COMMUNITY FACILITIES AGREEMENT
WITH CITY OVERSIZING PARTICIPATION
Developer Company Name: LGI Crowley Land Partners, LLC
Address,State,Zip Code: 1450 Lake Robbins Dr. Ste.430,The Woodlands,TX,77380
Phone&Email: 281-210-2584,jlipar(algihomes.com
Authorized Signatory,Title: Jack Lipar, Executive VP of Acquisitions
Project Name and Brief The Bridges Phase 2
Description:
Southwest corner of FM 1187 and Mc Cart Ave
Plat Case Number: FP-14-062 Plat Name: The Bridges Phase 2
Mapsco: Council District: 6 City Project Number: 02427
CFA Number: 2015-102 DOE Number: 7370
To be completed by ff.
Received by: 441 Date: �O`l
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
' a
City of Fort Worth,Texas p�G 2 2016
Standard Community Facilities Agreement with City Participation Q�
CFA Official Release Date:07.30.2015 ��C1�S� �QR6
Page 1 of 11
COMMUNITY FACILITIES AGREEMENT
WITH CITY OVERSIZING PARTICIPATION
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, LGI Crowley Land Partners, LLC , ("Developer"), desires to make
certain specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as The Bridges Phase 2
("Project") within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has reviewed the proposed Improvements and desires to have
the Developer oversize the proposed Improvements to provide capacity for future
development in the area("Oversized Improvements"); and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or "Agreement") in connection with the collective
Improvements for the Project; and
WHEREAS, the City has reviewed the Project and desires to participate in the
Project in accordance with this Agreement as presented by the Cost Summary Table and
Exhibits attached hereto and authorized by City Council via M&C PJ on
,20 ;and
WHEREAS, The City's cost participation shall be in an amount not to exceed
$22,206.00 ("Participation"); and
WHEREAS, the City has requested the Developer to cause, and the Developer
agrees to cause, the design, permitting and construction of the Project for which the City
will, subject to City Council approval, reimburse the Developer for the City's portion of
those costs after City's final acceptance of the Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to
comply with all provisions of said Policy in the performance of its duties and obligations
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 2 of 11
hereunder and to cause all contractors hired by Developer to comply with the Policy in
connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II,
of the Policy and recognizes that there shall be no reduction in the collateral until the
Project has been completed and the City has officially accepted the Improvements.
Developer further acknowledges that said acceptance process requires the
Developer's contractor(s) to submit a signed affidavit of bills paid signed by its
contractor and consent of surety signed by its surety to ensure the contractor has
paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will
provide in writing that the contractor has been paid in full by Developer for all the
services provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ®, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) ®, Street Lights &
Signs (C) Z.
E. The Developer shall award all contracts for the construction of community facilities in
accordance with Section II, paragraph 7 of the Policy and the contracts for the
construction of the public infrastructure shall be administered in conformance with
paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the
then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date: 07.30.2015
Page 3 of 11
(100%) of the contract price of the infrastructure, and a maintenance bond in
the name of the City for one hundred percent (100%) of the contract price of
the infrastructure for a period of two (2) years from the date of final
acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of Chapter
2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other
state-approved form) supplied by the contractor's insurance provider and
bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to
commence construction to the City's Construction Services Division so that
City inspection personnel will be available; to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, to not install or relocate any sanitary sewer, storm drain, or
water pipe unless a responsible City inspector is present and gives his consent
to proceed,and to make such laboratory tests of materials being used as may
be required by the City.
V. To require its contractor to have fully executed contract documents submitted
to the City to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any,until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 4 of 11
G. Developer shall provide, at its expense, unless otherwise agreed to by City, all
engineering drawings and documents necessary to construct the Improvements under this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer
in the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder. City will be responsible for the costs of utility
relocation necessitated by the City's participation in this Agreement.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,fully
indemnify, hold harmless and defend the City, its officers, agents and employees from
all suits, actions or claims of any character, whether real or asserted, brought for or on
account of any injuries (including death) or damages sustained by any persons or to
any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees.
