PERTAIN, rHE INSURANCIF AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF FUCH POLICIES AGGREC.�ATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LIMIT S GENERAL LLAINUTY :R111066S3270 021"08/1999 09/20/2000 0ENr-RAi_AGGRYnCATE 13 5.6,100,000 At I_t,WYNED AUTOS (Pt"nrn.01y1t; OTItUR THAN j CA(-OCCURRENOF 'S WORKERS COMPGN"MN AMU x DISEASE CA iiMPLOYEE $ 1,000,001) S5,000,000 Aggreolite Kc ]ohA4q-Y0i10! '�boc�oi�usmad�pro8�sk,nulU�6i6��ovv�m�� ix |b�un�o/uA�mo��ul6ni� bvu}| clmms�ns�mod .U,inthe policy period and /s,oh/ccr.toodeductible. The City o[f,�*rr \Yon}/ isawned oaadditional insured nutheir interest m^�.^pycu,m`tile General Liuhd.ry. Auto 6LUm`brwlla. City of Fort Worth CATE THEREOF,T14F ISSUING INSURER WILL ENDEAVOR TO MAIL. DAYS WRITTEN Environmental klanouem«ot \ NOT"rpTHE Cewr11FIo^rcWuDERNAMED rnTHE'eri,BUT FAILURE nonoaoSHALL IMPOSE NO OBLIGATION OR UAMI,4���KlPf)m TH INSURE$ OR l00OTb/nck�m�"n � Ro� v/nnh T]� 7a|02-63\/ �AUTHORIZED REPRESENTATIVE — ......... _ __ _ __ I � 1 t j ,POLE I HOUSE MW-3 o I � t "NHERB s I &r.t%cl%e v%4- SHOP I Lb FEED I I STORE CANOPY b� B HOUSE RENDON LOCKERS I ~ Al ®� AND MEARS FORMER I FORMER TANKHOLD $2 I TANKHOLD #I I I B MW-2 GAS METER I 'y' R E N D 0 N e L 0 0 0 W 0 R T H R 0 A D • I i 1 I Mdh;+Or ux i is , LEGEND: N ® - SOIL SAMPLE LOCATION S - MONITOR WELL LOCATION 7-s - FORMER UNDERGROUND STORAGE TANK 0 30 —W--- -, BURIED WATER LINE ' --e--- - OVERHEAD ELECTRIC LINE APPROXIMATE SCAM IN FEET DEWEY GROCERY ! ' --- --- � Z'� FIGURE 1 (ED E, LEIGH ENGINEERING, INC. ENVIRONMENTAL CONSULTING May 22, 2000 • ENGINEERING • REMEDIATION • RISK ASSESSMENT • REGULATORY COMPLIANCE Deena DePalma • LEGAL SUPPORT • COMPLIANCE TESTING City of Fort Worth Environmental Management REAL ESTATE SERVICES 1000 Throckmorton Rd. • DUE DILIGENCE REPORTS Fort worth, Texas 76102-6311 • REAL ESTATE APPRAISAL Fax: (817) 871-8079 • ENGINEERING BUILDING ASSESSMENT ENVIRONMENTAL SITE ASSESSMENT Re: Request for Approval to Install 1 Monitor Well FACILITIES CONSULTING TNRCC State Lead • REAL PROPERTY TAX CONSULTING Dewey's Grocery • FEASIBILITY STUDIES 12255 Rendon Rd. • SITE SELECTION CONSULTING Burleson, Texas 75028 • ASBESTOS CONSULTING LPST ID No. 114463 Dear Ms. DePalma: Per our conversation on May 9, 2000, Leigh Engineering, on behalf of the TNRCC State Lead Program, is requesting approval to install one monitor well in the right of way on Rendon Road. Please find attached the following documents: Document A-Informal Request For Monitor Wells and Document B-Formal Request For Monitor Wells. Due to time constraints, the informal and formal requests have been submitted simultaneously for your review. If you have any questions or require additional information, please feel free to contact either of the undersigned at (214) 630-9745. Sincerely, LEIGH ENGINEERING, INC. I fasonLongbine illiams, P.E. CORPORATE HEADQUARTERS Environmental Scientist Senior Project Manager 8908 AMBASSADOR ROW DALLAS,TEXAS 75247 cc: Rosemary Wyman —TNRCC State Lead Program TELEPHONE 214-630.9745 FACSIMILE 214-630-9819 WEB PAGE www.faighonginearing.com Document A Informal Request for Monitor Wells The following information is expected to fulfill the requirements of the City of Fort Worth Environmental Code, Article 1, Division 4, Section 12.5-156: 1. Currently, the horizontal extent of subsurface hydrocarbons has not been adequately defined at the site. Leigh recommends installing one off-site monitor well in an effort to delineate the upgradient extent of hydrocarbons in the subsurface. One well will be installed in the City of Fort Worth blanket easement once appropriate permits have been granted. This monitor well will be installed west of Rendon Road and east of Mom's Watering Hole in the City of Fort Worth blanket easement. No documentation of any specific spill/release events exists for the subject site; however, documentation of the events leading up the issuance of the TNRCC work order to install the proposed upgradient monitor well can be found in the attached Chronology of Events. Documentation of the need for the well can be found in the attached TNRCC Work Order. 2. Documentation of the requestor's efforts to locate the well on property other than City right- of-way property and easements can be found in the attached Records of Communication. 3. A preliminary plan for the location of the wells can be found in the attached map (Figure 1). 4. The exact location of the monitor well will be based on site accessibility and subsurface utilities. The drilling activities will be conducted by a State of Texas licensed monitor well driller and supervised by a Leigh professional. The well bore will be advanced with hollow stem augers equipped with continuous soil samplers to an estimated total depth of 25 feet below ground surface. The boring will be terminated at a depth sufficient to penetrate the shallow groundwater interval and will be terminated in bedrock if auger refusal is obtained. Prior to drilling, the drilling equipment will be decontaminated by steam cleaning. The soil boring will be converted to a permanent 4-inch diameter PVC groundwater monitor well. The well will be screened from total depth to approximately 2.5 feet below surface grade with 0.010-inch slot, schedule 40 PVC well screen. The well will be completed with a sand pack to one foot above the well screen, sealed with bentonite, grouted to the surface, and set in a flush-mount, 8-inch, cast iron manway box. A 2 feet by 2 feet concrete pad will be completed around the well. The well will require approximately 3 hours to install between the hours of 8 a.m. and 5 p.m. TNRCC Contract No.:5829-14872-0032 Work Order#: 88-0032, LPST#: 114463 W.O.Amendment#: 01 LPST Site Name: TRACT A &TRACT B/BURLESON TEXAS NATURAL RESOURCE CONSERVATION COMMISSION Remediation Division Work Order Initiation Form Payable I. WORK ORDER INITIATION: A. Type:Site Assessment B. Period of Performance: From: 10119/1999 To: 08/31/2000 C. Contractor: Leigh Engineering D. Contract Funding: Fund#: 6550/CFWD Fiscal Year: 2000 Previous Work Order Budget $406.68 Amount of Amendment or Work Order $7,769.57 Current Total For THIS Workorder $8,176.25 New Total for ALL WORK ORDERS Obligated in This Contract: $529,740.78 ( as of Date: 11/02/1999 Time: 10:17:55 ) Total BUDGET for This Contract: $1,000,000.00 OOWX F. Index No.: OSM PCA No.