Loading...
HomeMy WebLinkAboutContract 48055 CITY SECIL AW "ONTRACT Na sD`� Developer and Project Information Cover Sheet: Developer Company Name: McCart-Risinger, L.P. Address, State, Zip Code: 2111 N. Collins Suite 323 , Arlington TX, 76011 Phone& Email: 817-461-2232,Triton2l06@mac.com Authorized Signatory, Title: William W. Snider, Manager Project Name and Brief Creekside Estates Addition Phase II Description: Project Location: West Risinger Road, West of McCart Ave Plat Case Number: FP-15- Plat Name: Creekside Estates Addition 073,094, Mapsco: 1045 Council District: 6 City Project Number: 100061 CFA Number: 2016-034 DOE Number: None To be completed by staff Received by: `'�%"2 Date: 711, -///,f _ OFFI CiAL RECORD RECEIVED C$T'Y SECRETARY City of Fort Worth,Texas t'r WORTH TX AUG 2 2016 Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 CITY OF FORT T CITY'SECRETARY Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, McCart-Risinger, L.P., ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Creekside Estates Addition Phase II ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) 0, Sewer (A-1) ®, Paving (B) M, Storm Drain (B-1) 0, Street Lights & Signs (C) 0. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) 0, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) 0, Street Lights & Signs (C) N. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. I Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Creekside Estates Addition Phase II CFA No.: 2016-034 DOE No.: None An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1 Water Construction $ 235,415.00 2.Sewer Construction $ 226,134.00 Water and Sewer Construction Total $ 461,549.00 B. TPW Construction 1,Street $ 728,584.00 2.Storm Drain $ 145,976.00 3.Street Lights Installed by Developer $ 99,356.00 4. Signals TPW Construction Cost Total $ 973,916.00 Total Construction Cost(excluding the fees): S 1,435,465.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 9,230.98 D. Water/Sewer Material Testing Fee(2%) S 9.230.98 Sub-Total for Water Construction Fees $ 18,461.96 E. TPW inspection Fee(4%) $ 34,982.40 F TPW Material Testing(2%) $ 17,491.20 G. Street Ught Inspsection Cost $ 3,974.24 H. Signals Inspection Cost $ - H. Street Signs Installation Cost Sub-Total for TPW Construction Fees $ 56,447.84 Total Construction Fees: $ 74,909.80 Choice Financial Guarantee Options, choose one Amount Mark one Bond= 100% $ 1,435,465.00 Com fetion Agreement= 100%/Holds Plat $ 1,435,465.00 Cash Escrow Water/Sanitary Sewer= 125% $ 576 936.25 Cash Escrow Paving/Storm Drain= 125% $ 1,217,395.00 Letter of Credit= 125%w/2yr expiration period $ 1,794,331.25 x City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER McCart-Risinger,L.P. Jesus J. Chapa Assistant City Manager Name: William W. Snider !