M. The Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and all
claims, suits or causes of action of any nature whatsoever, whether real or asserted,
brought for or on account of any injuries or damages to persons or property, including
death, resulting from or in any way connected with the construction of the
infrastructure contemplated herein, whether or not such injuries, death or damages
are caused, in whole or in part, by the alleged negligence of the City of Fort
Worth, its ofigeers, servants, or employees. Further, Developer will require its
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 5 of 11
contractors to indemnify and hold harmless the City for any losses, damages, costs or
expenses suffered by the City or caused as a result of said contractor's failure to
complete the work and construct the improvements in a good and workmanlike
manner,free from defects, in conformance with the Policy, and in accordance with all
plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered
into by the Developer with its contractor along with an assignment of all warranties given
by the contractor, whether express or implied. Further, Developer agrees that all
contracts with any contractor shall include provisions granting to the City the right to
enforce such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows and further apportioned in the
Cost Summary Table below
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the Developer's
share of the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the Developer's share of the total construction cost as stated in
the construction contract.
ill. Developer shall pay in cash the total cost of streetlights or if the City is not
installing the streetlights, inspection fees equal to four percent (4%) of the
Developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs necessary for
Developer's portion of the Project.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in this
Agreement shall tenninate if the Improvements are not completed within two
(2) years; provided, however, if construction of the Improvements has started
within the two year period, the Developer may request that the CFA be
extended for one (1) additional year. If the Improvements are not completed
within such extension period, there will be no further obligation of the City to
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date: 07.30.2015
Page 6 of 11
participate. City participation in this CFA shall be subject to the annual
availability of City funds as approved by the City Council.
ii. Subject to paragraph i, above, the City shall reimburse Developer for the
City's costs upon presentation of proper documentation of completion of
installation of the Oversized Improvements.
iii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement
with its contractor or other related agreements.
iv. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if
at the end of two (2) years from the date of this Agreement (and any extension
period)the Improvements have not been completed and accepted.
V. The City may utilize the Developer's financial guarantee to cause the payment
of costs for construction of the Improvements before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails to
pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of supplies
and/or construction, the contractors and/or suppliers may put a lien upon the
property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 7 of 11
COST SUMMARY TABLE
Developer's Cost City's Cost Total Cost
A.Water and Sewer Construction
1.Water $ 235,841.20 $235,841.20
2. Sewer $ 703,232.00 $ 18,567.00 $ 721,799.00
Contingency 25% $ 2,785.00 $ 2,785.00
Water Construction Cost Sub-Total $ 939,073.20 $ 21,352.00 $960,425.20
B.TPW Construction
1. Paving $ 247,963.00 $ 247,963.00
2.Storm Drain $ 783,884.40 $ 783,884.40
3. Street Lights $ 101,496.00 $ 101,496.00
4.Traffic Signal $ _
TPW Construction Cost Sub-Total $ 1,133,343.40 $ - $ 1,133,343.40
Total Construction Cost $ 2,072,416.60 $ 21,352.00 $2,093,768.60
Construction Fees:
C.Water/Sewer Inspection Fee(2%) $ 18,781.46 $ 427.04 $ 19,208.50
D.Water/Sewer Material Testing Fee(2%) $ 18,781.46 $ 427.04 $ 19,208.50
Water Construction Fees Sub-Total $ 37,562.92 $ 854.08 $ 38,417.00
E.TPW Inspection Fee $ 41,273.90 $ - $ 41,273.90
F.TPW Material Testing Fee $ 20,636.95 $ - $ 20,636.95
G. Street Light Inspection Fee $ 4,059.84 $ - $ 4,059.84
H.Traffic Signal Inspection Fee $ - $ - $ -
l. Street Signs Installation Cost $ - $ - $ -
J.Civil/Geotechnical Engineering&Survey(20%) $ - $ -
TPW Construction Fees Subtotal $ 65,970.69 $ - $ 65,970.69
Total Construction Fees $ 103,533.61 $ 854.08 $ 104,387.69
TOTAL PROJECT COST $ 2,175,950.21 $ 22,206.08 $2,198,156.29
Financial Guarantee Options, choose one Amount Choice
(Mark one)
Bond = 100% $ 2,072,416.60
Completion Agreement= 100% /Holds Plat $ 2,072,416.60
Cash Escrow Water/Sanitary Sewer= 125% $ 1,197,050.25
Cash Escrow Paving/Storm Drain = 125% $ 1,399,933.88
The costs stated herein may be based upon construction estimates rather than actual costs. The City's
portion of inspection and material testing fees are directly allocated to the City's accounts for charges and
does not reimburse the Water Inspection and Material Testing Fees to the Developer.The City's
participation estimate shall be limited to the unit prices contained in City of Fort Worth Ordinance No.
