ORDINANCE NO. r~
AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST
OF IMPROVEMENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVE-
MENTS ON A PORTION OF BRIDGE STREET AND BRIDGEWOOD DRIVE
AND PORTIONS OF SUNDRY STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE
FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL
OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE
NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY
TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE
CAPTION OF SAME IN THE MINUTE BOOKS OF THE CITY COUNCIL
AND BY FILING THE COMPLETE ORDINANCE IN THE APPROPRIATE
ORDINANCE RECORDS OF THIS CITY AND PROVIDING AN EFFECTIVE
DATE.
WHEREAS, the City Council of the City of Fort Worth, Texas, has
heretofore ordered that each of the hereinafter described portions
of streets, avenues and public places in the City of Fort Worth,
Texas, be improved by raising, grading and filling same and by con-
structing thereon the following, to-wit:
PROJECT NO. 029-036-533, UNIT I, BRIDGE STREET FROM WEST PROP-
ri1LL5 UtC1V~, -tO De improved with seven-incri thick concrete
pavement with seven-inch high superimposed concrete curb on a
six-inch thick lime stabilized subgrade, so that the finished
roadway will be forty-four feet wide. Seven-inch thick con-
crete driveway approaches and turn lanes will be constructed
where specified.
PROJECT NO. 029-036-533, UNIT I-A, BRIDGE STREET FROM OAKLAND
HILLS DRIVE TO BRIDGEWOOD DRIVE, to be improved with seven-incYi
thick concrete pavement with seven-inch high superimposed curb
on a six-inch thick lime stabilized subgrade, so that the fin-
ished roadway will be sixty feet wide. Seven inch thick con-
crete driveway approaches and turn lanes will be constructed
where specified.
PROJECT NO. 029-036-533, UNIT I-B, BRIDGE STREET FROM
BRIDGEWOOD DRIVE TO WEST SERVICE ROAD - I-, 0, to a improved
with seven-rnch thick concrete pavement with seven-inch high
superimposed concrete curb on a six-inch thick lime stabilized
subgrade, so that the finished roadway will consist of two
thirty-six feet wide traffic lanes with a twenty-eight feet
wide median. Seven-inch thick concrete turn lanes will be con-
structed where specified.
PROJECT NO. 029-036-533, UNIT II, BRIDGEWOOD DRIVE FROM BRIDGE
STREET SOUTH 1085-FEET, to be improved with seven-inch thick
concrete pavement wit seven-inch high superimposed concrete
curb on a six-inch thick lime stabilized subgrade, so that the
finished roadway will be sixty feet wide. Seven-inch thick
concrete turn lanes will be constructed where specified.
~,
_t
The above, together with concrete curbs, gutters, driveways and
incidentals to such improvements, on proper grade and line where
same are not already so constructed, together with storm sewers and
drains and other necessary incidentals and appurtenances; all of
said improvements to be constructed as and where shown on the Plans
and Specifications therefor.
WHEREAS, the City Council of the City of Fort Worth, Texas, has
caused the Public Works Director to prepare and file estimates of
the cost of such improvements and estimates of the amount per front
foot proposed to be assessed against abutting property and the own-
ers thereof, and such estimates have been examined, NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS THAT:
I.
Such estimates be, and they are hereby adopted and approved.
II.
It is hereby found and determined that the total estimated cost
of improvements for those portions of streets, avenues, and public
places hereinafter described is $1,683,772.36. The amount or
amounts per front foot proposed to be assessed for such improvements
against abutting property and the owners thereof, are as follows, to
wit:
BRIDGE STREET Unit I: from the west property line of Lot 1,
B o~ck-A, Boaz Turnpike Addition to Oakland Hills
,~ Drive;
J The estimated amount per front foot to be assessed against abutting
property and the owners thereof is:
For pavement - $56.74
For curb - 1.44
resulting in a total estimated amount per front foot to be assessed
of $58.18, plus the cost incurred for concrete driveway construction
and turn lanes where specified.
