Loading...
HomeMy WebLinkAboutContract 26177 • t SPECIFICATIONS and P CONTRACT DOCUMENTS FOR CITY SECRETARY pw CONTRACT NO. CRY SECRETART"9 PITAL IMPROVEMENTS PROJECT CONTRACT 5 PW D.O.E. FILE IN CONTRACTOR'S BONDING C%HE CITY OF FORT WORTH CONSTRUCTION'S COPY UNIT I: WATER IMPROVEMENTS CLIENT DEPARTMENT UNIT II: SANITARY SEWER IMPROVEMENTS UNIT III: PAVING IMPROVEMENTS D.O.E. 2149 - Sylvania Ave. ( N.E. 28th to Premier) 2150 -Altaview Street (Kimbo to Chesser Boyer) 2151 - Fairview St. (Kimbo to Chesser) 2152 - Premier St. (Fairview to Mesquite) r 2153 -Tom Ellen St. (Chesser Boyer to Fairview) 2154 - Wesley St. (Kimbo to Chesser Boyer) 2913 - Chesser Boyer Rd. (Tom Ellen to Sta 62+97) rWATER PROJECT NO. PW77-060770154090 SEWER PROJECT NO. PS46-070460133190 T.P. & W. PROJECT NO. C115-020115040545/020115023230 FILE K- 1596 WC MARCH 2000 G BOB TERRELL MIKE GROOMER a,, rCITY MANAGER ASST. CITY MANAGER MAYOR HUGO A. MALANGA, P.E. A. DOUGLAS RADEMAKER, P.E. DALE FISSELER, P.E. 2 DIRECTOR DIRECTOR DIRECTOR TRANSPORTATION & DEPARTMENT OF ENGINEERING WATER DEPARTMENT PUBLIC WORKS � ,�P�E OF Tj ,%%% qs*� CC Carter= 13urgess Consultants in Planning,Engineering,Architecture, A* �� ' Construction Management,and Related Services �' 'r' '� N: " ® . .. DD e CARTER& BURGESS, INC. �1 -..GI�T ?;�'r,•�,,C�� e••••••'•••'••"°°° 3880 Hulen Street SCOTTYATES (Y1 io•�s ° • 81976 Fort Worth, Texas 76107 ,e 9:sp a• (817)736-6000 0 te40�F•e Q1s.r 96 4'� 3 2l�Of3� it ss°°°°°'°°•N�'�� C&B NO.981464020 City of Fort Worth, Texas "aear And Council conommunicalflon DATE REFERENCE NUMBER LOG NAME PAGE 8/8/00 **C-18177 1 30CARR 1 of 2 SUBJECT APPROPRIATION ORDINANCE AND AWARD OF CONTRACT TO RICHARD CARR CONSTRUCTION COMPANY FOR WATER LINE IMPROVEMENTS (UNIT 1), SANITARY SEWER IMPROVEMENTS (UNIT 11) AND PAVEMENT RECONSTRUCTION (UNIT 111) OF SYLVANIA AVENUE (N.E. 28TH STREET TO PREMIER STREET), ALTAVIEW STREET (KIMBO TO CHESSER BOYER), FAIRVIEW STREET (KIMBO TO CHESSER BOYER), TOM ELLEN STREET (CHESSER BOYER TO FAIRVIEW), WESLEY STREET (KIMBO TO CHESSER BOYER) AND CHESSER BOYER STREET TOM ELLEN TO STATION 62+97 SANITARY SEWER LINE REPLACEMENT ONLY To (NCL UUEE PR El"IC? YT. (FA//Z V/Ew 770 S APV/ TE) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the City Manager to transfer $537,920.11 from the Water and Sewer Operating Fund to the Sewer Capital Project Fund; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Project Fund in the amount of$537,920.11 from available funds; and 3. Authorize the City Manager to execute a contract with Richard Carr Construction Company in the amount of$1,889,371.13 for water line improvements (Unit 1), sanitary sewer improvements (Unit 11) and pavement reconstruction (Unit III) of Sylvania Avenue (N.E. 28th Street to Premier Street), Altaview Street (Kimbo to Chesser Boyer), Fairview Street (Kimbo to Chesser Boyer), Tom Ellen Street (Chesser Boyer to Fairview), Wesley Street (Kimbo to Chesser Boyer) and Chesser Boyer Street (Tom Ellen to Station 62+97 sanitary sewer line replacement only). Tp 1AIct vDe AI?FM/En 5T. CFA11?111Ew TO MCSQvirE) DISCUSSION: The 1998 Capital Improvement Program included funds for the reconstruction of Sylvania Avenue (N.E. 28th Street to Premier Street), Altaview Street (Kimbo to Chesser Boyer), Fairview Street (Kimbo to Chesser Boyer), Tom Ellen Street (Chesser Boyer to Fairview), and Wesley Street (Kimbo to Chesser Boyer). Chesser Boyer Street from Tom Ellen to Station 62+97 is not part of the 1998 Capital Improvement Program and will include sanitary sewer line replacement with permanent trench repairs. The street improvements will include the construction of concrete pavement, driveway approaches and sidewalks where shown on the plans. Water and sanitary sewer replacements will also be made. The project is located in COUNCIL DISTRICT 4, Mapsco 63D,Y and 64A. The project was advertised for bid on March 30 and April 6, 2000. On April 18, 2000, the following bids were received. City of Fort Worth, Texas "avow and Council Communi City of Fort Worth, Texas "CANOW And Council communicatio- n DATE REFERENCE NUMBERLOG NAME PAGE 8/8/00 **C-18177 30CARR 2 of 2 SUBJECT APPROPRIATION ORDINANCE AND AWARD OF CONTRACT TO RICHARD CARR CONSTRUCTION COMPANY FOR WATER LINE IMPROVEMENTS (UNIT 1), SANITARY SEWER IMPROVEMENTS (UNIT II) AND PAVEMENT RECONSTRUCTION (UNIT 111) OF SYLVANIA AVENUE (N.E. 28TH STREET TO PREMIER STREET), ALTAVIEW STREET (KIMBO TO CHESSER BOYER), FAIRVIEW STREET (KIMBO TO CHESSER BOYER), TOM ELLEN STREET (CHESSER BOYER TO FAIRVIEW), WESLEY STREET (KIMBO TO CHESSER BOYER) AND CHESSER BOYER STREET TOM ELLEN TO STATION 62+97 SANITARY SEWER LINE REPLACEMENT ONLY T 14/C1(/06 PleEM/ER_ ST, (Fl IR 1/11CA.1 TO MESl V/rE BIDDER BID AMOUNT TIME OF COMPLETION Richard Carr Construction Company $1,889,371.13 200 Working Days McClendon Construction Company, Inc. $1,936,429.18 J. L.Bertram Construction & Engineering Co., Inc. $1,940,827.29 Tri-Tech Construction, Inc. $1,945,765.15 Conatser Construction, Inc. $1,997,748.00 Jackson Construction, Inc. $2,013,405.55 Mid-State Utilities, Inc. $2,237,147.80 Richard Carr Construction Company is in compliance with the City's M/WBE Ordinance by committing to 5% MNVBE participation and documenting good faith effort. The City's goal on this combined project is 43%. Funding in the amount of $67,300.00 (Water: $31,800.00, Sewer: $35,500.00) is included for associated water and sanitary construction inspection and survey. Contingency funds to cover change orders for water and sewer replacements total $47,000.00 (Water: $23,000.00, Sewer: $24,000.00). The contingency for possible change orders for the pavement reconstruction is $28,750.00. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval and completion of recommendation 1, and adoption of the attached appropriation ordinance, funds will be available in the current capital budgets, as appropriated, of the Sewer and Water Capital Project Funds and the Street Improvements Fund. MG:k Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) 182)PS58 472045 070580174400 $537,920.11 Mike Groomer 6140 2)PS58 541200 070580174400 $502,420.11 APPROVED Originating Department Head: 2)PS58 531350 030580174400 $ 35,500.00 CITY COUNCIL AS AMENDED A.Douglas Rademaker 6157 (from) AUG 8 2000 3)C115 541200 020115040545 $771,653.04 Additional Information Contact: 3)C115 541200 020115023230 $185,188.79 y,/) 3)PS58 541200 070580174400 $478,420.11 lAa�v City Sa Sacrohrg of the 3)PW53 541200 060530175260 $454,109.19 City of Fort Worth,Tgsas A.Douglas Rademaker 6157 1 1)PE45 538070 0709020 $537,920.11 ArInnted Drdinque No. 1y290 APR-19-00 WED 1 : 27 PM F, W, DEPT, ENGINEERING FAX N0, 817 871 78.54 P. 1 CITY OK FORT WORTH DEPARTMENT OF ENGINEERING ADDENDUM NO. 1 TO THE PLANS AND SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 1998 CAPITAL IMPROVEMENTS PROJECT, CONTRACT 5 WATER PROJECT NO. PW77-060770154090 SEWER PROJECT NO. PS46-070460133190 T. P. &W. PROJECT NO. C115-020115040545/020115023230 DOE NO. 2149, 2150, 215112152, 2153, 2154,2913; FILE K-1596 BID RECEIPT DATE: APRIL 27,2000 ADDENDUM ISSUE DATE: APRIL 19,2000 The following modifications, clarifications, additions or deletions shall be made to the appropriate sections of the Contract Documents: 1. SPECTEICATIONS A. PART B -Proposal: UNIT I -WATER In'the description for Pay Items 29, 30, 32, and 33 the words"maximum width of shall be replaced by"maximum recommended width of'. UNIT II -SEWER In the description for Pay Items 19, 20, 21,22, 24, &25 the words "maximum width of shall be replaced by"maximum recommended width of". UNIT III - PAVING For Pay Item 2, Utility Adjustment, insert the Pre-bid price of ten thousand dollars -$10,000, UNIT IV - MISCELLANEOUS ITEMS-Note: The bid quantities provided for these items are provided to determine unit prices. See Additional Special Conditions DA-35 and DA-36 for measurement and payment. B. SECTION C-2 -SPECIAL PROVISIONS, CITY OF FORT WORTH TRANSPORTATION b PUBLIC WORKS DEPARTMENT: 1. Item 1, SCOPE OF WORK, make the following modifications: (1) Below the last line, add