19192-06-2010,as amended,("Unit Price Ordinance")or as determined by public competitive bid. The
City's cost participation(excluding inspection and material testing fees)is not a lump sum amount and
may be less than stated above depending upon actual quantities as shown on the Notice of Final
Completion package(`Green sheet')and based on unit prices from the construction contract documents. In
no event shall the City pay more per unit than as determined pursuant to the Unit Price Ordinance or public
competitive bid.
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date: 07.30.2015
Page 8 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A:Water Improvements
® Water Cost Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Cost Estimate
® Exhibit B: Paving Improvements
® Paving Cost Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 9 of 11
ATTACHMENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 02427
none
City of Fort Worth,Texas
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015
Page 10 of 11
IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in quadruplicate, effective as of the date subscribed by the
City's designated City Manager.
CITY OF FORT WORTH DEVELOPER:
LGI Crowley Land Partners,LLC
n
Jesus J. Chapa
Assistant City Manager N e: a L' r
9911 Tj le Exftstive VP of Acquisitions
Date:
Date:
Recommended by: ATTEST: (Only if required by
L\L=.� 0z - '41 Developer)
Wendy Ch' Babulal,EMBA,P.E.
Developrrfent Engineering Manager Signature
Water Department Name:
Dougl . Wiersig, P.E.
Director y an-Carman, Director
Transportation&Public Works Water Department
Department
FO
flpproved as to Form &Legality:
ATTEST:
ary J. e X
Richard A McCraken City Secretary
Assistant City Attorney
M&C No. 0/4
Date: 9411(o
r-e-ft (Zts ' N/A EFT. WORTH,ECORD
City of Fort Worth,Texas ETARY
Standard Community Facilities Agreement with City Participation
CFA Official Release Date:07.30.2015 TX
Page 11 of 11
NZ �
3 � a
W N
Im
O
LO
S O
O QO
N W
TC4
ui
W
J
Q Q n /�
= D= V (n c
N
° a
W >-
CON ON
0
W} }
OH NH r
Z
�a as
a rn a(n
Cf)
- W
I r
N \
` ZZ
NW
X�
WD
•
I I a obi
ICO co
, O Nry
y y a<
rL
O a
Z _Z
J J
W J Z W of
3 O J J
Ix
(n N Z O 4
0
U) -- <w Q co z o
LU
O O O Z Z '^a.CL Cl.w 0 0 0 T D "t
F F F r 3�v
J d a a w w I $
h$
0Ap.Ui4-,l—'JaMaS—d_0 VZ9; 45114^d +! dwaB I[r a�! a}ap a suawiunH ;as :0 :aP�
suoWWDHr :Qi jasn aW4911 T '91OZ '60 XDW :a3P0
c
9
n
1
L
So
0
i
6
lovs SITE
0
r
�r
n
L
rs
� " 610ER 20 THE BRIDGES PH 2 PAPE-DAWSON
DATE SEPTEMBER 2015 p
DESIGNER SCE _ FORT WORTH TEXAS F
CHECKED JHY DRAWN SCE r
a y. xm x7 IRK I RNikl lEX6f 76'10 I r1m mom~
SHEET
1 of 8 LOCATION MAP w"°w°cr^vem°w awe=mw mmaw ox
nas +G`E4'M#flPl/Rt�EirEE FFmu IdAnF7+1*fir RAs mw--.Yc;7*'-m%hT[Es E_Ecj�kLY 40 RAs NAT @EEN i4+L'RP-R rLr AL?cM. Wl Ox*CH nT M
IMc�wmelas Esxnr rK 30H3rA,IAxYS U7Jii4u hbAyfiwE AC
N
1 off,
A
Coca
b
0
r--,,, O , 04
Gi
❑ 0, O.C� �_.
