Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 48080
CITY SECRSTAXY CONTRACT N0. so Developer and Project Information Cover Sheet: Developer Company Name: Quail Valley Devco I, LLC Address, State, Zip Code: 8401 N. Central Expressway , Suite 350, Dallas, TX 75225 Phone&Email: 214-766-2288, cyeager @republicpropertygroup.com Authorized Signatory, Title: Clint Yeager, Vice President Project Name and Brief Walsh Ranch Quail Valley Phase IA Description: Project Location: Plat Case Number: FP-16-019 Plat Name: Walsh Ranch-Quail Valley Phase I Mapsco: 76IG Council District: 3 City Project Number: 100370 CFA Number: 2016-041 DOE Number: None To be completed by staff.- Received b� Date. �— `�7 -,1,6 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth,Texas Standard Community Facilities Agreement Ora CPA Official Release Date: 10.07.2015 Page 1 of 1 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Quail Valley Devco I LLC ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Walsh Ranch Quail Valley Phase IA ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 2 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) M, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) ®, Street Lights & Signs (C) ®. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 3 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 4 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims,suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 5 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, & the alleged negligence of the City of Fori Worth, its ofjtcers, servants, or employees. Further, Developer will require its contractors to indemnify, and bold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 5 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 6 the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 7 Cost Summary Sheet Project Name: Walsh Ranch Quail Valley Phase I CFA No.: 2016 041 DOE No.: None An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 432,323.53 2.Sewer Construction $ 326,312.50 Water and Sewer Construction Total $ 758,636.03 B. TPW Construction 1.Street $ 1,637,265.35 2.Storm Drain $ 916,628.20 3.Street Lights Installed by Developer $ 294,701.30 4. Signals $ TPW Construction Cost Total $ 2,848,594.85 Total Construction Cost(excluding the fees): $ 3,607,230.88 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 15,172.72 D. Water/Sewer Material Testing Fee(2%) $ 15,172.72 Sub-Total for Water Construction Fees $ 30,345.44 E. TPW Inspection Fee(4%) $ 102,155.74 F. TPW Material Testing(2%) $ 51,077.87 G. Street Light Inspsection Cost $ 11,788.05 H. Signals Inspection Cost $ - H. Street Signs Installation Cost Sub-Total for TPW Construction Fees $ 165,021.67 Total Construction Fees: $ 195,367.11 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 3,607,230.88 Completion Agreement=100%/Holds Plat $ 3,607,230.88 Cash Escrow Water/Sanitary Sewer-125% $ 948,295.04 Cash Escrow Paving/Storm Drain=125% $ 3,560,743.56 F5Cl2oUJ �A 125% $ 4,509,038.60 M&4'r City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 8 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Qual Valley Devco I,LLC Jesus J. Chapa Assistant City Manager Name: Clint Yeager Title: Vice Preside t Date: Z2 S4 Date: q 1.26 'd Recommended by: ATTEST: (Only if required by Developer) Wendy C ' Babulal, EMBA, P.E. Development Engineering Manager Signature Water Department Name: T)4 W Lj Douglas iersig, P.E. Director Transportation&Public Works Department Approved as to Form &Legality: ATTEST: F F®IQ� � O Richard A. McCracken Assistant City Attorney City M&C No. m 1A Date: 61?11 Ott 1•i4v, 1215 ! V IA- OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 FT.WORTH, TX Page 9 of 9 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement © Location Map ® Exhibit A: Water Improvments ® Water Cost Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate ® Exhibit B: Paving Improvements I Paving Cost Estimate DA Exhibit B-1: Storm Drain Improvements FX Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 10 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 1000370 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 5/2/2016 00 42 43 DAP-BID PROPOSAL Page 1 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 1A UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Unit of