HomeMy WebLinkAboutContract 48057 MY SECUTAW CONTRACT IMO, COMMUNITY FACILITIES AGREEMENT WITH CITY OVERSIZING PARTICIPATION Developer Company Name: LGI Crowley Land Partners, LLC Address,State,Zip Code: 1450 Lake Robbins Dr. Ste.430,The Woodlands,TX,77380 Phone&Email: 281-210-2584,jlipar(algihomes.com Authorized Signatory,Title: Jack Lipar, Executive VP of Acquisitions Project Name and Brief The Bridges Phase 2 Description: Southwest corner of FM 1187 and Mc Cart Ave Plat Case Number: FP-14-062 Plat Name: The Bridges Phase 2 Mapsco: Council District: 6 City Project Number: 02427 CFA Number: 2015-102 DOE Number: 7370 To be completed by ff. Received by: 441 Date: �O`l OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ' a City of Fort Worth,Texas p�G 2 2016 Standard Community Facilities Agreement with City Participation Q� CFA Official Release Date:07.30.2015 ��C1�S� �QR6 Page 1 of 11 COMMUNITY FACILITIES AGREEMENT WITH CITY OVERSIZING PARTICIPATION THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, LGI Crowley Land Partners, LLC , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as The Bridges Phase 2 ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has reviewed the proposed Improvements and desires to have the Developer oversize the proposed Improvements to provide capacity for future development in the area("Oversized Improvements"); and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project; and WHEREAS, the City has reviewed the Project and desires to participate in the Project in accordance with this Agreement as presented by the Cost Summary Table and Exhibits attached hereto and authorized by City Council via M&C PJ on ,20 ;and WHEREAS, The City's cost participation shall be in an amount not to exceed $22,206.00 ("Participation"); and WHEREAS, the City has requested the Developer to cause, and the Developer agrees to cause, the design, permitting and construction of the Project for which the City will, subject to City Council approval, reimburse the Developer for the City's portion of those costs after City's final acceptance of the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 2 of 11 hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) to submit a signed affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) ®, Street Lights & Signs (C) Z. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date: 07.30.2015 Page 3 of 11 (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed,and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any,until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 4 of 11 G. Developer shall provide, at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City will be responsible for the costs of utility relocation necessitated by the City's participation in this Agreement. