Contractor:C.Perry Builders,Inc. Change Order#=1 Date: 7I14I2016
City Project Mgr.Ronnie Clements City Inspector: Don Isaacs
Phone Number:(817)392-8014 1 Phone Number: (817)392-8078
Contract Time
(CD)
Original Contract Amount- -------- ------- $5,155,700.00 300
Extras to Date---------- ---– ------–------—------- $0.00 0
Credits to Date -- ----- – ----- -------- –— —--------- $0.00 0
Pending Change Orders(in M&C Process)----------–--------------–------------------------------------- $0.00 0
Contract Cost to Date---------- ------------------------------------------------------ $5,155,700.00 300
Amount of Proposed Change Order-------------------------------- --- $55,955.02 71
Revised Contract Amount-- -------- – – $5,211,655.02 371
Original Funds Available for Change Orders----- --- $0.00
Remaining Funds Available for this CO-------------------------------- $0.00
Additional Funding(if necessary)-------------------------------------------------------- $0.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.01085304%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $6,444,625.00
tr �.
During the City's plan review process,Jennings Avenue was changed from a public access easement to a public street.This change
required additional scope of work be added to the contract.Authorize a change in scope to increase the construction contract by$55,955.02
to add sidewalks and street lighting along Jennings Avenue to meet city standards;and to change the type of lighting in the parking lot to
match the street lighting on Jennings Avenue.Contractor will utilize a City of Fort Worth pre-approve contractor for the
lighting along Jennings Avenue.The total of Change Order#1 results in a increase to the on i a 1%.An additional 5
days are added to the project for these changes.Addidionally,there are 66 days added to a A 5 due to
delays associated with platting of the property and additional time for wall panel installati ® A li®
Aft Ay
Mary er,
AR
It is understood and agreed that the acceptance of this C nge Order by the contractor consitutes on and represents
payment in full(both time and money)for all costs arising out of,or incindental to the above Change Order.
-. s MtFame &ntrastorName Date__
C.Perry Builders,Inc. Go w61� S 7 2�
Qate
.2
Services 1v[ "
-� .ate. 7-22-1160
a fit
to 7 Z2 I S�
Date _t
1 M&C Number M&C Date Approved OFF
IC1 .CORD
CITY SETARY
FTC WORTH, TX
CPEEF:ZF:ZY BUILMERS, INC.
1002 Walker Road Sumrall, MS 39482 6315 Lone Star Lane Aubrey, TX 76227
Phone: (601) 758-3136 Fax: (601) 758-3106 Phone- (940) 365-9189 Fax: (940) 365-0351
EROPOSEDXHANGIL
Forest Recreation Center
3§27 Hernghlif Street Fort Worth, 3A 76111Q
7/5/2016--revised 7/12/2016- revised 7/15/2016
Add for revisions to the site plans — y
cost code --aesc p ion — —--- -- -------q .r unit',__
01.5000 General conditions 5 each 835.00 $4,175.00
02.0001 Survey Chan es 8 hours 135.00 $1.080.00
26.0000 Site li htin - SEE ATTACHED PROPOSAL 1 [at 23,043.55 $23,043.55
31.2200 Grading - SEE ATTACHED PROPOSAL 1 lot 2,500.00 $2,500.00
32.1313 Site concrete - SEE ATTACKED PROPOSAL 1 lot 16,830.58 $18.830.58
32.1723 1 Pavement markings 1 lot 950.001 $950.00
SUB TOTAL — — $48,579.13
OVERHEAD AND PROFIT i 10% $4,857.91
INSURANCE 2.00%! $1,119.10
BOND _ — 2.50%; $1,396.85
GRAND TOTAL $00,9$0.02
This quote is good for 10 Days
Please add 5 Da s from the time the change order is executed to our _
contract time for this change in scope. — —'
Al
Thomas M. Cog ins, Project Manager _
jC. Perry Builders, Inc.