I ❑ C)
U)
❑ -55:
❑
V
❑❑ ❑❑
❑ ❑
� ' ' '0000, ' ' � O❑;
L] ��
❑ i ❑❑F-I cq
a - O ❑
0 � I --� � ❑O O Uj LLJ
LLJ
a a❑ LJI❑❑ r- Lu 3f
QD
cr
0
❑❑0 F1 0 E F1❑O❑
AiA
Ir x
O wow =
LL
L!I
Ei o a0❑❑ O
r-- T-
uj
1--
Lu
w z o z
z >
C) >
w 3
LLI
z F w 0
o c*4 00
LL-
m
LU a 0 0 y m 0
LLI w LLI LLI C)
0 0 0 0 m (L cm
w 0 Cl. 0 Cl. il O(L
0 n 6 �w uj
w w Cl w w <z z 5 6 w-
Cl. Q- . Cl. W us Lo Lj
< uj
'm
b"At%-a"ND4d-V49,4w"
vjQp,p"Sing'FA
cli
/� �/ � W ,
C14
-11
�-3A 0 c!
Li Z
uj
i c❑ g
❑ -i
<
cli
I❑❑❑ LJ
Flo �❑,-� y
C\j
�— x LU
❑ �❑ -
❑ �❑❑ LU 3:
C6 P Lu
Lu U)
IF] Ll
❑D❑❑❑�0❑��Cl c, 0
❑
❑0
LL LU
r-)
Ld LLI W> z
-j -j -j
<
>
o
LLI LLI F-
z
<
< < 0 cli co
Or w
I w 0
w 2 La Zn
ui 2
Li
(n V) ce)
(D CL
0 0 w
W0- Cl. cn
0 0 C5 W W
Of Of z z �,c
C3 Q w
CL Cl. w
< cn w w
C x
C, C3 CL)
ND4d
•—W ym—n Pg-M
�) ;
fit
QA
—i
<
C)
En
C\j
cl)
LL1
i
Ir
co
A17 = LL x
LLJ
F-C
LLI
0
of
CL
<
LLJ
0 _ Z
<
0 5 CO
C-4
CL 0: g
LU V)
m
0
LLJ w
V) V)
0 0 CL
L.j
CL CL V)
0 0 mpo W
of of
z z
CL CL 0 LU
L.j V-)
—Nd --Nd
�a�iw a -*64 lChA w
fit
b
0
LLJ
m U) b Wt
ju
T
d U*
VA
lu
(18 NOidV4VH GkOIJ 5
9
C\l C\j
U) p
LU
Z i
Lu >
< CL<
2 0
(r 3: co
AIL - co Cc
W 0 m 7
(18 NOidV4VH (lkO-U LL x
LU
F-
z
LLJ
0
Q0
0 z
U) i 5;
Z
00
cr o g
w CA 0
W 0
0 LLI Li
U) U) CL m Lo
0 0
W Cl. CL
0 0 c; ui U9
F ir z 5 6
L'i V5 LJ ui
O
—6f AU
..4r (F AM ~4'tie liti m -M
Z
a
4040
C3
lu
J 4, 1
<
JU
CL
X
OC
w
3AY F- 0
Cc
cr o