� Title: Manager — Date: `'' Date: Recommended by: ATTEST: (Only if required by Developer) Wendy Chi abulal, EMBA, P.E. Development Engineering Manager Signature Water Department Name: D;r-A �J, j il� / — Doug W. Wiersig, P.E. Director Transportation& Public Works Department Approved as to Form & Legality: ATTEST: �,� F 0 O Richard A. McCracken Mary J. a Assistant City Attorney City Sec ary AS M&C No. 0j/A Date: 611/1 LA Coe-m. vz95 : N14 OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement FT. WORTH, TX CFA Official Release Date: 10.07.2015 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 - Changes to Standard Community Facilities Agreement Location Map go Exhibit A: Water Improvments is Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-l: Storm Drain Improvements Storm Drain Cost Estimate f Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT "1" Changes to Standard Agreement Community Facilities Agreement City Project No. 100061 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 z U) Q Q W = \ U O O 3 U t Q f'� w OdOa A3IMOaO N Fps r o cn U I v I 0 W L En �L - � N Q I� Q boo clrr ~ < o w w F- 'L'U �- V Z H z x a o o U < ol V zcno o v Y p f LU Q C'. t$31NAOd I o V X z Z 1 J Ln Z p a- J J W Kq Z a- Q ] 6T5' � I _ m A9a 3O mw J U Li Hooae a 3lJ ; & pp_— a S y L� x 9 �s6 y11 �n } Y t n Q Q LL YY�^Y�Y y�V m� C WD Q �WD 4 m fit P'ddW AlINI]IA\tl3J\95u.-e ZHd aPR jJ 020\N9I S3O\BLOOT02\OTOZ\ASIeRuoP!wd\uo4mPa+d\wa7sAs aly\leool'1eP\\ H-LV 911=WV MOT:IV 9TOZ'8T tWeW'Aegy:NO Ined'as":A8 O3LLOld Page 1 of 3 CREEKSIDE PHASE 2 PUBLIC IMPROVEMENTS QUANTITY MATRIX Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section Units Bid p No. Qty. Unit Price Bid Value 1 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON 2.53 $4,500.00 A.$96,OOO. 2 3312.4112 16"x 8"Tapping Sleeve&Valve 33 1225 EA 3 $4,500.00 3 3311.0241 8"Water Pipe 33 11 10,33 11 12 LF 3000 $32.00 4 3312.3003 8"Gate Valve 33 12 20 EA 5 $1,050.00 5 3312.0001 Fire Hydrant 33 12 40 EA 3 $3,500.00 6 3312.2203 1"Water Service 33 12 10 EA 92 $950.00 $87,400.00 7 3312.3002 6"Gate Valve 33 1220 EA 3 $850.00 $2,550.00 8 3305.0109 Trench Safety 33 05 10 LF 2880 $1.00 $2,880.00 9 13312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 7 $850.00 $5,950.00 TOTAL UNIT I:WATER IMPROVEMENTS $235,415.00 SEWERIMPROVEMENTS 10 3331.3201 4"Sewer Service 3331 50 EA 92 $600.00 $55,200.00 11 3339.1033 Additional Depth Manhole(Over 6'Depth) 33 39 10,33 VF 10 $175.00 $1,750.00 12 3339.1001 4'Manhole 33 39 10,33 39 20 EA 12 $4,000.00 $48,000.00 13 0241.2103 8"Sewer Abandonment Plug 0241 14 EA 2 $500.00 $1,000.00 14 3331.4115 8"Sewer Pipe 3331 12,3331 20 LF 2686 $36.00 $96,696.00 15 3331.4119 8"DIP Sewer Pipe 33 11 10 LF 171 $64.00 $10,944.00 16 3305.0109 Trench Safety 