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby,fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries (including death) or damages sustained by any persons or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees. M. The Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from or in any way connected with the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its ofigeers, servants, or employees. Further, Developer will require its City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 5 of 11 contractors to indemnify and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner,free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows and further apportioned in the Cost Summary Table below i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the Developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the Developer's share of the total construction cost as stated in the construction contract. ill. Developer shall pay in cash the total cost of streetlights or if the City is not installing the streetlights, inspection fees equal to four percent (4%) of the Developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs necessary for Developer's portion of the Project. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in this Agreement shall tenninate if the Improvements are not completed within two (2) years; provided, however, if construction of the Improvements has started within the two year period, the Developer may request that the CFA be extended for one (1) additional year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date: 07.30.2015 Page 6 of 11 participate. City participation in this CFA shall be subject to the annual availability of City funds as approved by the City Council. ii. Subject to paragraph i, above, the City shall reimburse Developer for the City's costs upon presentation of proper documentation of completion of installation of the Oversized Improvements. iii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iv. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. V. The City may utilize the Developer's financial guarantee to cause the payment of costs for construction of the Improvements before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 7 of 11 COST SUMMARY TABLE Developer's Cost City's Cost Total Cost A.Water and Sewer Construction 1.Water $ 235,841.20 $235,841.20 2. Sewer $ 703,232.00 $ 18,567.00 $ 721,799.00 Contingency 25% $ 2,785.00 $ 2,785.00 Water Construction Cost Sub-Total $ 939,073.20 $ 21,352.00 $960,425.20 B.TPW Construction 1. Paving $ 247,963.00 $ 247,963.00 2.Storm Drain $ 783,884.40 $ 783,884.40 3. Street Lights $ 101,496.00 $ 101,496.00 4.Traffic Signal $ _ TPW Construction Cost Sub-Total $ 1,133,343.40 $ - $ 1,133,343.40 Total Construction Cost $ 2,072,416.60 $ 21,352.00 $2,093,768.60 Construction Fees: C.Water/Sewer Inspection Fee(2%) $ 18,781.46 $ 427.04 $ 19,208.50 D.Water/Sewer Material Testing Fee(2%) $ 18,781.46 $ 427.04 $ 19,208.50 Water Construction Fees Sub-Total $ 37,562.92 $ 854.08 $ 38,417.00 E.TPW Inspection Fee $ 41,273.90 $ - $ 41,273.90 F.TPW Material Testing Fee $ 20,636.95 $ - $ 20,636.95 G. Street Light Inspection Fee $ 4,059.84 $ - $ 4,059.84 H.Traffic Signal