HomeMy WebLinkAboutContract 48055 CITY SECIL AW
"ONTRACT Na sD`�
Developer and Project Information Cover Sheet:
Developer Company Name: McCart-Risinger, L.P.
Address, State, Zip Code: 2111 N. Collins Suite 323 , Arlington TX, 76011
Phone& Email: 817-461-2232,Triton2l06@mac.com
Authorized Signatory, Title: William W. Snider, Manager
Project Name and Brief Creekside Estates Addition Phase II
Description:
Project Location: West Risinger Road, West of McCart Ave
Plat Case Number: FP-15- Plat Name: Creekside Estates Addition
073,094,
Mapsco: 1045 Council District: 6 City Project Number: 100061
CFA Number: 2016-034 DOE Number: None
To be completed by staff
Received by: `'�%"2 Date: 711, -///,f
_
OFFI CiAL RECORD RECEIVED
C$T'Y SECRETARY
City of Fort Worth,Texas t'r WORTH TX AUG 2 2016
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015 CITY OF FORT T CITY'SECRETARY
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, McCart-Risinger, L.P., ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements") related
to a project generally described as Creekside Estates Addition Phase II ("Project") within the
City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) 0, Sewer (A-1) ®, Paving (B) M, Storm Drain (B-1) 0, Street Lights &
Signs (C) 0.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section II, of the Policy. Developer shall
ensure its contractor(s) pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 3 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) 0, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) 0, Street Lights &
Signs (C) N.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section II, of the Policy. Developer shall
ensure its contractor(s) pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 3 of 11
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state-
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 4 of 11
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
I Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused, in
whole or in Part, by the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 6 of 11
the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 7 of 11
Cost Summary Sheet
Project Name: Creekside Estates Addition Phase II
CFA No.: 2016-034 DOE No.: None
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1 Water Construction $ 235,415.00
2.Sewer Construction $ 226,134.00
Water and Sewer Construction Total $ 461,549.00
B. TPW Construction
1,Street $ 728,584.00
2.Storm Drain $ 145,976.00
3.Street Lights Installed by Developer $ 99,356.00
4. Signals
TPW Construction Cost Total $ 973,916.00
Total Construction Cost(excluding the fees): S 1,435,465.00
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 9,230.98
D. Water/Sewer Material Testing Fee(2%) S 9.230.98
Sub-Total for Water Construction Fees $ 18,461.96
E. TPW inspection Fee(4%) $ 34,982.40
F TPW Material Testing(2%) $ 17,491.20
G. Street Ught Inspsection Cost $ 3,974.24
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost
Sub-Total for TPW Construction Fees $ 56,447.84
Total Construction Fees: $ 74,909.80
Choice
Financial Guarantee Options, choose one Amount Mark one
Bond= 100% $ 1,435,465.00
Com fetion Agreement= 100%/Holds Plat $ 1,435,465.00
Cash Escrow Water/Sanitary Sewer= 125% $ 576 936.25
Cash Escrow Paving/Storm Drain= 125% $ 1,217,395.00
Letter of Credit= 125%w/2yr expiration period $ 1,794,331.25 x
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
McCart-Risinger,L.P.
Jesus J. Chapa
Assistant City Manager Name: William W. Snider
!� Title: Manager —
Date: `''
Date:
Recommended by:
ATTEST: (Only if required by Developer)
Wendy Chi abulal, EMBA, P.E.
Development Engineering Manager Signature
Water Department Name:
D;r-A �J, j il� / —
Doug W. Wiersig, P.E.