the line: UNIT IV: MISCELLANEOUS ITEMS (2) Modify the last sentence to read"Award of contract shall be to the low bidder of Units I, 11, III, and IV combined." (3) Modify the last sentence to read"Units I, II, III, and IV combined: 200 working days." 2, CONSTRUCTION, add the following description after PAY ITEM NO. 1: PAY(TEM NO, 2 - UTILITY ADJUSTMENT:This item is included for the basic purpose of establishing a contract price which will be comparable to the final cost of making necessary adjustments required due to street improvements to water, sanitary sewer, and natural gas service lines and appurtenances where such service lines and appurtenances are the property owner's Addendum No. 1 - Page 1 APR- 9-00 WED 1 :28 PM F, W. DEPT. ENGINEERING FAX N0, 817 871 7854 P. 2 1998 FW CIP responsibility to maintain. An arbitrary figure has been placed in the Proposal; however, this does not guarantee any payment for utility adjustments, neither does it confine utility adjustments to the amount shown in the Proposal. It shall be the Contractor's responsibility to provide the services of a licensed plumber to make the utility adjustments determined necessary by tho Engineer. No payment will be made for utility adjustments except those adjustments determined necessary by the Engineer. Should the Contractor damage service lines due to his negligence,where such lines would not have required adjustment or repair otherwise,the lines shall be repaired and adjusted by the Contractor at the Contractors'expense. The payment to the Contractor for utility adjustments shall be the actual cost of the adjustments plus ten percent(10%) to cover the cost of bond and overhead incurred by the Contractor in handling the utility adjustments. C. SECTION H - Environmental Monitoring Information It is anticipated that petroleum contamination will be encountered on this project while working near the intersection of N.E. 28th Street and Sylvania Avenue. All soil from this area which is removed from the site must be tested and disposed of in accordance with these Contract Documents. No testing is required for soil which remains in place or for soil which is removed and later used as backfill at the same location. It is not anticipated at this time that there will be any other type.of contamination encountered In the soil in this area. If there is any indication of other types of contamination,work shall be stopped and the City of Fort Worth Environmental Management Office contacted immediately. 2. PLANS A. Sheet U19 1. The call out"6'max. trench width"(near Station 54+40), shall be changed to read"Max. Pavement Repair Width Allowed is 6 feet". B. Sheet U20 1. The call out"B'max, trench width"(near Station 55+35)shall be changed to read"Max. ' Pavement Repair Width Allowed is 6 feet". C. Sheet U21 1. The call out"6'max, trench width"(near Station 59+50)shall be changed to read"Max. Pavement Repair Width Allowed is 6 feet". F This Addendum forms a part of the Contract Documents referenced above and modifies the original Contract Documents and plans. Acknowledge receipt of this Addendum on the space provided below, and on Page 28 of the Bid Proposal and note the outer envelope of your bid. Failure to acknowledge receipt of this Addendum could subject bidder to disqualification. RECEIPT ACKNCAILEDCED: A. Douglas Rademaker, P.E., Director f1 �, By: By: T-�� 4 Rick Trice, E. Manager r Title: Sri AM ATble Consultant Services Address: 3,z5OC-f_)_l�(` �1ti1 r-M —7(D l C`r' Telephone: • • • • • • • • • - • • • • •VNDOFADDENDUM l.GRET001 N:WLIIAMS :���t Addendum No. 1 -Page 2 Vii:$..•._ 62PM�,_ SPECIFICATIONS and CONTRACT DOCUMENTS FOR 1998 CAPITAL IMPROVEMENTS PROJECT CONTRACT 5 IN THE CITY OF FORT WORTH UNIT I: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS UNIT III: PAVING IMPROVEMENTS D.O.E. 2149 - Sylvania Ave. ( N.E. 28th to Premier) 2150 -Altaview Street (Kimbo to Chesser Boyer) 2151 - Fairview St. (Kimbo to Chesser) 2152 - Premier St. (Fairview to Mesquite) 2153 - Tom Ellen St. (Chesser Boyer to Fairview) 2154 - Wesley St. (Kimbo to Chesser Boyer) 2913 - Chesser Boyer Rd. (Tom Ellen to Sta 62+97) WATER PROJECT NO. PW77-060770154090 SEWER PROJECT NO. PS46-070460133190 T.P. & W. PROJECT NO. C115-020115040545/020115023230 FILE K- 1596 MARCH 2000 BOB TERRELL MIKE GROOMER KENNETH BARR CITY MANAGER ASST. CITY MANAGER MAYOR HUGO A. MALANGA, P.E. A. DOUGLAS RADEMAKER, P.E. DALE FISSELER, P.E. DIRECTOR DIRECTOR DIRECTOR TRANSPORTATION & DEPARTMENT OF ENGINEERING WATER DEPARTMENT PUBLIC WORKS CA= Carter= Burgess �P�E°F r Consultants in Planning,Engineering,Architecture, Construction Management,and Related Services p' ' ' ' • ' ' ' ' ' of TF�pI 0 GREfCItTI N:VV�UACKS •• ~ I j J S CARTER& BURGESS, INC. P�0"�•'• 41STFa;'.•'f � s •SCOTT YATES 3880 Hulen Street - /•»_••••••••AeA••••••• Fort Worth, Texas 76107 oo•-p 81'178 �Q71 (817)735-6000 +�1t siaNA` E�� C&B NO. 981464020 TABLE OF CONTENTS SECTION A UNITS I, II & III: WATER, SEWER & PAVING A-1 Notice to Bidders A-2 Comprehensive Notice to Bidders A-3 Prevailing Wage Rates A-4 Fort Worth M/WBE Policy A-5 Bid Proposal A-6 Vendor's Compliance to State Law SECTION B UNITS I & II: WATER & SEWER B-1 Special Instructions to Bidders B-2 General Conditions B-3 Supplementary Conditions to General Conditions B-4 Special Conditions B-5 Additional Special Conditions B-6 Material Specifications B-7 Miscellaneous Details SECTION C UNIT III: PAVING C-1 Special Instructions to Bidders C-2 Special Provisions C-3 Material Specifications C-4 Details SECTION D UNITS I, II & III: WATER, SEWER& PAVING Certificate of Insurance Performance Bond P, Payment Bond Maintenance Bond Worker's Compensation SECTION E CONTRACT SECTION F TEST HOLE REPORTS SECTION G PERMITS& EASEMENTS SECTION H 1W ENVIRONMENTAL MONITORING INFORMATION i A-1 NOTICE TO BIDDERS NOTICE TO BIDDERS Sealed Proposals for the following: UNIT I: WATER IMPROVEMENTS: WATER PROJECT NO. PW77-060770154090 UNIT II: SANITARY SEWER IMPROVEMENTS: SEWER PROJECT NO. PS46-070460133190 UNIT III: PAVING IMPROVEMENTS: T.P. & W. PROJECT NO. C115-020115040545/020115023230 D.O.E. 2149 - Sylvania Ave. ( N.E. 28th to Premier) 2150 - Altaview Street (Kimbo to Chesser Boyer) 2151 - Fairview St. (Kimbo to Chesser) 2152 - Premier St. (Fairview to Mesquite) 2153 -Tom Ellen St. (Chesser Boyer to Fairview) 2154 - Wesley St. (Kimbo to Chesser Boyer) 2913 - Chesser Boyer Rd. (Tom Ellen to Sta 62+97) Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas will be received at the Purchasing Office until 1:30 P.M., Thursday, April 27, 2000, and then publicly opened and read aloud at 2:00 P.M. in the Council Chambers. Plans, Specifications and Contract Documents for this project may be picked up at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. One set of plans and documents will be provided for a deposit of fifty dollars ($50.00); such deposit will be refunded if the document is returned in good condition within ten (10) days after bids are opened. Additional sets may be purchased on a non-refundable basis for fifty dollars ($50.00) per set. A Pre-bid Conference will be held on Tuesday, April 18, 2000, at 9:00 A.M. with prospective bidders in Conference Room No. 255A on the second floor of the City Hall, 1000 Throckmorton Street, Fort Worth, Texas. Bidders are encouraged to review the plans and specifications prior to the Pre-bid Conference. The Affidavit Statement of the City of Fort Worth Minority and Women Business Enterprises. Specifications must be submitted with the bid at the time of the bid opening. Failure to submit the Affidavit Statement with the bid shall result in rejection of the bid as non-responsive. Submission of Bids: This project is a COMBINED CONTRACT as defined in Ordinance No. 13781. The offeror shall list all first and second tier subcontracting and/or supplier opportunities. All other provisions of Attachment 1 of Ordinance 13471 as amended by Ordinance 13781 apply to this contract. The Contractor is required to submit Good Faith Effort documentation with all first and second tier subcontracting and/or supplier opportunities for the entire project. Notice to Bidders - 1 For additional information concerning this project, please contact Mr. Scott Yates, P.E. of Carter & Burgess, Inc. at (817) 735-6254 or Gopal Sahu, P.E., Project Manager of the City of Fort Worth, Department of Engineering at (817) 871-7949. ADVERTISING DATES: March 30, 2000 April 6. 