Inspection Fee $ - $ - $ - l. Street Signs Installation Cost $ - $ - $ - J.Civil/Geotechnical Engineering&Survey(20%) $ - $ - TPW Construction Fees Subtotal $ 65,970.69 $ - $ 65,970.69 Total Construction Fees $ 103,533.61 $ 854.08 $ 104,387.69 TOTAL PROJECT COST $ 2,175,950.21 $ 22,206.08 $2,198,156.29 Financial Guarantee Options, choose one Amount Choice (Mark one) Bond = 100% $ 2,072,416.60 Completion Agreement= 100% /Holds Plat $ 2,072,416.60 Cash Escrow Water/Sanitary Sewer= 125% $ 1,197,050.25 Cash Escrow Paving/Storm Drain = 125% $ 1,399,933.88 The costs stated herein may be based upon construction estimates rather than actual costs. The City's portion of inspection and material testing fees are directly allocated to the City's accounts for charges and does not reimburse the Water Inspection and Material Testing Fees to the Developer.The City's participation estimate shall be limited to the unit prices contained in City of Fort Worth Ordinance No. 19192-06-2010,as amended,("Unit Price Ordinance")or as determined by public competitive bid. The City's cost participation(excluding inspection and material testing fees)is not a lump sum amount and may be less than stated above depending upon actual quantities as shown on the Notice of Final Completion package(`Green sheet')and based on unit prices from the construction contract documents. In no event shall the City pay more per unit than as determined pursuant to the Unit Price Ordinance or public competitive bid. City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date: 07.30.2015 Page 8 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A:Water Improvements ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 9 of 11 ATTACHMENT "1" Changes to Standard Agreement Community Facilities Agreement City Project No. 02427 none City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 Page 10 of 11 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, effective as of the date subscribed by the City's designated City Manager. CITY OF FORT WORTH DEVELOPER: LGI Crowley Land Partners,LLC n Jesus J. Chapa Assistant City Manager N e: a L' r 9911 Tj le Exftstive VP of Acquisitions Date: Date: Recommended by: ATTEST: (Only if required by L\L=.� 0z - '41 Developer) Wendy Ch' Babulal,EMBA,P.E. Developrrfent Engineering Manager Signature Water Department Name: Dougl . Wiersig, P.E. Director y an-Carman, Director Transportation&Public Works Water Department Department FO flpproved as to Form &Legality: ATTEST: ary J. e X Richard A McCraken City Secretary Assistant City Attorney M&C No. 0/4 Date: 9411(o r-e-ft (Zts ' N/A EFT. WORTH,ECORD City of Fort Worth,Texas ETARY Standard Community Facilities Agreement with City Participation CFA Official Release Date:07.30.2015 TX Page 11 of 11 NZ � 3 � a W N Im O LO S O O QO N W TC4 ui W J Q Q n /� = D= V (n c N ° a W >- CON ON 0 W} } OH NH r Z �a as a rn a(n Cf) - W I r N \ ` ZZ NW X� WD • I I a obi ICO co , O Nry y y a< rL O a Z _Z J J W J Z W of 3 O J J Ix (n N Z O 4 0 