3305 10 LF 2686 $2.001 $5,372.00 17 3301.0002 Post-CCTV Inspection 3301 31 LF 2686 $2-001 $5,372.00 18 3301.0101 Manhole Vacum Testing 3301 30 EA 12 $150.001 $1,800.00 TOTAL UNIT I:SEWER IMPROVEMENTS $226,134.00 PAVING IMPROVEMENTS 19 3211.05016"Lime Treatment 3211 29 SY 10550 $2.75 $29,012.50 20 3213.0102 7"Conc Pvmt 32 13 13 SY 9854 $36.00 $354,744.00 21 3213.0106 11"Conc Pvmt 32 13 13 SY 2238 $52.00 $116,376.00 22 3211.0502 8"Lime Treatment 3211 29 SY 2406 $3.00 $7,218.00 23 3216.0102 T'Conc Curb and Gutter 32 1613 LF 6461 $4.00 $25,844.00 24 3211.0400 Hydrated Lime 32 11 29 TN 233 $175.00 $40,811.40 25 3213.0353 4"Conc Sidewalk 32 13 20 SF 27267 $4.25 $115,884.75 26 0241.0402 Remove Asphalt Drive 0241 13 SF 7492 $2.00 $14,984.00 27 3212.0303 3"Asphalt Pvmt Type D 32 12 16 SY 11 $30.00 $330.00 28 3212.0501 4"Asphalt Base Type B 32 12 16 SY 11 $30.00 $330.00 29 3213.0501 Barrier Free Ramp,Type R-1 1000000 EA 2 $1,200.00 $2,400.00 30 3213.0506 Barrier Free Ramp,Type P-1 1321320 EA 8 $1,200.001 $9,600.00 31 13441.4006 Install Alum Sign Ground Mount 13441 30 1 EA 13 $850.001 $11,050.00 TOTAL PAVING IMPROVEMENTS $728,584.65 \\dai.local\file system\Production\ResidentialSF\2010\2010078\DESIGN\020_Creekside_PH2\Correspondance\SPECS-COFW\00 42 43 Bi Proposal_DAP_Creekside Public Page 2 of 3 CREEKSIDE PHASE 2 PUBLIC IMPROVEMENTS QUANTITY MATRIX Project Item Information Bidder's Proposal Bidlist Item No. Description Specification Section Units Bid Qty. Unit Price Bid Value DRAINAGE IMPROVEMENTS 32 3349.5001 10'Curb Inlet 33 49 20 EA 3 $2,500.00 $7,500.00 33 3341.0201 21"RCP,Class III 3341 10 LF 88 $48.00 $4,224.00 34 3341.0205 24"RCP,Class III 3341 10 LF 104 $50.00 $5,200.00 35 3341.0302 30"RCP,Class III 3341 10 LF 320 $62.00 $19,840.00 36 3349.0002 5'Storrs Junction Box 33 49 10 EA 2 $5,000.00 $10,000.00 37 3349.0001 4'Storrs Junction Box 0241 14 EA 1 $4,000.00 $4,000.00 38 9999.0001 45"x29"Eliptical Pipe 00 00 00 LF 236 $220.00 $51,920.00 39 9999.0002 38"x24"Eli tical Pie 00 00 00 LF 142 $175.00 $24,850.00 40 9999.0003 3'x2'RCB Plug 00 00 00 EA 1 $1,000.00 $1,000.00 41 3341.1001 3'x2'Box Culvert 3341 10 LF 112 $120.00 $13,440.00 42 3305.0112 Concrete Collar 33 05 17 EA 3 $500.00 $1,500.00 43 10241.3106 30"Storm Abandoment Plug 10241 14 1 EA 3 $500.001 $1,500.00 44 13305.0109 Trench Safety 1330510 1 LF 1002 $1.001 $1,002.00 TOTAL DRAINAGE IMPROVEMENTS1 $145,976.00 GRADING IMPROVEMENTS 45 3123.0105 Borrow by Delivery 31 2323 CY 25000 $5.00 $125,000.00 46 3124.0101 Embankment by Plan 31 2400 CY 25000 $1.00 $25,000.00 47 0170.0102 Mobilization(4%) 01 7000 LS 1 $2,500.00 $2,500.00 48 3110.0101 Site Clearing 31 1000 LS 1 $42,500.00 $42,500.00 TOTAL GRADING IMPROVEMENTS $195,000.00 \\dai.local\file system\Production\ResidentialSF\2010\2010078\DESIGN\020_Creekside_PH2\Correspondance\SPECS--COFW\00 42 43_Bi Proposal_DAP_Creekside Public MATCH LINE 1 I � o 2 O .. 