HomeMy WebLinkAboutOrdinance 9751 B
ta
ORDINANCE NO.
AN ORDINANCE DETERMINING THE NECESSITY FOR AND ORDERING AMID PROVIDING
FOR THE IMPROVEMENT OF A PORTION OF RAYNER AVENUE
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN
THE CITY OF FORT WORTH, TEXAS; LETTING CONTRACT TO JAMES W.
JACKSON, INC. AND FOR THE MAKING AND CONSTRUCTION OF SUCH IMPROVIIMENTS
AND AUTHORIZING ITS EXECUTION; MAKING APPROPRIATIONS FOR THE PURPOSE
OF PAYING THE INDEBTEDNESS THEREBY INCURRED; MAKING PROVISIONS FOR
THE LEVYING OF ASSESSMENTS AGAINST ABUTTING PROPERTIES AND THE OWNERS
THEREOF FOR A PART OF THE COST OF SUCH IMPROVEMENTT'S AND THE ISSUANCE
OF ASSIGNABLE CERTIFICATES IN EVIDENCE OF SUCH ASSESSMENTS; DIRECTING
THE CITY SECRETARY TO FILE A NOTICE OF ADOPTION OF THIS ORDINANCE
WITH THE COUNTY CLERK OF TARRANT COUNTY, TEXAS; DECLARING THAT THIS
ORDINANCE AND ALL SUBSEQUENT PROCEEDINGS RELATING TO SAID STREET
IMPROVEMENT ARE AND SHALL BE PURSUANT TO THE ACT OF THE FIRST CALLED
SESSIONS OF THE FORTIETH LEGISLATURE OF THE STATE OF TEXAS, CHAPTER
106; COMMONLY KNOWN AS ARTICLE 1105b CF VERNON'S TEXAS CIVIL STATUTES
AS AMENDED BY ACTS 1967, 60TH LEGISLATURE, PAGE 365, CHAPTER 176,
SECTION 1, EMERGENCY EFFECTIVE MAY 12, 1967; AND DIRECTING THE CITY
SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION
OF SAME IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING THE
COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY
AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the Public Works Director for the City of Fort Worth, Texas has prepared
Plans and Specifications for the improvements of the hereinafter described portions
of streets, avenues and public places in the City of Fort Worth, Texas, and same
having been examined by the City Council of the City of Fort Worth, Texas, and found
to be in all matters and things proper, NOW THEREFORE:
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT:
I.
The hereinafter described Plans and Specifications are hereby approved and
adopted.
II.
There exists a public necessity for the improvement of the hereinafter
described portions of streets, avenues and public places in the City of Fort
Worth, Texas, to wit:
RAYNER AVENUE From East First Street to S.H. 121 , known
and designated as Project No. 29-024320-00.
III.
Each of the above described portions of streets, avenues and public places in the
City of Fort Worth, Texas, shall be improved by raising, grading, and filling same and
by constructing thereon the following to-wit:
RAYNER AVENUE From East First Street to S.H. 121 , ]mown and des-
ignated as Project No. 29-024320-00, a six-inch
thick reinforced concrete pavement with seven-inch
high monolithic concrete curb on a six-inch thick
lime stabilized subgrade so that the finished road-
way will be forty feet wide. Six-inch thick concrete
driveway approaches will be constructed where required.
The above, together with concrete curbs, gutters, driveways and incidentals to
such improvements, on proper grade and line where same are not already so constructed,
together with storm sewers and drains and other necessary incidentals and appurtenances;
all of said improvements to be constructed as and where shown on the Plans and
Specifications therefore.
IV.
The cost of said improvements as herein defined shall be paid for as follows,
to-wit:
A. The property abutting on that portion of the street, avenue or public place
and the real and true owners therof shall pay all of the cost of curbs and gutters in
front of their property and not exceeding nine-tenths (9/10ths) of the estimated cost of
the remainder of such improvements.
B. The City of Fort Worth shall pay all of the remainder of the cost of said
improvements after deducting the amounts herein specified to be paid by the abutting
properties and the real and true owners thereof as set out in subsection A.
