HomeMy WebLinkAboutContract 26208 LOW
CITY
CRETARY
FORT WORTHWATER DEPARTMEN't EXEC
COPY ED
}
SPECIFICATIONS AND CONTRACT DOCUMENTS
FOR
VILLAGECREEK WASTEWATER
TREATMENT PLANT
CITY SECRETARY D
CONTRACT NO.
DIGESTER GAS FUELED TURBINE GENERATORS
GENERAL CONSTRUCTION CONTRACT (GC)
TURBINE GENERATOR EQUIPMENT AND INSTALLATION
CONTRACT (TC)
PROJ Ecr NO. PE42-07042016011.0
VOLUME I
Parts A through D
Parts F and G
NOVEMBER 1999
1
TMJ
MULTATECII ENGINEERING,INC.
1407 Texas Street,Suite 200
Fort Worth,Texas 76102
Phone:(817)877--5571 Metro:(817)429-7457 Fax:(817)877-4245
RIE] PROJECT No.96040
City of Fort Worth, Texas
"agor And Council Communication
DATE REFERENCE NUMBER LOG NAME PAGE
6/20/00 C-18093 60ARCHER 1 of 2
SUBJECT AWARD OF CONTRACT TO ARCHER WESTERN CONTRACTORS, LTD. FOR
VILLAGE CREEK WASTEWATER TREATMENT PLANT DIGESTER GAS FIRED
TURBINE GENERATORS GENERAL CONSTRUCTION CONTRACT
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a construction contract
with Archer Western Contractors, Ltd. for the general construction of the Village Creek Wastewater
Treatment Plant Digester Gas Fired Turbine Generators on the low bid of$2,390,190.
DISCUSSION:
On July 14, 1998 (M&C C-16891), the City Council authorized the execution of an engineering
agreement with Multatech Engineering, Inc. for the design of a digester gas fired engine/generator at
Village Creek Wastewater Treatment Plant. Using the methane gas produced by the plant processes,
the additional engine or turbine generators will be capable of generating approximately 60% of the
electrical power required by the plant. Currently the excess methane gas is "flared."
Archer Western Contractors, Ltd. will modify the existing engine generator room of the blower building for
the installation of the two new 5.2 MW turbine generators and associated equipment. The City Council
authorized the execution of a contract for the purchase and installation of the generators with Solar
Turbines, Inc. on May 30, 2000 (M&C C-18047).
On February 3, 2000, the following bids were received:
Bidder Amount Bid Time Of Completion
Archer-Western Contractors, Ltd. $2,390,190 365 Calendar Days
Oscar Renda Contracting, Inc. $2,578,000
Archer Western Contractors, Ltd. is in compliance with the City's M/WBE Ordinance by committing to
31% M/WBE participation. The City's goal on this project is 31%.
The total authorized amount includes $71,705 for possible change orders and $19,505 for staff support.
r
City of Fort Worth, Texas
"Affor And cou"Cil Communication
DATE REFERENCE NUMBER LOG NAME PAGE
6/20/00 C-18093 60ARCHER 2 of 2
SUBJECT AWARD OF CONTRACT TO ARCHER WESTERN CONTRACTORS, LTD. FOR
VILLAGE CREEK WASTEWATER TREATMENT PLANT DIGESTER GAS FIRED
TURBINE GENERATORS GENERAL CONSTRUCTION CONTRACT
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the Commercial Paper-Sewer Fund.
MG:I
Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY
Office by: (to) .WWVED
Mike Groomer 6140 CITY COUNCL
Originating Department Head:
JUN 84 2000
Dale Fisseler 8207 (from) � ))
PS46 541200 070460300130 $2,390,190.00
Additional Information Contact: city8enalaryCd*0
CUT of Pott tre0ift ftus
Dale Fisseler 8207
FORT WORTH WATER DEPARTMENT
SPECIFICATIONS AND CONTRACT DOCUMENTS
FOR
VILLAGE CREEK WASTEWATER
TREATMENT PLANT
DIGESTER GAS FUELED TURBINE GENERATORS
GENERAL CONSTRUCTION CONTRACT (GC)
TURBINE GENERATOR EQUIPMENT AND INSTALLATION
CONTRACT (TC)
PROJECT NO. PE42-070420160110
VOLUME 1
Parts A through D
Parts F and G
NOVEMBER 1999
Z AGM
MULTATECH ENGINEERING, INC.
1407 Texas Street,Suite 200
Fort Worth,Texas 76102
Phone:(817)877-5571 Metro:(817)429-7457 Fax:(817)8774245
MEI PROJECT No.96040
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
TABLE OF CONTENTS
VOLUME 1
PART A - INVITATION TO BID
Notice to Bidders
Special Instructions to Bidders
PART B- BID FORMS
Proposals
General Construction Contract
Turbine Equipment Contract
Vendor Compliance to State Law
Contractor Compliance to State Law
Appendix A
Prequalification Forms
Appendix B
M/WBE Bid Specifications (Paper-Goldenrod)
Appendix C
Workman's Compensation Insurance Coverage
PART C -GENERAL CONDITIONS
General Conditions (Paper- Canary Yellow)
PART CS - SUPPLEMENTARY CONDITIONS
Supplementary Conditions (Paper-Green)
PART D - SPECIAL CONDITIONS
Special Conditions (Paper-Green)
PART F - BONDS
Performance Bond
Payment Bond
Maintenance Bond
Certificate of Insurance
PART G - CONTRACT
Contract
Appendix A
State Revolving Fund (SRF) Requirements
Addendum No. 2 — Page 1 of
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
TABLE OF CONTENTS
VOLUME 2
PART E -TECHNICAL SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
01100 Summary
01125 Summary of Multiple Contracts
01140 Work Restrictions
01210 Allowances
01230 Alternates
01250 Contract Modification Procedures
01290 Payment Procedures
01310 Project Management and Coordination
01320 Construction Progress Documentation
01322 Photographic Documentation
01330 Submittal Procedures
01400 Quality Requirements
01420 References
01500 Temporary Facilities and Controls
01600 Product Requirements
01650 Starting of Systems, Training and Commissioning
01700 Execution Requirements '
01731 Cutting and Patching
01770 Closeout Procedures
01781 Project Record Documents '
01782 Operation and Maintenance Data
DIVISION 2 - SITEWORK '
02070 Selective Demolition
02205 Soil Materials
02223 Backfilling
02240 Soil Stabilization
02265 Trench Excavation Safety Protection System
02300 Earthwork
02371 Drilled Concrete Piers (Caissons)
02511 Hot-Mix Asphalt Paving
02584 Underground Ducts and Utility Structures
02751 Cement Concrete Paving
A
Addendum NAPage 2 of 6
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
DIVISION 3 - CONCRETE
03100 Concrete Formwork
03200 Concrete Reinforcement
03300 Cast-In-Place Concrete
03370 Concrete Curing
03540 Self-Leveling Floor Underlayment for Topping Concrete Floors
03732 Concrete Repair
DIVISION 4 - MASONRY
04200 Unit Masonry
DIVISION 5 - METALS
05120 Structural Steel
05500 Metal Fabrications
05521 Aluminum Handrails and Railings
05530 Aluminum Grating
DIVISION 6 -WOOD AND PLASTICS
06100 Rough Carpentry
DIVISION 7 -THERMAL AND MOISTURE PROTECTION
07110 Sheet Membrane Waterproofing
07160 Bituminous Dampproofing
07175 Water Repellents
07410 Preformed Metal Siding
07600 Flashing and Sheet Metal
07900 Joint Sealers
DIVISION 8 - DOORS AND WINDOWS
08110 Hollow Metal Doors and Frames
08112 FRP Doors and Frames
08330 Overhead Coiling Doors
08385 Acoustical Door Assemblies
08710 Finish Hardware
08800 Glass and Glazing
Addendum NAPage 3 of 6
VCVW TP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
DIVISION 9 - FINISHES .
09700 Special Floor Coating
09900 Painting
DIVISION 10 -SPECIALTIES
10522 Fire Extinguishers, Cabinets and Accessories
DIVISION 11 - EQUIPMENT
11368 Heat Recovery Unit
11372 High Pressure Gas Compressor Sets
11382 Gas Turbine/Generator Sets
DIVISION 12 - FURNISHING NOT USED
DIVISION 13 - SPECIAL CONSTRUCTION
13400 Instrumentation General Provisions
13410 Instrumentation Commissioning
13420 Instruments
13449 Local Subsystem Control Panels
13450 Instrumentation Wiring
DIVISION 14 - CONVEYING SYSTEMS NOT USED
Addendum No. 2 — Page 4 of 6 ,
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
TABLE OF CONTENTS
VOLUME 3
PART E —TECHNICAL SPECIFICATIONS
DIVISION 15 — MECHANICAL
15050 Basic Mechanical Materials and Methods
15060 Hangers and Supports
15061 Stainless Steel Pipe and Fittings
15075 Mechanical Identification
15084 Mechanical Insulation
15122 Meters and Gages
15170 Motors
15181 Steel Pipe and Fittings
15191 Fuel Oil Piping Systems
15193 Hot Oil Piping Systems
15197 Polyethylene Pipe and Fittings
15411 Water Service Piping
15412 Water Distribution Piping
15420 Drainage and Vent Piping
15488 Natural Gas Piping Systems
15489 Digester Gas Piping Systems
15510 Hydronic Piping System
15540 Pumps
15710 Heat Exchangers
15815 Metal Ductwork
15820 Duct Accessories
15853 Power Ventilators
15932 Air Outlets and Inlets
15940 Sequence of Operation
15990 Testing, Adjusting and Balancing
Addendum 3:
"15110 Hydronic Valves
15973 Instrument Air Control System"
Addendum N9�2 Page 5 of 6
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040 ,
DIVISION 16 — ELECTRICAL
16050 Basic Electrical Materials and Methods
16060 Grounding and Bonding
16075 Electrical Identification
16120 Conductors and Cables '
16124 Medium-Voltage Cables
16130 Raceways and Boxes
16140 Wiring Devices '
16341 Medium-Voltage Switchgear
16350 Medium-Voltage Transformers
16410 Enclosed Safety Switches
16442 Panelboards
16461 Dry-Type Transformers - 600 Volts and Below
16481 Motor Controllers—600 Volts and Below
16482 Motor Control Centers
16491 Fuses - 600 Volt and Below
16510 Lighting Fixture and Lamps
Addendum No. 2 Y Page 6 of 6
PART A
INVITATION TO BID
PART A
INVITATION TO BID
TABLE OF CONTENTS
PART A - INVITATION TO BID Page
Notice to Bidders A-2
Special Instructions to Bidders A-4
A- 1
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
PART A - NOTICE TO BIDDERS
Sealed proposals for requested for the furnishing of all labor, materials, equipment, and all
necessary appurtenances and incidental work for the
Digester Gas Fueled Turbine Generators
for the Village Creek Wastewater Treatment Plant,
Water Department Project Number PE42-070420160110
shall be addressed to
Mr. Bob Terrell, City Manager
City of Fort Worth
1000 Throckmorton Street
(P. O. Box 17027)
Fort Worth, Texas 76102
and will be received until
1:30 p.m. on the date of the bid opening
at the Office of the Purchasing Manager, City of Fort Worth, in the lower level of the Municipal
Building, 1000 Throckmorton, Fort Worth, Texas, 76102. The bids will be publicly opened and
read aloud in the City Council Chambers at
2:00 P.M., Thursday, February 3, 2000
Any bids received after the closing time will be returned unopened.