2000 Notice to Bidders - 2 r � A-2 F COMPREHENSIVE NOTICE TO BIDDERS F F f i f COMPREHENSIVE NOTICE TO BIDDERS Sealed Proposals for the following: 1998 CAPITAL IMPROVEMENTS PROJECTS UNIT l: WATER IMPROVEMENTS WATER PROJECT NO.: PW77-060770154090 UNIT II: SANITARY SEWER IMPROVEMENTS SEWER PROJECT NO.: PS46-070460133190 UNIT III: PAVING IMPROVEMENTS T/PW PROJECT NO.: C115-020115040545/020115023230 D.O.E. 2149 - Sylvania Ave. ( N.E. 28th to Premier) 2150 - Altaview Street (Kimbo to Chesser Boyer) 2151 - Fairview St. (Kimbo to Chesser) 2152 - Premier St. (Fairview to Mesquite) 2153 - Tom Ellen St. (Chesser Boyer to Fairview) 2154 -Wesley St. (Kimbo to Chesser Boyer) 2913 - Chesser Boyer Rd. (Tom Ellen to Sta 62+97) Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 P.M., Thursday, April 27, 2000, and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. Plans, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. One set of plans and documents will be provided for a deposit of fifty dollars ($50.00); such deposit will be refunded if the document is returned in good condition within ten (10) days after bids are opened. Additional sets may be purchased on a non-refundable basis for fifty dollars ($50.00) per set. A Pre-Bid Conference will be held Tuesday, April 18, 2000, at 10:00 a.m. in Conference Room 255a on the second floor of city Hall, 1000 Throckmorton Street, Fort Worth, Texas. All bidders are encouraged to attend. The Affidavit Statement of the City of Fort Worth Minority and Women Business Enterprises Specifications must be submitted with the bid at the time of the bid opening. Failure to submit the Affidavit Statement with the bid shall result in rejection of the bid as non-responsive. All bidders will be required to comply with Provision 5159a of Vernon's Annotated Civil Statues of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. Bid security is required in accordance with the Special Instructions to Bidders. Comprehensive Notice to Bidders - 1 The major work on the above-referenced project shall consist of the following: Unit I Water Improvements 1,764 LF 10" Water Pipe Replacement 5,679 LF 8" Water Pipe Replacement 114 LF 6" Water Pipe Replacement 27 EA 6" to 10" Gate Valves 8 EA Standard Fire Hydrant 133 EA Water Service Line Connections & Meters Unit II Sanitary Sewer Improvements 6,983 LF 8" Sanitary Sewer Pipe Replacement 51 LF 6" Sanitary Sewer Pipe Replacement 24 EA Sanitary Sewer Manholes 156 EA Sanitary Sewer Service Lines Unit III Paving Improvements 25,378 SY 6"Reinforced Concrete Pavement 4,900 SY 7" Reinforced Concrete Curb 13,120 LF 7"Attached Concrete Curb 24,897 SF Concrete Sidewalks Submission of Bids: This project is a COMBINED CONTRACT as defined in Ordinance No. 13781. The offeror shall list all first and second tier subcontracting and/or supplier opportunities. All other provisions of Attachment 1 of Ordinance 13471 as amended by Ordinance 13781 apply to this contract. The Contractor is required to submit good Faith Effort documentation with all first and second tier subcontracting and/or supplier opportunities for the entire project. The total bid of the combined proposal is the apparent successful bidder. Unit I consists of the water line improvements, Unit II consists of the sanitary sewer improvements and Unit III consists of street improvements. Pre-qualification Requirements for Water Department Work: The water and/or sanitary sewer improvements must be performed by a contractor who is pre- qualified by the Water Department at the time of bid opening. A general contractor, who is not pre-qualified by the Water Department, must employ the services of a sub-contractor who is pre- qualified. The procedure for pre-qualification is outlined in the "Special Instructions to Bidders (Water Department)". Bidders shall, if applicable, identify on the last page of the proposal section, the pre-qualified sub-contractor who shall install the water and/or sanitary sewer facilities. Comprehensive Notice to Bidders - 2 Failure to list a sub-contractor who is pre-qualified by the Water Department shall result in the rejection of the bid as non-responsive. The City reserves the right to reject any and/or all bids and waive any and/or all irregularities. No bid may be withdrawn until the expiration of forty-nine (49) days from the date the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation") as appropriate is received by the City. The award of contract, if made, will be within forty-nine (49) days after this documentation is received, but in no case will the award be made until the responsibility of the bidder to whom it is proposed to award the contract has been verified. Bidders are responsible for obtaining all Addenda to the contract documents and acknowledging receipt of the Addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not acknowledge receipt of all Addenda may be rejected as being non-responsive. Information regarding the status of Addenda may be obtained by contacting the Department of Engineering at (817) 871-7910. In accord with the City of Fort Worth Ordinance No. 13471, as amended by Ordinance No. 13781, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contract. A copy of the Ordinance can be obtained from the Office of the City Secretary. In addition, the bidder shall submit the MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation") as appropriate. The documentation must be received no later than 5:00 P.M., five (5) business days after the bid opening date. The bidder shall obtain a receipt for the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evident that the documentation was received by the City. Failure to comply shall render the bid non-responsive. For information concerning this project, please contact Scott Yates, P.E., with Carter&Burgess, Inc., at (817) 735-6254 or Gopal Sahu, P.E., Project Manager, City of Fort Worth at (817) 871- 8979. BOB TERRELL GLORIA PEARSON City Manager City Secretary A. Douglas Rademaker, P.E. Department of Engineering Director ADVERTISING DATES: March 30, 2000 DEPARTMENT OF ENGINEERING A rfl 0 2000 A. DO RADEMAKER P.E. DIRECTOR By: Rick Trice, P.E. Manager, Consulting Services Comprehensive Notice to Bidders - 3 r i F i � A-3 � PREVAILING WAGE RATES f f PREVAILING WAGE RATES CITY OF FORT WORTH HIGHWAY CONSTRUCTION PREVAILING WAGE RATES FOR 2000 CLASSIFICATIONS 2000 HOURLY RATES spaRaker jAsphalt Shoveler BBatching Plant Weigher Carpenter (Rough) Concrete Finisher-Paving fb`� concrete Finisher Helper av,ng Concrete Finisher-Structures .F agger7.00 FormBuilder-Structures Form Set er- a%Ang Curbs . 5 'Fo wetter- tructures $— "-5- "La o6 ger= o -Laborer-Utility . Taecfianic- $� 13.25 icer $ -Pipe Layer $ , Pipe-Layer F4elper - 6..5-1 Asphalt Distributo-r Operator — - _ _—$ - T1.45 Asphalt Paving`Mac ine Operato7 Concrete among Saw ib:53 Crane,Clamsh­e1,_Backhoe Der-nc�c, Dra ig ne-S-Ko-v--e]T X172 CY) $ 10.00 ,Cnane,Clamshell, Backfioe, ISe�rick,D�aglne,Sfi� (>1 172 2 ICY) $ " rout rid Loaderless) -- Front End Loader (over-2-V2 CY)—! 2-' ;MiOmg Mac me Aerator - `$ Nfixer_ - $_ --- --- - -- - 'Motor Grader Operato�FFne_G rade) -- -I i'2-3r 'Motor-Gra der Operator--_ _______-_.