(s):01917; G. Date of Commission/ED Approval of Contract: 03/04/1999 H. Contracts Section (Project Manager: ROSEMARY WYMAN II. APPROVAL OF WORK ORDER 17 �06 ' A. Contracts Section Manager Date �! 13 1 V�-r B. Division Director Date 1 / C. Deputy Director(if over$100,000) Date _/_/_ D. Executive Director,(if over$250,000) Date III. WORK ORDER TRACKING A. Copy Delivered to Fiscal Services Date —/_/_ Work Order No. 88-0032 Amendment No.01 WORK ORDER FOR: Site Assessment AT: TRACT A & TRACT B / BURLESON LPST#: 114463 GENERAL This Work Order which is a Fixed Unit Price work order, is entered into as of the date of signature on the Work Order Initiation Form, by and between the independent contractor Leigh Engineering, (herein termed the "CONTRACTOR") and the Texas Natural Resou'fce Conservation Commission (herein termed "TNRCC") . This Work Order is subject to the agreement for work at Petroleum Storage Tank Remediation Fund Sites (herein termed the "Agreement") entered into by the CONTRACTOR and TNRCC as of 10/19/1999, and is a part of-that Agreement and incorporated therein by reference for all purposes. This Work Order is subject to any amendments, modifications, or supplements issued to the Agreement, whether issued before or after this Work Order. Exhibits "A" & "B" are attached to this Work Order and incorporated as part of this Work Order for all purposes. Any amendments, modifications, or supplements issued to this Work Order shall be made a part of this Work Order as provided therein. SCOPE OF SERVICES The Scope of Services for this Work Order and the associated unit costs and extensions are listed in Exhibit A of this Work Order. The CONTRACTOR shall provide all services and the necessary personnel, materials, equipment, and facilities required to complete the tasks indicated in the Scope of Services according to the Specifications for those tasks which are listed in Exibit F of the Agreement. CONFLICT OF INTEREST If this is the first work order initiated at this LPST site under this contract, then the completed Conflict of Interest Form shall be attached as Exhibit B of this Work Order. ADDITIONAL INSTRUCTIONS Amendment for WO: 0088-0032:00 created on 11/01/1999 for LPST: 114463 Facility: TRACT A & TRACT B, 122255 & 12257 RENDON RD. , BURLESON, amended by ROSEMARY WYMAN This work order provides funding for further investigation/plume delineation at the site. The following tasks are authorized: Conduct a tax record search of three properties to determine the current property owners. Leigh will attempt to secure off-site access agreements. A maximum of 10 Project Manager hours is authorized for this task. - Clear utilities for drilling. - Mobilize to the site and install three monitoring wells. Wells to be 4-inch diameter, 30-feet deep, completed with 10 feet of riser and 20 feet of screen. These numbers can be adjusted, based on site conditions. - Survey in well tops with respect to existing monitoring wells. - Conduct a groundwater sampling event of all six wells. - Prepare a Monitoring Event Summary. Exhibit A -- WORK ORDER SCOPE OF SERVICES Work Order Date 11/02/1999 Work Order No 0088/0032:01 Contract Number 5829-14872 Price List Used: 2000 Unit ----Previous---- ---Additional--- ------Total----- Item Price Quantity Price Quantity Price Quantity Pricc 1.a. . .. INITIAL WORK ORDER 406.68 1.0 406.68 0.0 0.00 1.0 406.6 2. ...... LIGHT VEHICLE MILEAGE RATE: 0.28 0.0 0.00 300.0 84.00 300.0 84.0 3. ...... TRAILER MILEAGE RATE: 0.31 0.0 0.00 150.0 46.50 150.0 46.5 4... .... HEAVY VEHICLE 127.09 0.0 0.00 2.0 254.18 2.0 254.1 5....... HEAVY VEHICLE MILEAGE RATE: 0.46 0.0 0.00 350.0 161.00 350.0 161.0 10.... .. DRILL RIG MOBILIZATION/Demob 152.51 0.0 0.00 1.0 152.51 1.0 152.5 11...... DRILL RIG MILEAGE RATE: 2.29 0.0 0.00 150.0 343.50 150.0 343.5 23.b.. With a hollow-stem auger 10.68 0.0 0.00 90.0 961.20 90.0 961.2 26.b.. Blank Riser, for proper 9.66 0.0 0.00 30.0 289.80 30.0 289.5 26.e.. Well Screen, for proper 9.15 0.0 0.00 60.6 549.00 60.0 549.0 27.a. . Well Completion at Grade: 305.01 0.0 0.00 3.0 915.03 3.0 915.0 30.. .. .. SURVEY TOPS OF MONITORING 91.50 0.0 0.00 3.0 274.50 3.0 274.5 31. . . . .. MONITORING WELL GAUGING: 16.52 0.0 0.00 6.0 99.12 6.0 99.1 32.a. . During Drilling Activities: 16.52 0.0 0.00 9.0 148.68 9.0 148.E 32.d. . From a Drum: 33.04 0.0 0.00 1.0 33.04 1.0 33.0 33.a. . From Monitoring Well: 20.33 0.0 0.00 6.0 121.98 6.0 121.5 33.c. . From Faucet or Sampling 12.45 0.0 0.00 1.0 12.45 1.0 12.4 37.f. . Soil, BTEX + MTBE (EPA 42.70 0.0 0.00 10.0 427.00 10.0 427.0 37.ggg Water, BTEX + MTBE (EPA 42.70 0.0 0.00 8.0 341.60 8.0 341.E 58.e.. TPH < 1500 ppm; Benzene 30.50 0.0 0.00 6.0 183.00 6.0 183.c 62.a.. Using a Portable Groundwater 203.34 0.0 0.00 1.0 203.34 1.0 203.= 65.m. . 110/220 Generator: 76.25 0.0 0.00 1.0 76.25 1.0 76•: 69.d. . Monitoring Event Summary and 203.34 0.0 0.00 1.0 203.34 1.0 203.: 72.e.. Distribution Map for Total 71.17 0.0 0.00 1.0 71.17 1.0 71.- 72.f. . Distribution Map for TPH: 71.17 0.0 0.00 1.0 71.17 1.0 71. 