0 F-
U)
cr Im
LL
O C14 co
0 a: 0 < •+.-
W
6 m N O C)
LLJ
0
0 CL 0
0 W
z pe -
C
05 L)L) L"
w w
WI
fit
of
b
0 N
14-
LLI
m -0 aZ
T w 4C9
QW
uj
<
C)
- - - - - - - - - - - - - - - - - - - - - - U)
021 NOldViVH OkOlJ
- - - - — - - - - - - — - - - - - - — - -
cm
CL
CM
x z
LLJ
F-
y- - - - - - - - - - - - -
o
F-
F-
cr rn m
0 -
Od NOldV4VH OAOIJ U-
- - - - - - — - - -
- - - - - - - - -
X
w
Z
<
Of
N
Z 0
C> N QO
U) = 0 g 4--
W a
w V)3 m 0
Ld E
U) m a r 2E
N LLJCL 0:
0
X x
6 Lu
(75 L2 W
Lo
'm m L) W
iY-.r-Nd-
--W'411 L-dW-j%LW 2.0 PQ-M
------ fit
0 !
0
0
r)
E::] �_I ❑❑❑❑❑ ❑❑❑ o❑ ❑
El
Ej
<
11111111 El 11�11�11 0 1-4 Z -
IIFIIIFI Q
- IE
gqT111 OIL❑❑ ❑ ° ° ❑❑ ❑� °
41
F-7 LLj ❑ �( 7
LL,
Li
C\l
El x n 1
Z w
� ! �' ❑F=! !
C6 W
w
pCc
OCj❑ o 0 cn
Ir
LLJ 0
LL 2:
x
LU
� CL ❑
V)
LLJ
LLJ
Co ❑ C-0
Lz:]m LLJ
m m LLI
F—I w Z 0 CN co
to
0 a-
LLJ
CL V)
O
0
LLJ LLj
L) LLA
z 12
CL LLJ
< LLJ =
C3 23 0 V)
LO N N CC)
M t V O
r N
N 04
N
6S
69
O
ch
C)
LO
LO
c0
N
a
C) LO (0 cfl cm co
� � N Cl00 C) r- � O
cl l0 C0 'q N t0 O O CO to
M r- l0 LO r-- M 0)
�1 N ti O O 01
G
~ ER EA K} KT 64 64 Et? EA 14W
f- f- LO N rl- I- d' w
� 10 r- M d' d' Co N
V CO CO N N
V
69 69 69 69 69 fA 69 69 !A
` r M V ' O CA 1` N
d 000 � � V r- I- tt coo
o d�
V N O M O M p M 0) CA - - M IN
ER 0>
E!} 69 to EA (ffl 6% to 44
o
N
O N \ N
C/) 41) N LL co r+
h \° O LL N C N O
O U N U OLL U) U! �.
'a+
O O U j j 0 O
4) L°?