- __ __ -- - $- __ -__-13.75 Paveme-n-Fl0lar ing ac ine _ - 1 i�0� Roer, ll , SteeT e eant-Mix Pav mments 9. Roller,-Stee-WheTOTLier Flatw�eel or Tamping 'Roller, Pneuma ic,-S-eIfPropelle-a-Scraper ----- ----�-$ -�. ral`eingM ixer . Reinforcing Steel Setter aving -'-$ rrT ac - river- ing e Axle (L-ig­KtF $ 8. Truck river- an em Axle Semi-Trailer 'Truck DrK er- ow oy oa Truc cFDFK r_-T(a_nsit IGfix —____—______ —_�$ 1 Trac cTDriver- inc A-4 i FORT WORTH M/WBE POLICY r r r r City of Fort Worth Minority and Women Business Enterprise Specifications r SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is $25,000 or more, the M/WBE goal is applicable. If the total dollar Pvalue of the contract is less than$25,000,the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. The objective of the Policy is to increase the use of M/WBE firms to a level comparable to the availability of M/WBEs that provide r goods and services directly or indirectly to the City. M/WBE PROJECT GOALS The City's MBE/WBE goal on this project is 43 %of the base bid value of the contract. r COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal,or; 2. Good Faith Effort documentation, or; 3. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. M/WBE Utilization Form: received by 5:00 p.m.,five(5)City business days after the r bid opening date,exclusive of the bid opening date. 2. Prime Contractor Waiver Form: received by 5:00 p.m.,five(5) City business days after the bid opening date, exclusive of the bid opening date. 3. Good Faith Effort Form: received by 5:00 p.m.,five(5)City business days after the bid opening date,exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS. F Any questions,please contact the M/WBE Office at(817)871-6104. F F Rev.6/2198 f- - Rev_612i9A ATTACHMENT 1C Page 2 of 3 2.) Did you obtain a current list of M/WBE firms from the City's M/WBE Office? The list is considered in " compliance, if it is not more than 3 months old from the date of bid opening. Yes Date of Listing QZ /Ili1 00 No -iE W G tZECer?tlro A A(e-W 1,6r- op 6" 4�ja � Wlu, User (f roe- 3.) Did you solicit bids from E firms,within the subcontracting /or22svvupplre areas prev��y listed, at lea a calendar days pr r to bid opening by mail, exclusive of the day the bids are opened? 7� Yes If yes, attach M/WBE mail listing to include name of firm and address and a date No copy of letter mailed. 4.) Did you solicit bids from M/WBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? Yes If yes, attach list to include name of M/WBE firm, ep rson contacted, No phone number and date and time of contact. NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile is used, attach the fax confirmation, which is to provide M/WBE name, date, time, fax number and documentation faxed. r NOTE: If a SIC list of M/WBE is ten or less,the bidder must contact the entire list to be in compliance with questions 3 and 4. If a sic list of MIWBE is more than ten, the bidder must contact at least two-thirds of the list but not less than ten to be in compliance with questions 3 and 4. 5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of plans and specifications in order to assist the MIWBEs? �(iYes No 6.) If M/WBE bids were received and rejected,you must: (1) List the M/WBE firms and the reason(s)for rejection (i.e., quotation not commercially reasonable, qualifications, etc.) and (2) Attach affidavit and/or documentation to support the reason(s) listed below(i.e.. letters, memos, bids, telephone calls, meetings,etc.) (Please use additional sheets,if necessary,and attach.) po Company Name Telephone Contact Person Scope of Work Reason for Rejection =Re,. /98 ATTACHMENT 1C Page 3 of 3 ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain M/WBE participation on this project. The bidder further agrees to provide, directly to the City upon request, complete and .. accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from PO participating in City work for a period of time not less than one (1) year. P& The undersigned certifies that the information provided and the M/WBE(s) listed was/were contacted in good faith. It is understood that any M/WBE(s) listed in Attachment 1C will be contacted and the reasons for not u ing them will be verified by the 's M/WBE ffice. Authorized Signature rinte Signature - F��� KeN(n( K-ke-C EV,- C-"P" op Title Contact Name and Title (if different) Qct Ram CP4 taisreu c.�c,rx J ColMK $1-t) >I- S1-LI Company Name p one Number(s) Opp 350( togee�� Address ax Number Ge-A— *7(0(01 Apetc, Z'<< 2oa® City/State/Zip Date Rev.6/2/98 r t t r r r r r r A-5 I BID PROPOSAL r r i PROPOSAL TO: Mr. Bob Terrell City Manager Fort Worth, Texas FOR: 1998 Capital Improvements Projects Unit I: Water Improvements Water Project No. PW 77-060770150490 Unit Il: Sanitary Sewer Improvements Sewer Project No.: PS 46-070460133190 Unit III: Paving Improvements T/PW Project No.: C115-020115040545/020115023230 D.O.E. Project NOs.: 2149 - Sylvania Ave. ( N.E. 28th to Premier) 2150 -Altaview Street (Kimbo to Chesser Boyer ) 2151 - Fairview St. (Kimbo to Chesser) 2152 - Premier St. (Fairview to Mesquite) 2153 - Tom Ellen St. (Chesser Boyer to Fairview) 2154 - Wesley St. (Kimbo to Chesser Boyer) 2913 - Chesser Boyer (Tom Ellen to Sta 62+97) Pursuant to the foregoing "NOTICE TO BIDDERS," the undersigned has thoroughly examined the plans, specifications and the site, understands the amount of work to be done, and hereby proposes to do all the work and furnish all labor, equipment and materials necessary to fully complete all the work as provided in the plans and specifications and subject to the inspection and approval of the Director, Department of Engineering of the City of Fort Worth. The Contractor must be pre-qualified in accordance with the Water Department of the City of Fort Worth requirements. Total quantities given in the bid proposal may not reflect actual quantities; however, they are given for the purpose of bidding on and awarding the Contract. 4 Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish Performance, Maintenance and Payment Bonds approved by the City of Fort Worth for performing and completing the construction work within the time stated and for the following 5, sum, to-wit: (Furnish and install, including all appurtenant work, complete in place, the following items): sp W Bid Proposal - 1 PAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID PRICES WRITTEN IN WORDS UNIT I - WATER 1, 1,764 L.F. 10" DR14 PVC Water Pipe (includes removal and/or abandonment of existing water pipe) Ayr- Dollars & ents er Linear Foot $ (� l • ' $ 2. 5,679 L.F. 8" DR14 PVC Water Pipe (includes removal and/or abandonment of existing water Pipe) Dollars & Gents per Linear Foot $ �S $ 3. 114 L.F. 6" DR14 PVC Water Pipe (includes removal and/or abandonment of existing water pipe) " J� Dollars & ' `tunq- Chen per Linear Foot $ .�� $ -Z4ge7. 4. 2 EA. 10" Gate Valve with Cast Iron Box & Lid Iur� ���� Spuau Dollars & p ents per Each $ -I�0•21 $ 114c). t7- Bid 2Bid Proposal - 2 PAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID PRICES WRITTEN IN WORDS UNIT I -WATER 5. 17 EA. 8" Gate Valve with Cast Iron Box & Lid SnC4 wam>-W Dollars & tiW4--Cents per Each $ 00 . $ 1110q. S�v 6 8 EA. 6" Gate Valve with Cast Iron Box & Lid (� •l''�V�I tUtt DR.a7� Dollars & Cents per Each $ �Jf 3. 3—° $ 7 5 TON Cast Iron/Ductile Iron Fittings tm' Dollars & &I Cents per Ton $ 8. 8 EA. Standard Fire Hydrant, T-6" Bury Depth 1)"*&o �� AU&MB AWM' 61ollars & Cents per Each $ $ 9. 8 L.F. Fire Hydrant Barrel Extension .]C�{ Dollars & l ents per Linear Foot $ ?j8� . 51 $ 3100 ,°a Bid Proposal - 3 PAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID PRICES WRITTEN IN WORDS UNIT I -WATER 10 6 EA. Remove Existing Fire Hydrant ��tA.fa5C�1� Dollars & 8VelUrf e r Each $ $ 11 131 EA. �1. Service Taps to Main I ltib Dollars & Cents per Each $ 2'2'L. $ g3. 12. 2 EA. 1Y2" Service Taps to Main 1 we�►19bollars & GqK'-Y"�LL Cents per Each $ 3Z5. �Ck $ W-7, 32 13. 1 EA. 2" Service Taps to Main Dollars & 00�- Cents per Each $ 1-rS3.�`—� $ 41 14. 2,350 L.F. Install 1" Copper Service Main to Meter Dollars & wuzr�-Iwo Cents per Linear Foot $ Bid Proposal -4 PAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID PRICES WRITTEN IN WORDS UNIT I -WATER 15. 25 L.F. Install 1%' Copper Service Main to Meter Dollars & 0,q. � Cents per Linear Foot $ $ 1 �" 16. 25 L.F. Install 2" Copper Service Main to Meter Dollars & Cents per Linear Foot $ $ -- 17 17 EA. Install MultipleService Branches for 1" Copper Service Dollars & OR Y " Gents per Each $ 10 ,8� $ " 18. 