Contract Documents, including plans and specifications, have been prepared for this project and
may be obtained at the office of Multatech Engineering, Inc. (MEI), 1407 Texas Street, Suite
200, Fort Worth, Texas, 76102-3428, Telephone (817) 877-5571, for non-refundable fees as
follows:
$200.00 per full-size set
$150.00 per half-size set
Payment for the contract documents shall be made by check made payable to:
Multatech Engineering, Inc.
General Contract Documents and General Specifications for the Water Department projects,
dated January 1, 1978, with amendments, also comprise a part of the Contract Documents for
this project and may be obtained by paying $50.00 for each set, at the Engineering Office of the
Fort Worth Water Department, 1000 Throckmorton Street, Fort Worth, Texas 76102.
Prequalification of Bidders according Water Department Contract Documents is required.
A Performance Bond, a Payment Bond, and a Maintenance Bond, each for one hundred (100%)
percent of the contract price will be required.
The City reserves the right to reject any or all bids and waive any of all irregularities. No bid
may be withdrawn until the expiration of 90 days from the date bids are received.
Addendum NOA Page 1 of 2
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
This project is a State Revolving Fund (SRF) funded project. The contract is contingent upon
the release of funds from the Texas Water Development Board. In order to comply with the
,specifications and Contract Requirements for this work, the Contractor must insure and/or
comply with the requirements set forth in the State Revolving Fund forms, included in the
Contract Documents.
A Pre-Bid Conference for all bidding Contractors will be held by representatives of the Fort
Worth Water Department and the Consulting Engineers in the main administration building at
the Village Creek Wastewater Treatment Plant, 4500 Wilma Lane, Fort Worth, Texas, 76102 on
January 19, 2000 at 10:00 AM.
Robert Terrell
City Manager
Gloria Pearson
City Secretary
Publication: December 16, 1999
December 23, 1999
Addendum No.�t Page 2 of 2
SPECIAL INSTRUCTIONS TO BIDDERS
1. PREQUALIFICATION REQUIREMENTS. An acceptable experience record, an equipment
schedule, a current financial statement, and liabilities and net worth statement must be filed
with the Director of the Water Department at LEAST SEVEN DAYS PRIOR TO THE HOUR
FOR OPENING BIDS. The financial statement required shall have been prepared by an
independent certified public accountant or independent public accountant holding a valid permit
issued by an appropriate state licensing agency, and shall have been so prepared as to reflect
the current financial status. This statement must be current and no more than one (1) year old.
In the case that a bidding date falls within the time a new statement is being prepared, the
previous statement shall be updated by proper verification. Proposals submitted by a
prospective bidder who has not fulfilled the above requirements shall be returned unopened.
Prospective bidders whose qualifications are not deemed to be appropriate to the nature and/or
magnitude of the project on which the bids are to be received will be notified before the date of
the bid opening, and any proposals submitted by them shall be returned unopened. Liquid
assets in the amount of ten (10%) percent of the estimated project cost will be required.
For an experience record to be considered to be acceptable for a given project, it must reflect
the experience of the firm seeking qualification in the work of both the same nature and
magnitude as that of the project for which bids are to be received, and such experience must
have been on projects completed not more than five (5) years prior to the date on which bids
are to be received. The Director of the Water Department shall be the sole judge as to the
acceptability of experience for qualification to bid on any Fort Worth Water Department project.
The prospective bidder shall schedule the equipment he has available for the project and state
that he will rent such additional equipment as may be required to complete the project on which
he submits a bid.
2. BID SECURITY. A cashier's check, or an acceptable bidder's bond, payable to the City of
Fort Worth, in the amount of not less than five (5%) percent of the largest possible total of the
bid submitted must accompany the bid, and is subject to forfeiture in the event the successful
bidder fails to execute the Contract Documents within ten (10) days after the contract has been
awarded. For the bid bond to be acceptable, the name of the surety company issuing said bond
shall be licensed to do business in the State of Texas and shall be included on the current U.S.
Treasury list of acceptable sureties, and the amount of the bond written by any one acceptable
company shall not exceed the amount shown on the Treasury list for that company.
3. BONDS. A performance bond, a payment bond, and a maintenance bond each for one
hundred (100%) percent of the contract price will be required, Reference C3-3.7.
4. PREVAILING WAGE PROVISIONS: The wage determination to be included in the
Specifications is the minimum wage rates. A legible copy of this wage determination must be
posted and maintained by the Contractor in a prominent place on the jobsite where it can be
easily seen by employees at all times. No classification of laborers or mechanics other than
A-4
those designated in the wage determination for the project shall be employed. In the event that
classifications are required for classes of laborers and mechanics not listed in the wage
determination, the Contractor shall file with the Owner a request for a classification prior to
using an employee for which no classification has been included.
The Owner will make, or cause to be made, such investigations, including interviews with the
employees of the Contractor, and Subcontractor as may be necessary to assure that the
employees are being paid in accordance with the wage determination, and that all requirements
of the Labor Standards are being complied with. Particular attention will be given to the
requirement that a copy of the wage determination must be posted by the Contractor in a
prominent place at the site where it can be easily seen by the workers at all times. In
conducting an investigation, including those of complaint of alleged violations, all statements
written or oral made by an employee will be treated as confidential and shall not be disclosed to
the employer without the consent of the employee.
5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal,
the City reserves the right to adopt the most advantageous construction thereof to the City or to
reject the Proposal.
6. ADDENDA: Bidders wanting further information, interpretation or clarification of the contract
documents must make their request in writing to the Fort Worth Water Department Engineering
Services, at least 96 hours prior to bid opening. Answers to all such requests will be bound and
made a part of the Contract Documents. No other explanation or interpretation will be
considered official or binding. Should a bidder find discrepancies in, or omissions from, the
Contract Documents, or should the bidder be in doubt as to their meaning, the bidder should at
once notify the Fort Worth Water Department Engineering Services, in order that a written
addendum may be sent to all bidders. Any addenda issued will be mailed or be delivered to
each prospective bidder. The bid proposal as submitted by the bidder must be so constructed
as to include any addenda issued by the Fort Worth Water Department, prior to 24 hours of the
opening of bids with appropriate recognition of addenda so noted in the bid proposal.
7. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas.
8. NONRESIDENT BIDDERS: Pursuant to Article 6018, Texas Revised Civil Statues, the City
of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is
lower that the lowest bid submitted by a Texas resident bidder by the same amount that a
Texas resident would be required to underbid a nonresident bidder to obtain a comparable
contract in the state in which the nonresident's principal place of business is located.
"Nonresident bidder" means a bidder whose principal place of business is not in this state, but
excludes a contractor whose ultimate parent company or majority owner has a place of
business in this state.
This provision does not apply if this contract involves federal funds.
The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for
the bid to meet specifications. The failure of a nonresident contractor to do so will automatically
disqualify that bidder.
A- 5
9. PAYMENT: If the bid amount is less than $25,000, the contract amount shall be paid in one
(1) lump sum upon completion and acceptance by the City of Fort Worth Water Department.
10. AGE: In accordance with the policy ("Policy") of the Executive Branch of the Federal
Government, the Contractor covenants that neither it nor any of its officers, members, agents,
employees, program participants or sub contractors, while engaged in performing this contract,
shall in connection with the employment, advancement or discharge of employees or in
connection with the terms, conditions or privileges of their employment, discriminate against
persons because of their age except on the basis of a bona fide occupational qualification,
retirement plan or statutory requirement.
The Contractor further covenants that neither it nor its officers, members, agents, employees,
subcontractors, program participants, or persons acting on their behalf, shall specify, in
solicitations or advertisements for employees to work on this contract, a maximum age limit for
such employment unless the specified maximum age limit is based on a bona fide occupational
qualification, retirement plan or statutory requirement.
Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City
harmless against any claims or allegations asserted by third parties or subcontractors against
the City arising out of the Contractor's and/or its subcontractors' alleged failure to comply with
the above referenced Policy concerning age discrimination in the performance of the contract.
11. DISABILITY: In accordance with provisions of the Americans with Disabilities Act of 1990
("ADA"), the Contractor warrants that it and any and all of its subcontractors will not unlawfully
discriminate on the basis of disability in the provision of services to the general public, nor the
availability, terms and/or conditions of employment for applicants for employment with, or
employees of the Contractor or any of its subcontractors. The Contract warrants it will fully
comply with ADA's provision and any other applicable federal, state, and local laws concerning
disability and will defend, indemnify and hold harmless against any claims or allegations
asserted by third parties or subcontractors against the City arising out of the Contractor's and/or
its subcontractors' alleged failure to comply with the above referenced laws concerning
disability discrimination in the performance of this contract.
12. M/WBE. In accord with the City of Fort Worth Ordinance No. 11923, the City of Fort Worth
has Goals for the participation of minority business enterprises and women business
enterprises in City contracts. You may obtain a copy of the Ordinance from the Office of the
City Secretary. In order for a bid to be considered responsive, the AFFIDAVIT STATEMENT
included within these bid documents must be completed and submitted with your bid. Failure to
submit the completed AFFIDAVIT STATEMENT shall render your bid non-responsive. In
addition, the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and
GOOD FAITH EFFORT FORM, as applicable, must be submitted within five (5) City business
days after the bid opening. Failure to comply shall render your bid non-responsive.
13. SALES TAX: Refer to the SUPPLEMENTARY CONDITIONS
14. TRENCH SAFETY SYSTEM: The Bidder acknowledges by the submission of his bid that
he is solely responsible for the trench safety system not withstanding any other provisions of
the Contract Documents.
A - 6
The Owner may consider the safety record of Bidders and proposed subcontractors. Owner .
reserves the right to reject the Bid of any Bidder who does not meet any such evaluation to
Owner's satisfaction.
15. PRE-BID CONFERENCE: The pre-bid conference is for bidding Contractors. The pre-bid •
conference will also be open to subcontractors and material suppliers; however, if any
subcontractor or material supplier have any questions requiring an interpretation of the plans
and specifications, such questions shall be presented in the conference through a bidding
(prime) Contractor. During the conference, requests for interpretations will be limited to bidding
Contractors only; subcontractors and material suppliers will not be permitted the privilege of the
floor for the presentation of questions.