Director
Transportation& Public Works Department
Approved as to Form & Legality: ATTEST: �,� F 0
O
Richard A. McCracken Mary J. a
Assistant City Attorney City Sec ary AS
M&C No. 0j/A
Date: 611/1 LA
Coe-m. vz95 : N14
OFFICIAL RECORD
City of Fort Worth,Texas CITY SECRETARY
Standard Community Facilities Agreement FT. WORTH, TX
CFA Official Release Date: 10.07.2015
Page 9 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
Location Map
go Exhibit A: Water Improvments
is Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit B-l: Storm Drain Improvements
Storm Drain Cost Estimate
f Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 10 of 11
ATTACHMENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100061
None
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 11 of 11
z
U) Q Q
W =
\ U O O 3
U t Q
f'� w OdOa A3IMOaO N Fps r
o cn
U I v I 0 W L En
�L - � N Q
I� Q boo
clrr ~ < o
w w F-
'L'U �- V
Z H z
x a o o U
< ol V zcno
o v Y
p f LU Q
C'. t$31NAOd I o V X
z Z 1 J
Ln
Z p
a- J J W Kq Z
a- Q ] 6T5' � I
_ m
A9a 3O mw
J
U
Li
Hooae a 3lJ ;
&
pp_— a
S y L� x
9 �s6 y11 �n
}
Y t n
Q Q LL
YY�^Y�Y
y�V
m�
C WD
Q �WD
4
m
fit
P'ddW AlINI]IA\tl3J\95u.-e ZHd aPR jJ 020\N9I S3O\BLOOT02\OTOZ\ASIeRuoP!wd\uo4mPa+d\wa7sAs aly\leool'1eP\\ H-LV 911=WV MOT:IV 9TOZ'8T tWeW'Aegy:NO Ined'as":A8 O3LLOld
Page 1 of 3
CREEKSIDE PHASE 2 PUBLIC IMPROVEMENTS
QUANTITY MATRIX
Project Item Information Bidder's Proposal
Bidlist Item No. Description Specification Section Units Bid
p No. Qty. Unit Price Bid Value
1 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON 2.53 $4,500.00 A.$96,OOO.
2 3312.4112 16"x 8"Tapping Sleeve&Valve 33 1225 EA 3 $4,500.00
3 3311.0241 8"Water Pipe 33 11 10,33 11 12 LF 3000 $32.00 4 3312.3003 8"Gate Valve 33 12 20 EA 5 $1,050.00 5 3312.0001 Fire Hydrant 33 12 40 EA 3 $3,500.00
6 3312.2203 1"Water Service 33 12 10 EA 92 $950.00 $87,400.00
7 3312.3002 6"Gate Valve 33 1220 EA 3 $850.00 $2,550.00
8 3305.0109 Trench Safety 33 05 10 LF 2880 $1.00 $2,880.00
9 13312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 7 $850.00 $5,950.00
TOTAL UNIT I:WATER IMPROVEMENTS $235,415.00
SEWERIMPROVEMENTS
10 3331.3201 4"Sewer Service 3331 50 EA 92 $600.00 $55,200.00
11 3339.1033 Additional Depth Manhole(Over 6'Depth) 33 39 10,33 VF 10 $175.00 $1,750.00
12 3339.1001 4'Manhole 33 39 10,33 39 20 EA 12 $4,000.00 $48,000.00
13 0241.2103 8"Sewer Abandonment Plug 0241 14 EA 2 $500.00 $1,000.00
14 3331.4115 8"Sewer Pipe 3331 12,3331 20 LF 2686 $36.00 $96,696.00
15 3331.4119 8"DIP Sewer Pipe 33 11 10 LF 171 $64.00 $10,944.00
16 3305.0109 Trench Safety 3305 10 LF 2686 $2.001 $5,372.00
17 3301.0002 Post-CCTV Inspection 3301 31 LF 2686 $2-001 $5,372.00
18 3301.0101 Manhole Vacum Testing 3301 30 EA 12 $150.001 $1,800.00
TOTAL UNIT I:SEWER IMPROVEMENTS $226,134.00
PAVING IMPROVEMENTS
19 3211.05016"Lime Treatment 3211 29 SY 10550 $2.75 $29,012.50
20 3213.0102 7"Conc Pvmt 32 13 13 SY 9854 $36.00 $354,744.00
21 3213.0106 11"Conc Pvmt 32 13 13 SY 2238 $52.00 $116,376.00
22 3211.0502 8"Lime Treatment 3211 29 SY 2406 $3.00 $7,218.00