O
o cV c � a
o co M CO
V N o `o o V c o O
Q 0 ci0 t`
O � 69 0
6m IR
V
O cc
� a
� � m o
2 a) O O 0 LO
a c o C:)
c°fl o0 0o ti
N � �° O O N
3 60k 69 69 669
Boa
p U 0 0 C:) O O O
U C O O � O O O O O
N T Lj O O N N
p •U 69 69 69 669
Ua0
a) co w
N U c co c00 O LP O
C
CL � 69 O EA 69 6 6 09 O
69
N
U 0
3 Cl) O O O v O0 00)
N a) c i (co o69 069 v � 069
Ln p• ` 69 69 69 69
r a 0)
Op N c :3
0 D m
o 0 o O O� o0
LO LO
fu
Q �
0 J W J W J J
cfl
U �
D Li
m H oo LO
> a� a U �,
= oa (D.00 nU-) � m
p
d) U) v � v, 3v3 (.5 c coo
[� w .r
'a 3 N cn v U') c0 I- CO U
E c
m co Z C7 U
004243
DAP-am PROPOSAL
Pap Ia2
SECTION[00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Infomution Biddces Proposal
Bidlist Item No. Description Specification Section No. Mnk of Bid Unit Price Bid Value
UNIT 1:WATER IMPROVEMENTS
3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON 3.8 56300.00 533,560.00
33110261 8"PVC Water Pipe,Complete in Place 33 11 12 LF 4,039 5."'0..70 583,60730
3312.0001 Fire Hyttrant,Complete in Place 33 12 40 EA 8 53,40000 527,200.00
3312 0110 Connection to Existing 8"Water Main 331225 EA 2 SZ000.00 54,000.00
3312 2003 1"Water Service 33 12 10 EA 121 5570.00 568,970.00
33123003 a"Gate Valve 331200 EA 12 $1,15000 $13,800.00
3312.4311 36"x8"Tapping Sleeve&Valve 331225 EA I S14.3 . S 14.300.00
3305 0109 Trench Safety 330510 LF 4,039 S0 10 $403.90
TOTAL WATER IMPROVEMENTS 5235.84120
UNIT 11:SANITARY SEWER IMPROVEMENTS
3301 0002 Post-CCTV Inspection 33 01 31 LF 5,028 S2 00 510.056.00
3301 0101 Manhole Vacuum Testing 33 0130 EA 51 S175.00 58.925.00
3305.0109 Trench Safety 33 05 10 LF 5.028 S1.00 55,028,00
3305.0113 Trench Water Stops 33 05 15 EA 19 S150.00 51850.00
33313101 4"Smvr Service 33 31 50 EA 121 5645.00 578,045.00
3331.4115 s"PVC Sewer Pipe 3311 10,3331 12.33 31 20 LF 3,937 555.00 5216,535 00
3331.4116 8"Sewer Pipe,CSS BaekfEli 3411 10.3331 12,333120 LF 588 S110.00 564,680.00
3331.4201 10'PVC Sewer Pipe 3311 10,3331 12.333120 LF -272 S8600 423,39100
3331.4202 10"Sewer Pipe.CSS Bacsf i 0 3411 10,3331 12.333120 LF -231 S170.00 -539,270 00
3331.4201 10"PVC Sewer Pipe 33 11 10.3331 12,33 3120 LF 272 S8600 V-3392 00
33314202 10"Sesser Pipe.CSS Backfill 34 11 10.3331 12.33313-0 LF 231 S170.00 S39,27000
3331.4215 15"PVC Sewer Apt 33 11 10,3331 12.333120 LF 463 S108.00 $50.00400
3331.4216 15"Sewer Pipe,CSS Backs 11 3311 10,3331 12,33 3120 LF 40 $214.001 S8,56000
33391001 4'Manhole 33 39 10.33 39 20 EA 51 S4.30000 5219,300.00
3339.1003 4'Extra Depth Manhole 33 39 10,33 39 30 VF 341 $24000 $57.816.00
TOTAL SANITARY SEWER lArPROVE111£NTS 5731,799.00
UNIT III:DRAINAGE IMPROVEMENTS-DIeCART AVENUE
0231.0800 Remove Rip Rap 0241 13 SF 207 55.00 51.035.00
0231.4401 Remove Head vWUSEr 0241 14 EA I 5800.00 5800.00
3137.0102 Large Stone Rip Rap Dry 313700 SY 330 57200 523,040.00
3341.0201 21"RCP,Class III 3341 10 LF 93 S6400 55,95'_00
3341.0409 48"RCP.Class 111 334940 LF 84 S16900 S14,196.00
3331.1103 4x4 Box Culvert 3341 10 LF 20 5205.00 54.100.00
3341 1303 6x4 Box Culvert 3341 10 LF 154 5308.00 $47,132.00
3341.1302 7x4 Box Culvert 3341 10 LF 121 $37000 541,770.00
3331.1605 9x8 Box Culvert 3341 10 LF 748 S48-100 5360,536.00
33491000 Headwall.Box Culvert 334940 CY 273,1 5814.00 S--)2--)303.40
3349.6001 10'Recessed Inlet 33 49 20 FA 3 53,300.00 59.900.00
9999.0001 T.xDOT PR I Pedestrian GRAL LF 530 594.00 S49,921000
TOTAL DRAINAGE IMPROVEMENTS-?*IcC:ART AVENUE 5783.884.40
CRY OF PORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS•DEVELOPEA AWARDED PROJECTS
Faro Vasm Aprd 2.2014 00 843 Bd PmP�.