75.b.. LPST Project Manager: 71.17 0.0 0.00 13.0 925.21 13.0 925.'. 75.h.. Geologist: 61.00 0.0 0.00 5.0 305.00 5.0 305. 75.j.. Removal Technician, Level 2: 45.75 0.0 0.00 5.0 228.75 5.0 228• 75.o.. Draftsperson: 45.75 0,.0 0.00 3.0 137.25 3.0 137. 80.a... Sample Shipping: 50.00 0:0 0.00 2.0 100.00 2.0 100. 80.j. . . Other Reimbursables: 50.00 0.0 0.00 1.0 50.00 1.0 50. CURRENT W.O. TOTAL 406.68 7,769.57 8,176. i CHRONOLOGY OF EVENTS j I Chronology of Events Dewey's Grocery 12255 Rendon Road Burleson (Tarrant County), Texas 76028 LPST ID NO. 114463 Leigh Project No. 99-9011.00 January 18, 1999 The UST System was removed. Soil samples were collected for analysis of benzene, toluene, ethyl benzene and total xylenes (BTEX) and total petroleum hydrocarbons (TPH). Benzene and TPH concentrations were above TNRCC Action Limits. February 15, 1999 Mike Sewell of SLA Environmental Services, Ltd reported the elevated BTEX and TPH concentrations to Lonnie Gilley of the TNRCC. February 15, 1999 The TNRCC assigned the facility a Leaking Petroleum Storage Tank (LPST) Number based on the sample results from the tank removal. February 23, 1999 A Release Determination Report based on tank removal activities was completed and submitted to the TNRCC. June 9, 1999 Leigh received a faxed work order from the TNRCC to conduct a receptor survey, install three monitor wells and prepare a Risk Based Assessment Report. July 13, 1999 Three groundwater monitor wells(MW-1, MW-2 and MW-3)were installed to a total depth of 20-25 feet. Groundwater samples collected from all three wells indicated benzene concentrations above Plan A Target Concentrations (for Category II). Groundwater Flow was reported to the northeast. September 28, 1999 Leigh submitted the Risk Based Assessment Report to the TNRCC. November 2, 1999 The TNRCC issued a Work Order to install three off-site monitoring wells. One of the monitor wells was proposed upgradient from the Subject Site near Rendon Road. The other two monitor wells were proposed northeast and downgradient of the Subject Site on private property. C:\My Documents\Chronology of Events.doc i TNRCC WORK ORDER i RECORDS OF COMMUNICATION IN 8700 Stcmmons Fr\yy, Suite 408 Dallas,TX 7S229 LEIGH Ph: (214)630-9745 Fax: (214)630-9819 ENGINEERING A FA0/4a 210MAI COM/ORAT10N RECORD OF COMMUNICATION Date: Z - �� Job Number: /9-90 // Time: �7 r Ja Job Name:_ Person Contacted: Agqm, ,s-el 1 Affiliation and Title: p u-h'y Type of Communication: one phone-out face-to-face voice mail other SUIOAARY: ct 4 5�� Sigature: (continue on back as needed) LClbll L-il6'meclIIIs N 8700 Stcnullons Fnty,Suite 408 Dallas,TX 75229 LEIGH Ph: (214)630-9745 Fax: (214)630-9819 ENGINEERING ♦ 1110/[[[IOMAL [011011 ATIOM RECORD OF COMMUNICATION Date: / Job Number: c1 r-- Time: 10! Job Name: OLWC t,, v Person Contacted: 6el- Affiliation and Title: Type of Communication: phone phone-out face-to-face voice mail other SUMMARY: 14-6 ins wC� Sigature: (continue on back as needed) Lo 8700 Stemmons Fnvy,Suite 408 Dallas,TX 75229 LEIGH Ph:(214)630-9745 Fax:(214)630-9819 ENGINEERING r�o►c�uoN..� eo�row�7oM RECORD OF COMMUNICATION Date; Z ' / �� Job Number:- Time: . = , Job Name: '�t' °l,� Person Contacted: Gf Affiliation and Title: nC/' Type of Communication: phone-' phone-out face-to-face voice mail other SUMMARY: 1 n G Sigature: (continue on back as needed) L.clyu cugulcclu,g WA� 8700 Stenuitons Frwy,Suite 408 Dallas,TX 75229 , LEIGH Ph: (214)630-9745 Fax:(214)630-9819 ENGINEERING • ►II0II8@I61tA6 COIIOIIAT10" RECORD OF COMMUNICATION Date: ( Z Z Z - Job Number: �'j S'90 l� Time: �j : Job Name: &(, 'e'(i✓ Person Contacted: Affiliation and Title: Type of Communication: phone-- phone-out face-to-face voice mail other SUN24ARY: /Uo 9^S C"rr Sigature: (continue on back as needed) LC►bu cuailmul utg N 8700 Stemntons Fnvy,Suite 408 Dallas,TX 75229 L E I G H Ph:(214)630-9745 Fax:(214)630-9819 ENGINEERING A roto CO•roMAT►ON RECORD OF COMMUNICATION on Date: 1 7- Job Number: &('4 -T0// Time: ZJob Name:_ Person Contacted: Affiliation and Title: Type of Communication: phone phone-out face-to-face voice mail other SUMMARY: ./UD Sigature: (continue on back as needed) LCIb'11 L'll(�'llltLl Ills ` 8700 Stemnions Fnvy,Suite 408 Dallas,TX 75229 LEIGH Ph: (214)630-9745 Fax:(214)630-9819 E�NGINEERI�NIG • RECORD OF COMMUNICATION /®0 Date:— v Z Job Number• Time• V.49a Job Name: �.f. fl Person Contacted: lb vel Affiliation and Title: Type of Communication: phone phone-out face-to-face voice mail other SUMMARY:. _r�t • A AAJ h �.�t c�►��e� =c�., E Si$ature: (continue on back as needed) FIGURE - 1 I I -POLE I I\/ 1 \ I I \\ I \ 3t I \ 0 0 HOUSE L ` I I \\ Z 1 \\ MW-3 o ANGELESSz I HERB I w G SHOP I ce Lb j FEED I STORE CANOPY MW-1 AN�PY � HOUSE RENDDOD MEARS LOCKERS I v I I I B MW-2 GAS METER R E N D 0 N B L 0 0 D W 0 R T H R 0 A D OI I -w I I I I I I i LEGEND: ® - SOIL SAMPLE LOCATION 0 - PROPOSED OFF-SffE MONITOR WELLS B - MONITOR WELL LOCATION T-3 - FORMER UNDERGROUND STORAGE TANK —w— - BURIED WATER LINE u 15 30 -�-- - OVERHEAD ELECTRIC LINE APPROX.SCALE IN FEET FIGURE 1 PROJECTNO.: 00-9011.00 PROPOSED MONITOR WELL FILENAME: 009011.DWG 1.: LOCATIONS DRAtVMG BY: D.FAIR DATE: 03/23, TNRCC-DEWEY'S GROCERY REVISED BY: D.FAIR DATE: 04/05 ' L E Z G H 12255 RENDON ROAD,BURLESON,TEXAS E N G=N E E R= N G f "0-1 1 I I Z' Document B Formal Request for Monitor Wells The following information is expected to fulfill the requirements of the City of Fort Worth Environmental Code, Article 1, Division 4, Section 12.5-157: 1. Documentation of coordination with TXU Electric, TXU Gas, Southwester Bell Telephone, AT&T, Sammons Cable and Bethesda Water Supply can be found in the General Utility Locate performed by Dig Tess, Texas One Call and Bethesda Water Supply. Other departments and utility owners that are listed in the Fort Worth Environment Code, but did not require notification, can be found in Table-1. 