11002 Walker Road
!Sumrall, Mississippi 39482
MENFAM MINOMM
f',jl-r3 EZI ;='I I
breakdown
Victory Forest Creek Breakdown
Description QtY Unit- Total
T e n a—ra _P�ow—er&—Permit ea $ 3,000.00 P
Site
Power Secondary Conduit and Trench 170 ft $ 3,292.46
Data Secondary Conduit&Trench 170 ft $ 2,752.60
Lighting Conduit &Trench 1310 ft 11,219.75
Lighting WiEng 1310 ft $ 3,617.22
Li hti g Poles 13 $ 27,945.17
Building
___F�_ov�e_r Conduit 6280 ft $ 12,888.57,
Lighting Conduit ft $ 8,431.25
Disconnect Switches Conduit { 2430 ft $ 5,111.40
Tel/Data/HDMI Rough-In 2650 ft $ 11,390.68
Power Wiring 6280 ft $ 9,717.08
Lighting Winnn 4090 ft $ 5,797.93
Disconnect Switches Wiring 2430 ft 5,635.78'
Liahtina Devices 66 ea $ 10,049.11
Power Devices 211 ea $ 19,933.17
Liahtinci Fixtures 261 ea $ 134,898.56
Disconnect Switches ea $ _21,61-4.91
Gear Conduit 530 ft 7,643.98
Gear Wiring 530 ft $ 25,099.27
Gear 1 Is $ 30,607.56
Grounding 1 Is $ 6,303.53
366,950.00
Additive items
_ Li hting Conduit& Trench - CO#1 650 ft $ 8,924.42
Lighting Wiring -CO#1 650 $ 2,877.21
Lighting Poles - CO#I 1 is $ 11,241.92
$ 389,993.54
726 Dalworth St.Suite 1002 1de1 Tel.214-543-2205
Grand Prairie TX 75050 07/12/2016 / 6:23 p. m. Email. mrivera@tonyelec.com
�a
MtiiFR SIERRA Miller Sierra Contractors, Inc.
1760 S. Pipeline Rd.
Euless, TX 76040
Phone: (817) 461-8802
Fax: (817) 461-8836
Request for Change Order
To: C Perry Builders, Inc
6315 Lonestar Lane
Aubrey, TX 76227
Project: Victory Forest Community Rec C
RFC No: 5
Date: 6/28/2016
Description: Revision Cost Changes
Notes: This is the proposed price for the added sidewalk and paving per the revision.
Please let me know if there is something else you need priced. The dirtwork will have to be
provided at+/- .10.
Thank you,
Serena Karl
MSC
The above work is subject to the same conditions as specified in the original contract wiless
otherwise stipulated.
Upon approval the sum of$16,830.58will be added to the contract price.
Original Contract $819,000.00
Other Approved Change Orders $15,207.60
Total Contract to Date $834,207.60
This Request $16,830.58
Other Pending Requests $0.00
Total Contract plus Pending RFCs $851,038.18
Authorized Signature: Date:
Miller Sierra Contractors, Inc.
Authorized Signature: — _ Date:
C Perry Builders, Inc
Tom Coggins
From: Cyle Burchfield <cburchfield @amsexcavating.com>
Sent: Monday,July 11, 2016 2:29 PM
To: Tom Coggins
Cc: rod @amsexcavating.com; ashley @amsexcavating.com; melissa @amsexcavating.com
Subject: RE: Victory Forest Rec Center- Revised Site Plans
Tom,
As we discussed last week on the phone in regards to these revised plans. Our additional excavation and grading cost for
these changes is $2,500. Please issue a change order for this additional work so we can proceed with the work.
Thank you very much,
Cyle Burchfield
AMS Company, Inc.
891 Walter Holiday Drive
Cleburne, Texas 76033
Office: (817) 641-8804
Fax: (817) 558-6400
Cell: (817) 235-1201
cburchfield(@amsexcavatin�.com
From: Tom Coggins [mailto:tom @cperrybuilders.com]
Sent: Monday, June 20, 2016 11:41 AM
To: George Hill; 'mrivera @tonyelec.com'; Kevin Massar; darrell_delong @hotmail.com; Landscape Estimator;
'paul.urbanmech @yahoo.com'; 'cburchfield @amsexcavating.com'; Serena Karl; Billy Hodges
Cc: Aaron Nicholas; Alvin Crosson; Kendall Humphrey
Subject: VFRC - revised site plans
Good morning. We have finalty received the revised site dra�,Jngs. We need each company to
review and let us know in writing how these changes will affect your contract price. Ptease note
that the road going through the project will now be a public road and wilt follow those guidelines
with The City of Fort Worth. We wilt need your pricing by Tuesday June 28, 2016, ble plan on
starting the site work can July 5; 2016. 'Thank you for your help on this.
PROJECT MANAGER / ESTIMATOR
601-329-4058
tonyaacperrVbuilders.corn
1002 WALKER ROAD,SUMRALL,MS 39482 P601.758.3136 F601.758.3106
6315 LONE STAR LANE,AUBREY,TX 76227 P940,365.9920 F940.365.0351 Altemate P 214-765-9199
r'
i