004243
DAP-BID PROPOSAL
Page 2 oft
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UMT PRICE BID Bidder's Application
Project Item Information Biddees Proposal
BidGst hem No Description Speeifiau Unit of Bid Measure Seetfon No Measure Quantity Price Bid Value
UNIT IV:PAVING IMPROVEMENTS-NfcCART AVENUE
3211 0400 Hydrated Lime(361bs/sy) 321129 TON 72.7 5171.00 512.431,70
3211.0502 8"Lime Treatment 32 11 29 SY 4,039 53.00 SIM 17.00
3213.0105 10'Conc Pavement 3213 13 SY 3,740 S4900 S183-260.00
3213 0301 4'Cone Sidewalk 32 13 20 SY 516 543.00 $22.188.00
3213 0501 Barrier Free Ramp,Type R-1 321320 EA 2 51,460.00 53,920 00
9999.0002 Type 1(R)Barricade EA 1 51,650.00 $1,650.00
3124.0101 Embanianent per plans Cy 5468 52.45 $13396.60
TOTAL PAVING IMPROVEMENTS-,NleCART AVENUE 5247,963.30
UNIT V:STREET LIGHT IMPROVEMENTS-NTcCART AVENUE
605.011 I Furnish/Install Ele Pediel 2 260500 EA 1.0 55,00000 55,000.00
2605.3015 '_"CONDT PVC SCH 80M 26 05 33 LF 4,024 S6.00 S24,14400
3441 1501 Ground Box T37e B 3441 10 EA 5 S500.00 5-_500.00
34413003 Rdww)•Ilium Assembly TY 18,18A,19 and D-40 344120 EA 12 $3,11500 537,380.00
3441.3302 Rd%V Ilium Foundation TY 3.5,6,and 8 34 41 20 EA 12 S1,100.00 $13.200.00
344.3404 2-2-2-4 Quadplex Alum Eiee Conductor 34 41 20 LF 4,024 53,00 $12,072.00
TB3-17 Knockdo%vn Base EA 12 $600.00 S7?00.00
TOTAL STREET LIGHT IMPROVEMENTS-NIeCART AVENUE $101,496.00
BID SUMIN4tRY
UNIT I WATER IMPROVEMENTS S235.84120
UNIT 11,SANITARY SEWER IMPROVEMENTS 5721.799.00
UNIT III-DRAINAGE IMPROVEMENTS-McCART AVENUE 5783.884 40
UNIT IV PAVING IMPROVEMENTS-McCARTAVENUE S247,963.30
UNIT V.STREET LIGHT IMPROVEMENTS-McCART AVENUE SI01,496.00
TOTAL CONSTRCfCTION BID 52,090,98390
Contractor agree to complete WORK for FINAL ACCEPTANCE within 215 calendar days after the date when the
CONTRACT commeoces to ran as provided in the General Candidaim
END OF SECTION
CrrY OF FORT WORTH
STANDARD CONSSMUC r7ON SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PRWECTS
Form Vim AF2.2014 00 L X!Bd hopaot OM v