The amounts payable by the abutting properties and the real and true owners
thereof shall be assessed against such properties and the real and true owners thereof
and shall constitute a first and prior lien upon such properties and a personal
liability of the real and true owners thereof and shall be payable to-wit:
When the improvements are completed and accepted by the City on a particular
unit, the sums assessed against property abutting upon such completed and accepted units
shall be and become payable in five (5) equal installments, due respectively on or
before thirty (30) days, and one (1 ), two (2), three (3) , and four (4) years from the
date of such completion and acceptance and the assessments against the property abutting
upon the remaining units shall be and became due and payable in such installments after
the date of completion and acceptance of such respective unit. The entire amount
assessed against the particular parcels of property shall bear interest from the date of
such completion and acceptance of the improvements on the unit upon which the particular
property abuts at the rate of eight (8%) percent per annum, payable annually except as
to interest on the first installment, which shall be due and payable on the date said
installment matures provided that any owner shall have the right to pay any and all of
such installment at any time before maturity by paying principal with interest accrued
to the date of payment and further provided if default be made in the payment of any
installment promptly as the same matures, then at the option of the City of Fort Worth
or its assigns, the entire amount of the assessment upon which such default is made
shall be and become immediately due and payable; but it is specifically provided that no
assessments shall in any case be made against any property or any owner therof in excess
of the special benefits to property in the enhanced value therof by means of said
improvements in the unit upon which the particular property abuts, as ascertained at the
hearing provided by the law in force in the City, nor shall any assessment be made in
any case until after notice of hearing as provided by law. Said assessments against the
respective lots and parcels of property and owners thereof shall be evidenced by
certificates of a special assessment which shall be executed in the name of the City of
Fort Worth, PROVIDED, however, that acting through its duly authorized Director of
Public Works, the City of Fort Worth retaining the right to authorize payment of the
sums assessed against abutting property upon such completed and accepted unit in not
more than forty-eight equal regular monthly installments of not less than $9.00 each,
the first of such installments to become due and payable not more than 30 days after the
-3-
completion and acceptance by the City of the particular unit, PROVIDED FUR19M, that the
City Attorney is hereby empowered to authorize payments of said sums in lesser
installments and/or over a longer period of time in cases in which the Director of
Public Works has previously determined that an extreme financial hardship upon the
property owner will otherwise result and PROVIDED FOFMM, that such method of payment
shall be authorized only in instances where the owner or owners of property abutting
upon such completed and accepted unit shall have executed and delivered to the City of
Fbrt Worth a lawful, valid and binding note and mechanic's and materialman's contract
upon forms supplied by the City granting a mechanic's lien upon and conveying the said
abutting property in trust to secure the payment by said owner or owners according to
the terms thereof of the sums assessed against such property.
V.
The assessments against the respective lots and parcels of property and the
owners thereof shall be evidenced by certificates of special assessment, which shall be
executed in the name of the City by the Mayor of said City and the City Secretary shall
attest the same and impress the corporate seal of the City thereon, and which may have
attached thereto coupons in evidence of the several installments, or in evidence of any
of the installments in Which the assessment is payable, which certificates shall be
issued to the City of Fort Worth, shall recite the terms and time of payment, the amount
of assessment, the description of the property, and the name of the owners, as far as
known, and shall contain such other recitals as may be pertinent thereto, and shall
further recite substantially that all proceedings with reference to the making of such
improvements have been regularly had in canpliance with law, and that all prerequisites
to the fixing of the assessment lien against the property described in said certificates
and the personal liability of the owners thereof, have been regularly had, done and
performed, and such recitals shall be prima facia evidence of the matters so recited,
and no further proof shall be required in any court, and the said certificates shall
provide substantially that if default be made in the payment of any installment pramptly
as the same matures, then, at the option of the City of Fort Worth, or its assigns, the
entire amount of the assessment shall be and become immediately due and payable,
together with reasonable attorney's fees and costs of collection, if incurred, all of
which, as well as the principal and interest on the assessment, shall be a first and
prior lien against the property, superior to all other liens and claims except State,
County, School District, and City ad valorem taxes. No error or mistake in naming any
owner or in describing any property or in any other matter or thing, shall invalidate
any assessment or any certificate issued in evidence thereof, and the omission of
improvements on any particular unit or in front of any property exempt by law from the
lien of special assessment for street improvements shall not invalidate any assessment
levied. The certificates referred to need not contain recitals in exactly the works
above provided for, but the substance thereof shall suffice, and they may contain other
and additional recitals pertinent thereto.
VI.
Bids having been advertised for as required by Article 1105b of the revised Civil
Statutes of Texas, as amended, and the bid of JAMES W. JACKSON, I*.C. having been found
to be the lowest and best bid for the making and construction of said improvements, the
contract therefore is hereby awarded to JAMES W. JACKSON, INC. , at and for the prices
stated in the Proposal of said company and as reported and recommended by the Public
Works Department, Which said report and
recommendation is on file with the City, the City Manager, and the City Secretary are
hereby directed to execute the said contract in the name of the city of Fort Worth,
Texas, and to impress the corporate seal of the City thereon, the said contract
embracing, among other things, the prices for the work.