BRIDGE STREET Unit I-A: from Oakland Hills Drive to Bridgewood
Drive;
The estimated amount per front foot to be assessed against abutting
property and the owners thereof is:
For pavement - $67.01
For curb - 1.44
For storm drain - 19.63
For preparation of
right-of-way - 2.94
For top soil
and seeding - 5.02
For street lights and
traffic markers - 5.37
~., ,,
resulting in a total estimated amount per front foot to be assessed
of $101.41, plus the cost incurred for concrete driveway approaches
and turn lanes where specified.
BRIDGE STREET
The estimated amount
be assessed against
Unit I-B: from Bridgewood Drive to West Service
Road I-820.
per front foot to
abutting property
For pavement
For curb
For storm drain
For preparation of
right-of-way
For top soil
and seeding
For street lights
be assessed per front foot to
and the owners thereof is:
- $67.01
- 1.44
- 19.63
- 2.94
- 5.02
and
traffic markers - 5.37
resulting in a total estimated amount per front foot to be assessed
of $101.41, plus the cost incurred for concrete turn lanes where
specified.
BRIDGEWOOD DRIVE Unit II: from Bridge Street south 1085 feet.
The estimated amount per front foot to be assessed against abutting
property and the owners thereof is:
For pavement - $67.01
For curb - 1.44
For storm drain - 19.63
For preparation of
right-of-way - 2.94
For top soil
and seeding - 5.02
For street lights and'
traffic markers - 5.37
resulting in a total estimated amount per front foot to be assessed
of $101.41, plus the cost incurred for concrete turn lanes where
specified.
III.
A hearing be given and held by and before the City Council of
the City of Fort Worth, Texas, to all owning or claiming any proper-
ty abutting upon said portions of highways, street`s, avenues and
public places, as well as to all owning or claiming any interest in
any such property. Such hearing shall be given and held on the 29th
day of March, 1983, at 10:00 a.m., in the Council Chamber in the
City Hall in the City of Fort Worth, Texas, and the City Secretary
is hereby directed to give or cause to be given notice of the time
and place of such hearing and of other matters and facts in accord-
ance with the terms and provisions of an Act passed at the First
Called Session of the Fortieth Legislature of the State of Texas,
and known as Chapter 106 of the Acts of said session, now being
known as Article 1105b of Vernon's Texas Civil Statutes as amended
by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1,
emergency effective May 12, 1967. Such notice shall be by adver-
+ ^ to A ,,
tisement inserted at least three (3) times in a newspaper published
in the City of Fort Worth, Texas, the first publication to be made
at least twenty-one (21) days before the date of said hearing. Said
notice shall comply with and be in accordance with the terms and
provisions of said Act as amended. The City Secretary is further
directed to give or cause to be given personal notice of the time
and place of such hearing to all owning or claiming any property
abutting on said portions of highways, streets, avenues and public
places, as well as to all owning or claiming any interest in any
property. Such personal notice shall be in writing and shall be
given or caused to be given by the City Secretary by depositing such
written notice in the United States mail at least fourteen (14) days
before the date of the hearing, postage prepaid, in envelopes ad-
dressed to all persons owning or claiming any interest in the
respective properties abutting the highways, streets, avenues and
public places or portions thereof to be improved, as the names of
such person are shown on the current rendered tax rolls of the City
of For Worth and at the addresses so shown, or if the name of such
respective owners do not appear on such rendered tax rolls, then ad-
dress to such owners as their names are shown on the current unrend-
ered tax rolls of the City of Fort Worth at the addresses shown
thereon. In those cases in which an owner of property abutting a
highway, street, avenue or public place or portion or portions
thereof which is to be improved is listed as "unknown" on the then
current City of Fort Worth tax rolls, or the name of an owner is
shown on the City of Fort Worth tax rolls but no address for such
owner is shown, no notice need be mailed. In those cases where the
owner is shown to be an estate, the mailed notice may be addressed
to such estate. In this connection, the City Secretary shall pre-
pare and file or cause to be prepared and filed with these proceed-
ings a list of the properties to be assessed., the names f those per-
sons owning or claiming any interest in said properties to whom the
notice was mailed, together with the last known addresses determined
as aforesaid of the respective owners and those persons owning or
claiming any interest in said property.