The pre-bid conference will be held as noted in PART A— NOTICE TO BIDDERS. ,
16. PROPRIETARY REFERENCE: Wherever in the plans and/or specifications, equipment,
materials, or other items are specified or referred to by a manufacturer's trade.name, number of
other designation, said specifications or reference shall be intended as a guide only as to the
type or quality of such items to be furnished and/or installed and shall not be interpreted to be
the specific equipment, material or item to be furnished. Exception, if the terms "No Equal" are
specifically noted on the plans or specifications.
17. MULTIPLE CONTRACTS: There will be multiple (2) contracts implemented for this Project.
A. General Construction Contract (GC) —see description below.
B. Turbine Generator Equipment and Installation Contract (TC) — see description below.
18. GENERAL CONSTRUCTION CONTRACT (GC)
A. Work in the General Construction Contract includes, but is not limited to, the following:
1. Site preparation, including clearing, building demolition and relocations, and
earthwork.
2. Removal and disposal of existing machinery.
3. Site improvements, including roadways, parking lots, pedestrian paving, site
development furnishings and equipment, and landscaping.
4. Trenches for site utilities.
5. Selective demolition.
6. Foundations, including footings, foundation walls, and piles.
7. Slabs-on-grade, including earthwork, subdrainage systems, and insulation.
8. Below-grade building construction, including excavation, backfill, and thermal and
moisture protection.
9. Exterior closure, including walls, doors, windows and louvers.
10. Roofing, including repair, coverings, flashings and openings.
11. Interior construction, including partitions, doors, interior windows, and fittings.
12. Fire-protection specialties.
13. Stairs, including railings and finishes.
14. Interior finishes.
15. Equipment indicated on drawings.
16. Furnishings indicated on drawings.
A- 7
17. Special construction indicated on drawings.
18. Mechanical/Piping systems indicated on drawings.
19. Electrical/Instrumentation systems indicated on drawings.
20. Furnish, install, commission and test new medium voltage electrical system.
B. Temporary facilities and controls in the General Construction Contract include, but are not
limited to, the following:
1. Temporary facilities and controls that are not otherwise specifically assigned to the
Turbine Generator Equipment and Installation Contract.
19, TURBINE GENERATOR EQUIPMENT AND INSTALLATION CONTRACT (TC)
A. The work in the TC includes, but is not limited to, the following broad categories:
1. Furnish, install, commission and test two (2) new nominal 5.2 MWe industrial gas
turbine/generator sets.
2. Furnish, install, commission and test two (2) new nominal 2000 scfm high-pressure
gas compressor sets.
3. Furnish, install, commission and test two (2) new turbine exhaust gas heat recovery
units.
4. Furnish, install, commission and test new medium voltage electrical system.
5. Mechanical/Piping systems indicated on drawings.
6. Electrical/Instrumentation systems indicated on drawings.
B. Acceptable Contractors.
1. Due to the magnitude, complexity and special nature of the equipment, the
turbine/generator equipment and installation contractor shall be limited only to a
prime manufacturer of industrial gas turbine equipment whose products have been
in satisfactory use in similar service for not less than twenty-five years or in
comparable continuous duty service with a total combined operating experience of
500,000 hours.
2. Turbine/generator equipment and installation contractors shall be by one of the
following:
a. Solar Turbines, Inc.
b. Rolls-Royce Energy Systems, Inc.
C. General Electric, Inc.
3. Other individual gas turbine manufacturers may be considered for the TC contract
if pre-qualification information is received by Multatech Engineering no less than
twenty-one (21) days before the bid date.
C. Alternate Financing Option:
1. The City of Fort Worth (Owner) may elect to enter into a municipal lease
financing agreement. The turbine/generator manufacturer shall provide this
alternate financing option as part of the bid submittal.
2. The alternate financing agreement shall be based on the following terms:
A- 8
■
a) Maximum amount financed -- Value of TC contract bid
b) Term -- 10 years
C) Number of payments-- 108
d) Close date -- maximum of 3 months from date of TC
contract
e) First payment due -- 1 year from close date
f) Funds transferred into escrow account at close date.
g) Monthly draws from escrow account to fund construction cost.
h) Interest credited to escrow account monthly.
i) No pre-payment penalties.
j) No residual value after last payment.
k) Transfer of title to Owner after last payment (no fees owed by Owner for
title transfer).
1) Meets all criteria of non-appropriation.
m) No bond issuing restrictions on the Owner.
D. Total Maintenance Contract:
1. The City of Fort Worth (Owner) will enter into a total maintenance program for
the following equipment:
a. Gas turbine generator systems including all auxiliary equipment, controls
and instrumentation.
b. High pressure gas compressor systems including all auxiliary equipment,
controls and instrumentation.
C. Heat recovery units including all auxiliary equipment, controls and
instrumentation.
E. Bid Evaluation.
1. The Turbine Generator Equipment and Installation Contract (TC) will be
evaluated on a life cycle cost basis as set forth in Section 11382, Digester Gas
Fueled Turbine Generators.
F. State of Texas Air Discharge Permit.
1. The City of Fort Worth has applied for and received an air discharge permit for
operating two (2) nominal 5.2 MWe industrial gas turbines. A copy of the permit
is attached as Appendix A to Section 11382, Digester Gas Fueled Turbine
Generators.
"20. STATE REVOLVING FUNDS
Upon notification of tentative status as apparent low or responsive bidder.
Contractor shall submit ED-103 and ED-904 Forms."
A- 9
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
PART B
BID FORMS
TABLE OF CONTENTS
PROPOSALS:
General Construction Contract GCP 1 - 5
Turbine Equipment Contract TCP 1 —7
Vendor Compliance to State Law B-1
Contractor Compliance to State Law B-2
APPENDIX A— Prequalification Forms
APPENDIX B - M/WBE Bid Specifications (Paper Goldenrod)
APPENDIX C—Workman's Compensation Insurance Coverage
PART B — B - 1
Addendum No. 2— Page 1 of 1
JAN-25 00 10:38 FROM:MULTATECH 817-877-4245 TO:817 640 8734 PAGE:14
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
PROPOSAL
FOR
GENERAL CONSTRUCTION CONTRACT (GC)
(This proposal must not be removed from this book of Contract Documents.)
Village Creek Wastewater Treatment Plant
Digester Gas Fueled Turbine Generators
DATE: February 3, 2000
TO: Bob Terrell, City Manager
Fort Worth, Texas
PROPOSAL FOR: The Furnishing of all materials, except materials specified to be fumished by
the City, equipment and labor and all necessary appurtenances and incidental work to provide a
' complete and serviceable roject designated as:
Digester Gas Fueled Turbine Generators
Fort Worth Water Department Project No. PE 42-070420180110
Is General Construction Contract (GC)
Pursuant to the foregoing "Notice to Bidders", the undersigned Bidder, having thoroughly
examined the Contract Documents, including plans, special contract documents, and the
General Contract Documents and General Specifications for Water Department Projects, the
site of the project and understanding the amount of work to be done, and the prevailing
conditions, hereby proposes to do all the work, furnish all labor, equipment and material except
as specified to be furnished by the City, which is necessary to fully complete the work as
provided in the Plans and Contract Documents and subject to the inspection and approval of the
Director of the City Water Department of the City of Fort Worth, Texas; and binds himself upon
acceptance of this Proposal to execute a contract and furnish an approved Performance Bond,
Payment Bond' Maintenance Bond, and such other bonds, if any, as may be required by the
Contract Documents for the performing and completing of the said work. The undersigned
Bidders propose to do the work within the time stated and for the following Base Bid Sums.-
BASE
ums:SASE BID S U.S.
1 A. GENERAL CONSTRUCTION CONTRACT �Z��j Q t9 p. OU
B. ALLOWANCE FOR MISCELLANEOUS MODIFICATIONS TO PIPING/ELECTRICAL AND $50,000.00
INSTRUMENTATION SYSTEMS FOR ALTERNATE EQUIPMENT
TOTAL GENERALCONSTRUCTIONCONTRACT (GC)BASE BID:7,NJ rJ%LLk01
��YFiE 1t�n1D�� �1a6�`( 'TFldaspa ld dt4t 90Nher.o r�"AVT ----� U.S,oflil= $
F V4T 47
(AMOUNT SHALL BE SHOWN IN BOTH WORDS AND FIGURES. IN CASE OF DISCREPANCY THE
AMOUNT SHOWN IN WORDS WILL GOVERN,)
PART B—Page GCF 1 of 5
Addendum No. 2-• Page 1 of 14
,TPN-25 00 10:38 FROM:MULTATECH 817-877-4245 T0:817 640 8734 PAGE:15
VCW1in1TP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
The undersigned Bidder shall list the following sub-contractors, or "SELF" if work is to be
performed by Bidder's own forces, that are a part of this Total Base Bid. List only one sub-
contractor for each category. Failure to list sub-contractors or to list more than one sub-
contractor for each category may be cause for rejection of this proposal:
PLUMBING SUB-CONTRACTOR
MECHANICAL SUB-CONTRACTOR
ELECTRICAL SUB-CONTRACTOR
The undersigned Bidder agrees to begin construction within seven (7) calendar days after issue
of the work order, and to complete the contract within
Two Hundred Fifty-two (252)
calendar days after beginning construction as set forth in the written work order to be furnished
by the Owner,
The undersigned Bidder acknowledges receipt of the following addenda:
Addendum No. ! Dated
Addendum No, Z Dated 7a
Addendum No. 3 Dated l Zp00
1 Addendum No. � Dated p�Ofl�
The bid bond attached in the sum of:
Five Percent of Bid Amount Dollars
($ ---------5Z---------)
which is five percent (5%) of the Total Base Bid is to become the property of the Owner in the
event the contract and bond are not executed within the time set forth, as liquidated damages
for the delay and additional expense to the Owner caused thereby.
The undersigned Bidder agrees that this bid shall be good and may not be withdrawn
For a period of ENINETY (90) 1 Calendar days after the closing time for receiving bids.
PART 6—Page GCP 2 of 5
Addendum No. 2—Page 2 of 14
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
Within ten (10) days after acceptance of this Proposal, the undersigned Bidder will execute the
formal contract and will deliver an approved Performance Bond, Payment Bond and
Maintenance Bond and such other bonds as required by the Contract Documents, for the faithful
performance of the Contract. The attached bid bond is to become the property of the City of Fort
Worth, Texas, in the event the contract and bond or bonds are not executed and delivered
within the time above set forth, as liquidated damages for the delay and additional work caused
thereby.