1 EA. Relocate 1" Service Meters and MMeet� , e�rBoxes f,KAUAma) I �ekrtDollars & torcents per Each $ $`7 , $ ken 31 Bid Proposal - 5 PAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID PRICES WRITTEN IN WORDS UNIT I -WATER 19. 113 EA. Furnish and Set Class A Meter Box Q� Dollars & k Cents per Each $ 5-1. 24 $ (,,4`70. Le 20. 17 EA. Furnish and Set Class B (Bullhead) Meter Box Dollars & :-(;R6ents per Each $ q-1 $ 21. 3 EA. Furnish & Set Class C Meter Box �irtw•Brix Dollars & �t Cents per Each $ 5(p • L $ 8, 22. 1 L.S. Furnish and Lay 2" Pipe & Fittings for Temporary Service -IT-wau � UIID � Dollars & Cents per Lump Sum $ 'L�� . I� $ 23. 125 C.Y. Crushed Limestone Dollars & Cents per Cubic Yard $ $ Bid Proposal - 6 PAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID PRICES WRITTEN IN WORDS UNIT I -WATER 24. 50 C.Y. Class B Concrete (2500 psi) Dollars & COY -Vista— Cents per Cubic Yard $ (A 25. 50 C.Y. Class E Concrete (1500psi) Dollars & Cents per Cubic Yard $ 26. 4 EA. Dehole 0'-5' in Depth Dollars & ents per Each $ 27, 1 EA. Dehole 5'-10' in Depth U Dollars & lents per Each $ �'Z`l. $ (27, 2� 28. 100 L.F. Concrete Curb & Gutter Replacement Dollars & Suri- tTtr�cr Cents per Linear Foot $ $ $ Bid Proposal - 7 PAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID PRICES WRITTEN IN WORDS UNIT I -WATER 29. 175 L.F. Concrete Pavement on 2:27 Concrete Base per Figure 1 (maximum width of 4') Dollars & qS Z� ents per Linear Foot $ $ z 30. 100 L.F. Concrete Pavement on 2:27 Concrete Base for Water Services per Figure 1 (maximum __,,wiideeth of 2') �k(GG Dollars & Cents per Linear Foot $ . L-0- $ 1931019- 31 0, s31 200 L.F. Minimum 1-Y2" HMAC on Reinforced Concrete Base Per Figure 2 Dollars & Cents per Two. Foot $ t e ati $ m� 32. 7,400 L.F. 2" Hot or Cold Mix Asphalt Temporary Pavement Per Figur{e�A (maximum width of 4') alt Dollars & 11tY-'1 '(t,ut� cef 88, Cents per Linear Foot $ 0( , Bid Proposal - 8 it PAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID PRICES WRITTEN IN WORDS UNIT I -WATER 33. 2,250 L.F. 2" Hot or Cold Mix Asphalt Temporary Pavement for Water Service Connection per Figure A (maximum width of 2') �k tat t Dollars & - AD Cents per Linear Foot $ q • $ 34. 10 L.F Concrete Encasement ___ rut Ar Dollars & Cents per Linear Foot $ 35. 350 L.F. Install Services Up To 2" by Other Than Open Cut Dollars & �W0qents per Linear Foot $ L�',. $ rzo, 36. 100 L.F. Trench Safety System (over 5' depth) OC Dollars & SWI*Cents per Linear Foot $ l . $ (1 00 SUB-TOTAL UNIT I - WATER $ 454 (0q, 4 Bid Proposal - 9 LIST OF CAST IRON FITTINGS FOR 10", 8" and 6" WATER LINES AS REQUIRED BY E2-7.11A TO BE SUBMITTED WITH BIDS Contractor shall fill in blanks for"Weight Each Fitting (lb)" and "Total Weight (lb)" as a part of bid: NUMBER OF SIZE OF WEIGHT E TOTAL FITTINGS FITTINGS TYPE OF FITTINGS FITTING BH�j WEIGHT (LB)) 2 10" MJ Solid Sleeve S01B 1 10" Cleaning Wye 15 3 ✓L,!53 2 10" x 6" Tee 140 SibD 5 10" x 8" Tee $ ( O 5 8" 11.25 Degree Bend 320 8 8" MJ Solid Sleeve t7 11 b 3 2 4 8" Cleaning Wye �S Q a 5 8" x 6" Tee S 1 8" 25D 53M 21S Bend �p 7 8" x 8" Tee p 1 8" 22D 23M 07S Bend p S 1 8" 22.5 Degree Bend r7 1 5 8" x 6" Reducer 31zlo 4 6" MJ Solid Sleeve VA 1 8" Wye Branch J f`js i Bid Proposal - 10 DESCRIPTION OF ITEMS WITH PAY APPROXIMATE UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID UNIT II - SEWER 1. 5,858 L.F. 8" SDR-35 PVC Pipe, all depths (includes removal and/or abandonment of existing sewer pipe) ung Dollars & s n Cents per Linear Foot $ 22. 5 $ 2. 1,125 L.F. 8" Class 51 Ductile Iron Pipe, all depths (includes removal and/or abandonment of existing sewer pipe)'' Dollars & .. u w,"-"rte Cents per Linear Foot $ 2j t. 3. 20 L.F. 6" SDR-35 PVC Pipe, all depths (includes removal and/or abandonment of existing sewer pipe) &Lnts Dollars & e Linear Foot $ $ 425. 4% 4. 31 L.F. 6" Class 51 Ductile Iron Pipe, all depths (includes removal and/or abandonment of existing sewer pipe) Dollars & ,� Ss Ct6 Cents per Linear Foot $ - $ Bid Proposal - 11 DESCRIPTION OF ITEMS WITH PAY APPROXIMATE UNIT AMOUNT ITEM QUANTITY BID PRICE BID PRICES WRITTEN IN WORDS UNIT II - SEWER 5, 22 EA. Standard 4' Diameter Manhole (to 6' depth) G 1 k A-ki) w J ,G ,—I—U.o Dollars & I I�.1 Pmt 4�yCCents per Each $ �s $ 34 IS1.10- 6 2 EA. 4' Diameter Manhole (to 6' Depth) With Hydraulic Slide Dollars & !��WAM-T�w Cents per Each $ (s0 �� $ 2l1(. 7 13 V.F. Additional Depth Over 6' of Standard 4' Diameter Manhole Dollars & =5ew per Vertical Foot $ 14 C, , $ 10101b. DI 8. 2 EA. Concrete Collar for Manhole, per Figure 121 Dollars & 00 Cents per Each $ ` $ 2 3 9. 24 EA. Watertight Manhole Inserts Dollars & 46 Cents er Each $ ��. $ Ssu, — Bid Proposal - 12 DESCRIPTION OF ITEMS WITH PAY APPROXIMATE UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID UNIT II - SEWER 10. 15 EA. Remove and Dispose of Existing Sewer Manhole —Ikk �JAAQ,t� �1 Dollars & �Ptl�Gt��fslL96—cents per Each $ 4(,eo, 3a $ teo5. 2° 11, 146 EA. 4" Sanitary Sewer Service Tap t'bA Dollars & Cents per Each $ O� , °s $ ��la(. 3-2- 1Z `1 . 1 EA. 6" Sanitary Sewer Service Tap Dollars & � ► Cents per Each $ 1QaI .-' $ Q-7. 13. 3,815 L.F. 4" Sanitary Sewer Service Line Replacement Dollars & nts'per Linear Foot $ 14. 25 L.F, 6" Sanitary Sewer Service Line Replacement �ilFakt.9�l� Dollars & ents per Linear Foot $ S $ 4-70 �r Bid Proposal - 13 DESCRIPTION OF ITEMS WITH PAY APPROXIMATE UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID UNIT II - SEWER 15. 125 C.Y. Crushed Limestone Dollars & Cents per Cubic Yard $ $ 333.2, 5-0 16. 50 C.Y. Class B Concrete (2500 psi) Dollars & b j Cents per Cubic Yard $ ( . 40 $ 4-70, 17. 50 C.Y. Class E Concrete (1500 psi) Dollars & 0 0qCents per Cubic Yard $ C01. 4 $ 34.70.`b 18. 6,100 L.F. Trench Safety System (over 5' depth) AArr Dollars & �ener Linear Foot $ 19. 250 L.F. Minimum 1-Y2" HMAC on Reinforced Concrete Base per Figure 2 (maximum width of 4') Dollars & $en-ts per Linear Foot $ $ T7���•— Bid Proposal - 14 DESCRIPTION OF ITEMS WITH PAY APPROXIMATE UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID UNIT II - SEWER 20. 50 L.F. Minimum 1-%" HMAC on Reinforced Concrete Base for Sewer Service per Figure 2 (maximum width of 2') �MDollars & Centsp`€� iL near Foot 21, 7,500 L.F� 2" Hot or Cold Mix Asphaltic Temporary Pavement Repair per Figure B (maximum width of 4' except where otherwise indicated) Dollars & lh per Linear Foot $ 22. 3,000 L.F 2" Hot or Cold Mix Asphaltic Temporary Pavement for Sewer Services per Figure B (maximum width of 2') ��11 Dollars & ' on'fs per Linear Foot $ 23. 50 L.F. Concrete Curb & Gutter Replacement Cwy Dollars & en s per Linear Foot $ 3� $ �CP7sp Bid Proposal - 15 DESCRIPTION OF ITEMS WITH PAY APPROXIMATE UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID UNIT II - SEWER 24. 1,000 L.F. Concrete Pavement on 2:27 Concrete Base per Figure 1 (maximum width of 4' except where otherwise indicated) Dollars & 5tN' Cents per Linear Foot $ 2. $ ?'s r0." 25. 350 L.F. Concrete Pavement on 2:27 Concrete Base for Sewer Services per Figure 1 (maximum width�of 2') l liSUN-IZLA:> Dollars & 0Cper Linear Foot $ I? $ -751, �E? 26. 24 EA. Vacuum Test Manholes Dollars & Cents per Each $ O s� $ 27. 7,034 L.F. Post Construction Television Inspection of Sanitary Sewer Lines Dollars &� - Cents per Linear Foot 1 $ Bid Proposal - 16 DESCRIPTION OF ITEMS WITH PAY APPROXIMATE UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID UNIT II - SEWER 28. 10 L.F. Concrete Encasement l� Dollars & ent per Linear Foot $ $ 701, 29. 1 EA. Adjust Manhole Rim Elevation -Scuaj Dollars & �tA o Cents per Each $ `j • $ 02- 30. 230. 560 L.F. Pre-Construction Cleaning & Television Inspection of Sanitary Sewer Lines Dollars & Cents per Linear Foot $ Z3 $ 1245• 9-* 31 560 L.F. Remove and Dispose of 6" Sanitary Sewer Line Dollars & CentsperLinear Foot $ $ 32. 1 EA. Cut and Plug Existing Sanitary Sewer gluam Dollars & • 2� L1 Cents per Each $ [�1 $ ��• — Bid Proposal - 17 DESCRIPTION OF ITEMS WITH PAY APPROXIMATE UNIT AMOUNT ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE BID UNIT II - SEWER 33. 2 EA. Dehole 0' - 5' in Depth I�ltUt� Dollars & &ents per Each $ 6� $ 34. 