FORT WORTH City of Fort worth CONTRACT NO.
Change Order Request
Project Name I Dirks Road Ph II City Sec# 1 45378
Client Project#(s)l 00768/6793
Project Description Construction of Dirks Road Ph II
Contractorl Austin Bridge&Road LP Change Order# ® Date 7/1/2016
City Project Mgr.I Leon Wilson City Inspector Karl Bennett
Dept. TPW Water Sewer Contract Time
Totals (WD)
Original Contract Amount $10,742,244.51 $10,742,244.51 345
Extras to Date $893,859.64 $893,859.64 233
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $11,636,104.15 $11,636,104.15
Amount of Proposed Change Order $76,944.89 $0.00 $0.00 $76,944.89 165
Revised Contract Amount $11,713,049.04 $11,713,049.04 743
Original Funds Available for Change Orders $590,823.45 $590,823.45
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) $76,944.89 $76,944.89
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 9.04%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $13,427,805.64
JUSTIFICATION(REASONS)FOR CHANGE ORDER
On June 8,2016 the City met onsite with ABR and Kennedy Consulting to discuss the groundwater seepage into the roadway subgrade for
phase 213/2C. At the conclusion of the meeting it was decided that a subsurface drainage system was necessary. Kenndy Consulting
provided a design solution to ABR on June 15,2016.ABR submitted a proposal for the additional scope on June 27,2016. This change
order includes the necessary items to construct the subsurface drainage system.ABR submitted a third notice of del he
groundwater seepage on June 30,2016. The delay claim is currently under review. F OR
�i ao
Vg
�(a000aoa°
SAS
Contractor's Company Name Contractor(Name) C act ignature Date
Austin Bridge&Road LP
InspffiUdlospection Supervisor Date Project Wna Program Manager Date
/6
Assi i ctor Dept Date Boktor,4niractiiig Department(Dept) Date
r
ASSTS nt bv Date Assist City Manager Date
' z6 -ACV
Council Action if required)
M&C Number M&C Date Approved r-='r lr s ilQt, RECORD '
CITY SECRETARY
FT: WORTH, TX
� � }
a e!!7
Lj
� \ ze&®
k
f t
§ ° k
+D £!!ƒ
§ 2
$ f eeew
) E §
0o
.-, &
o}
L)
2
� §
= 3 :
§
; t5
« 7 A
� !�
Egg 0
Lj
LLI
— v
m
o`
w
v
o
Z- a m 33 v
� H
t
� � U
m
O
N U a
C Z'
L p iU
N
p� O
3 O L-
C J
p N W
LL'O O
-60
U �
m
L
U
a
z
a
o �
= eo
a �
s
cs U Q
Ns
3
U �
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Renaissance Storm Drain $50,218.00
Total $50,218.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00