The undersigned Bidder certifies that he has been furnished at least one set of the General
Contract Documents and General Specifications for Water Department Projects dated .January
1, 1978, and that he has read and thoroughly understands all the requirements and conditions
of those General Documents and the specific Contract Documents and appurtenant plans.
The undersigned Bidder assures that its employees and applicants for employment and those of
any labor organization, subcontractors, or employment agency is either furnishing or referring
employee applicants to the undersigned and are not discriminated against as prohibited by the
terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400.
The undersigned Bidder has included the following material with his bid:
Vendor Compliance to State Law
Contractors Compliance with Workers' Compensation Law
Acceptable Bid Bond
SRF Forms ED-103 and ED-104
Within five (5) business days after the bid opening as being low bidder, the undersigned Bidder
agrees to furnish to Fort Worth Water Department Attachments 1A through 1C, documenting
M/WBE participation in this Project. Include certification schedules for each M/WBE participant.
In the event of the award of contract to the undersigned Bidder, the undersigned Bidder will
furnish a Performance Bond and a Payment Bond and a Maintenance Bond for the full amount
of the contract, to secure proper compliance with the terms and provisions of the contract
documents and to guarantee payment of all lawful claims for labor performed and materials
furnished in the fulfillment of the contract.
The work proposed to be done shall be accepted when fully completed and finished in
accordance with the plans and specifications.
The undersigned Bidder understands that the Owner reserves the right to reject any or all bids
and to waive any informalities in the bidding.
PART B—Page GCP 3 of 5
Addendum No�&—Page 3 of 14
5 00 10:39 FROM:MULTATECH 817-877-4245 TO:817 640 8734 PAGE:17
VCWVV F DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
The undersigned Bidder certifies that the bid prices contained in the proposal have been
carefully checked and are submitted as correct and final.
Respectfully submitted,
Archer Western Contractors, Ltd.
Contractor
SEAL: (If bid Is by a Corp.) By:
Matthew Walsh
Title: President
1170 W. Corporate Drive, Suite 109
Business Address
Arlington, T% 76006
City, State, Zip Code
817/640-3898
Telephone
817/640-8734
Fax
PART B—Page GCP 4 of 5
Addendum No. 2—Page 4 of 14
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
ATTENTION BIDDER:
The following Check List contains items to be submitted with, before, or after written Bid
Proposal: ..
A. Submit the following Prequalification Documents seven (7) calendar days prior to Bid
Opening:
1. Experience Record
2. Financial Statement
3. Equipment Schedule
B. Submit with Bid:
1. Vendor Compliance to State Law
2. Contractor Compliance with Workers' Compensation Law
3. Acceptable Bond
4. SRF Forms ED-103 and ED-104
C. Submit five (5) business days after Bid Opening
1. MBE and WBE Utilization Form (Attach. 1A)
2. Prime Contractor Waiver Form (Attach. 1 B), if required
3. Good Faith Effort Form (Attach. 1C), if required
D. Submit ten (10 business days after Award of Contract:
1. Executed contract documents with:
a. Performance, Payment and Maintenance Bonds with original Power of Attorney
b. Completed insurance forms including worker's compensation
C. Signed proposals.
d. Signed Contract (Section G)
2. Signed Letters of Intent or Contracts with MWBE firms listed on MWBE Attachment
1A
END OF PROPOSAL
PART B—Page GCP 5 of 5
Addendum No. 2—Page 5 of 14
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
m
PROPOSAL
FOR
TURBINE GENERATOR EQUIPMENT
AND INSTALLATION CONTRACT (TC)
(This proposal must not be removed from this book of Contract Documents.) 1
Village Creek Wastewater Treatment Plant
Digester Gas Fueled Turbine Generators
DATE:
TO: Bob Terrell, City Manager ,
Fort Worth, Texas
PROPOSAL FOR: The Furnishing of all materials, except materials specified to be furnished by
the City, equipment and labor and all necessary appurtenances and incidental work to provide a
complete and serviceable project designated as:
Digester Gas Fueled Turbine Generators '
Fort Worth Water Department Project No. PE 42-070420160110
• Turbine Generator Equipment and Installation Contract(TC)
Pursuant to the foregoing "Notice to Bidders", the undersigned Bidder, having thoroughly
examined the Contract Documents, including plans, special contract documents, and the
General Contract Documents and General Specifications for Water Department Projects, the
site of the project and understanding the amount of work to be done, and the prevailing '
conditions, hereby proposes to do all the work, furnish all labor, equipment and material except
as specified to be furnished by the City, which is necessary to fully complete the work as
provided in the Plans and Contract Documents and subject to the inspection and approval of the
Director of the City Water Department of the City of Fort Worth, Texas; and binds himself upon
acceptance of this Proposal to execute a contract and furnish an approved Performance Bond,
Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the ,
Contract Documents for the performing and completing of the said work. The undersigned
Bidders propose to do the work within the time stated and for the following Base Bid Sums:
PART B—Page TCP 1 of 7
Addendum NOA Page 6 of 14
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
ALTERNATE BASE BID
BID
$U.S. $U.S.
A. TURBINE GENERATOR EQUIPMENT COST
1. SPECIFIED EQUIPMENT
Manufacturer and Model No.
2. ALTERNATE EQUIPMENT
Manufacturer and Model No.
is
B. HIGH PRESSURE GAS COMPRESSOR EQUIPMENT COST
1. SPECIFIED EQUIPMENT
Manufacturer and Model No.
2. ALTERNATE EQUIPMENT
Manufacturer and Model No.
C. HEAT RECOVERY EQUIPMENT COST
1. SPECIFIED EQUIPMENT
Manufacturer and Model No.
2. ALTERNATE EQUIPMENT
Manufacturer and Model No.
PART B — Page TCP 2of7
Addendum NPage 7 of 14
D. INSTALLATION COST (ALL OTHER COSTS LESS A., B., & C. ABOVE)
1. SPECIFIED EQUIPMENT
Manufacturer and Model No.
2. ALTERNATE EQUIPMENT '
Manufacturer and Model No.
E. ALLOWANCE FOR GENERATOR ELECTRONIC RELAYING SYSTEM
AND ELECTRONIC FEEDER RELAYING SYSTEM. $135,000.00
TOTAL TURBINE GENERATOR EQUIPMENT AND INSTALLATION CONTRACT (TC)BASE BID:
U.S. Dollars $
(AMOUNT SHALL BE SHOWN IN BOTH WORDS AND FIGURES. IN CASE OF DISCREPANCY THE
AMOUNT SHOWN IN WORDS WILL GOVERN.)
w
ALTERNATE FINANCING OPTION
Interest Rate % Per annum
Monthly multiplier(to determine monthly payment by
multiplying amount financed by monthly multiplier).
TOTAL MAINTENANCE PROGRAM
Monthly rate, U.S. dollars, payable in advance for $ Per month
year#1.
Maximum Annual Increase.
Year 2 - % of Year 1
Year 3 - % ofYear 2 %
Year 4 - % of Year
Year 5 - % of Year 4
Year 6 - % ofYear 5 % '
Year? - % of Year
Year 8 - % ofYear 7
Year 9 - % of Year
Year 10 - % of Year 9 %
PART B— Page TCP 3 of 7
Addendum NO Page 2
The undersigned Bidder shall list the following sub-contractors, or "SELF" if work is to be
performed by Bidder's own forces, that are a part of this Total Base Bid. List only one sub-
contractor for each category. Failure to list sub-contractors or to list more than one sub-
contractor for each category may be cause for rejection of this proposal:
PLUMBING SUB-CONTRACTOR
MECHANICAL SUB-CONTRACTOR
ELECTRICAL SUB-CONTRACTOR
The undersigned Bidder agrees to begin construction within seven (7) calendar days after issue
of the work order, and to complete the contract within
Two Hundred Fifty-two (252)
calendar days after beginning construction as set forth in the written work order to be furnished
by the Owner.
The undersigned Bidder acknowledges receipt of the following addenda:
i
Addendum No. Dated
Addendum No. Dated
Addendum No. Dated
Addendum No. Date
� f
Addendum No. Dated i
The bid bond attached in the sum of:
Dollars
($ )
which is five percent (5%) of the Total Base Bid is to become the property of the Owner in the
event the contract and bond are not executed within the time set forth, as liquidated damages
for the delay and additional expense to the Owner caused thereby.
The undersigned Bidder agrees that this bid shall be good and may not be withdrawn
For a period of NINETY (90) Calendar days after the closing time for receiving bids.
PART B— Page TCP 4 of 7
Addendum N45� Page 3
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
Within ten (10) days after acceptance of this Proposal, the undersigned Bidder will execute the
formal contract and will deliver an approved Performance Bond, Payment Bond and '
Maintenance Bond and such other bonds as required by the Contract Documents, for the faithful
performance of the Contract. The attached bid bond is to become the property of the City of Fort
Worth, Texas, in the event the contract and bond or bonds are not executed and delivered 1
within the time above set forth, as liquidated damages for the delay and additional work caused
thereby.
The undersigned Bidder certifies that he has been furnished at least one set of the General
Contract Documents and General Specifications for Water Department Projects dated January
1, 1978, and that he has read and thoroughly understands all the requirements and conditions
of those General Documents and the specific Contract Documents and appurtenant plans.
The undersigned Bidder assures that its employees and applicants for employment and those of
any labor organization, subcontractors, or employment agency is either furnishing or referring
employee applicants to the undersigned and are not discriminated against as prohibited by the
terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400.
The undersigned Bidder has included the following material with his bid:
Vendor Compliance to State Law
Contractors Compliance with Workers' Compensation Law
Acceptable Bid Bond
SRF Forms ED-103 and ED-104
Equipment Schedule
Within five (5) business days after the bid opening as being low bidder, the undersigned Bidder
agrees to furnish to Fort Worth Water Department Attachments 1A through 1C, documenting '
M/WBE participation in this Project. Include certification schedules for each M/WBE participant.
In the event of the award of contract to the undersigned Bidder, the undersigned Bidder will
furnish a Performance Bond and a Payment Bond and a Maintenance Bond for the full amount
of the contract, to secure proper compliance with the terms and provisions of the contract
documents and to guarantee payment of all lawful claims for labor performed and materials a
furnished in the fulfillment of the contract.
The work proposed to be done shall be accepted when fully completed and finished in
accordance with the plans and specifications.
The undersigned Bidder understands that the Owner reserves the right to reject any or all bids
and to waive any informalities in the bidding.
PART B—Page TCP 5 of 7
Addendum No&age 10 of 14
VCVW TP DIGESTER CTAS FUELED TURBINE GENERATORS MEI 96040
The undersigned Bidder certifies that the bid prices contained in the proposal have been
carefully checked and are submitted as correct and final.