VII.
To provide for the payment of the indebtedness incurred by the City of Fort
Worth, Texas, by said contract, there is hereby appropriated out of available funds and
current revenues of the City, an amount sufficient to pay said indebtedness so incurred.
VIII.
The improvements provided for herein shall be made and constructed, notice given,
hearing held and assessment levied and all proceedings taken and had in accordance with
and under the terms of the powers and provisions of Chapter 106 of the Acts of the First
Called Session of the Fortieth Legislature of the State of Texas, now known as Article
1105b of Vernon's Texas Civil Statutes, as amended, which law has been adopted as an
amendment to and made a part of the Charter of the City of Fort Worth, Texas, and under
which law these proceedings are taken and had.
IX.
Each unit above described shall be and constitute a separate and independent unit
of improvement and the assessments herein provided for shall be made for the improvements
in each unit according to the cost of the improvements in that unit and according to the
benefits arising from the improvements in that unit.
X.
In making assessments, if the name of the owner be unknown, it shall be
sufficient to so state the fact, and if any property be owned by an estate or by any
firm or corporation, it shall be sufficient to so state, and it shall not be necessary
to give the correct name of the owner, but the real and true owners of the property
mentioned shall be liable and the assessments against the property shall be valid.
XI.
The Director of Public Works of the City of Fort Worth, Texas, be and he is hereby
ordered and directed to file with the City Council, estimates of the cost of such
improvements in each unit, in accordance with the terms of the powers and provisions of
the Charter of the City of Fort Worth, Texas.
XII.
The City Secretary is directed to prepare, sign and file with the County Clerk of
Tarrant County, Texas, a notice in accordance with the provisions of the Act passed at
the Fifth Called Session of the Forty-first Legislature of the State of Texas, and shown
as Chapter 21 of the Acts of said Session of the Legislature, said Act having been passed
in the year 1930, and now known as Article 1220a of Vernon's Texas Civil Statutes.
-5-
9
XIII.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council and by filing the
complete ordinance in the appropriate Ordinance Records of this City.
XIV.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS / DAY OF , 19
APPROVED AS TO FORM AND IBGALITY:
ity Attorney
-6-
s City of Fort Worth, Texas
Mayor and Council Communication
DATE REFERENCE SUBJE PAG
NUMBER MAIN REPLACEMENT AND AWARD OF CONTRACT FORI
10-28-86 C-9945 ONSTRUCTION OF RAYNER AVENUE FROM EAST Iof
FIR51 SIRELI 10 SH 121 (AIRPORT FREEWAY)
RECOMMENDATION
It is recommended that the City Council:
1. approve the following bond fund transfer:
FROM TO AMOUNT REASON
94-009905-00 94-024320-00 $54,722 To provide funds for
Special Assessment Rayner Avenue the property owner's
Unspecified share of construction
cost.
29-025901-00 29-024320-00 $150600 _b To provide funds for
Reconstruction Rayner Avenue �- --�� the City's share of
Unspecified the construction cost.
2. authorize the City Manager to execute a contract with James W. Jackson,
Inc. for the construction of Rayner Avenue from East First Street to
SH 121 (Airport Freeway);
3. authorize the City Manager to reject the bid proposals for Water Contract
(Unit I), 10-Inch Water Main Replacement in Rayner Avenue, since all the
contractors failed to comply with bid specifications.
4. adopt the attached ordinance: Adopted Ordir ice No.7 1
0
A. declaring the necessity for and ordering the improvements;
B. making provisions for levying the assessments;
C. directing the Transportation and Public Works Department to prepare
estimates and amounts to be assessed;
D. awarding the contract to James W. Jackson, Inc., in the amount of
$70,306.40 based on their lowest responsive bid for street
construction;
E. making appropriations to cover the indebtedness thereby incurred for
improvements of the project described below; and
�►�sy
5. adopt the attached ordinance:
A. approving the estimate of costs and amounts proposed to be assessed;
and,
DATE REFERENCE SUBJECT:REJECTION OF CONTRACT FOR 10 INCH ATERPACE
NUMBER AIN REPLACEMENT AND AWARD OF CONTRACT FO 2 4
10-28-86 C-9945 iONSTRUCTION OF RAYNER AVENUE FROM EAST °'
FIRST STREET TO SH 121 (AIRPORT FREEWAY)
B. setting November 25, 1986, as the date for the benefit hearing.
BACKGROUND
On August 16, 1985, the Transportation and Public Works Department received
paving petitions signed by the owners of 55.2 percent of the land adjacent to
Rayner Avenue between East First Street and State Highway 121 (Airport
Freeway), requesting the street to be improved on the assessment basis. The
street is open on the ground and is being used by the public. All of the
adjacent property is Zoned "I" and "J" (Light Industrial), and is partially
developed.