U) -- <w Q co z o LU O O O Z Z '^a.CL Cl.w 0 0 0 T D "t F F F r 3�v J d a a w w I $ h$ 0Ap.Ui4-,l—'JaMaS—d_0 VZ9; 45114^d +! dwaB I[r a�! a}ap a suawiunH ;as :0 :aP� suoWWDHr :Qi jasn aW4911 T '91OZ '60 XDW :a3P0 c 9 n 1 L So 0 i 6 lovs SITE 0 r �r n L rs � " 610ER 20 THE BRIDGES PH 2 PAPE-DAWSON DATE SEPTEMBER 2015 p DESIGNER SCE _ FORT WORTH TEXAS F CHECKED JHY DRAWN SCE r a y. xm x7 IRK I RNikl lEX6f 76'10 I r1m mom~ SHEET 1 of 8 LOCATION MAP w"°w°cr^vem°w awe=mw mmaw ox nas +G`E4'M#flPl/Rt�EirEE FFmu IdAnF7+1*fir RAs mw--.Yc;7*'-m%hT[Es E_Ecj�kLY 40 RAs NAT @EEN i4+L'RP-R rLr AL?cM. Wl Ox*CH nT M IMc�wmelas Esxnr rK 30H3rA,IAxYS U7Jii4u hbAyfiwE AC N 1 off, A Coca b 0 r--,,, O , 04 Gi ❑ 0, O.C� �_. I ❑ C) U) ❑ -55: ❑ V ❑❑ ❑❑ ❑ ❑ � ' ' '0000, ' ' � O❑; L] �� ❑ i ❑❑F-I cq a - O ❑ 0 � I --� � ❑O O Uj LLJ LLJ a a❑ LJI❑❑ r- Lu 3f QD cr 0 ❑❑0 F1 0 E F1❑O❑ AiA Ir x O wow = LL L!I Ei o a0❑❑ O r-- T- uj 1-- Lu w z o z z > C) > w 3 LLI z F w 0 o c*4 00 LL- m LU a 0 0 y m 0 LLI w LLI LLI C) 0 0 0 0 m (L cm w 0 Cl. 0 Cl. il O(L 0 n 6 �w uj w w Cl w w <z z 5 6 w- Cl. Q- . Cl. W us Lo Lj < uj 'm b"At%-a"ND4d-V49,4w" vjQp,p"Sing'FA cli /� �/ � W , C14 -11 �-3A 0 c! Li Z uj i c❑ g ❑ -i < cli I❑❑❑ LJ Flo �❑,-� y C\j �— x LU ❑ �❑ - ❑ �❑❑ LU 3: C6 P Lu Lu U) IF] Ll ❑D❑❑❑�0❑��Cl c, 0 ❑ ❑0 LL LU r-) Ld LLI W> z -j -j -j < > o LLI LLI F- z < < < 0 cli co Or w I w 0 w 2 La Zn ui 2 Li (n V) ce) (D CL 0 0 w W0- Cl. cn 0 0 C5 W W Of Of z z �,c C3 Q w CL Cl. w < cn w w C x C, C3 CL) ND4d •—W ym—n Pg-M �) ; fit QA —i < C) En C\j cl) LL1 i Ir co A17 = LL x LLJ F-C LLI 0 of CL < LLJ 0 _ Z < 0 5 CO C-4 CL 0: g LU V) m 0 LLJ w V) V) 0 0 CL L.j CL CL V) 0 0 mpo W of of z z CL CL 0 LU L.j V-) —Nd --Nd �a�iw a -*64 lChA w fit b 0 LLJ m U) b Wt ju T d U* VA lu (18 NOidV4VH GkOIJ 5 9 C\l C\j U) p LU Z i Lu > < CL< 2 0 (r 3: co AIL - co Cc W 0 m 7 (18 NOidV4VH (lkO-U LL x LU F- z LLJ 0 Q0 0 z U) i 5; Z 00 cr o g w CA 0 W 0 0 LLI Li U) U) CL m Lo 0 0 W Cl. CL 0 0 c; ui U9 F ir z 5 6 L'i V5 LJ ui O —6f AU ..4r (F AM ~4'tie liti m -M Z a 4040 C3 lu J 4, 1 < JU CL X OC w 3AY F- 0 Cc cr o 0 F- U) cr Im LL O C14 co 0 a: 0 < •+.- W 6 m N O C) LLJ 0 0 CL 0 0 W z pe - C 05 L)L) L" w w WI fit of b 0 N 14- LLI m -0 aZ T w 4C9 QW uj < C) - - - - - - - - - - - - - - - - - - - - - - U) 021 NOldViVH OkOlJ - - - - — - - - - - - — - - - - - - — - - cm CL CM x z LLJ F- y- - - - - - - - - - - - - o F- F- cr rn m 0 - Od NOldV4VH OAOIJ U- - - - - - - — - - - - - - - - - - - - X w Z < Of N Z 0 C> N QO U) = 0 g 4-- W a w V)3 m 0 Ld E U) m a r 2E N LLJCL 0: 0 X x 6 Lu (75 L2 W Lo 'm m L) W iY-.r-Nd- --W'411 L-dW-j%LW 2.0 PQ-M ------ fit 0 ! 0 0 r) E::] �_I ❑❑❑❑❑ ❑❑❑ o❑ ❑ El Ej < 11111111 El 11�11�11 0 1-4 Z - IIFIIIFI Q - IE gqT111 OIL❑❑ ❑ ° ° ❑❑ ❑� ° 41 F-7 LLj ❑ �( 7 LL, Li C\l El x n 1 Z w � ! �' ❑F=! ! C6 W w pCc OCj❑ o 0 cn Ir LLJ 0 LL 2: x LU � CL ❑ V) LLJ LLJ Co ❑ C-0 Lz:]m LLJ m m LLI F—I w Z 0 CN co to 0 a- LLJ CL V) O 0 LLJ LLj L) LLA z 12 CL LLJ < LLJ = C3 23 0 V) LO N N CC) M t V O r N N 04 N 6S 69 O ch C) LO LO c0 N a C) LO (0 cfl cm co � � N Cl00 C) r- � O cl l0 C0 'q N t0 O O CO to M r- l0 LO r-- M 0) �1 N ti O O 01 G ~ ER EA K} KT 64 64 Et? EA 14W f- f- LO N rl- I- d' w � 10 r- M d' d' Co N V CO CO N N V 69 69 69 69 69 fA 69 69 !A ` r M V ' O CA 1` N d 000 � � V r- I- tt coo o d� V N O M O M p M 0) CA - - M IN ER 0> E!