The City Secretary shall certify that each of the parties in
said list whose address is shown on the then current rendered or un-
rendered tax rolls of the City of Fort Worth was mailed a copy of
the notice of hearing and shall further certify the date or dates
on which said notice was mailed. A copy of each notice shall be at-
tached to such certificate. The certificate of the City Secretary
will be conclusive evidence of the facts therein recited.
IV.
The City Secretary is hereby directed to engross and enroll
this ordinance by copying the caption of same in the Minute book of
the City Council and by filing the complete ordinance in the appro-
priate Ordinance Records of this City.
~-
=>
V.
This ordinance shall take effect and be in full force and
effect from and after the date of its passage.
Passed and approved this day of , 19
APPROVED AS TO FORM AND LEGALITY:
,.City Attorney
Date : ~ ~J
~~ty ®f ' lF'®~t ~~rth, ~C~x~~ - -
.~
:.
J~ v ~
~~, ~
~~
DATE REFERENCE SUBJECT Award of Contract - Bridge Street PACE
3/1/83 NUMBER John T. White Road Connection, 3
**C-6780 Contract I Excavation and Draina a lot
City Council action is requested on Project Nos. 021-03b-533-00 (Engineering)
and 029-036-533-00 (Construction), as described below:
Roadway R.O.W.
Unit Street Limits Width - Feet Width - Feet
I. Bridge W.P/L of Lot 44 to 60 64 to 80
Street 1, Block A, Boaz
Turnpike Addn.
to Oakland Hills
Drive
I-A. Bridge Oakland Hills Dr. 60 80
Street to Bridgewood Dr.
I-B. Bridge Bridgewood Dr. 2-36' Lanes 120
Street to W. Service Rd. W/28' Median
I-820
II. Bridgewood Bridge St. 60 80
Drive to So. 1085'
Origin of Project
On April 5, 1980, the citizen of Fort Worth approved a $47,813.000 bond program-
for street and storm drainage improvements and on May 20, 1980 (M&C G-4548),
the City Council allotted the funds into specific categories. One of the
categories was Major Thoroughfares and Collectors, which included Bridge
Street-John T. White Road Connection, at an estimated construction cost of
$3,506,000.
Improvements
Bridge Street will be improved with major thoroughfare grade concrete pavement
with concrete curb, complete with required drainage facilities. The
improvements will be accomplished in two contracts to allow for major utility
relocations. Contract I (this contract) will provide for the excavation and
shaping of the roadway and the installation of the required drainage
facilities. Then upon completion of the relocation of the utility facilities
into the new right-of-way, by the utility companies, Contract II will be
advertised for and let to accomplish the paving portion of the improvements.
'~.~
Receipt of Bids
ti~ Contract I, Excavation and Drainage, was advertised for bids on January 20
and 27, '1983, and the following bids were received on February 10, 1983, with
115 working days allotted to complete the project.
,.
~~
~~
n
t
4~
DATE REFERENCE SUBJECT Award of Contract - Bridge Street PAGE
NUMBER
3/1/83 **C-6780 John T. White Road Connection, 2 _of 3
Bidder Amount
Brown & Blakney, Inc. $395,359.55
Joe R. Starks Constr. Co., Inc. 452,847.00
Orval Hall Excav. Co., Inc. 481,574.70
Weaver Construction Co. 483,201.40
Atkins Bros. Equip. Co., Inc. /+89,854.10
Martin Eby Constr. Co ., Inc. 544,084.00
M.A. Vinson Constr. Co., Inc. 691,646.15
Hall Construction Co 742,647.30
Lanzo Construction Co. 757,089.30
Engineers' Estimate $650,000.00
Units I-A and I-B of Bridge Street and Unit II, Bridgewood Drive are interior
stye°ets to a development, which in accordance with current Development Policy,
provides that a portion of the cost of Contract I be assessed against abutting
properties. Secondly, State Statute 1105b provides that assessments can be
levied against abutting properties for street improvements, based on an
estimated cost of such improvements and adjustments made thereto at such time
as the actual bid is received. Consequently, an estimate of cost of Contract II
(Paving Improvements) has been furnished to the City by the Consulting Engineer
on this project in order that assessments covering the completed roadway may
be levied at this time. The Engineers' estimate of construction cost for
Contact II is $1,178,259.48.