2 EA. Dehole 5' - 10' in Depth Once Nne� rrr�r A- Dollars & In1(wtr Gc4 Cents per Each $ r;4 • i $ 'Zoo. SUB-TOTAL UNIT II - SEWER $ Q-1?> 47b. TOTAL WATER & SANITARY SEWER IMPROVEMENTS BID $ Bid Proposal - 18 PAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID PRICES WRITTEN IN WORDS UNIT III - PAVING 1 12 EA. Project Designation Signs Dollars & cents per Each $ ,. $ �° 2 1 L.S. Utility Adjustment �cT�c.A-iu0 Dollars & Cents per Lump Sum $ n o� $ oOo= 3. 42,457 S.F. Remove Old Concrete (Pavement with Curb) (Sylvania) r Dollars & ents per Square Foot $ $ 4. 11,460 L.F. Remove Old Concrete (Curb & Gutter) l t,lls �j Dollars & S Cents per Linear Foot $ 10 $ 5. 18,597 S.F. Remove Old Concrete (Sidewalk & Driveway) Dollars & omr- I3 t7 " Cents per Square Foot $ $ l Bid Proposal - 19 PAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID PRICES WRITTEN IN WORDS UNIT III - PAVING 6. 1,557 S.F. Remove Old Concrete (Valley Gutter) Dollars & 1 �1 (f-7- Cents per Square Foot $ 7. 7,213 C.Y. Unclassified Street Excavation "-;Sl K Dollars & ,/ sa— Cents per Cubic Yard $ $ `c8038. 8. 468 C.Y. Topsoil Dollars & Cents per Cubic Yard $ $ 54 1� 9. 31,180 S.Y. 6" Lime Stabilized Subgrade UNC Dollars & Sixes - _ Cents per Square Yard $ $ 10. 440 Tons Lime for Subgrade (28 lbs/SY) AUK Dollars & 1 .°�° Cents per Tons $ 00 $ Bid Proposal - 20 PAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID PRICES WRITTEN IN WORDS UNIT III - PAVING 11 134 Tons Hot Mix Asphaltic Concrete Transition Pavement Dollars & Cents per Tons $ �J 3 ' $ 12. 25,378 S.Y. 6" Reinforced Concrete Street Pavement With #3 @24" C-C Both Ways Dollars & 41T7 At.4-0- Cents per Square Yard $ g $ 13. 4,900 S.Y. 7" Reinforced Concrete Street Pavement With #3 @24" C-C Both Ways (Sylvania Avenue) Dollars & Cents per Square Yard $ O .�- $ OOt 14. 2 E.A. Replace Existing Inlet Top bollars & Cents per Each $ t ' $ �" Bid Proposal - 21 PAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID PRICES WRITTEN IN WORDS UNIT III - PAVING 15. 13,120 L.F. 7" Attached Concrete Curb Dollars & Zo Cents per Linear Foot $ $ ` 16. 24,897 S.F. Concrete Sidewalks & Driveways Dollars & Cents per Square Foot $ �, $ 17. 33,107 L.F. Silicone Joint Sealant Dollars & Std -a&tfe-- Cents per Linear Foot $ $ 18. 1,870 L.F. Sawcut and Dowell Into Existing Concrete Pavement M11 Dollars & q.. en per Linear Foot $ $ TOTAL UNIT III - PAVING $ 2 4%7 4 Bid Proposal - 22 rPAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID rPRICES WRITTEN IN WORDS UNIT IV - MISCELLANEOUS ITEMS 1. 16 HR. Screen, Analyze and Evaluate Potentially Petroleum Contaminated Areas (soils and water). Provide On-Site Personnel, Including 15% Office Management Time and Appropriate Field Screening Device �✓(ta Kr�- Dollars & Cents per Job Site Hour $ $ 2. 100 C.Y. Load, Haul and Disposal of 'P Petroleum Contaminated Material with 0 to 1500 PPM TPH Dollars & o� ' lH� _C'ents per Cubic Yard $ 15 • 3� $ 3. 100 C.Y. Load, Haul and Dispose of Petroleum Contaminated Material with 1500 to 3000 PPM TPH /I rr Dollars & -5e7. e7 3,7q4 Gv&nts per Cubic Yard 1 $ $ r r Bid Proposal - 23 r rPAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID FPRICES WRITTEN IN WORDS UNIT IV - MISCELLANEOUS ITEMS 4. 1,000 GAL. Handling Petroleum Contaminated Water �WD Dollars & 43 7EZo. 4Q,t4'<�Vyeents per Gallon $ �. $ 5. 10 EA. Soil Analysis for Total Petroleum Hydrocarbons by Method 418.1 to Include Sample Shipping, Disposal and Report of Results Dollars & �1Y-M- O(Waf-Cents per Each $ J�' $ 6. 10 EA. Water Analysis for Total Petroleum Hydrocarbons by Method 418.1 to Include Sample IL Shipping, Disposal, and Report of Results Dollars & 11 - (kKT–Cents per Each $ �2J • $ 7. 10 EA. Soil Analysis for BTEX by Method 8020 to Include Sample Shipping, Disposal and Report of Results Dollars & &kry- I Cents per Each $ �� • $ ��a`— Bid Proposal - 24 PAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID PRICES WRITTEN IN WORDS UNIT IV - MISCELLANEOUS ITEMS 8. 10 EA. Water Analysis for BTEX by Method 8020 to include Sample Shipping, Disposal and Report of Results cr�Srrvct�f Dollars & '�-t(4R71 tNcfCents per Each $ $ 9. 10 EA. Water or Soil Analysis for Total Organic Halogens (TOX) by SW846 Method 9020, Including Sample Shipping, Disposal and Report of Results r/ uND(1;�� IW13Ga'r vp Dollars & � IZc�. 32 MM " Cents per Each $ $ 10. 10 EA. Soil Analysis for Total Lead by SW846 Method 601, Including Sample Shipping, Disposal and FReport of Results rDollars & Cents per Each $ $ 11. 10 EA. Soil Analysis for T LP Metals, y C e , Including Sample Shipping, Disposal and Report of Results keV Dollars & 4-7 ?a / � 1 , `�t'f'�'' Scktet�(Cents per Each $ Bid Proposal - 25 �i PAY APPROXIMATE DESCRIPTION OF ITEMS UNIT AMOUNT ITEM QUANTITY WITH BID PRICE BID PRICES WRITTEN IN WORDS UNIT IV - MISCELLANEOUS ITEMS 12. 1 EA. Soil Analysis for TCLP Volatiles, Including Sample Shipping, Disposal and Report of Results EV U r - 2 Dollars & Cents per Each $ Q�t .?� $ . 13. 1 EA. Soil Analysis for TCLP Base Neutrals and Acid Compounds, Including Sample Shipping, Disposal and Report of Results Dollars & Cents per Each $ 3�(2-Jj $ 34 TOTAL UNIT IV - MISCELLANEOUS ITEMS $ Bid Proposal - 26 BID SUMMARY Subtotals Unit I —Water Improvements $ 454 1 1 nl • t� - Unit II - Sanitary Sewer Improvements $ Aq g ( 420 ` +l Unit III — Paving & Storm Drainage Improvements $ � Z� 410, Unit IV - Miscellaneous terns $ 14 ,-5-1 ( 19-- TOTAL UNIT I, II, III & IV BID Bid Proposal - 27 Within ten (10)days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond, and such other bonds as required by the Contract Documents, for the faithful performance of the contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth as liquidated damages for delay and additional work caused thereby. The undersigned bidder certifies that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Project dated January 1, 1978, and he has read and thoroughly understands all the requirements and conditions of those General Documents and these specific Contract Documents and appurtenant plans. This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04(F)of the Texas Limited Sales, Excise and Use Tax Act. Taxes: All equipment and materials not consumed by or incorporated into the project construction are subject to State sales tax under House Bill11, enacted Autust 15, 1991. The successful bidder shall be required to complete the attached Statement of Materials and Other Charges Contractor at the time of executing the contract. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors or employment agency, in either furnishing or referring employee applicants to the undersigned, are not discriminated against as prohibited by the terms of City Ordinance No. 7278, as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the Unit I, Unit Il, and Unit III combined contract within 200 working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A. or B. below, as applicable:) [] A. The principal place of business of our company is in the State of [] Nonresident bidders in the State of . our principal place of business are required to be percent lower than resident bidders by state law. A copy of the statute is attached. [] Nonresident bidders in the State of . our principal place of business, are not required to underbid resident bidders. y B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. Bid Proposal - 28 Receipt is acknowledged of the following addenda: (SEAL) If bidder is Corporation Addendum No. 1 Respectfully submitted, /1 Addendum No. 2 (IGH snruCfMO NMOIAn( Addendum No. 3 By: f�' ZT TITLE ( S E A L ) If bidder is Corporation. -2;60l O-Om c>r fr 5fUBT-- AR E S S Ef ? '759-4101 4K Telephne R3l- tal -Aka, Bid Proposal - 29 �J i f 1 i E r A-6 r VENDOR'S COMPLIANCE TO STATE LAW t 1 i r r� COMPLIANCE TO STATE LAW The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of contracts to nonresident bidders. This law provides that,in order to be awarded a contract as low bidder,nonresident bidders (out-of-State contractors whose corporate offices or principal