} 69 to EA (ffl 6% to 44 o N O N \ N C/) 41) N LL co r+ h \° O LL N C N O O U N U OLL U) U! �. 'a+ O O U j j 0 O 4) L°? O o cV c � a o co M CO V N o `o o V c o O Q 0 ci0 t` O � 69 0 6m IR V O cc � a � � m o 2 a) O O 0 LO a c o C:) c°fl o0 0o ti N � �° O O N 3 60k 69 69 669 Boa p U 0 0 C:) O O O U C O O � O O O O O N T Lj O O N N p •U 69 69 69 669 Ua0 a) co w N U c co c00 O LP O C CL � 69 O EA 69 6 6 09 O 69 N U 0 3 Cl) O O O v O0 00) N a) c i (co o69 069 v � 069 Ln p• ` 69 69 69 69 r a 0) Op N c :3 0 D m o 0 o O O� o0 LO LO fu Q � 0 J W J W J J cfl U � D Li m H oo LO > a� a U �, = oa (D.00 nU-) � m p d) U) v � v, 3v3 (.5 c coo [� w .r 'a 3 N cn v U') c0 I- CO U E c m co Z C7 U 004243 DAP-am PROPOSAL Pap Ia2 SECTION[00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Infomution Biddces Proposal Bidlist Item No. Description Specification Section No. Mnk of Bid Unit Price Bid Value UNIT 1:WATER IMPROVEMENTS 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON 3.8 56300.00 533,560.00 33110261 8"PVC Water Pipe,Complete in Place 33 11 12 LF 4,039 5."'0..70 583,60730 3312.0001 Fire Hyttrant,Complete in Place 33 12 40 EA 8 53,40000 527,200.00 3312 0110 Connection to Existing 8"Water Main 331225 EA 2 SZ000.00 54,000.00 3312 2003 1"Water Service 33 12 10 EA 121 5570.00 568,970.00 33123003 a"Gate Valve 331200 EA 12 $1,15000 $13,800.00 3312.4311 36"x8"Tapping Sleeve&Valve 331225 EA I S14.3 . S 14.300.00 3305 0109 Trench Safety 330510 LF 4,039 S0 10 $403.90 TOTAL WATER IMPROVEMENTS 5235.84120 UNIT 11:SANITARY SEWER IMPROVEMENTS 3301 0002 Post-CCTV Inspection 33 01 31 LF 5,028 S2 00 510.056.00 3301 0101 Manhole Vacuum Testing 33 0130 EA 51 S175.00 58.925.00 3305.0109 Trench Safety 33 05 10 LF 5.028 S1.00 55,028,00 3305.0113 Trench Water Stops 33 05 15 EA 19 S150.00 51850.00 33313101 4"Smvr Service 33 31 50 EA 121 5645.00 578,045.00 3331.4115 s"PVC Sewer Pipe 3311 10,3331 12.33 31 20 LF 3,937 555.00 5216,535 00 3331.4116 8"Sewer Pipe,CSS BaekfEli 3411 10.3331 12,333120 LF 588 S110.00 564,680.00 3331.4201 10'PVC Sewer Pipe 3311 10,3331 12.333120 LF -272 S8600 423,39100 3331.4202 10"Sewer Pipe.CSS Bacsf i 0 3411 10,3331 12.333120 LF -231 S170.00 -539,270 00 3331.4201 10"PVC Sewer Pipe 33 11 10.3331 12,33 3120 LF 272 S8600 V-3392 00 33314202 10"Sesser Pipe.CSS Backfill 34 11 10.3331 12.33313-0 LF 231 S170.00 S39,27000 3331.4215 15"PVC Sewer Apt 33 11 10,3331 12.333120 LF 463 S108.00 $50.00400 3331.4216 15"Sewer Pipe,CSS Backs 11 3311 10,3331 12,33 3120 LF 40 $214.001 S8,56000 33391001 4'Manhole 33 39 10.33 39 20 EA 51 S4.30000 5219,300.00 3339.1003 4'Extra Depth Manhole 33 39 10,33 39 30 VF 341 $24000 $57.816.00 TOTAL SANITARY SEWER