Respectfully submitted,
Contractor
SEAL: (If bid is by a Corp.) By:
Title:
Business Address
City, State, Zip Code
Telephone
Fax
PART B—Page TCP 6 of 7
Addendum Nq 2 Page 11 of 14
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
ATTENTION BIDDER '
The following Check List contains items to be submitted with, before, or after written Bid
Proposal:
A. Submit the following Prequalification Documents seven (7) calendar days prior to Bid
Opening:
1. Experience Record
2. Financial Statement
3. Equipment Schedule
B. Submit with Bid:
1. Vendor Compliance to State Law
2. Contractor Compliance with Workers' Compensation Law
3. Acceptable Bid Bond
4. SRF Forms ED-103 and ED-104
5. Equipment Submittals for Industrial Gas Turbine Generators, High Pressure Gas
Compressor Sets, and Heat Recovery Units.
C. Submit five (5) business days after Bid Opening:
M/WBE Forms - N/A
D. Submit ten (10 business days after Award of Contract:
1. Executed contract documents with:
a. Performance, Payment and Maintenance Bonds with original Power of
Attorney.
b. Completed insurance forms including worker's compensation.
C. Signed proposals.
d. Signed Contract (Section G)
END OF PROPOSAL
PART B— Page TCP 7 of 7
Addendum NOA Page 12 of 14
JAN-25 00 10:43 FROM:MULTATECH 817-877-4245 TO:817 640 8734 PPAE:26
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
VENDOR COMPLIANCE TO STATE LAW
The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of
contracts to non-resident bidders. This law provides that, in order to be awarded a contract as
low bidder, non-resident bidders (out-of-state contractors whose corporate offices or principal
place of business are outside of the State of Texas) bid projects for construction, improvements,
supplies or services In Texas at an amount lower than the lowest Texas resident bidder by the
same amount that a Texas resident bidder would be required to underbid a non-resident bidder
In order to obtain a comparable contract In the state in which the non-resident's principal place
of business is located. The appropriate blanks in Section A must be filled out by all out-of-state
or non-resident contractors in order for your bid to meet specifications. The failure of out-of-
state or non-resident contractors to do so will automatically disqualify that bidder. Resident
bidders must check the box in Section B.
eidA. Non-resident vendors in (give state), our principal place of business,
are required to be percent lower than resident bidders by state law.
Non-resident vendors in Florida(give state) our principal place of business, are not
required to underbid resident bidders.
0 B. Our principal places of business or corporate offices are in the State of Texas.
k�
BIDDER:
Archer W _s ern Cont acto G- Ltd. BY: Matthew Walsh
Company
1170 W_ Corggrate Dr. . #109 Signature:
;gV"&
rA 7 ink nn_ TX 7{006 Title: President
City State Zip (Please Print)
THIS FORM MUST BE RETURNED WITH YOUR PROPOSAL
(Forms are examples only)
PART 8 —Page B 1
Addendum No.2—Page 13 of 14
,,,A.,"icin 617-877-4245 T0:817 640 8734 PAGE:27
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
CONTRACTOR COMPLIANCE WITH
WORKERS' COMPENSATION LAW
(a) Contractor agrees to provide to the Owner(City) a certificate showing that it has obtained
a policy of workers compensation insurance covering each of its employees employed on
the project in compliance with state law, No Notice to Proceed will be issued until the
Contractor has complied with this section.
(b) Contractor agrees to require each and every subcontractor who will perform work on the
project to provide to it a certificate from such subcontractor stating that the subcontractor
has a policy of workers compensation insurance covering each employee employed on the
project. Contractor will not permit any subcontractor to perform work on the project until
such certificate has been acquired. Contractor shall provide a copy of all such certificates
to the Owner (City).
Pursuant to Article 8308-3.23 of Vernon's Annotated Civil Statutes, Contractor certifies that it
provides workers' compensation insurance coverage for all of its employees employed on City
of Fort Worth Project Number PE 42-070420160110.
Archer Western Contractors, Ltd.
CONTRACT-QR
By:
w a s
President
Title {
February 3rd, 2000 1,
Date
STATE OF TEXAS §
COUNTY OF TARRANT §
BEFORE ME, the undersigned authority, on this day personally appeared
Matthew Walsh , known to me to be the person whose name is subscribed to the
foregoing instrument, and acknowledged to me that he executed the same as the act and dead
of Archer Western Contractors, fit*e purposes and consideration therein expressed and
in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this 3rd day of
February 2000.
��PR\A��KEC
Notary Public in and f r
.��`�••'"va'��F�`'�� the State of Texas
�O•�{aF Vgl''9
THIS FORM MUST 6E RETURNED WITH YOUR PROPOSAL
(Forms are examples only)
q�0, •'•
••'•.FXPI RES,.� �
PART a — Page B 2
Addendum No. 2—Page 14 of 14
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
PART B - BID FORMS
APPENDIX A
PREQUALIFICATIONS FORMS
' VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
PART B - BID FORMS
APPENDIX A
PREQUALIFICATIONS FORMS
TABLE OF CONTENTS
1. Experience Record PreQ — 2
2. Financial Statement PreQ — 3 and 4
3. Equipment Schedule PreQ — 5
Note: The forms above must be received by the Fort Worth Water Department seven
(7) days prior to bid date to be considered a "Qualified Bidder."
Mail to: S. Frank Crumb. P.E. Engineering Coordinator
Fort Worth Water Department
1000 Throckmorton
Fort Worth, Texas 76102
Include a transmittal letter with each submittal identifying this project name and number.
PART B — PreQ Page 1
Addendum No. 2 —Page 1 of 1
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
, EXAMPLE
EXPERIENCE RECORD
List of Projects your Organization has successfully completed:
w
AMOUNT OF TYPE OF WORK DATE NAME AND ADDRESS OF
CONTRACT AWARD ACCEPTED OWNER
List of Projects your Organization is now engaged in completing:
AMOUNT OF TYPE OF WORK ANTICIPATED DATE NAME AND ADDRESS OF
CONTRACT AWARD OF COMPLETION OWNER
List of Surety Bonds in Force on above Uncompleted Work:
AMOUNT OF TYPE OF BOND AMOUNT NAME AND ADDRESS OF
CONTRACT AWARD OF BOND SURETY
r PART B— PreQ Page 2
1
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
EXAMPLE
FINANCIAL STATEMENT
Condition of Bidder at close of business month, , 2000.
ASSETS ,
1. Cash on hand $
In bank
Elsewhere
2. Accounts receivable from completed contracts
(exclusive of claims not approved for payment)
r
3. Accounts receivable from other sources than above
4. Amounts earned on uncompleted contracts (not
included in Item 3) (Contract price on completed
portion of uncompleted contracts less total cost
of completed portion)
5. Deposit for bids on other guarantees
6. Notes Receivable Past Due
Due 90 days
Due later
7. Interest earned
B. Real Estate
Business Property, present value
Other property, present value
9. Stocks and Bonds, Listed on Exchange
Unlisted
10. Equipment, machinery, fixtures '
Less depreciation
11. Other Assets •
TOTAL ASSETS
PART B— PreQ Page 3
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
EXAMPLE
LIABILITIES AND NET WORTH
1. Notes Payable to Banks Regular $
(For Certified Checks)
Equipment Obligations
Others $
2. Accounts payable Current
Past Due
3. Real Estate Mortgages
4. Other Liabilities
5. Reserves
6. Capital Stock Paid Up Common
Preferred
7. Surplus
TOTAL LIABILITIES $
PART B— PreQ Page 4
VCWVVTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
EXAMPLE
EQUIPMENT SCHEDULE
List of Equipment owned by bidder that is in serviceable condition and available for use:
Portions of work Bidder proposes to sublet in case of Award of Contract including amount and
type:
Part B— PreQ Page 5
Addendum No. 2—Page 1 of 1
APPENDIX B
M / WBE BID SPECIFICATIONS
VCWWTP DIGESTER GAS FUELED TURBINE GENERATORS MEI 96040
PART B - BID FORMS
APPENDIX B
M/WBE BID SPECIFICATIONS
TABLE OF CONTENTS
APPENDIX B (Pages — Goldenrod) Pages
1. Special Instructions for Bidders 1
(City of Fort Worth M/WBE Enterprises Specifications
2. Attachment 1A— MBE and WBE Utilization Form 2
3. Attachment 1 B — Prime Contractor Waiver Form 1
4. Attachment 1 C — Good Faith Effort Form 3
5. Ordinance No. 11923 22
6. Ordinance No. 13471 17
PART B — M/WBE Page 1
Addendum N6 Page 1 of 1
City of Fort Worth
Minority and Women Business Enterprises Specifications
SPECIAL INSTRUCTIONS TO BIDDERS
APPLICATION OF POLICY
a MOe 0 o e oa s e Ica � o ollar al
e c+s s 2 � oa s o app ca eME
POLICY STATEMENT
It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business
Enterprises (MN BE) in the procurement of all goods and services to the City on a contractual basis. The
objective of the Policy is to increase the use of MIWBE firms to a level comparable to the availability of qualified
M/WBEs which provide goods and services directly or indirectly to the City:
MIWBE PROJECT GOALS
The City's MBE/WBE goal for this project is 31 % of the base bid value of the contract.
COMPLIANCE TO BID SPECIFICATIONS
On the City contract of$25,000 or more, bidders are required to comply with the intent of the City's M/ BE
Ordinance by either of the following:
1. Meet or exceed the above stated Minimum MIWBE goals, or
2. Good Faith Effort documentation, or,
3. Waiver documentation.
SUBMISSION OF REQUIRED DOCUMENTATION
The applicable documents must be received by the Managing Department,within the following times allocated,
in order for the entire bid to be considered responsive to the specifications.
1. M/ BE Utilization Form received by 5:00 PM,five (5) City business days after the
bid opening date,exclusive of the bid opening date.
2. M/ BE Goals Waiver Form received by 5:00 PM,five(5) City business_daks; after the
bid opening date,exclusive of the bid opening date.
3. M/WBE Good Faith Effort Form received by 5:00 PM,five(5) City business days after the
bid opening date,exclusive of the bid opening date.
TomO S D RR SP_O SI17O�P.E(i C
Any question, please contact the M/WBE Office at(817-871-6104)
a,
Rev. 6/2/98
City of Fort Worth -
Minority and Women Business Enterprises Specifications
Affidavit Statement
Project Name village Creek WWTP - Digester Gas Project No. pF_42-07o47n16011n
Fueled Turbine Generators
FAILURE TO SUBMIT THIS COMPLETED AFFIDAVIT STATEMENT WITH THE
BID AT TIME OF BID OPENING, WILL RESULT IN THIS BID BEING
CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS.
The undersigned bidder hereby certifies that they will comply with the City's M/WBE _
Ordinance and the specifications of this bid in the following manner:
[check the most appropriate number(s)) `
1. X THE M/WBE PARTICIPATION WILL MEET OR EXCEED THE
STATED GOAL, WILL COMPLETE THE MMBE UTILIZATION
FORM. -
2. THE M/WBE PARTICIPATION WILL BE LESS THAN THE STATED
GOAL, WILL COMPLETE "GOOD FAITH EFFORT FORM".