2. A detailed scale drawing showing all property and improvements located within one hundred feet of the proposed well installations can be found in the attached site map (Figure 2). 3. The exact location of the monitor well will be based on site accessibility and subsurface utilities. The drilling activities will be conducted by a State of Texas licensed monitor well driller and supervised by a Leigh professional. The well bore will be advanced with hollow stem augers equipped with continuous soil samplers to an estimated total depth of 25 feet below ground surface. The boring will be terminated at a depth sufficient to penetrate the shallow groundwater interval and will be terminated in bedrock if auger refusal is obtained. Prior to drilling, the drilling equipment will be decontaminated by steam cleaning. The soil boring will be converted to a permanent 4-inch diameter PVC groundwater monitor well. The well will be screened from total depth to approximately 2.5 feet below surface grade with 0.010-inch slot, schedule 40 PVC well screen. The well will be completed with a sand pack to one foot above the well screen, sealed with bentonite, grouted to the surface, and set in a flush-mount, 8-inch, cast iron, manway box. A 2 feet by 2 feet concrete pad will be completed around the well. The well will require approximately 3 hours to install between the hours of 8 a.m. and 5 p.m. 4. The well will be drilled with the use of an industrial truck-mounted drill rig. The drilling rig will use 8-inch hollow stem augers to advance the well bore to the appropriate depth. After the well has been constructed, by the procedures outlined in the above section, the well will be developed with the use of a submersible pump or single-use disposable polyethylene bailer. 5. The well will be constructed by Rone Engineers, and operated and maintained by Leigh Engineering, Inc. The following personnel can be contacted if necessary: Leigh Engineering, Inc. Rone Engineers Sonja Williams, P.E. Jay Canafax 8908 Ambassador Row 8908 Ambassador Row Dallas, TX 75247 Dallas, TX 75247 Phone: (214) 630-9745 Phone: (214) 630-9745 Fax: (214) 630-9819 Fax: (214) 630-9819 6. The well will be in service for a period of at least two years, at which time the operation of the monitor well will be re-evaluated to determine is further monitoring is required. 7. The removal of the well will be conducted by a licensed water well driller under the supervision of a TNRCC CAPM. The monitor well will be removed by attempting to pull the casing and screen. Following removal of the casing, each borehole will be plugged with bentonite chips and hydrated. The top two feet of each borehole will be patched at the surface with a grout/concrete plug, and the area will be restored to match its surroundings. 8. While the wells are in operation, monitoring will occur on a quarterly basis (or as directed by the TNRCC), and samples will be taken during normal business hours between 8-5. During each monitoring event, groundwater samples will be collected from the proposed off- site monitor well. Groundwater samples will be collected per TNRCC guidelines. Prior to groundwater sample collection, Leigh will gauge each well with an electronic interface probe and depths to groundwater or Phase Seperated Hydrocarbons (PSH) will be recorded. Proper decontamination of the interface probe, PVC bailer and/or purging pump will be conducted between each well to prevent possible cross contamination. Purge water and decontamination water will be treated through a wastewater treatment trailer and discharged on-site as irrigation to existing landscape. The monitor wells will be allowed to recharge to static water level prior to sampling. Groundwater samples will be collected using single-use polyethylene disposable bailers and/or a purging pump. Samples will be collected in laboratory prepared glassware, immediately placed on ice, and delivered under proper chain-of-custody to the following certified analytical laboratory: Xenco Laboratories 11078 Morrison Road, Suite D Dallas, Texas 75229 Phone: (972) 481-9999 9. Documentation of the requestor's efforts to contact adjacent property owners and obtain approval for drilling activities can be found in the attached Records of Communication. 10. Documentation of the need for the well can be found in the attached TNRCC work order. 11. A description and diagram of the measures that Leigh Engineering will take to barricade the work area and control the flow of passing traffic can be found in the attached Traffic Control Plan. I 0 ULITITY LOCATES DIG TESS TEXAS ONE CALL BETHESDA WATER SUPPLY I DIG TESS i i GENERAL UTILITIES CHECKLIST FOR THE CITY OF Facility Name: ew eoes 6rd Ger Mapsco pg a grid: Address: "Ce't4o Cross Streets: ur/.P_(-Aki =P: County: vt - brill Date: -5-4 -06 Nature of work: Ile. liom 0 jC,*qey,- brilllngCO- ne- ' 11-1-ing Fe DIG TESS: 1-(800)-DIG-TESS [1-800-344-8377] Confirmation Number: 06 1 1�t go 6 p TEXAS ONE CALL/FAX: (FAX#: 1-800-217-37151 Phone: 1-800-245-4545 Confirmation Number: Checklist Phone big One Other Comments TESS Call - Southwestern Bell: 800-395-0439'-7' TCI Cable Vision: — Lone Star Gas: ✓ �; Co��. Other Phone(ATaT etc): -- Other: TU Electric: / /'- l ! ✓ W.