On October 1, 1985 (M&C G-6449), the City Council authorized the Director of
Transportation and Public Works to design the improvement of Rayner Avenue with
in-house forces and advertise the project for bids. The Water Department
determined that an existing 10 inch water main in Rayner Avenue was in need of
replacement, and engineering plans were prepared for advertisement with the
street construction project. This 10-inch water main, however, will be replaced
by the Water Department Field Operations crews.
PROJECT DESCRIPTION
ROADWAY R.O.W.
STREET LIMITS WIDTH-FEET WIDTH-FEET
Rayner Avenue From East First 40 70
Street to SH 121
(Airport Freeway)
PROPOSED IMPROVEMENTS
It is proposed to improve this segment of Rayner Avenue with a 6-inch thick
reinforced concrete pavement and a 7-inch high concrete curb on a 6-inch thick
lime stabilized subgrade. Concrete driveway approaches will be constructed
where required. The new roadway will be 40 feet wide in the existing 70 foot
wide right-of-way.
RECEIPT OF BIDS
Bids for the project were received September 11, 1986, after being advertised
on August 21 and 28, 1986, with 30 working days allotted.
The bids are tabulated as follows:
DATE REFERENCE SUBJECT:REJECTION OF CONTRACT
NUMBER AIN REPLACEMENT AND AWARD OF CONTRACT FO AE 4
10-28-86 C-9945 CONSTRUCTION OF RAYNER AVENUE FROM EAST of
-FIRST STREH IU SH M (AIKPURT FRE-EW
UNIT I: WATER MAIN
BIDDER AMOUNT
Larry H. Jackson* $30,235.00
Circle C. Construction* $35,440.00
Lowell B. Allison* $35,473.58
Atkins Brothers, Inc.* $35,670.00
J.D. Vickers, Inc.* $35,859.00
Texas Diggers, Inc.* $38,280.00
*The staff has reviewed the bids received for compliance with all bid
specifications. It is the opinion of the staff that none of the bids submitted
for Unit I comply with the MBE/WBE Policy. It is proposed to reject all bids
for this unit.
UNIT II:
**Lowell B. Allison Contractors, Inc. $61,706.16
James W. Jackson, Inc. $70,306.40
XIT Paving & Construction, Inc. $70,838.25
Walt Williams Construction, Inc. $76,425.65
J.L. Bertram Const. & Engineering Inc. $76,626.00
Bob Moore, Inc. $77,123.33
PMA Concrete $81,709.75
Austin Road Company $82,341.59
Centerline Constructors, Inc. $86,193.25
Ed Bell Construction Company $86,997.90
APAC-Texas Inc, Texas $105,425.40
Bitulithic Division
**The staff reviewed bids received for compliance with all bid specifications.
It is the opinion of staff that the bid submitted by Lowell B. Allison
Contractors, Inc., was non-responsive to specifications as they did not comply
with the City's MBE/WBE Policy. The lowest responsive bidder James W. Jackson
Inc., is in compliance with the City's MBE and WBE Policy for this particular
bid.
PROJECT FINANCING
Based on the lowest responsive bid of $70,306.40 for street improvements,
$54,721.10 is anticipated to be the property owner's share of the project
costs. This amount will be provided by a bond fund transfer from the Special
Assessments Fund 94, Unspecified Account No. 009905-00 where sufficient funds
are available to Account No. 024320-00, Rayner Avenue.
DATE REFERENCE SUBJECT: REJECTION OF CONTRACT FOR 10 INCH WATERAGE
NUMBER MAIN REPLACEMENT AND AWARD OF CONTRACT FOR 4 4
10-28-86 C-9945 CONSTRUCTION OF RAYNER AVENUE FROM EAS of
FIRST STREET TO SH 121 AIRPORT FREEWAY
The cost to the City for street construction is calculated at $15,585.30. A
bond fund transfer is necessary from Street Improvement Fund 29, Project
No. 025901-00, Reconstruction Unspecified, in which sufficient funds are
available, to Project No. 024320-00, Rayner Avenue, to finance this project.
