Loading...
HomeMy WebLinkAboutContract 46853-CO3 =Y SECRETAW ��r�rRa►cT CIO. �-(�g53-CD3 FORT 1'!'cx,ORTH® City of Fort Worth Change Order Request Breakdown Project Namel North Z.Boaz Park-Dog Park Improvements City Sec# 1 46853 Client Project#(s)i C210/541200/803490221883 Contractorl Raydon, Inc. PM Scott Penn I Inspector Adilda Cazorla Change Order Submittal# 0 Date 4/26/2016 Contract Time Dept. PACSD Totals CD Original Contract Amount $585,575.70 $585,575.70 120 Extras to Date $112,330.45 $112,330.45 Credits to Date $0.00 Pending Change Orders(in M&C Process) Contract Cost to Date $697,906.15 $697,906.15 120 Amount of Proposed Change Order $0.00 0 Revised Contract Amount $697,906.15 $697,906.15 120 Original Funds Available for Change Orders $20,000.00 $20,000.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT X19 18% - MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $731;969.63 40*040M D ( ` S4 G D ADDITIONS:Add Unit 4-Line Item 1, Installation of 12 Solar LED fixtures w/poles-$0.00;Add Unit 4-Line Item 2, installation of Art/Donor wall-$0.00. These two additional items were paid outside of this contract with private funds,in the amount of$26,449.00 for the security lighting and$33,472.25 for the art/donor wall;totaling$59,921.25. In order to complete this additional work the contract time was exceeded by 112 Calendar Days(per contract,Liquidated Damages of$72,800—$650/day). As part of this changer order, 112 LD days are to be waived for the performance of this additional work. R�,CEIVED LFT. WORTH J 26 2016 G1n�SAgTE1 G FOR r�TH City of Fort Worth Change Order Additions Project Name I North Z Boaz Park-Dog Park Improvements City Sec# 46853 Client Project# I C210/541200 1803490221883 ConlnaCtDrJ Raydon,Inc. PM Scott Penn Inspects Adilda Cazorla Change Order Submittal# Date 412612016 ADDITIONS ITEM Qty nit nit Cost ota DESCRIPTION DEPT ecwrty ig bog: 1 Drill 18"Piers(min.5'depth) PA D 12. 0 0 EA 0.00 2 Install reinforcement steel,set anchor bolts&pour piers PACSD 12.00000000 EA 0.0 3 Back fill piers PA CS 1 0.00 4 Install Solar LED lights wlpo s A D 12,00000000 EA 0.00 Art/Donor Wall: 5 layout,excavation&hauling PACSD 1.000 LS 0.00 6 Concrete footing PACSD 1.00000000 L 7 cast stone bricks,cast stone for plaques,installed PACSD 00000 LS 0.00 8 MU block wall PA 0 00 000 L 0 9 Leuder lime stone installed PACSD 1.00 LS OAO 0 cast cap stone installed —PA D ­71-0-00-0—WO-0 LS Flashing,weepholes,damp proofing,stailess steel pins,styrene foam,mortar,s PA 1.00000000 L 12 crushed lime stone,filter fabric,concrete edging PA SD 1.0000 0 LS 0.0 13 install art work 1,00000000 L 0.0 PACSD 30.00 Sub Total Additions Change Order Additions Page 2 of 5 • FoRrwogry City of Fort Worth Change Order Deletions Project Name I North Z.Boaz Park-Dog Park Improvements City Sec# 46853 Client Project# I C210/541200/803490221883 Raydon,Inc. PMJ Scott Penn Inspecbr Adilde Cazorla Change Order Submittal# ® Date 4/26/2616 DELETIONS ITEM DESCRIPTION UFPT ry Unit Unit Cost Total NA so. PACSO $0.00 Sub Total Deletions Change Order Deletions Page 4 of 5 M/SBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO, NA Total $0.00 Previous Change Orders CO# DATE AMOUNT NA Total -$0.00" CFW Change Order Approval Pa - COApp03 Page 1 of 3 Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/PACS/02218 - North Z Boaz Community Park - Phase II/Contractor/Change Orders/Change Order #3 Breakdown 4-26-16.xis Attachments(0) No Attachments have been added to this form. https:Hproj ectpoint.buzzsaw.com/_bz_web/Forms/FonnPrint.aspx?Siteld=51500&ProcessI... 7/26/2016 . CFW Change Order Approval Pa- COApp03 Page 2 of 3 FORT WORTH, City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: '3 Change Order No.: Pa - COApp03 Date Started: 2016-04-25 City Sec. No.: 46853 Date Due: 2016-06-14 Project Name: North Z Boaz Community Park - Phase II 02218 DOE Numbers: Project Numbers: Project Phase II - ZBonz Dog Park; installation of donor wall & Description: security lighting, waiving of contract time overages Project Manager: Scott Penn City Inspector: Adilda Cazorla TT Contractor: Raydon, Inc. - - COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: Park and Recreation $ 0.00 0 Total Cost:,- 0.00 _ Total Requested Days: 0 Approval Status: https://projectpoint.bi,7. aw.com/—bz—web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 7/26/2016 CFW Change Order Approval Pa- COApp03 Page 3 of 3 Approved: Yes Comments: User: Debra Rose Date: 2016-04-27 4:20 PM Approved: Yes Comments: User: Debra Rose Date: 2016-07-19 9:47 AM Approved: Yes Comments: User: Brian Smith Date: 2016-07-20 10:59 AM Approved: Yes Comments: User: Scott Penn Date: 2016-07-20 11:12 AM Approved: Yes Comments: User: Joel McElhany Date: 2016-07-21 4:45 PM Approved: Yes Comments: User: David Creek Date: 2016-07-21 1:09 PM Approved: Yes 0 Comments: o 0 User: Doug Black Date: 2016-07-21 3:44 PM V � A Approved: Yes ,► S Comments: User: Susan Alanis N� 1. ser, 1ty Sec 10MY Date: 2016-07-22 1:51 PM Action Required: Waiving of remaining contract days for additional work performed (paid b... OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX https:✓/proj ectpoint.buzzsaw.com/_bz_web/Forms/ForrnPrint.aspx?Siteld=51500&ProcessI... 7/26/2016