�f Cry-lta S�wj Yh,v1S 0 Cri 12 L4�•'/i,t-ie5 OtHer: Uther: City Utilities Phone Check Comments/Confirmation Number Water a Sewer: Storm Sewer: Traffic/ Signal: Streets Cut a Barricade: To: W 122301 From: One Call—TESS Fax — H — 5-3-2000 3:37pm P. 1 of 2 SEQUENCE NUMBER 0001 CDC = XXX * ROUTINE MESSAGES Sent to Office (s) as follows NO UTILITIES TXU-ELEC-SM&P TXU-GAS-SM&P SWBT-SM&P-F Locate Request No. 001245859 Prepared By LINDA HEIL On 03-MAY-00 At 1227 MapRef Grid: 323430097140C Footprint: 002 Location: County: TARRANT Town: RENDON Address: 12255 RENOON RD Beginning Work Date 05/06/00 Time of Day: 10: 30 AM Duration: 10 HOURS Expiration Date Excavation Type : OTHER Nature of Work : MONITOR WELL INSTL Blasting ? NO 48 Hr Notice ? YES White Line ? UNKNOWN Digging Deeper Than 16 Inches ? UNKNOWN Person Calling : DEBRA BOOPSINGH Company Name : LEIGH ENGINEERING Work by LEIGH ENGINEERING For LEIGH ENG Person to Contact : DEBRA BOOPSINGH Phone No. ( 214 )630-9745 / ( ) ( Hours: 09: 00 AM/05: 00 PM ) Remarks : MARK ALL UNDERGROUND FACILITIES AS NECESSARY Near Intersection: RENDON BLOODWORTH RD USE PAINT & FLAGS TO MARK PROP. CALL IF THERE ARE NO UTIL IN AREA Map Cross Reference : MAPSCO 121, F 001245859 to 912146309819 at 15: 18: 08 on WED, 05%03/00 for XXX #0001 To: )W 122301 From: One Call—TESS Fax — H — 5-3-2000 3:37pm p. 2 =- SEQUENCE NUMBER 0002 CDC = XXX * ROUTINE * MESSAGES Sent to Office (s) as follows NO UTILITIES TXU-ELEC-SM&P TXU-GAS-SM&P SWBT-SM&P-F' Locate Request No. 001245883 Prepared By ROBERT HUNTER On 03-MAY-00 At 1236 N1apRef : Grid: 323430097140C Footprint : 002 Location: County: TARRANT Town: RENDON Address: 12255 RENOON RO Beginning Work Date 05/06/00 Time of Day: 10: 30 AM Duration: 10 HOURS Expiration Date Excavation Type : OTHER Nature of Work : MONITOR WELL INSTALL Blasting ? NO 48 Hr Notice ? YES White Line ? UNKNOWN Digging Deeper Than 16 Inches ? UNKNOWN Person Calling : DEBRA BOOPSINGH Company Name : LEIGH ENGINEERING Work by LEIGH ENGINEERING For LEIGH ENG Person to Contact : DEBRA BOOPSINGH Phone No. f 214 )630-9745 / ( ) f Hours: 09: 00 AM/06: 00 PM ) Remarks : MARK ALL UNDERGROUND FACILITIES AS NECESSARY Near Intersection: RENDON BLOODWORTH RO PLEASE USE PAINT AND FLAGS TO MARK PROPERTY, PLEASE CALL IF THERE ARE NO UTILITIES IN AREA. Map Cross Reference : MAPSCO 121, F 001245883 to 912146309819 at 15: 18: 15 on WED, 05/03/00 for XXX #0002 TEXAS ONE CALL Texas One Call System FAX-A-LOCATE Request Form DD 800-217-3720(FAX) RM CONTACT PERSON: Debra Boopsi ngh PHONE NUMBER: 214-630-9745 Alternate Contact: Estrel 1 Barrett COMPANY: Leigh Engineering FAX NUMBER: 214-630-9819 BEGINNING WORK DATE: Work scheduled to start approx. 5/6/00 Time: 10:30am TOWN: Rendon(unincorporated) COUNTY Tarrant STREET&NUMBER: 12255 Rendon Road NEAREST INTERSECTION: Rendon Bloodworth Rd. MAP PAGE 121 GRID: K TYPE OF WORK: Moni for wel 1 i nstal 1 BLASTING? YES: NO: X MAYBE: DURATION: 10 hrs WORK IN STREET: X SIDEWALK: PRIVATE PROPERTY: X FRONT: X REAR: X SIDE: X OTHER(SPECIFY): WORKING FOR: Leigh Eng. CONTACT PERSON: Debra Boops i ngh BEST TIME TO CALL: gam to 5 pm REMARKS AND DRIVING DIRECTIONS: Please use paint and flags to mark property. Please call if there are no utilities in the area 05/03/2000 10:40 FAX 2146309819 Q001 *xxxx:k*:k�xx:k**xxx***x xxx TX REPORT sxx ���x:k:kxxxx:kxxxxxxxxxx TRANSMISSION OR TX/RX NO 2261 CONNECTION TEL 18002173720 SUBADDRESS CONNECTION ID ST. TIME 05/03 10:39 USAGE T 00'53 PGS. SENT 1 RESULT OR Texas One Call System FAX-A-LOCATE Request Form 800-217-3720(FAX) CONTACT PERSON: Debra Boopsi ngh PHONE NUMBER: 214-630-9745 Alternate Contact: Estrel l Barrett COMPANY: Leigh Engineering FAX NUMBER: 214-630-9819 BEGINNING WORKDATE: Work scheduled to start approx. 5/6/00 Time: 10:30am TOWN: Rendon(unincorporated) COUNTY Tarrant STREET&NUMBER: 12255 Rendon Road NEAREST INTERSECTION: Rendon Bloodworth Rd. MAP PAGE 121 GRID: K TYPE OF WORK: Monitor wel l instal l BLASTING? YES: NO: X MAYBE: DURATION: 10 hrs WORK IN STREET: X SIDEWALK: PRIVATE PROPERTY:X FRONT: X REAR: X SIDE: X OTHER(SPECIFY): WORKING FOR: Leigh Eng. CONTACT PERSON: Debra Boopsi ngh BEST TIMM TO CALL: 9am to 5 pm REMARKS AND DRIVING DIRECTIONS: Please use paint and flags to mark property. Please call if there are no utilities in the area To: )M (1765) From: One Call Systems Fax — D — 5-3-2000 2:06pm P. 1 or = SEQUENCE NUMBER 0001 CDC = XXX ZP =NO UTILITIES FWE=TXU-ELEC-SM&P LG2=TXU-GAS-SM&P T28=SWBT-SM&P-F ------// Texas One Call System //----------------------------/ocsi/- Serial No-- 1245859-->ROUTINE Lead Time-- 19 County--TARRANT Town--RENDON Data Base Lookup-- 32343OO9714OC- 2MAPSCO 121, F TapeRecorder--124132519 Street--12255 RENDON RD Near Intersection-- RENOON BLOODWORTH RD Type of Work--MONITOR WELL INSTL In St--X On ,Sidewalk-- Pvt. Prop--X Other-- On Prop Location Front--X Rear--X Side--X Contact--DEBRA BOOPSINGH Phone--214-630-9745 Working for--LEIGH ENG Start Date/Time--06-MAY-00 At 1030 Remarks: USE PAINT & FLAGS TO MARK PROP. CALL IF THERE ARE NO UTIL IN AREA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Contractor--LEIGH ENGINEERING Phone--214-630-9745 Address--8908 AMBASSADOR ROW; DALLAS TX 75247 Caller--DEBRA BOOPSINGH Prepared--03-MAY-00 At 1227 By--LINDA HEIL To: XXX (1765) From: One Call Systems Fax — 0 — 5-3-2000 2:06pm p. 2 of 2 SEQUENCE NUMBER 0002 CDC = XXX ZP =NO UTILITIES FWE=TXU-ELEC-SM&P LG2=TXU-GAS-SM&P T28=SWBT-SM&P-F ------// Texas One Call System //----------------------------/ocsi/- Serial No-- 1245883-->ROUTINE Lead Time-- 19 County--TARRANT Town--RENOON Data Base Lookup-- 32343009714OC- 2MAPSCO 121, F TapeRecorder--124132943 Street--12255 RENDON RD Near Intersection-- RENDON BLOODWORTH RD Type of Work--MONITOR WELL INSTALL In St--X On Sidewalk-- Pvt. Prop--X Other-- On Prop Location Front--X Rear--X Side--X Contact--DEBRA BOOPSINGH Phone--214-630-9745 Working for--LEIGH ENG Start Date/Time--06-MAY-00 At 1030 Remarks: PLEASE USE PAINT AND FLAGS TO MARK PROPERTY, PLEASE CALL IF THERE ARE NO UTILITIES IN AREA. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Contractor--LEIGH ENGINEERING Phone--214-630-9745 Address--8908 AMBASSADOR ROW; DALLAS TX 75247 Caller--DEBRA BOOPSINGH Prepared--03-MAY-00 At 1236 By--ROBERT HUNTER BETHESDA WATER SUPPLY F 8908 Ambassador Row Dallas,Texas 75247 • Telephone (214) 630-9745 Facsimile(214) 630-9819 I:bx T�DD To: Paul w/Bethesda Water Supply From: Jason Longbine . i Fax: (817)447-9370 Pages: (including cover) Phone: (817)295-2131 Date: 5-5-00 Re: Water Utility Survey CC: ❑ Urgent ❑ Original to be mailed ❑ Please Comment ❑ Please Reply ❑ For Your File ❑ Signature Requested ❑ For Review ❑ Please Recycle e Comments: I spoke to someone in your office and they gave me your name to contact. I am working on a state lead job for a co-worker and I need to get a water utility survey for the site we are working on to satisfy the permit requirements of the City of Fort Worth. The project will include installing 3 monitor wells (the proposed locations of the wells is shown on the site map that is included. The physical address is 12255 Rendon Road, which is at the intersection of Rendon Rd. and Rendon Bloodworth Rd. If you need any additional information, please call me at (214) 630-9745. The project is not scheduled to begin until late next week. If it is possible, I would need to.get a confirmation that the utility survey request was received and performed. Thank you ENVIRONMENTAL/GEOTECHNICAL/CONSTRUCTION TESTING/REAL ESTATE SERVICES 05/05/2000 08:51 FAX 2148309819 IJ001 sssssssstsssssttsssst sts TX REPORT sss ss:sssssttssss:as�s�s TRANSMISSION OR TX/RX NO 2291 CONNECTION TEL 18174479370 SUBADDRESS CONNECTION ID ST. TIME 05/05 08:50 USAGE T 01'02 PGS. SENT 2 RESULT OR 8908 Ambassador Row _ Dallas,Texas 75247 Telephone(214) 630-9745 Facsimile(214)630-9819 Ix To: Paul w/Bethesda Water Supply From: Jason Longbine Fax: (817)447-9370 Pages: (including cover) Phone: (817)295-2131 i Date: 6-5-00 Re: Water Wtility Survey cc: ❑ urgent ❑ Original to be mailed ❑ Please Comment ❑Please Reply ❑ For Your dile ❑ signature(Requested ❑ For Review ❑Please Recycle • Comments: I spoke to someone in your office and they gave me your name to contact. 1 am working on a state lead job for a co-worker and I need to get a water utility survey for the site we are working on to satisfy the permit requirements of the City of Fort Worth. The project will include installing 3 monitor wells (the proposed locations of the wells Is shown on the site map that is included. The physical address is 12255 Rendon Road,which is at the intersection of Rendon Rd. and Rendon Bloodworth Rd_ If you need any additional I i I j ,POLE I \\ HOUSE 0 I � MW-3 ANGELESS Z I HERB W ; &rad r'en 4- SHOP I FEED I STORE CANOPY MW-1 bPY ^ 9 HOUSE ON i RENDON LOCKERS I I ~ �.1 >®� AND MEARS FORMER FORMER TANKHOLD J2 TANKHOLD #1 I 9 MW-2 GAS METER R E N D 0 N B L 0 0 D W 0 R T H R 0 A D • � I I I I I — fro pas off 's -� I►�'lo�;'4-or ux I S LEGEND: N ® - SOIL SAMPLE LOCATION 9 - MONITOR WELL LOCATION T— — FORMER UNDERGROUND STORAGE TANK o so ec —w— — BURIED WATER UNE --e-- — OVERHEAD ELECTRIC UNE APPROXIMATE SCALE IN FEET DEWEY GROCERY ! FIGURE 1 12255 RENDON ROAD BLIRLES�N_TEXAS 05/05/2000 15: 11 4479370 BETI-ESDA WATER PAGE 01 BETHESDA WATER SUPPLY CORPORATION MAILING ADDRESS TELEPHONE OFFICE LOCATION P. O. BOX 130 (817) 295-2131 509 SOUTH BURLESON BLVD. BURLESON, TEXAS 76097-0130 FAX (817) 447-9370 BURLESON, TEXAS 76028 FAX COVER SHEET DATE : May 5, 2000 TO: Leigh Engineering, Inc. ATTN: Jason Longbine FAX # 214-630-9819 FROM: Paul NUMBER OF PAGES INCLUDING COVER. SHEET : ! COMMENTS : The area of work proposed on the drawing_ faxed to our office show you to be clear of our water lines. Our water mains are in the County R.O.W. in this area. If you should vary tom your proposal and decide to dia in the right-of whys___._._. please notify me before digging Thank you TABLE-1 Name of Department or Utility Owner Date of Communication and Purpose Texas Department of Transportation Not Applicable Tarrant County Water Control and Improvement Dist. Not Applicable Tri nityRiver Authority Not Applicable Sammons Cable/TCI Cable Not Applicable Tarrant County Dept. of Public Works and Trans. Not Applicable FIGURE - 2 N LOT CEMETERY HEVRON EMPTY LOT �'p 1p STORAGE CHURCH OF CHRIST UNITS Oy LOUIS'S CLEANERS EMPTY LOT RENDON VIDEO BARBARA'S BEAUTY SHOP Cc TRAILER PARK 5- S LOT LOT Z-fo-T ® ® _ CONSTRUCTION TRAILER AABCO SITE PARK PAINTING GELESS HERB TRAILER PARK 7-TRAILERS 5 kATER HORANT SITEON 500'RADIUS NCE PONUERSOSA LN ® ® ® ® ® ® MOBIL HOME PASTURE EMPTY LOT TARVER RENDON ELEMENTARY LOT LOT LEGEND: ROMAN Q — PROPOSED OFF—SITE MONITOR WELLS ENTERPRISES SCRAP YARD ® — HOUSE FIGURE 2 PROJECT NO.: 00-9011.00 SITE VICINITY MAP FILENAME: 009011V.DwG DRAWING BY: D.FAIR DATE: 03/23/ F TNRCC-DEWEY'S GROCERY REVISED BY: D.FAIR DATE. 04/05/ LEIGH 12255 RENDON ROAD,BURLESON,TEXAS E N G=N E E R=N G T DQT A l l AA41 APPRnVrn Rv. a nNGNINF nATF: 04/05/ i I RECORDS OF COMMUNICATION �I L.�Igu uuguLLu � N 8700 Stemmons Fnvy,Suite 408 Dallas,TX 75229 LEIGH Ph: (214) 630-9745 Fax: (214)630-9819 ENGINEERING A /01O/[g110MAL GORIORATIOM RECORD OF COMMUNICATION Date: — `L�G'i Job Number: 71 - So Tinge:_ _Lo . �� Job Name:_ Person Contacted: M0 M wS c,.% CA�� 1� Af Affiliation and Title: +,-c SS Type of Communication: phone-in phone-out ace-to-face voice mail other SUMMARY: •G-/6n f' 76 s M S �.c_� ,�e-� ►'�, Gt '/c z fz_S qj -kf the d jo ;kj� fess ;4J U;^ T WIrG t,✓�t r 7L /�'�/7 c nl� Gti c� � � ,��-P /11='C;...