23 3216.0102 T'Conc Curb and Gutter 32 1613 LF 6461 $4.00 $25,844.00
24 3211.0400 Hydrated Lime 32 11 29 TN 233 $175.00 $40,811.40
25 3213.0353 4"Conc Sidewalk 32 13 20 SF 27267 $4.25 $115,884.75
26 0241.0402 Remove Asphalt Drive 0241 13 SF 7492 $2.00 $14,984.00
27 3212.0303 3"Asphalt Pvmt Type D 32 12 16 SY 11 $30.00 $330.00
28 3212.0501 4"Asphalt Base Type B 32 12 16 SY 11 $30.00 $330.00
29 3213.0501 Barrier Free Ramp,Type R-1 1000000 EA 2 $1,200.00 $2,400.00
30 3213.0506 Barrier Free Ramp,Type P-1 1321320 EA 8 $1,200.001 $9,600.00
31 13441.4006 Install Alum Sign Ground Mount 13441 30 1 EA 13 $850.001 $11,050.00
TOTAL PAVING IMPROVEMENTS $728,584.65
\\dai.local\file system\Production\ResidentialSF\2010\2010078\DESIGN\020_Creekside_PH2\Correspondance\SPECS-COFW\00 42 43 Bi
Proposal_DAP_Creekside Public
Page 2 of 3
CREEKSIDE PHASE 2 PUBLIC IMPROVEMENTS
QUANTITY MATRIX
Project Item Information Bidder's Proposal
Bidlist Item No. Description Specification Section Units Bid Qty. Unit Price Bid Value
DRAINAGE IMPROVEMENTS
32 3349.5001 10'Curb Inlet 33 49 20 EA 3 $2,500.00 $7,500.00
33 3341.0201 21"RCP,Class III 3341 10 LF 88 $48.00 $4,224.00
34 3341.0205 24"RCP,Class III 3341 10 LF 104 $50.00 $5,200.00
35 3341.0302 30"RCP,Class III 3341 10 LF 320 $62.00 $19,840.00
36 3349.0002 5'Storrs Junction Box 33 49 10 EA 2 $5,000.00 $10,000.00
37 3349.0001 4'Storrs Junction Box 0241 14 EA 1 $4,000.00 $4,000.00
38 9999.0001 45"x29"Eliptical Pipe 00 00 00 LF 236 $220.00 $51,920.00
39 9999.0002 38"x24"Eli tical Pie 00 00 00 LF 142 $175.00 $24,850.00
40 9999.0003 3'x2'RCB Plug 00 00 00 EA 1 $1,000.00 $1,000.00
41 3341.1001 3'x2'Box Culvert 3341 10 LF 112 $120.00 $13,440.00
42 3305.0112 Concrete Collar 33 05 17 EA 3 $500.00 $1,500.00
43 10241.3106 30"Storm Abandoment Plug 10241 14 1 EA 3 $500.001 $1,500.00
44 13305.0109 Trench Safety 1330510 1 LF 1002 $1.001 $1,002.00
TOTAL DRAINAGE IMPROVEMENTS1 $145,976.00
GRADING IMPROVEMENTS
45 3123.0105 Borrow by Delivery 31 2323 CY 25000 $5.00 $125,000.00
46 3124.0101 Embankment by Plan 31 2400 CY 25000 $1.00 $25,000.00
47 0170.0102 Mobilization(4%) 01 7000 LS 1 $2,500.00 $2,500.00
48 3110.0101 Site Clearing 31 1000 LS 1 $42,500.00 $42,500.00
TOTAL GRADING IMPROVEMENTS $195,000.00
\\dai.local\file system\Production\ResidentialSF\2010\2010078\DESIGN\020_Creekside_PH2\Correspondance\SPECS--COFW\00 42 43_Bi
Proposal_DAP_Creekside Public
MATCH LINE
1 I �
o 2 O
..
14.E
N
_G 2._............. p p
N
LU
2
kQ
s ........ n �
.... ... wc �
_ a
0
3� i9 w
n J Q
uj
y,'�x NO Z LL Q
....
o
N • • N' ° ........ O
Ln
O �
u
z b 1
d W d d W
e ..... ..... - _........ __.
H `
a '
—. ..
y < ..— • c LU
W Z
4r X
a� j a x _ -
_. a
, .... a
TI _ m w
._ �......... .... W~ _... ...
�2
3 o "
ji 2
�^ w
_..... __ �. x W
........ i w
m 2 �.... ....h. ..--..-...... I .......... + / LU
LU
:
i
f
3A'ao ll!H oarn,9
' ZE� 1 m
iS 210
0
I
:
W I m W;2 T.......
Nl N33H7 ASSOW
9 jr
W3 i g ^Y
,. ij 1177
't ........._..
i
1S'd AAO4 ;
........_.......................
.......