Project Cost and Financing
In accordance with Section VI of the Policy For The Installation of Community
Facilities, approved by the City Council on August 31, 1982 (M&C G-5381),
properties abutting Unit I will be assessed based on Par. 3, Border Streets,
whereas properties abutting Units I-A, I-B and II will be assessed based on
Par. 5, Interior Streets to a Development.
Three of the four property owners being assessed on this project dedicated the
required right-of-way and will be afforded an extended period for the payment
of such assessments. The extended period provides that the assessments shall be
payable in ten (10) equal installments, the first of such installments being
payable thirty (30) days after completion and acceptance of the project
(Contract I and II) by the City Council. The balance being due and payable in
nine (9) equal installments with interest on the unpaid balance at eight
percent (8%) per annum, with principal and interest due on the anniversary date
of the initial payment.
The one property owner from whom the city had to purchase the required
right-of-way will be afforded the normal five (5) payment schedule for the
payment of the assessments. The first one-fifth being due and payable thirty
(30) days after completion and acceptance of the project (Contract I and II) by
the City Council and the balance being due and payable in four (4) equal
installments with interest on the unpaid balance at eight percent (8%) per
annum, with principal and interest due on the anniversary date of the initial
payment.
Based on Contract I and the Engineers' Estimate, it is proposed that
approximately $243,056.22 will be assessed against properties abutting all
units. Funding for such assessments will be provided for by a bond fund
transfer from the "Revolving Fund Unspecified" account at such time as Contract
II (Paving Improvements) is awarded.
~~
C'
iy
DATE REFERENCE SUBJECT Award of Contract - Bridge Stree j PAGE
NUMBER John T. White Road Connection, 3 3
3j1/83
**C-6780
Contract I, Excavation and Drainage _ --- of _. .-----
Cost to the City, based on Contract I and the Engineers' Estimate for Contract
II will be approximately $1,440,716.14 of which $110,153.33 (7%) is for
engineering. It is proposed that only appropriate bond fund transfers be made
at this time to provide for Contract I (Excavating and Drainage).
Recommendations
It is recommended that
1. The following bond fund transfers be approved.
From To Amount Reason
029-023-176-00 029-023-901-00 $400,000.00 To provide funds for
Bridge Street Major Thoroughfares City's construction
John T. White Unspecified cost.
Connection
029-023-901-00 029-036-901-00 $400,000.00 To provide funds for
Major Thoroughfares Streets in New City's construction
Unspecified Additions cost.
Unspecified
029-036-901-00 029-036-533-00 $400,000.00 To provide funds for
Streets in New Bridge Street the City's construc-
Additions John T. White tion cost (Contract
Unspecified Connection I)•
021-095-901-00 021-036-533-00 $ 27,700.00 To supplement the
Engineering Bridge Street engineering funds in
Unspecified John T. White in the project
Connection account.
2. An ordinance be adopted ~pOPTFD ORDINANCE N0. ~~ S~
A. Declaring the necessity for and ordering the improvements,
B. Making provisions for levying assessments,
C. Directing the Transportation and Public Works Department to prepare
estimates of costs and amounts to be assessed,
D. Awarding the contract to Brown & Blakney, Inc., in the amount of
$395,359.55 based on its low bid for Excavation and Drainage (Contract
I)
E. Making appropriations to cover the indebtedness thereby incurred for
improvements of the project named above, and
3. An ordinance be adopted~DOPTED ORDINANCE N4.87s3
roving the estimates of costs and amounts propose ssed, 3
A.
~P~t~
and
B. Setting March 29, 1983, as the date for the benefit ~i~iU NClL I
DAI dg
~i A P 1 1~~
SUBMITTED FOR T ~
CITY MANAGER'S
/f
~ DISPOSITION BY COUNCIL. R SED BY
~~//f~
~
OFFICE BY
/
r
~=~C ~ APPROVED
__
~~
_
. [] OTHER (DE ~ ~ ~ ecretary o th
e
ORIGINATING
DEPARTMENT HEAD Gary Santerre
C 0$ k'OiC WOS TT
~~
~IC'('rY~'ECRETARY
FOR ADDITIONAL INFORMATION
CONTACT Odell Schmidt EXt 7805 DATE