14.E N _G 2._............. p p N LU 2 kQ s ........ n � .... ... wc � _ a 0 3� i9 w n J Q uj y,'�x NO Z LL Q .... o N • • N' ° ........ O Ln O � u z b 1 d W d d W e ..... ..... - _........ __. H ` a ' —. .. y < ..— • c LU W Z 4r X a� j a x _ - _. a , .... a TI _ m w ._ �......... .... W~ _... ... �2 3 o " ji 2 �^ w _..... __ �. x W ........ i w m 2 �.... ....h. ..--..-...... I .......... + / LU LU : i f 3A'ao ll!H oarn,9 ' ZE� 1 m iS 210 0 I : W I m W;2 T....... Nl N33H7 ASSOW 9 jr W3 i g ^Y ,. ij 1177 't ........._.. i 1S'd AAO4 ; ........_....................... ....... �- - 3 N Il HDlVW i1N3W3A0MdWl'd3iVM\VzD\s6uLmejG\ZHd BPtqaaJj OZO\N9IS30\BLOOTOZ\0T0Z\ASleryrap! m\uolpnpad\WalsAs aIJU—I•!eP\\:H1dd3lI3 Wd SE:b:ld 9TOZ'[Z NNE'AeP-uPaM:NO lFweO'P+BMOH:A9 03-UOld MATCH LINE CD CD co D I : o N 0 11 0 - o i N r! II U 1 I I � � 1 Ln go LU n Z Y • it !' I I = �c� " , a K I W ' • jII I r-I DC r=- g' I I I I I o � a w m W W ui Ln Id ui • \ ' ! W LU / LV Q oavn •/ Z A . �= Ln o ' "� I "" I \ 1 I� 1 - i i I I m 1 6 1 , ! . e • IC Fo r - -- - - N1 .330 ASSOW • �y(( FF, 9 7 1 I r j 1 - ----- - - N 11 H:)lV W P-d3M3S AWMNVS\VD\s6uuneq\ZHd aP.M-JJ OZO\N9IS30\StOOTOZ\OTOZUSleAuap!-,d\uo!Mpojd\wa;s/s aly\l—l'1eP\\:H1Vd311=I WV 80:TT:iV 9TOZ 19T 4»eW'Aepug:,,gyp Ined 1-neiN:AS 0311014 C) C)- v 1 l ---7f �� N O 1 di LU z I II, - W - U� IF co� o � i� > � 00 w W QLLJ LLJ w - ZA - MATCH LINE ? uj uj h W IL IL Y O Q: Q. J � y R) aD OiR qr ILS �2�u xx � �aWa 3NIl HU IN CID B+P'J.I8IMG 9NIAVd\V:0\56uwv-10\ZHd BPKWO OZO\N9IS30\BLOOTOZ\OTOZ\4sleRuaOr,7d\uopnDojd\Lua"alyUeO1?eP\\:HiVd3l1_A WV OS:OI UV 9IOZ'BI 4PJeW'Aepu:J:NO Iced lasn :A9 03J101d t II � loll IS i � �u a re M IF 1 I ` - / r — MATCH LINE s ° ----- 1 $ u _ _ _ 1 l ■ I I! It a�- /�•�, 1 3 1 LLJ � tl R t • `I 1 O t I` W z a /4k I✓ > o W O H h I; • I I, 1.� A W I; ' I •' 1 1 .. � •il - - Uj LA wi o W t ' LL J; t I W I ! a��H aarn / � ■ / �"� X 10] I I a F ( - LtLtj��jj fV^ N1 JA ASSOW y ■ �d �c, --- y 0 5 A Nil HXVW 13ww mw1 imn L*RLLS1Y_nkdkvAwjM W aP"aap OZOI N!)MgM8LOOi0rOTOZWg8llualsad%uoi 7Pad\war-k 91Y11■m,ipp11:KLvd3lld WV OZ:ZT:1V 9TOZ'8T Ww■W'A&PPA:NO R1■d'asa■.OI:A8 0311O1d MATCH LIME / s I _ — lad r s / °° \ • (V 1 --- - -- S II c I � n I , I, LL 1 Q I ' ; / ' � ,, l a Y •' G � V I I 0 OC w i ;I I •� w 9 W ' L Z a , T^ i . I I 1 ij I' UHF _ H0 "' I • ' I ' ' W 7 W W I � � I W S W J � � II • I I� \ \ Z (3 TTIH(] Vn ' W W A F- K — C coo � C X 1O) I 1 n c Nl`33�i)ASSOW 41 , Nil H:)IVW v 1 1 6 C 1 I R Y ' � - I 1 ✓ Q � H �ONY 3d+ti113�i11S1V 1 d1ZHd ap�sflaar�Oi01N9IS3618L00TOZ10T021d5191w 1�11�Dad1w 21WOOPIM 341W9114 WV EZ:TT:1V 9TOZ'gT 4p+eW'spuj:NO M'asn—m-:ag O311O1d