Sufficient funds are available in Street Improvements Fund 29, Account
No. 095103-00, Engineering Salaries, to finance engineering inspection and
administrative costs.
DAI :nh
APPROVED B`
CITY COUP CI
City secretary of the
City of Fort Worth,Texok
SUBMITTED FOR THE
CITY MANAGER'S DISPOSITION BY COUNCIL: PROCESSED BY
OFFICE BY: ❑ APPROVED
ORIGINATING ❑ OTHER (DESCRIBE)
DEPARTMENT HEAD: Gary Santerre CITY SECRETARY
FOR ADDITIONAL INFO'WrATT'fNet 7805 DATE
CONTACT: ��JJ I
uj
Lu
cc
MARSHALL
k, 2400 -25
0
10
F2
01 IR uj
3 7-
42
cl
n-
4 Avl
In
!n
9
r
7,r
A.
tl?_
JR-A
%
A I R PORT S.H. 121
1-R
72 j
5-
`�•� �• - J�~Ira O
22R
77 t
2
j7
L_._ i��17L
5R r
3 D TIL
Zi 2t;.0 EAST FIRST STREET
r,7j3 7
i�)s
9
L
.L
Fir-
!?
P& 44
PROJECT NO. 29-024320-00
RAYNER AVENUE
AIM, East First Street to S.H. 121
FORT WORTH, TEXAS
October 28 , 19 86
TO THE HCNORABIE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS.
Gentlemen :
In accordance with the proceedings of your Honorable Body, I have prepared
estimates of the cost of street improvements as shown below:
Estimates of the total cost of improvements on a portion of RAYNER AVENUE,
and portions of sundry other streets, avenues and public places in the City o Fbrt
Worth, Texas, and estimated amounts per front foot to be assessed against abutting
property and the owners thereof, on each portion of street, avenue and public place
are as follows, to-wit:
PRWECT NO. 29-024320-00, RAYNER AVENUE FROM EAST FIRST STREET TO S.H. 121, to be
improved by constructing a six-indh thickreinforced concrete pavement with
seven-inch high monolithic concrete curb on a six-inch thick lime stabilized
subgrade, so that the roadway will be forty feet wide. Six-inch thick concrete
driveway approaches will be constructed where required.
The following assessment rates have been established:
Six-inch thick reinforced concrete pavement................$44.32/L.F.
Seven-inch curb.................0......0......0............$ 3.43/L.F.
Six-inch thick concrete driveway approaches................$ 2.57/S.F.
The assessments result in the following division of cost:
TOTAL COST TO PROPERTY O e ERS (ASSESSKWM).................$ 54,721 .10
COST TO THE CITY OF FORT WORTH.............$ 15,585.30
Engineering, Inspection & Administration...$ 3,515.32
(5% of Project Bid $ 70,306.40)
TOTAL COST TO CITY OF FORT WORTH............................$ 19,100.62
TOTAL ESTIMATED CONSTRUCTION cOST...........................$ 73,821 .72
"'�1. kL
G. Dallas Williams
Am,, City Engineer
PROJECT NO. 29-024320-00, RAYNER AVENUE FROM EAST 1ST STREET Ta S.B. 121 , to be improved by
instructing a six-inch thick reinforced concrete pavement with seven-inch high monolithic con-
,ate curbs on a six-inch thick lime stabilized subgrade, so that the finished roadway will be
forty feet wide. Six-inch thick concrete driveway approaches will be constructed where
required.