3. NO M/WBE PARTICIPATION, WILL COMPLETE "GOOD FAITH EFFORT".
4. NO SUBCONTRACT OR SUPPLIER OPPORTUNITIES AVAILABLE,
WILL COMPLETE WAIVER FORM.
Matthew Walsh
`Auth rized Signatu a Printed Signature
President Joe Lindeman/Texas Area Manager
Title Contact Name and Title (if different)
Archer Western Contractors, Ltd. 817/64n- 898
Company Name Contact Telephone Number(s) -
1170 W. Corporate Drive, Suite 109 • ,817/640-8734
Address Fax Number.y -`
. n
Arlington; T% 76006 January 27, 2000
City/State/ ip-Code Date _
Rev 3/6196
THIS FORM MUST BE RETURNED WITH YOUR PROPOSAL
(Forms are examples only) "" �'
ATTACHMENT 1A
PAGE 1 of 2
City of Fort Worth
Minority and Women Business Enterprise Specifications
MBE/WBE UTILIZATION FORM
Archer Western Contractors, Ltd. January 27,- 20W.
„.,.PRIME COMPANY NAME _ BID DA
Village Creek WWTP Digester Gas Fueled PEM
—070420160110
PROJECT NAME Turbine Generators PROJECT NUMBER
CITY'S MNVBE PROJECT GOAL 3)tyd MNVBE PERCENTAGE ACHIEVED 31, a/
Failure to complete this form, In Its entirety with supporting documentation, and received by the Managing Department
on or before 5:00 p.m.five (5) City business days after the bid opening, exclusive of the bid opening date, will result in
the bid being considered non-responsive to bid specifications.
The undersigned bidder agrees to enter into a formal agreement with the MBE and/or WBE firms for work listed in this
schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing
` misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered
non-responsive to specifications.
a' e oto' .Name, Cei2ifled `peri `AII:Co -ding` 11'.1te`sato` e x . ;Dollar". mo`un
Ip n e: o co e�of:WU 6:1
s°
a
Y
1
AN
-N- -�,K NIIV1/lEs�rrust.be locatedin lrJine�caGrrl~y'riarketp11 race';or<currentlyVaoin�.bu"sTness in;the markefplace'at thetime°of.bid. :. "
r+� W
a d e aymen o e nme conn ctor ossu con ra or �consjdered`�1'� i
a b a co
0 0. guPplien_-•-ns ae
sp THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m.,FIVE(5)CITY BUSINESS DAYS AFTER BID
OPENING,EXCLUSIVE OF BID OPENING DATEOPENING
Rev.6/2/98
�' pages 1 and 2 of Attachment 1A must be received by the Managing Department
t _ ATTACHMENT 1A
h i PAGE 2 of 2
w , : City of Fort Worth
Minority and Women Business Enterprise Specifications
a e,' @_ A11 e' All�Tte s o3be - 01 ou
o red
m
The bidder further agrees to provide, dire5tly to the City upon request, complete and accurate information regarding
actual work performed by all subcontractors, irryp�luding MBE (s) and/or WBE(s) arrangements submitted with this bid.
The bidder also agrees to allow an audit and/dMfiximination of any books, records and files held by their company that
will substantiate the actual work performed by'tl4ef 0BE(s) and/or WBE(s) on this contract, by an authorized officer or
employee of the City. Any intentional and/or knowing rpisre resentation of facts will be grounds for terminating the
contract or debarment from City work for a period of not letsrtharythree (3)years and for initiating action under Federal,
State or Local laws concerning false statements. Any fail4re .to Arfrply v4th this ordinance and creates a material
breach of contract may result in a determination of an irrespotsit)Je offeror and barred from participating in City work
for a period of time not less than one(1)year.
,A ts E MUST BE CERTIFIED BY THE CITY BEFORI ANT CT AWARD
;I Mattbrew Walsh
Authorized St6nAtViV 'Printed Signature
Presi.denrt Joe Lindeman/Texas Area Manager
Title i Contact Name and Title(if different) '
.. Archer Western Contractors, Ltd. 81.7/640-3898
_Company Name`_ Telephone Number(a)
z n„r.- 1170 TAT.` Corporate Drive; Suite .109 817/640-8734 - •Y-` �'
Address
FaNumber:,x . ...'_. ... .. -
.. T - _ s
./kr�.7L1 t- 1� T% f6L'}�Dfi .�- `...� ..•a:. n^JaTivapp27'...-'2000 .
a.
_ ... .� •yam.:-..�.:.:
c ityistate p Code _ '_Date - ..
THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m�FIVE(5)CITY BUSINESS DAYS AFTER BID
OPENING,EXCLUSIVE OF BID OPENING DATEOPENING
.w
F; Rev.6/2198
jjtr:Pages 1 and 2 of Attachment 1A must be reeelved by the MaAagl.ig Department
City of Fort Worth
Minority and Women Business Enterprises Specifications
MBE/WBE Utilization Form
Company Name/Contact Name Certified Specify All Contracting Specify All Items to be Tier Dollar
Address and Telephone N NCTRCA [TXDOT Scope of Work Supplied Amount
Rebar Services/Supply NCTRCA Reinforcing Steel First $ 9,000.00
PO Box 40584 and Welded Wire
Fort Worth,Texas 76140 Fabric
817-483-4603
Attn:Johnnie Thompson
Texoma Industrial Insulation NCTRCA Pipe Insulation per Pipe Insulation per First $ 39,622.00
PO Box 497 Specification Section Specification Section
Denison,Texas 75020 15084 15084
903-463-1676 Furnish&Installed Furnish&Installed
Ann:Juan Lamas
Garland Heating&Air Conditioning NCTRCA Heating and Air Heating and Air First $ 64,317.00
2113 South Garland Ave. Conditioning Conditioning
Garland,Texas 75041 Furnish&Installed Furnish&Installed
972-278-3506
Attn:Louis Harper
North Texas Trucking NCTRCA Trucking and Haul Off First $ 6,800.00
PO Box 542842 of Demolished Items
Dallas,Texas 75354
214-674-2817
Ann:David Davila
Lockett Enterprises NCTRCA Electrical Electrical Second $ 250,480.00
3813 Quiveria Circle Switchgear Switchgear
R Carrollton,Texas 75007 Furnish Only Furnish Only
972-399-8844
Attn:Rodney Lockett
Lockett Enterprises NCTRCA Light Fixtures Light Fixtures Second $ 16,513.00
3813 Quiveria Circle Wire,Cable&Term Kits Wire,Cable&Term Kits $ 67,540.00
Carrollton,Texas 75007 Misc Electrical Mat'I Misc Electrical Mat'I $ 89,850.00
972-399-8844
Attn:Rodney Lockett
North Texas Cherokee Co NCTRCA Pipe,Valves&Fittings Pipe,Valves&Fittings First $ 40,000.00
9966 Monroe Drive
Dallas,Texas 75220
214-654-0022
Attn:Bruce Cannon
Furnish Only Furnish Only
W-T Hawkins&Associates NCTRCA Pumps, Heat Exchangers Pumps, Heat Exchangers First $ 148,100.00
2801 Winterplace Circle Air Dryers and Filters Air Dryers and Filters
Plano,Texas 75075 Expansion Joints, Expansion Joints,
972-867-5410 Control Valves Control Valves
Pressure Gauges and Pressure Gauges and
Strainers Strainers
Contract Amount GRAND TOTAL $ 732,222
without Allowance
$2,340,190 PERCENTAGE 31.29%
ATTACHMENT 1C
Page 1 of 3
Ciof Fort Worth
Minority and Women Business Enterprise Specifications
GOOD FAITH EFFORT
Prime Company Name Bid Date
3 Project Name Project Number
If yod`,have failed to secure M/WBE Participation and you have subcontracting and/or supplier opportunities or if your
r
WN E'participation is less than the City's project goal,you must complefe this form:
If the bidder's method of compliance with the MfWBE goal is based upon demonstration of a "good
faith effort", the bidder will have the burden of correctly and accurately preparing and submitting
the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the
Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation
` the facts or intentional discrimination by the bidder.
Failure to.complete this form in its;entirety with its supporting' documentation and�,be received by the
Managing Department on or before 5:06.m. five(5) City business days4,.after bid'opening exry
ciuse of the bid
o enin._ `date`'will resulfin the bid beim considered non-res onsive to bidspecifications.-
,
1.) Please list each and every subcontracting and/or supplier opportunity (DO NOT LIST NAMES OF
FIRMS) which will be used in the completion of this project, regardless of whether it is to be
provided by a M/WBE or non-M/WBE.
(Use additional sheets, if necessary)
List of Subcontracting List of : Supplier
Opportunities Opportunities
Rev 6/2/98
ATTACHMENT 1C
Page 2 0f 3
2.) Did you obtain a current list of M/WBE firms from the City's M/WBE Office? The lisI.-
considered in compliance, if it is not more than 3 months old from the date of the bid opening.
Yes Date of Listing / /
No
3.) Did you solicit bids from M/WBE firms, within the subcontracting and/or supplier areas
previously listed, at least ten calendar days prior to the bid opening by mail, exclusive of the
day the bids are opened?
Yes If yes, attach M/WBE mail listing to include name of firm and address and a
No dated copy of the letter mailed.
4.) Did you solicit bids from M/WBE firms, within the subcontracting and/or supplier areas
previously listed, at least ten calendar days prior to the bid opening by telephone, exclusive of
the day the bids are opened?
Yes If yes, attach list to include name of M/WBE firm, person contacted
No phone number and date and time of contact.
Note: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a
facsimile is used, attach a fax confirmation, which is to provide M/WBE name, date, fax number and L
'&o Umentation faxed.
1C lis_ of�MM/BENOW
��yy"s ten po� les`s` theib"id`dermust, contact theenbre list o e n{
��M �'�. .igbY'+,,,�'+O :t �'
nce th 4u t ons.3 and=4 If a SlC list of MMIBE is,more h M� O- the W deus sconta
o thErds of�the list,;but.not less than.ten,to'..bb'in complianceAwith,questions 3 an4 ; :.
kr,+
6.) Did you provide plans and specifications to potential M/WBEs or information regarding the
location of plans and specifications in order to assist the M/V1/BEs?
Yes
No
6.) If the M/WBE bids were received and rejected, you must:
(1) List the M?WBE firms and reason(s) for rejection (i.e. quotation not commercially
reasonable, qualifications, etc.) and
(2) Attach affidavit and/or documentation to support the reason(s) listed below (i.e. letters,
memos, bids, telephone calls, meetings, etc.)