lArPROVE111£NTS 5731,799.00 UNIT III:DRAINAGE IMPROVEMENTS-DIeCART AVENUE 0231.0800 Remove Rip Rap 0241 13 SF 207 55.00 51.035.00 0231.4401 Remove Head vWUSEr 0241 14 EA I 5800.00 5800.00 3137.0102 Large Stone Rip Rap Dry 313700 SY 330 57200 523,040.00 3341.0201 21"RCP,Class III 3341 10 LF 93 S6400 55,95'_00 3341.0409 48"RCP.Class 111 334940 LF 84 S16900 S14,196.00 3331.1103 4x4 Box Culvert 3341 10 LF 20 5205.00 54.100.00 3341 1303 6x4 Box Culvert 3341 10 LF 154 5308.00 $47,132.00 3341.1302 7x4 Box Culvert 3341 10 LF 121 $37000 541,770.00 3331.1605 9x8 Box Culvert 3341 10 LF 748 S48-100 5360,536.00 33491000 Headwall.Box Culvert 334940 CY 273,1 5814.00 S--)2--)303.40 3349.6001 10'Recessed Inlet 33 49 20 FA 3 53,300.00 59.900.00 9999.0001 T.xDOT PR I Pedestrian GRAL LF 530 594.00 S49,921000 TOTAL DRAINAGE IMPROVEMENTS-?*IcC:ART AVENUE 5783.884.40 CRY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS•DEVELOPEA AWARDED PROJECTS Faro Vasm Aprd 2.2014 00 843 Bd PmP�. 004243 DAP-BID PROPOSAL Page 2 oft SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UMT PRICE BID Bidder's Application Project Item Information Biddees Proposal BidGst hem No Description Speeifiau Unit of Bid Measure Seetfon No Measure Quantity Price Bid Value UNIT IV:PAVING IMPROVEMENTS-NfcCART AVENUE 3211 0400 Hydrated Lime(361bs/sy) 321129 TON 72.7 5171.00 512.431,70 3211.0502 8"Lime Treatment 32 11 29 SY 4,039 53.00 SIM 17.00 3213.0105 10'Conc Pavement 3213 13 SY 3,740 S4900 S183-260.00 3213 0301 4'Cone Sidewalk 32 13 20 SY 516 543.00 $22.188.00 3213 0501 Barrier Free Ramp,Type R-1 321320 EA 2 51,460.00 53,920 00 9999.0002 Type 1(R)Barricade EA 1 51,650.00 $1,650.00 3124.0101 Embanianent per plans Cy 5468 52.45 $13396.60 TOTAL PAVING IMPROVEMENTS-,NleCART AVENUE 5247,963.30 UNIT V:STREET LIGHT IMPROVEMENTS-NTcCART AVENUE 605.011 I Furnish/Install Ele Pediel 2 260500 EA 1.0 55,00000 55,000.00 2605.3015 '_"CONDT PVC SCH 80M 26 05 33 LF 4,024 S6.00 S24,14400 3441 1501 Ground Box T37e B 3441 10 EA 5 S500.00 5-_500.00 34413003 Rdww)•Ilium Assembly TY 18,18A,19 and D-40 344120 EA 12 $3,11500 537,380.00 3441.3302 Rd%V Ilium Foundation TY 3.5,6,and 8 34 41 20 EA 12 S1,100.00 $13.200.00 344.3404 2-2-2-4 Quadplex Alum Eiee Conductor 34 41 20 LF 4,024 53,00 $12,072.00 TB3-17 Knockdo%vn Base EA 12 $600.00 S7?00.00 TOTAL STREET LIGHT IMPROVEMENTS-NIeCART AVENUE $101,496.00 BID SUMIN4tRY UNIT I WATER IMPROVEMENTS S235.84120 UNIT 11,SANITARY SEWER IMPROVEMENTS 5721.799.00 UNIT III-DRAINAGE IMPROVEMENTS-McCART AVENUE 5783.884 40 UNIT IV PAVING IMPROVEMENTS-McCARTAVENUE S247,963.30 UNIT V.STREET LIGHT IMPROVEMENTS-McCART AVENUE SI01,496.00 TOTAL CONSTRCfCTION BID 52,090,98390 Contractor agree to complete WORK for FINAL ACCEPTANCE within 215 calendar days after the date when the CONTRACT commeoces to ran as provided in the General Candidaim END OF SECTION CrrY OF FORT WORTH STANDARD CONSSMUC r7ON SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PRWECTS Form Vim AF2.2014 00 L X!Bd hopaot OM v m t�1 s