% L%t/Cif [%1 �t^Q.n .-'lCt c-t.-r• `1 i�.�E '�� �P 3q g j -Tid e`.pJZJ C lav f b1 f Sigature: (continue on back as needed) LcISn LlIgHICC111q; / ��` 8700 Stcmmons Frwy,Suite 408 Dallas,TX 75229 LEIGH Ph: (214)630-9745 Fax: (214)630-9819 ENGINEERING I'AO/920I0MA1. COOPONATIOM RECORD OF COMMUNICATION Date: L - tl�` Job Number:_ 0/9-,90 // Time: ( r Ja Job Name: Person Contacted: Ampm_ G-er I Affiliation and Title: L.,)AV Type of Communication: one phone-out face-to-face voice mail other SLrl AARY: V1 D gao ct A5(,✓� Sigature: (continue on back as needed) MLciSn C17g'unctamg 8700 Stcmmons Fnvy, Suite 408 Dallas,TX 75229 L E I G H Ph: (214) 630-9745 Fax:(2 14)630-9819 ENGINEERING A /IIOI696I0MAI. COO►OAATIOM RECORD OF COMMUNICATION Date: Q Job Number: Time: /Q.' Job Name: Person Contacted: 6 C/' Affiliation and Title: Type of Communication: phone phone-out face-to-face voice mail other SUMMARY: 14-6 Grt S w� Sigature: (continue on back as needed) L.clbu r.ubull.wuly LN 8700 Stcmntons Frnvy, Suite 408 Dallas,TX 75229 LEIGH Ph: (214)630-9745 Fax: (214)630-9819 ENGINEERING O/[aZIOMA1. COMPGRAT1 oM RECORD OF COMMUNICATION Date: �Z ' 6''q Job Number: �/g `9e) Time:— - ,3 Job Name: 2(,� Person Contacted: (� Affiliation and Title: nU' 157" .s Type of Communication: phone-' phone-out face-to-face voice mail other SUMMARY: YA n 6 G-►`S wy L Sigature: (continue on back as needed) LCIgtt cngincciml; ` 8700 Stcmnions Frwy,Suite 408 Dallas,TX 75229 LEIGH Ph: (214)630-9745 Fax:(214)630-9819 E�NGI6A00110NEERInNIG RECORD OF COMMUNICATION Date: ( Z ' Z- Z ^q Job Number: r Time: n7 : O Job Name: i✓ Person Contacted: Affiliation and Title: Type of Communication: phone phone-out face-to-face voice mail other SUMMARY: /L/b _ /-;"7S C_-f/ _ Sigature: (continue on back as needed) Letgn 1:nguBCu ulg 8700 Stcninions Fnvy,Suite 408 Dallas,TX 75229 ENEE GINNEERING Ph: (214)630-9745 Fax: (214)630-9819 G A /110/ttt1011A6 CORPORATION RECORD OF COMMUNICATION Date: 7- dU Job Number: 0 9q -F t// Time: I z r�y Job Name:__t0®C,e/P0 Person Contacted: Affiliation and Title: Type of Communication: phone phone-out face-to-face voice mail other SUMMARY: A10 �25w1/ Sioahire- (continue on back as needed) Lelgil cnguiUciuig 8700 Stcmmons Frwy, Suite 408 Dallas,TX 75229 LEIGH Ph: (214) 630-9745 Fax:(214)630-9819 ENGINEERING raO/(•OIONAL GO11/OOA710N RECORD OF COMMUNICATION Date: / 2� 90 Job Number: -90 ell Time: V-00 Job Name: ,(/C Person Contacted: 6 Affiliation and Title: Type of Communication: phone phone-out face-to-face voice mail other SUMMARY: T�e v►u,�,�{/ s ,�e� c�.;r���c��c a�_ . L Sigature: (continue on back as needed) TNRCC WORK ORDER TNRCC Contract No.:5829-14872-0032 Work Order#: 88-0032 LPST#: 114463 W.O.Amendment#: 01 LPST Site Name: TRACT A &TRACT B/ BURLESON TEXAS NATURAL RESOURCE CONSERVATION COMMISSION Remediation Division Work Order Initiation Form Payable I. WORK ORDER INITIATION: A. Type:Site Assessment B. Period of Performance: From: 10119/1999 To: 0813112000 C. Contractor: Leigh Engineering D. Contract Funding: Fund#: 6550/CFWD Fiscal Year: 2000 Previous Work Order Budget $406.68 Amount of Amendment or Work Order $7,769.57 Current Total For THIS Workorder $8,176.25 New Total for ALL WORK ORDERS Obligated in This Contract: $529,740.78 ( as of Date: 11102/1999 Time: 10:17:55 ) Total BUDGET for This Contract: $1,000,000.00 o o zf/X F. Index No.: 0S35-I PCA No.(s):01917;; G. Date of Commission/ED Approval of Contract: 03/04/1999 H. Contracts Section Project Manager: ROSEMARY WYMAN IL APPROVAL OF WORK ORDER A. Contracts Section Manager Ilr� Date B. Division Director Date I I C. Deputy Director(if over$100,000) Date D. Executive Director(if over$250,000) Date —i—l- 111. i—l_III. WORK ORDER TRACKING A. Copy Delivered to Fiscal Services Date _l�l_ Work Order No. 88-0032 Amendment No.01 WORK ORDER FOR: Site Assessment AT: TRACT A & TRACT B / BURLESON LPST#: 114463 GENERAL This Work Order which is a Fixed Unit Price work order, is entered into as of the date of signature on the Work Order Initiation Form, by and between the independent contractor Leigh Engineering, (herein termed the "CONTRACTOR") and the Texas Natural Resoul-ce Conservation Commission (herein termed "TNRCC") . This Work Order is subject to the agreement for work at Petroleum Storage Tank Remediation Fund Sites (herein termed the "Agreement") entered into by the CONTRACTOR and TNRCC as of 10/19/1999, and is a part -of-that Agreement and incorporated therein by reference for all purposes. This Work Order is subject to any amendments, modifications, or supplements issued to the Agreement, whether issued before or after this Work Order. Exhibits "A" & "B" are attached to this Work Order and incorporated as part of this Work Order for all purposes. Any amendments, modifications, or supplements issued to this Work Order shall be made a part of this Work Order as provided therein. SCOPE OF SERVICES The Scope of Services for this Work Order and the associated unit costs and extensions are listed in Exhibit A of this Work Order. The CONTRACTOR shall provide all services and the necessary personnel, materials, equipment, and facilities required to complete the tasks indicated in the Scope of Services according to the Specifications for those tasks which are listed in Exibit F of the Agreement. CONFLICT OF INTEREST If this is the first work order initiated at this LPST site under this contract, then the completed Conflict of Interest Form shall be attached as Exhibit B of this Work Order. ADDITIONAL INSTRUCTIONS Amendment for WO: 0088-0032:00 created on 11/01/1999 for LPST: 114463 ; Facility: TRACT A & TRACT B, 122255 & 12257 RENDON RD. , BUR.LESON, amended