�- - 3 N Il HDlVW
i1N3W3A0MdWl'd3iVM\VzD\s6uLmejG\ZHd BPtqaaJj OZO\N9IS30\BLOOTOZ\0T0Z\ASleryrap! m\uolpnpad\WalsAs aIJU—I•!eP\\:H1dd3lI3 Wd SE:b:ld 9TOZ'[Z NNE'AeP-uPaM:NO lFweO'P+BMOH:A9 03-UOld
MATCH LINE
CD
CD
co
D
I : o
N
0 11
0
- o i N r!
II U
1
I
I
� � 1
Ln
go
LU
n Z
Y • it !' I I = �c� "
, a K
I
W
' • jII I r-I DC r=-
g' I I I I I o
� a
w
m
W W
ui
Ln
Id
ui
• \ ' ! W LU
/ LV
Q
oavn
•/ Z
A .
�= Ln
o
' "� I "" I \ 1 I� 1 - i i I I m 1 6 1 , ! . e • IC Fo r
- -- - -
N1 .330 ASSOW • �y((
FF, 9 7 1 I r j
1
- ----- - - N 11 H:)lV W
P-d3M3S AWMNVS\VD\s6uuneq\ZHd aP.M-JJ OZO\N9IS30\StOOTOZ\OTOZUSleAuap!-,d\uo!Mpojd\wa;s/s aly\l—l'1eP\\:H1Vd311=I WV 80:TT:iV 9TOZ 19T 4»eW'Aepug:,,gyp Ined 1-neiN:AS 0311014
C)
C)-
v
1
l ---7f �� N
O 1
di
LU z
I
II, - W
-
U�
IF co� o � i� > �
00 w W
QLLJ
LLJ
w -
ZA
- MATCH LINE ? uj
uj
h W
IL
IL Y
O Q:
Q.
J � y
R)
aD
OiR qr ILS
�2�u
xx �
�aWa
3NIl HU IN
CID
B+P'J.I8IMG 9NIAVd\V:0\56uwv-10\ZHd BPKWO OZO\N9IS30\BLOOTOZ\OTOZ\4sleRuaOr,7d\uopnDojd\Lua"alyUeO1?eP\\:HiVd3l1_A WV OS:OI UV 9IOZ'BI 4PJeW'Aepu:J:NO Iced lasn :A9 03J101d
t
II �
loll
IS
i �
�u a re M
IF
1
I ` -
/ r — MATCH LINE s
° ----- 1 $ u
_ _
_ 1
l ■
I I!
It a�-
/�•�,
1 3
1 LLJ
�
tl
R t • `I 1
O
t I` W
z
a /4k I✓
> o
W O H
h I; • I I, 1.� A W
I; ' I •' 1 1 .. �
•il - -
Uj
LA
wi
o W
t
' LL J; t
I W
I ! a��H aarn / � ■ / �"�
X
10] I I a F
( - LtLtj��jj fV^
N1 JA ASSOW y
■ �d �c,
--- y 0
5 A Nil HXVW
13ww mw1 imn L*RLLS1Y_nkdkvAwjM W aP"aap OZOI N!)MgM8LOOi0rOTOZWg8llualsad%uoi 7Pad\war-k 91Y11■m,ipp11:KLvd3lld WV OZ:ZT:1V 9TOZ'8T Ww■W'A&PPA:NO R1■d'asa■.OI:A8 0311O1d
MATCH LIME
/ s I _ —
lad r s
/ °° \ • (V
1 --- - -- S II
c
I � n
I ,
I,
LL
1 Q
I ' ;
/ ' � ,, l a Y •' G � V
I I
0
OC w i ;I I •�
w
9 W ' L Z
a , T^
i . I I 1 ij
I' UHF
_ H0 "'
I • ' I ' ' W 7
W
W
I � �
I
W S W
J � � II • I I� \ \ Z
(3 TTIH(] Vn ' W
W
A F-
K — C
coo � C
X
1O) I 1
n
c
Nl`33�i)ASSOW 41 ,
Nil H:)IVW
v 1 1 6 C
1 I R Y ' � - I 1 ✓ Q �
H �ONY 3d+ti113�i11S1V 1 d1ZHd ap�sflaar�Oi01N9IS3618L00TOZ10T021d5191w 1�11�Dad1w 21WOOPIM 341W9114 WV EZ:TT:1V 9TOZ'gT 4p+eW'spuj:NO M'asn—m-:ag O311O1d