OWNER & LBGAL DESCRIPTION ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST FIRST STREET INTERSECTS F. A. HIGH70WM ADDITION
WEMIDE
000001269232
JAMES L. BRITTAIN
3908 S FRWY I 83.50'Pavement 44.32 3700.72
FT WCC TX 76110 83.50'Curb 3.43 286.41
SIR LOT 1
E177.761N 1/2 1
163.701SF Dr. App 2.57 420.71
4407.84
ADJUSTED:
F. A. HIGHTOWER ADDITION
00001269240
VSS L. BRITTAIN
3908 S FRWY I 83.50'Pavement 44.32 3700.72
FT WORTH TX 76110 83.50'Curb 3.43 286.41
BIR LOT 1
E152.8' S 1/2 1
101 .701SF Dr. App 2.57 261.37
4248.50
ADJUSTED:
F. A. HIGHTOWER ADDITION
000001269259
JAMES L. BRITTAIN
3908 S FRWY I 84.00'Pavement 44.32 3722.88
FT WORTH TX 76110 84.00'+Curb 3.43 288.12
BIR IAT 2
E190.24'2
4011.00
ADJUSTED:
SUBTOTALTHIS pXZ.................................... 12667.34 -1-
& IBGAL DESCRIPTION ZONING FRONTAGE RATE AMOUNT ASSESSMENT
F. A. HIGHTOWER ADDITION
WESTSIDE
000001269275
JAMES L. BRITTAIN
3908 S FRWY I 84.00'Pavement 44.32 3722.88
FT WORTH TX 76110 84.00'Curb 3.43 288.12
BIR NOT 3
E 202.72'3
202.451SF Dr. App 2.57 520.30
4531 .30
ADJUSTED:
JOHN LITTLE SURVEY - A958
000005940788
ALMOND B. ODOR
115 N. RAYNER STREET J 100.00'Pavement 44.32 4432.00
FT WUM TX 76111 100.00'Curb 3.43 343.00
A 958 TR 45A01
A 958 TRS 45A & 45A1
93.951SF Dr. App 2.57 241 .45
5016.45
.�`OUSTED:
F. A. HIGHTOWER ADDITION
000004990137
R & T JOINT VENTURE
1901 W VICKERY J 50.00'Pavement 44.32 2216.00
FT WORTH TX 76102
BIR IAT 4
2216.00
ADJUSTED:
F. A. HIGHTOWER ADDITION
000005654769
R & T JOINT VERT URE 100.00'Adj. to:
121 N RAYNOR ST J 85.00'Pavement* 44.32 3767.20
FT WORTH TX 76111
BIR IyT 5
3767.20
ADJUSTED:
UBWTALTHIS PAGE.................................... 15530.95 -2-
OWNER & IBGAL DESCRIPTION ZONIM FRONTAGE RATE AMOUNT ASSESSMENT
a. 121 SECT'S DAVID EVANS ADDITION
EASTSIDE
000000876739
R C WOO JT. VENTURE
4909 AIRPORT FRWY I 78.00'Pavement 44.32 3456.96
FT WORTH TX 76117
BIR IDT 1 R
3456.96
ADJUSTED:
DAVID EVANS ADDITION
000000876747
J E GOUIDY
PO BOX 7655 I 200.00'Pavement 44.32 8864.00
FORT WORTH 76111
BIR LOT 2
LOTS 2 THRU 5
8864.00
DAVID EVANS ADDITION
000000876755
EFNESTO M JIMENdEZ
116 RAYNER I 44.00'Paven ent 44.32 1950.08
FT WORTH TX 76111 44.00'Curb 3.43 150.92
BIZ IDT 6
101.701SF Dr. App 2.57 261.37
2362.37
ADJUSTED:
DAVID EVANS ADDITION
000000876763
JAMES L BRITTAIN
3908 S FREEWAY I 44.00'Paveoent 44.32 1950.08
FT WORTH TX 76110 44.00'Curb 3.43 150.92
BIR IDT 7
101.701SF Dr. App 2.57 261.37
2362.37
ADJUSTED:
"UBZ'OM THIS PAGE.... 17045.70 -3-
OWNER & LEGAL DESCRIPTION ZONIM FRONTAGE RATE AMOUNT ASSESSMENT
e
DiAVID EVANS ADDITION
RNSTSIDE
000000876771
E J HURILL
108 RAYNIM N I 43.00'Pavement 44.32 1905.76
FT Wl'MH TX 76111 43.00'Curb 3.43 147.49
SIR IDT 8
101.701SF Dr. App 2.57 261.37
2314.62
AQTUSTED:
CHARLES EVANS ADDITION
000000876720
JANICE F4M WOMACR
117 N SYLVANIA I 150.00'Pavement 44.32 6648.00
FT WORTH TX 76111 150.00'Curb 3.43 514.50
SIR IDT 5R
7162.50
"'!"JUS`ITED:
TOTALCOST TO PROPERTY OV*ERS........................................ 54721.11
COSTTO CITY OF FT. WORTH............................ 15585.30
EW
INERRING INSPECTION & ADMINISTRATION.............. 3515.32
TOTALCOST TD CITY OF FORT W RTH .................................... 19100.62
TOTALESTIMATED CONSTRUCTION COST.................................... 73821.73
TOTAL FOOTAGE......................... 1129.00 -4-
* Adjusted frau 100 feet to 85 feet due to project limits.
-5