by ROSEMARY WYMAN This work order provides funding for further investigation/plume delineation at the site. The following tasks are authorized: Conduct a tax record search of three properties to determine the current property owners. Leigh will attempt to secure off-site access agreements. A maximum of 10 Project Manager hours is authorized for this task. - Clear utilities for drilling. - Mobilize to the site and install three monitoring wells. Wells to be 4-inch diameter, 30-feet deep, completed with 10 feet of riser and 20 feet of screen. These numbers can be adjusted, based on site conditions. - Survey in well tops with respect to existing monitoring wells. - Conduct a groundwater sampling event of all six wells. - Prepare a Monitoring Event Summary. Exhibit A - WORK ORDER SCOPE OF SERVICES Work Order Date 11/02/1999 Work Order No 0088/0032:01 Contract Number 5829-14872 Price List Used: 2000 Unit ----Previous---- ---Additional--- ------Total--- Item Price Quantity Price Quantity Price Quantity Pr= 1.a.... INITIAI. WORK ORDER 406.68 1.0 406.68 0.0 0.00 1.0 4C--- 2..... .. 2..... .. LIGHT VEHICLE MILEAGE RATE: 0.28 0.0 0.00 300.0 84.00 300.0 E4 3.. .... . TRAILER MILEAGE RATE: 0.31 0.0 0.00 150.0 46.50 150.0 4= 4... . ... HEAVY VEHICLE 127.09 0.0 0.00 2.0 254.18 2.0 2 5.. . . .. . HEAVY VEHICLE MILEAGE RATE: 0.46 0.0 0.00 350.0 161.00 350.0 15. 10.. .... DRILL RSG MOBILIZATION/Demob 152.51 0.0 0.00 1.0 152.51 1.0 1=- 11. . . .. . ==11. . . .. . DRILL RIG MILEAGE RATE: 2.29 0.0 0.00 150.0 343.50 150.0 34: 23.b.. With a hollow-stem auger 10.68 0.0 0.00 90.0 961.20 90.0 SS_ 26.b.. Blank Riser, for proper 9.66 0.0 0.00 30.0 289.80 30.0 28= 26.e.. Well Screen, for proper 9.15 0.0 0.00 60.0 549.00 60.0 5+= 27.a. . Well Completion at Grade: 305.01 0.0 0.00 3.0 915.03 3.0 9_= 30. . . ... SURVEY TOPS OF MONITORING 91.50 0.0 0.00 3.0 274.50 3.0 27, 31. . . . .. MONITORING WELL GAUGING: 16.52 0.0 0.00 6.0 99.12 6.0 .: 32.a.. During Drilling Activities: 16.52 0.0 0.00 9.0 148.68 9.0 11= 32.d.. From a Drum: 33.04 0.0 0.00 1.0 33.04 1.0 =_ 33.a.. From Monitoring Well: 20.33 0.0 0.00 6.0 121.98 6.0 1:= 33.c.. From Faucet or Sampling 12.45 0.0 0.00 1.0 12.45 1.0 07 37.f.. Soil, BTEX + MTBE (EPA 42.70 0.0 0.00 10.0 427.00 10.0 427 37.ggg Water, BTEX + MTBE (EPA 42.70 0.0 0.00 8.0 341.60 8.0 311- 58.e.. TPH < 1500 ppm; Benzene 30.50 0.0 0.00 6.0 183.00 6.0 1== 62.a.. Using a Portable Groundwater 203.34 0.0 0.00 1.0 203.34 1.0 2C= 65.m.. 110/220 Generator: 76.25 0.0 0.00 1.0 76.25 1.0 69.d. . Monitoring Event Summary and 203.34 0.0 0.00 1.0 203.34 1.0 2C= 72.e.. Distribution Map for Total 71.17 0.0 0.00 1.0 71.17 1.0 72.f.. Distribution Map for TPH: 71.17 0.0 0.00 1.0 71.17 1.0 75.b.. LPST Project Manager: 71.17 0.0 0.00 13.0 925.21 13.0 S== 75.h.. Geologist: 61.00 0.0 0.00 5.0 305.00 5.0 3C_ 75.j.. Removal Technician, Level 2: 45.75 0.0 0.00 5.0 228.75 5.0 2 75.o.. Draftsperson: 45.75 0.0 0.00 3.0 137.25 3.0 1. 80.a... Sample Shipping: 50.00 0.0 0.00 2.0 100.00 2.0' lr 80.j... Other Reimbursables: 50.00 0.0 0.00 1.0 50.00 1.0 CURRENT W.O. TOTAL 406.68 7,769.57 8,17= TRAFFIC CONTROL PLAN Traffic Control Plan Dewey's Grocery 12255 Rendon Road Burleson (Tarrant County), Texas 76028 LPST ID NO. 114463 Leigh Project No. 99-9011.00 Engineering judgement was used in applying the guidelines of the Transportation Training Division, Texas Engineering Extension Service "Reference Guide to Zone Traffic Control". Several guidelines for sidewalk closures, and shoulder work were compiled to generate this Traffic Control Plan. This plan is designed to facilitate vehicle and pedestrian traffic for the duration of the work, and is based on a knowledge of field conditions (the speed limit is 30mph) and the duration of the scheduled work (short-term stationary). Calculations: The distance of the taper was calculated using the formulas from the "Reference Guide to Zone Traffic Control" as follows: Shoulder Taper = 1/3L, where L=WS2/ 60 when the speed is 40 mph or less (as in this instance). W= Width of offset (An W value of 10 feet was used as a conservative estimate of the offset) S= Posted Speed (30 mph) The length of the shoulder taper was calculated to be 50 feet. The "Reference Guide to Zone Traffic Control" suggests a maximum spacing of 30 feet between cones. This plan includes cones spaced 25 feet apart. The Reference Guide suggests a "Road Work Ahead" sign placed 120 feet from the start of the taper, based on a posted speed of 30 mph. Specifications: This plan includes the placement of five 18" cones, a "Road Work Ahead" sign and a "Shoulder Work" sign along Rendon Road and Rendon Bloodworth Road. A 50-foot upstream taper comprising three 18" cones will be placed along Rendon Road. Two more cones will be placed immediately alongside the work area. A 24"x24" "Road Work Ahead" sign will be placed 120 feet upstream of the start of the taper, also on Rendon Road. Since the work is occurring near an intersecting roadway a 24"x24" "Shoulder Work" sign will be placed on the right shoulder of Rendon Bloodworth Road. Figure 1 is a detailed diagram of the Traffic Control Plan. N ROAD WORK AHEAD -mss HOUSE o 0 Z , w Z MW-3 o Q ANGELESS Z GS' HERB w SHOP FEED MW-1 --o--- STORE CANOPY HOUSE ANOPY n RENDON LOCKERS AND MEARS 5 • SHOULDER ............ WORK e�MW-2 GAS METER R E N D 0 N B L 0 0 D W 0 R T H R 0 A D e a LEGEND: ® - SOIL SAMPLE LOCATION Q - PROPOSED OFF-SITE MONITOR WELL MONITOR WELL LOCATION T-3 - FORMER UNDERGROUND STORAGE TANK ® - WORK ZONE U 15 30 60 • - 1 B" CONE APPROX.SCALE IN FEET i'IGURE 1 PROJECT NO.: 00-9011.00 ILO TRAFFIC CONTROL PLAN FILENAME: 009011.DWG DRAWING BY: D.FAJR DATE 03/23/OC TNprr-n w v,c r,unr rlDv