place of business are outside of the State of Texas) bid projects for construction,improvements,supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required too underbid a nonresident bidder in order to obtain a comparable contract in the State in which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all out-of-State or nonresident bidders in order for your bid to meet specifications. The failure of out-of-State or nonresident contractors to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident vendors in (give State),our principal place of business,are required to be percent lower than resident bidders by State law. A copy of the Statute is attached. P Nonresident vendors in (give State),our principal place of business,are not required to underbid resident bidders. B. Our principal place of business or corporate offices are in the State of Texas. E] BIDDER: By: (Please print) Signature: Title: City State Zip (Please print) THIS FORM MUST BE RETURNED WITH YOUR QUOTATION r r i 1 1 f B-1 � SPECIAL INSTRUCTIONS TO BIDDERS (WATER DEPARTMENT) f am dw SPECIAL INSTRUCTIONS TO BIDDERS (WATER DEPARTMENT) 1. PREQUALI FI CATION REQUIREMENTS: All contractors submitting bids are required to be pre-qualified by the Fort Worth Water Department prior to submitting bids. This pre- qualification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, an acceptable experience record, an acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7) calendar days prior to the date of the opening of bids. A. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status of the submitting company. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. B. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. C. The Director of the Water Department shall be the sole judge as to the racceptability for financial qualification to bid on any Fort Worth Water Department project. D. Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. E. The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/or expertise. F. Any proposals submitted by a non-pre-qualified bidder shall be returned unopened, and if inadvertently opened, shall not be considered. r G. The City will attempt to notify prospective bidders whose qualifications (financial r or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a rwaiver of any necessary pre-qualification. 2. BID SECURITY: A cashier's check or acceptable bidder's bond payable to City of Fort Worth in an amount of not less than five percent (5%) of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10) days after the r' r f t contract has been awarded. To be an acceptable surety on the bond, (1) the name of the surety shall be included on the current U.S. Treasury, or (2) the surety must have capital and surplus equal to ten times the limit of the bond. The surety must be licensed to do business in the State of Texas. The amount of the bond shall not exceed the amount shown on the Treasury list or one-tenth (1/10) the total capital and surplus. 3. BONDS: A performance bond, a payment bond and a maintenance bond each for one hundred percent (100%) of the contract price will be required, Reference C3-3.7. 4. WAGE RATES: Not less than the prevailing wage rates established by the City of Fort Worth, Texas, and as set forth in the Contract Documents must be paid on this project. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the State in which the nonresident's principal place of business is located. "Nonresident bidder" means a bidder whose principal place of business is not in the State of Texas, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in the State of Texas. This provision does not apply if this contract involves Federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the contract amount is $25,000 or less, the contract amount shall be paid within forty-five (4) calendar days after completion and acceptance by the City. 1 9. AGE: In accordance with the policy ("Policy") of the Executive Branch of the Federal Government, Contractor covenants that neither it, nor any of its officers, members, agents, employees, program participants or subcontractors while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the basis of a bona fide occupational qualification, retirement plan, or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan, or statutory requirement. Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors alleged failure to comply with the above referenced policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with the ADA's provisions and any other applicable Federal, State and local laws concerning disability and will defend, indemnify and hold City s harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or it's subcontractors alleged failure; to comply with the above-referenced laws concerning disability discrimination in the performance of this agreement. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with the City of Fort Worth Ordinance No. 13471, as amended by Ordinance No. 13781, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the 0- Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or GOOD FAITH EFFORT FORM ("Documentation") as appropriate. The documentation must be received no later than 5:00 PM, five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a Women Business Enterprise (WBE) on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE ' and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and /or initiating action under appropriate Federal, State or local laws or f" ordinances relating to false statements. Further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a �i period of time of not less than three (3) years. f w I B-2 GENERAL CONDITIONS (WATER DEPARTMENT) PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER, 1, 1987 TABLE OF CONTENTS C1-1 DEFINITIONS C1-1.1 Definition of Terms C1-1 (1) C1-1.2 Contract Documents C1-1 (1) C1-1.3 Notice to Bidders C1-1 (2) C1-1.4 Proposal C1-1 (2) C1-1.5 Bidder C1-1 (2) C1-1.6 General Conditions C1-1 (2) C1-1.7 Special Conditions C1-1 (2) C1-1.8 Specifications C1-1 (2) C1-1.9 Bond C1-1 (2) C1-1.10 Contract C1-1 (3) C1-1.11 Plans C1-1 (3 ) C1-1.12 City C1-1 (3) C1-1.13 City Council C1-1 (3) C1-1.14 Mayor C1-1 (3) C1-1.15 City Manager C1-1 (3 ) C1-1.16 City Attorney C1-1 (3) C1-1.17 Director of Public Works C1-1 (4) C1-1.18 Director, City Water Department C1-1 (4) C1-1.19 Engineer Cl-1 (4) C1-1.20 Contractor C1-1 (4) C1-1.21 Sureties C1-1 (4) C1-1.22 The Work or Project C1-1 (4) C1-1.23 Working Day C1-1 (4) C1-1.24 Calendar Day C1-1 (4 ) C1-1.25 Legal Holiday C1-1 (4) C1-1.26 Abbreviations C1-1 (5) C1-1.27 Change Order C1-1 (6) C1-1.28 Paved Streets and Alleys C1-1 (6) C1-1.29 Unpaved Streets and Alleys C1-1 (6) C1-1.30 City Streets C1-1 (6) C1-1.31 Roadway C1-1 (6) C1-1.32 Gravel Street Cl-1 (6) C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2 (1) C2-2.2 Interpretation of Quantities C2-2 (1) C2-2.3 Examination of Contract Documents and Site C2-2 (2) C2-2.4 Submitting of Proposal C2-2 (3) C2-2.5 Rejection of Proposals C2-2 (3 ) C2-2.6 Bid Security C2-2 (3) (1) C2-2.7 Delivery of Proposal C2-2 (4) C2-2.8 Withdrawing Proposals C2-2 (4 ) C2-2.9 Telegraphic Modification of Proposals C2-2 (4 ) C2-2.10 Public Opening of Proposal C2-2 (4) C2-2.11 Irregular Proposals C2-2 (4) C2-2.12 Disqualification of Bidders C2-2 (5) C3-3 AWARD AND EXECUTION OF DOCUMENTS C3-3.1 Consideration of Proposals C3-3 (1) C3-3.2 Minority Business Enterpise Women-Owned Business Enterprise compliance C3-3 (1) C3-3.3 Equal Employment Provisions C3-3 (1) C3-3. 4 Withdrawal of Proposals C3-3 (2) C3-3.5 Award of Contract C3-3 (2) C3-3.6 Return of Proposal Securities C3-3 (2) C3-3.7 Bonds C3-3 (2) C3-3. 8 Execution of Contract C3-3 (4 ) C3-3.9 Failure to Execute Contract C3-3 (4 ) C3-3.10 Beginning Work C3-3 (4 ) C3-3.11 Insurance C3-3 (4 ) C3-3.12 Contractor's Obligations C3-3 (7) C3-3.13 Weekly Payroll C3-3 (7) C3-3.14 Contractor's Contract Administration C3-3- (7) C3-3.15 Venue C3-3 (8 ) C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4 (1) C4-4. 