(Please use additional sheets,if necessary,and attach)
Company Name Telephone Contact Person Scope of Work Reason for
Rejection
i�
N� ADDITIONAL INFORMATION:
Rev 6/2/98
• ATTACHMENT 1C
Page 3 of 3
Please provide additional information you feel will further explain your good and honest efforts to
obtain M/WBE participation on this project.
The bidder further agrees to provide, directly to the City upon request, complete and
accurate information regarding actual work performed on this contract, the payment
therefore and any proposed changes to the original arrangements submitted with this bid.
The bidder also agrees to allow an audit and/or examination of any books, records and files
held by their company that will substantiate the actual work performed on this contract, by
an authorized officer or employee of the City.
Any intentional and/or knowing misrepresentation of facts will be grounds for terminating
the contract or debarment from City work for a period of not less than three (3) years and
for initiating action under Federal, State or Local laws concerning false statements. Any
failure to comply with this ordinance and creates a material breach of contract may result in
a determination of an irresponsible offeror and barred from participating in City work for a
period of time not less than one (1) year.
The undersigned certifies that the information provided and the M/WBE(s) listed was/were
contacted in good faith. It is understood that any M/WBE(s) listed in Attachment 1C will be
contacted and reasons for not using them will be verified by the City's M/WBE Office.
Authorized Signature Printed Signature
Title Contact Name and Title (if different)
Company Name Contact Telephone Number.(s)
Address Fax Number
City/State/Zip Date
Rev 6/2/98
ORDINANCE NO. 11923
REPEALING ALL MINORITY AND WOMEN BUSINESS ENTERPRISE
POLICIES AND DISADVANTAGED BUSINESS ENTERPRISE POLICIES
PREVIOUSLY ADJUSTED; ADOPTING AN ORDINANCE TO REMEDY
THE UNDERUTILIZATION OF MINORITY AND WOMEN BUSINESSES,
AND TO ENHANCE THE UTILIZATION OF SAME; DEFINING MINORITY
BUSINESS ENTERPRISE, AND WOMEN BUSINESS ENTERPRISE FOR
PURPOSE OF CERTIFICATION; REQUIRING MINORITY BUSINESS
ENTERPRISE AND WOMEN BUSINESS ENTERPRISE PARTICIPANTS TO
BE QUALIFIED AND DOING BUSINESS IN LOCALITY FROM WHICH
THE CITY REGULARLY SOLICITS; ADOPTING THE U.S. SMALL
BUSINESS ADMINISTRATION'S DEFINITION FOR A SIZE STANDARD;
ESTABLISHING SEPARATE GOALS FOR MINORITY BUSINESS
ENTERPRISES AND WOMEN BUSINESS ENTERPRISES IN THE SPECIFIC
AREAS OF CONSTRUCTION, PROFESSIONAL SERVICES AND
PURCHASING; ESTABLISHING PROCEDURES FOR PROJECT SPECIFIC
GOALS; PROVIDING GENERALLY FOR THE PROCEDURES TO BE
FOLLOWED IN THE BID/PROPOSAL PROCESS; REQUIRING BIDDERS
TO SUBMIT DOCUMENTATION OF COMPLIANCE IN ORDER TO BE
RESPONSIVE TO BID/PROPOSAL SPECIFICATIONS; ESTABLISHING
WAIVER OF GOALS PROCEDURES; ALLOWING FOR DEBARMENT FOR
MISREPRESENTATION OF FACTS AS IT RELATES TO COMPLIANCE;
PROVIDING SEVERABILITY CLAUSE; AND PROVIDING AN EFFECTIVE
DATE.
WHEREAS, the City Council commissioned an Availability/Disparity Study
(Study) conducted by Browne, Bortz & Coddington, Inc. (BBC) and
a Public Hearing (Hearing) conducted by Carl Anderson, Esq., and
found disparities in the utilization of minority and women business
enterprises in contracts awarded by the City of Fort Worth (City);
and
WHEREAS, the Study and Hearing found that discrimination occurred in the
major contracting areas (construction, purchasing, and professional
services) of the City of Fort Worth and resulted in significant
underutilization of minority and women business enterprises; and
WHEREAS, minority and women business enterprises have had and continue to
have difficulties in obtaining financing, bonding, credit, insurance,
and assistance programs have not been effective in either remedying
. the effects of underutilization in City contracting or in preventing
ongoing underutilization; and
WHEREAS, the Study and the Hearing determined that race-neutral alternatives
for enhancing minority and women business enterprise contracting
are not completely sufficient; and
WHEREAS, the City has also been a passive participant in discriminatory
behavior practiced by private industry within the relevant
Marketplace in the award of contracts to minorities and women
businesses, the purpose of this ordinance is to overcome the effects
of this past underutilization and prevent any ongoing discrimination
in the City's contracting processes; and
WHEREAS, the provisions of this ordinance may increase the utilization of
minority and women business enterprises in contracts awarded by
the City of Fort Worth; and
WHEREAS, the City Council now desires to provide a narrowly tailored remedy
for past underutilization of minority and women businesses through
the annual setting and defining of percentage goals for different
categories of contracts, providing penalties for fraudulent misuse of
this ordinance, requiring regular review of the necessity for the
provisions of this ordinance, limiting those minority and women's
business enterprises that participate under this ordinance to those
that qualify and do business in the City's Marketplace, providing for
post bid submission of required information about minority and
women business enterprises and establishing waiver of goals
procedures;
NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY
OF FORT WORTH, TEXAS, THAT:
SECTION 1.
It is the policy of the City of Fort Worth to attempt to provide
a remedy for past underutilization of qualified minority and women
businesses and prevent ongoing underutilization of minority and
women business enterprises in the City's contracting process by
ensuring the full and equitable participation of minority and women
business enterprises in the provision of goods and services to the
City on a contractual basis in the manner identified in Attachment I
of this ordinance.
SECTION 2.
The ultimate goal of this ordinance is to remedy the effects of
past underutilization in the Marketplace by increasing the use of
minority and women business enterprises above the present low
M level to one more comparable to their availability in the Fort Worth
Marketplace. The City Manager shall set an annual goal for MBE
and WBE participation in City procurement activities, based upon
the availability within the Marketplace. The initial goals, based
upon availability, shall be thirteen percent ( 13%) for minority
businesses and twelve percent (12%) for women businesses and shall
be reviewed as provided for elsewhere herein. These goals are not
quotas.
SECTION 3.
■ The provisions of this ordinance shall apply to all contracts
awarded by the City, except as may be hereafter specifically
exempted, and shall be liberally construed for the accomplishment
of its policies and purposes. Specific goals shall be established in
the areas of construction, professional services and purchases of
other goods and services. Goals may be set on individual projects
based on the type of work or services to be performed, or goods to
rbe acquired and the availability of minority and women businesses
in the City's Marketplace.
rSECTION 4.
The provisions of this ordinance shall be considered in
determining the responsiveness to specifications of offerors to the
bid/proposal. The City shall consider the offeror's responsiveness
ir
-3-
to this ordinance in the evaluation of bids/proposals and shall award
contracts to the lowest responsible offeror meeting the
specifications, inclusive of compliance to this minority and women
business enterprise ordinance.
SECTION 5.
Debarment procedures shall be established for firms willfully
misrepresenting the facts in compliance with this ordinance to the
City.
SECTION 6.
Waiver procedures to the regulations established in this
ordinance shall be provided for City procurement activities where a
public calamity requires the emergency expenditure of funds; the
purchase of goods or services from source(s) where subcontracting
or supplier opportunities are nonexistent; where an economic risk or
undue delay for the acquisition of goods or services will be imposed
on the City, or when the availability of minority and women
businesses is negligible.
SECTION 7. s
From and after the date this ordinance takes effect, it shall
supersede all previous City Council Policies affecting minority and
women business enterprise and disadvantage business enterprises.
SECTION 8.
The City Manager, with the advice and counsel of the
Disadvantaged Business Enterprise Advisory Committee ("DBEAC")
in accord with City of Fort Worth Resolution No. 1148, is hereby
-4-
authorized to establish, implement and administer regulations
necessary to carry out the intent of this ordinance.
SECTION 9.
The City Council shall regularly, at least every three (3) years,
determine whether there is a continuing need for a minority and
women business enterprise program, make relevant findings, and, if
�. necessary, repeal in whole or in part or enact appropriate
amendments to this ordinance.
SECTION 10.
It is hereby declared to be the intention of the City Council
that the sections, paragraphs, sentences, clauses and phrases of this
ordinance are severable, and, if any phrase, clause, sentence,
paragraph or section of this ordinance shall be declared
unconstitutional by the valid judgment or decree of any court of
competent jurisdiction, such unconstitutionality shall not affect any
of the remaining phrases, clauses, sentences, paragraphs and
sections of this ordinance, since the same would have been enacted
by the City Council without the incorporation in this ordinance of
any such unconstitutional phrase, clause, sentence, paragraph or
section.
SECTION 11.
This ordinance shall take effect and be in full force and effect
from on and after June 1 , 1995 : provided, however, that this
ordinance shall not affect any procurement activity where formal
solicitation began before the effective date of this ordinance, and it
is so ordained.
-5-
APPROVED AS TO FORM AND LEGALITY:
City Attorney: Gary Steinberger, Assistant City Attorney
Date Original Signed:, APRIL 19. 1995
Date Adopted by the City Council: APRIL 18. 1995
Date Effective: JUNE 1. 1995
ATTACHMENT I
I_ DEFINITIONS :
1. "Bidder" means any person, firm, corporation, or partnership,
which submits a bid or proposal to provide labor; goods or
services to the City where City funds are expended. The term
includes the term "Offeror" as well as offers received from
providers of professional services.
2. " Certified " means those firms, within the Marketplace, that
are certified by either the North Central Texas Regional
Certification Agency (NCTRCA) or the Texas Department of
Transportation (TxDOT), highway division.
3 . " City" means the City of Fort Worth, Texas.
4. "Construction " means the erection, rehabilitation, alteration,
conversion, extension, demolition, improvement, remodeling or
repair to any real property, including streets, storm drains and
facilities providing utility service owned by the City.
5 . "Contract" means a binding agreement whereby the City either
grants a privilege or is committed to expend or does expend its
funds or other resources for or in connection with a)
construction of any public improvement, and b) purchase of
any services (including professional services). The term
includes "purchase order".
6. "Contract Officer" means the person employed by the City to
oversee the performance of the contract.
7. "Contracting Department" means the department responsible
for payment of contract obligations.
8 . "Contractor" means the person, firm, corporation, or
partnership with which the City has entered into an agreement.
Includes the terms "Vendor" and "Prime Contractor".
9. "Coordinator" means the administrator of the MBE/WBE
Office.