2 Special Provisions C4-4 (1) C4-4.3 Increased or Decreased Quantities C4-4 (1) C4-4 .4 Alteration of Contract Documents C4-4 (2) C4-4.5 Extra Work C4-4 (2) C4-4.6 Schedule of Operations C4-4 (3) C4-4.7 Progress Schedules for Water and Sewer Plant Facilities C4-4 (4 ) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 (1) C5-5.2 Conformity with Plans C5-5 (1) C5-5. 3 Coordination of Contract Documents CS-5 (2) C5-5.4 Cooperation of Contractor C5-5 (2) C5-5.5 Emergency and/or Rectification Work C5-5 (3) C5-5.6 Field Office C5-5 (3) C5-5.7 Construction Stakes C5-5 (3) C5-5.8 Authority and Duties of Inspectors C5-5 (4) CS-5.9 Inspection CS-5 (5) CS-5.10 Removal of Defective and Unauthorized Work C5-5 (5) C5-5.11 Substitute Materials or Equipment C5-5 (5) C5-5.12 Samples and Tests of Materials CS-5 (6) C5-5.13 Storage of Materials C5-5 (6) CS-5.14 Existing Structures and Utilities CS-5 (7) C5-5.15 Interruption of Service C5-5 (7) C5-5.16 Mutual Responsibility of Contractors C5-5 (8 ) C5-5.17 Cleanup C5-5 (8 ) C5-5.18 Final Inspection C5-5 (9) (2) C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 Laws to be Observed C6-6 (1) C6-6.2 Permits and Licenses C6-6 (1) C6-6.3 Patented Devices, Materials and Processes C6-6 (1) C6-6.4 Sanitary Provisions C6-6 (2) C6-6.5 Public Safety and Convenience C6-6 (2) C6-6.6 Privileges of Contractor in Streets, Alleys, and Right-of-Way ""` C6-6 (3) C6-6.7 Railway Crossings C6-6 (4) C6-6.8 Barricades, Warnings and Watchmen C6-6 (4) C6-6.9 Use of Explosives, Drop Weight, etc. C6-6 (5) C6-6.10 Work Within Easements C6-6 (6) C6-6.11 Independent Contractor C6-6 (8) C6-6.12 Contractor 's Responsibility for Damage Claims C6-6 (8) C6-6.13 Contractor's Claim for Damages C6-6 (10) C6-6.14 Adjustment of Relocation of Public Utilities, etc. C6-6 (10) C6-6.15 Temporary Sewer Drain Connections C6-6 (10) C6-6.16 Arrangement and Charges of Water Furnished by City C6-6 (11) C6-6.17 Use of a Section of Portion of the Work C6-6 (11) C6-6.18 Contractor' s Responsibility for Work C6-6 (11) C6-6.19 No Waiver of Legal Rights C6-6 (12) C6-6.20 Personal Liability of Public Officials C6-6 (12) C6-6.21 State Sales Tax C6-6 (12) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1) C7-7.2 Assignment of Contract C7-7 (1) C7-7.3 Prosecution of the Work C7-7 (1) C7-7. 4 Limitations of Operations C7-7 (2) C7-7.5 Character of Workman and Equipment C7-7 (2 ) C7-7.6 Work Schedule C7-7 (3 ) C7-7.7 Time of Commencement and Completion C7-7 (4) C7-7.8 Extension of time of Completion C7-7 (4) C7-7.9 Delays C7-7 (4 ) C7-7.10 Time of Completion C7-7 (5) C7-7.11 Suspension by Court Order C7-7 (6) C7-7.12 Temporary Suspension C7-7 (6) C7-7.13 Termination of Contract due to National Emergency C7-7 (7) C7-7.14 Suspension of Abandonment of the Work and Annulment of Contract C7-7 (7) C7-7.15 Fulfillment of Contract C7-7 (9) C7-7.16 Termination for Convenience of the Onwer C7-7 (10) C7-7.17 Safety Methods and Practices C7-7 (13) C8-8 MEASUREMENT AND PAYMENT C8-8.1 Measurement of Quantities C8-8 (1) C8-8.2 Unit Prices C8-8 (1) 4 - (3) C8-8 .3 Lump Sum C8-8 (1) C8-8.4 Scope of Payment C8-8 (1) C8-8.5 Partial Estimates and Retainage C8-8 (2) C8-8.6 Withholding Payment C8-8 (3) C8-8 .7 Final Acceptance C8-8 (3) . C8-8.8 Final Payment C8-8 (3) C8-8.9 Adquacy of Design C8-8 (4) C8-8.10 General Guaranty. C8-8 (4) C8-8.11 Subsidiary Work C8-8 (5) C8-8.12 Miscellaneous Placement of Material C8-8 (5) C8-8.13 Record Documents C8-8 (5) (4) QENZ AL CONSTRUCTION NOTES 1. Applicable design and details shall conform to "General Contract Documents and Specifications for Water Department Protects" (GCD) effective July 1, 1978, with the latest revisions. 2. All horizontal blocking, cradle blocking, and vertical tie-down blocking to be in accordance with Fig. (s) 9, 10, and 11 of the GCD. 3. Fire hydrants shall be located a minimum of 3'-0" behind the face of curb per Fig. 5 GCD. 4. All gate valve installations for sizes up to 12" are to be per Fig. 3 GCD and sizes 16" and larger Fig. 4 GCD. 5. The proposed water and/or sewer mains at times will be laid close to other existing utilities and structures both above and below the ground. The contractor shall make necessary provisions for the support and protection of all utility poles, fences, trees, shrubs, gas mains, telephone cables, TU cables, drainage pipes, utility services, and all other utilities and structures both above and below the ground during construction. It is the contractor's responsibility to notify all utility owners prior to any construction in the area and verify the actual location of all buried utilities that may or may not be shown on the plans. The contractor shall preserve and protect all underground and overhead facilities and be responsible for any damage he may cause to w them. The Contractor shall contact the following @ least 48 hours prior to excavating at each location: Fort Worth Water Department 871-8306 Lone Star Gas Company Metro (214) 263-3444 Texas Utility Service Company 336-2328 Southwestern Bell Telephone Company Enterprise 9800 Western Union Cable Division (214) 939-1930 Sammons Cable T.V. 737-4731 6. Contractor shall verify the elevation, configuration, and angulation of existing line prior to construction of tie-in materials. Such verification shall be considered as subsidiary cost of project and no additional compensation will be allowed. Elevation ad ustments at connections may be made with bends, offsets, or oint deflections. All nonstandard bends shall be made usin the closest standard M.J. fittings with the required 3oint deflections. (deflections not to exceed manufacturer's recommended deflection per joint) 7. Contractor shall keep at least one lane of traffic open at all times during construction and access to all places of business and residence at all times. (reference C6-6.5 GCD) 8. No excavated materials, backfill materials, equipment, or supplies shall be stored within floodways or drainage easements. (reference C6-6.6 GCD) 9. Trenches which lay outside existing or future pavements shall be backfilled above the top of the embedment with Type "C" _ backfill material. When Type "C" backfill material is not suitable, at the direction of the Engineer, Type "B" material shall be used. All backfill material shall be compacted to a minimum of 90% proctor densityby means of tamping only. Trenches which cross under exsting or future pavement shall be backfilled per Fig. "A" with 95% proctor density by jetting, tamping, or a combination of such methods. 1O.Rim elevations of the proposed sanitary sewer manholes in repaved streets are shown as final finished grades in these plans. They shall be constructed to 15" below final finished grade by utility contractor and adjusted by paving contractor in accordance with Fig. M of the special contract documents. Manhole inserts and concrete collars shall be installed where indicated on the plans per E-100-4 and Fig. 121 of the special contract documents respectively. Standard four foot diameter manholes shall be in accordance with section E2A, Fig. 103 and Fig. 104 GCD, standard four foot drop access manholes per Fig. 107 GCD, and shallow manholes per Fig. 106 GCD. 11.The top of the water lines shall be a'minimum of 3'-6" below the top of the curb for 12" and smaller mains except where otherwise shown on these plans. 12 .All water meters shall be placed or relocated 3'-0" behind the face of the proposed curb or as directed by the Engineer. 13 .All existing water services shall be replaced with 1" minimum copper tubing unless a larger size is indicated on the plans. Corporation stops shall be fully opened prior to trench backfill. Curb stops with lock wings shall be tested for full flow when the system is pressure tested. Extend 1" water services to those lots where no water services have been extended to. Locate these services at normal locations or as directed by the Engineer. a.The normal location of water service lines shall be 5' east or north of the center of the property frontage. b.For 40' or less lot frontage, all water services shall be placed 18" from the east or south property line.