10. "Good Faith Effort" means having: absence of malice or any
intentions to deceive; good intentions and sincerity to meet the
goals of this ordinance. Documentation submitted by the
bidders to explain why its good and honest efforts did not meet
or exceed the stated MBE/WBE goals. Compliance with each
of the following is required for a Good Faith Effort:
-7-
10. 1 . List each and every subcontracting and/or supplier
Opportunity for the completion of this project.
10.2. Obtain a current (less than two (2) months old from the
bid open date) list of M/WBE subcontractors and/or
suppliers from the City's M/WBE Office.
10.3. Attend the pre-bid conference, if scheduled by the City,
and attempt to utilize M/WBEs that attended.
10.4. Solicit bids from M/WBEs, within the subcontracting
and/or supplier areas previously listed, at least ten days
prior to bid opening by mail.
10.5. Solicit bids from M/WBEs, within the subcontracting
and/or supplier areas previously listed, at least ten days
prior to bid opening by telephone.
10.6. Solicit bids from M/WBEs, within the subcontracting
and/or supplier areas previously listed, at least ten days
prior to bid opening by advertisement in a local
newspaper.
10.7. Provide plans and specifications or information
regarding the location of plans and specification to
M/WBEs.
10.8. Submit documentation if M/WBE bids were rejected on
the basis of quotation not being commercially
reasonable, qualifications, etc.
Note: If a SIC code list of M/WBEs is five or less, the bidder
must contact the entire list to be in compliance with
10.4 and 10.5. If a SIC code list of M/WBEs is more
than five, the bidder must contact at least two-thirds of
the list but not less than five to be in compliance with
10.4 and 10.5.
Note: Bidders who continuously list the same M/WBEs when
contact has previously been unsuccessful as result of
disconnected numbers or returned mail, will not be
deemed in compliance with the Good Faith Effort
requirements.
11 . "Joint Venture" means an association of two or more persons
or businesses to carry out a single business enterprise for
Profit for which purpose they combine their property, capital,
skills, knowledge and management in an agreed to
proportionate share.
-8-
12. "Marketplace" means the geographic market area represented
by the Fort Worth/Dallas Consolidated Metropolitan Statistical
Area.
13 , "Minority " means a citizen of the United States or lawfully
admitted permanent resident that is Asian American, American
Indian, Black or Hispanic.
(A) "Minority Business Enterprise" is defined as a qualified
business concern currently doing business and/or located in the
Marketplace area meeting the following criteria:
( 1 ) which is at least 51 percent owned by one or more
minority persons, or, in the case of any publicly owned
business, at least 51 percent of the stock is owned by one
or more minority persons; and
(2) whose management and daily business operations are
controlled by one or more minority persons who own it;
and
(3) meeting the size standards set forth by SBA.
(B) "Procurement" means the buying, renting, leasing or
otherwise obtaining or acquiring any supplies, materials,
equipment or services.
(C) "Professional Services" means services which require
predominantly mental or intellectual labor and skills, includes,
but is not necessarily limited to, architects, engineers,
surveyors, doctors, attorneys, and accountants.
(D) "Project Manager" see Contract Officer.
(E) "Purchasing" means the buying, renting, leasing or otherwise
obtaining or acquiring any supplies, materials, equipment or
services excluding construction and professional services
previously defined.
I'FF) " Qualified " means an individual or business entity having
previously performed or received training in the work, industry
or profession required.
(G) " Size Standard" is the average annual gross receipts for a
company and its affiliates for the previous three (3) fiscal
years which must not exceed the amounts as defined by the
United States Small Business Administration's (SBA) standard
industry classification (sic) codes. These codes are outlined in
the most recent edition of SBA 49 CFR 23 .62, Appendix B and
13 CFR 121 .401 -407 and 601 .
-9-
(H) " Subcontract" means an agreement between the contractor and
another business entity for the performance of work.
(I) "Women Business Enterprise" is defined as a qualified
business concern currently doing business and/or located in the
Marketplace area meeting the following criteria: r
( 1 ) which is at least 51 percent owned by one or more
women, or, in the case of any publicly owned business, at
least 51 percent of the stock is owned by one or more
women; and
(2) whose management and daily business operations are
controlled by one or more women who own it, and
(3) meeting the size standards set forth by SBA. -
II. PROGRAM GOALS y
(A) Citywide goals for the utilization of minority business
enterprises (MBE) and women business enterprises (WBE) shall
be reviewed annually by the City Council.
( 1 ) The City Manager shall, on or before October 31 of each year,
beginning October 31 , 1996, conduct an analysis of the availability
of MBEs and WBEs and present to the City Council an annual
report on MBE and WBE availability and utilization. Based on r
availability of MBE/WBEs in the Marketplace and the City's most
recent goals attainment and with the advice and counsel of the
DBEAC, the City Manager shall recommend to the City Council -
reasonable goals for the remainder of the current fiscal year.set
goals for the remainder of the current fiscal year.
(2) These goals shall be expressed in terms of percentages of the
total dollar value of all contracts to be awarded by the City, and
shall be established separately for all categories of construction
professional services, and purchasing as well as any other
categories that the City Council or City Manager deem appropriate.
(B) Individual project goals shall be set by the M/WBE Office in
collaboration with the Contract Officer and Risk Management
(where appropriate) prior to solicitation. These project goals
shall be reasonable and shall be based upon:
( 1 ) Specific subcontracting and/or materials opportunities
required to complete the project, and
-10-
(2) The availability of MBE/WBE in the identified
subcontracting and,`or materials opportunities in the
Marketplace.
(C) MBE/WBE participation shall be counted toward meeting MBE
and WBE goals in accordance with the following provisions :
( 1 ) For the purpose of determining compliance with the goals
requirements established in this ordinance, businesses
will be counted as MBE and WBE only when they have
been certified as such prior to award of the bid or
proposal.
(2) Any business(es) listed by an offeror, which is not
certified prior to, award of bid proposal will have that
amount of participation deducted from the total
MBEIWBE utilization in order to determine the offeror's
responsiveness. It is the responsibility of the offeror to
secure additional certified or certifiable MBE/WBE
participation before responsiveness to this ordinance is
determined.
(3) The offeror may count toward its MBE or WBE goals first
and second tier MBE and WBE subcontractors and/or
suppliers.
(4) The offeror will be given credit toward the MBE/WBE
contract goal only when the MBE or WBE performs a
commercial useful function. An MBE or WBE is
considered to perform a commercially useful function
when:
(a) it is responsible for the execution of a distinct element
of the work by actually performing, managing and
supervising the work involved in accordance with
normal business practice; and
(b) when the firm receives due compensation as agreed upon
for the work performed.
(5) Regardless of whether an arrangement between the
contractor and the MBEJPWBE represents standard industry
practice, if the arrangement erodes the ownership, control
or independence of the MBE/WBE or does not meet the
commercially useful function requirement, the offeror
shall receive no credit toward the goals.
(6) An offeror may count toward its MBE or WBE goal a
portion of the total dollar value of a contract with a joint
venture equal to the percentage of MBE or WBE
-11-
participation in the joint venture. The MBE or WBE involved
in the joint venture must be responsible for a clearly defined
portion of the work to be performed, equal to a share in the
ownership, control, knowledge, management, responsibility,
risks, and profits of the joint-venture.
(7) Except for joint ventures, all prime contractors, whether
same is a majority firm, MBE or WBE, shall comply with
this ordinance in order to be considered responsive.
(8) The bidder may not count toward the goal any agreements
with MBE or WBE that are not located within the
Marketplace or otherwise do not meet the guidelines as
set forth in this section.
III. MBE AND WBE UTILIZATION REQUIREMENTS
(A) In addition to the requirements set forth elsewhere, bid
conditions and requests for proposals shall include a statement
of both MBE and WBE goals established for the project.
(B) Bid conditions, requests for proposals, and all other specifications
for contracts to be awarded by the City shall require that offerors
make a good faith effort to subcontract with or purchase supplies
from MBE and WBE. Such specifications shall require the offeror
to meet or exceed the stated goals or submit documentation of GFE
for all contracts of $25,000 or more to permit a determination of
compliance with the specifications.
(C) Construction and Professional Services contracts and such
other contracts which may be completed for under sealed
proposal procedures (estimated cost of $25,000 or more) and
Purchasing contracts (estimated cost of $ 15,000 or more) shall
be awarded and administered in accordance with the following
standards and procedures:
(1) Competitive bids shall include the MBE and WBE specifications
in the bid specifications. MBE and WBE specifications consist
of the SPECIAL INSTRUCTIONS TO BIDDERS, AFFIDAVIT
STATEMENT, MBE/WBE UTILIZATION FORM, PRIME
CONTRACTOR WAIVER FORM and the GOOD FAITH EFFORT
FORM.
(a) The AFFIDAVIT STATEMENT shall be submitted with
the bid on the bid opening date.
(b) The MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR _
WAIVER FORM and/or the GOOD FAITH EFFORT FORM shall
be submitted to the contracting department no later than 5:00 p.m.,
five (5) City business days after bid opening date.
-12- ,
(c) An offeror that equal or exceeds the MBE and WBE
project goals, must submit the MBE/WBE Utilization
Form.
(d) the PRIME CONTRACTOR WAIVER FORM shall be
submitted with any bid that includes no subcontracting
and/or supplier opportunities. If substantial
subcontracting and/or substantial supplier opportunities
arise in the performance of the contract awarded in the
reliance on the PRIME CONTRACTOR WAIVER FORM,
the contractor shall notify the City before subcontracts
for the work and/or supplies are let and the contractor
shall comply with the requirements of this ordinance.
(e) GOOD FAITH DOCUMENTATION, including the GOOD
FAITH EFFORT FORM, shall be submitted with any bid
and/or proposal that fails to include MBE/WBE
participation that equals or exceeds the MBE/WBE
project Goals.
(f) The submission of the applicable completed form(s)
within the allotted time will be considered when
determining the responsiveness of the bid. Failure
to comply with the bid specifications, inclusive of
the MBE and WBE specifications, shall render the
bid non-responsive.
(2) Other that responses to Requests For Proposals for those
professional services defined in Chapter 2254 of the
Texas Government Code, responses to Requests for
Proposals shall include a section which identifies the
particular MBEs and/or WBEs to be utilized in
performing the contract.
(a) Specify as to MBEs and WBEs, the estimated percentage
of the MBE and WBE participation, the type of work to
be performed by the MBE or WBE, and such other
information as may be reasonably required to determine
the responsiveness to the Request for Proposal.
(b) Responses that do not meet or exceed the MBE and WBE
utilization goals, as required by the request for
proposal, must submit a GFE explanation. Failure to
include such GFE explanation shall render the response
non-responsive.
(3) Initial responses to requests for proposals for those
professional services defined in Chapter 2254 of the Texas
Government Code shall not include a response to the
-13-