Specification Bid No. Description Measure Section No. Quantity Unit Price Bid Value UNIT I:WATER IMPROVEMENT 1 3311.0001 Ductile Iron Water Fittings w/Restraint TON 3311 11 1.09 $3,150.00 $3,433_50 2 3311.0161 6"PVC Water Pipe LF 3311 12 180 $30.00 $5,400.00 3 3311.0261 8"PVC Water Pipe LF 3311 12 100 $39.00 $3,900.00 4 3311.0461 12"PVC Water Pipe LF 3311 12 4650 $45.00 $209,250.00 5 3311.0467 12"PVC Water Pipe,CLSM Backfill LF 3311 12 150 $40.00 $6 000.00 6 3312.0001 Fire Hydrant EA 331240 8 $3,500.00 $28,000.00 7 3312.3003 8'Gate Valve EA 33 12 20 10 $1,175.00 $11,750.00 8 3312.3005 12"Gate Valve EA 33 12 20 26 $2,250.00 $58,500.00 9 3312.4305 30"x 12"Tapping Sleeve&Valve EA 33 12 25 1 $10,000_00 $10,000.00 10 3312.2003 1"Water Service EA 33 12 10 30 $625.00 $18,750.00 11 3305 0109 Trench Safety LF 33 05 10 5080 $1.50 $7,620.00 12 9999.0011 Pressure Test and Cleaning LF 00 00 00 5080 $1.00 $5,080.00 13 0241.1118 4"-12"Pressure Plug EA 0241 14 15 $550.00 $8,250.00 14 15 1 17 18 19 21 22 - 23 - -24 - -- 25 - - _26 27 - - - -28- - - 29 - - - 30 31 32 --33 -. 34 35 -3s 37 38 _ 39 -40- 41 1 - - - 42 43 _. 44 45 TOTAL UNIT I:WATER IMPROVEMENT $375,933.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS W ALSH RANCH-QUAIL VALLEY-PHASE I P Form Version September 1,2015 HZ PROJECT 8303061.02 S'2120', z 42 43 DAP-BID PR O POSAL Page 2 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 1A UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Unit of Specification Bid Description Measure Section No. Quantity Unit Price Bid Value Nn_ UNIT II:SANITARY S EWER 1 PR VEMENTS 1 3331.4115 8"Sewer Pipe LF 33 11 10,33 31 12,3331 20 4940 $25.00 $12.3,5.00__.00 2 3331.4116 8"Sewer Pipe,CSS Backfill LF 33 11 10,33 31 12,3331 20 120 $45.00 $5,400.00 3 3331.4201 10"Sewer Pipe LF 33 11 10,33 31 12,333120 660 $_29.0.0 $19,140_.0.0 4 3339.1001 4'Manhole EA 33 39 10,33 39 20 22 $4,000.00 $88,000.00 5 3305.0113 Trench Water Stops EA 33 05 15 18 $500.00 $9,000.00 6 3331.3101 4"Sewer Service EA 33 31 50 34 $325.00 $11,050.00 7 3305.0109 Trench Safety LF 33 05 10 5720 $1.50 $8,580.00 8 3301.0002 Post-CCTV Inspection LF 3301 31 5720 $1.50 ,$8,580.00 9 3301.0101 Manhole Vacuum Testing EA 33 01 30 22 $250.00 _$5,500.00 10 9999.0002 External Drop Manhole Connection EA 00 00 00 2 $2,50000 $5,000.00 12 13 14 15 16 17 18 22 23 24 25 -27..- - 28 29 - 30 31 32 33 34 . 35 3s 37 38- 39 40 41 TOTAL UNIT II:SANITARY SEWER IMPROVEMENT-1 $283,750.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY•PHASE 1,0 HZ PROJECT 8303061.02 Form Version September 1,2015 DAP,BID PROPOSAL Page 3 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 1A UNIT PRICE BID Bidder's Application Project item Information Bidder's Proposal Bidlist Item Unit of Specification Bid Description Unit Price Bid Value No. Measure Section No. Quantity UNIT III: DRAINAGE IMPROVEMENTS 1 3341.0201 21"RCP,Class 111 LF 3341 10 104 $51.00 $5,304.00 2 3341.0205 24"RCP,Class III LF 3341 10 1004 $58.00 $58,232.00 3 3341.0-302320"RCP,Class III LF 3341 10 1860 $78.00 $145,080.00 4 3341.0309 36"RCP,Class III LF 3341 10 350 $85.00 $29,750.00 5 3341.0402 42"RCP,Class III LF 3341 10 360 $100.00 $36,000.00 6 3341.0409 48"RCP,Class III LF 3341 10 360 $140.00 $50,400.00 7 3341.0602 60"RCP,Class III LF 3341 10 318 $200.00 $63,600.00 8 3341.1303 6x4 Box Culvert LF 3341 10 158 $270:00 $42,660.00 9 3349.0001 4'Storm Junction Box EA 33 49 10 5 $4,000.00 $20,000.00 10 3349.0002 5'Storm Junction Box EA 33 49 10 2 $4,750.00 $9,500.00 11 3349.0003 6'Storm Junction Box EA 33 49 10 1 $5,500.00 $5,500-00 12 3349.1000 Headwall, Box Culvert CY 33 49 40 8 $2,000.00 $16,000.00 13 3349 1003 24 Flared Headwall, 1 pipe EA 33 49 40 1 $2,500.00 $2,500.00 14 3349.1007 36"Flared Headwall, 1 pipe EA 33 49 40 1 $6,500.00 $6,50.0;00 15 3349.1109 42"Flared Headwall,2 pipes EA 33 49 40 1 $7,000.00 $7,O0Q00 16 3349.2013 60"Parallel Headwall, 1 pipe EA 33 49 40 1 $7,500.00 $7,500.000 17 3349.5001 10'Curb Inlet EA 33 49 20 21 $3,000.00 $63,000.00 18 3349.7003 6'Drop Inlet EA 33 49 20 8 $6,000.00 $48,000.00 19 3305.0112 Concrete Collar EA 33 05 17 1 $250.00 $250.00 20 9999.0003 Factory Storm Wye Connection EA 00 00 00 17 $250.00 $4,? 0.00 _ _.. 21 9999.0004 Drainage Detention Structures CY 00 00 00 200 $550.00 _$110,000.00 22 3137.0104 Medium_Stone Riprap,dry. SY 31 37 00 700 $75.00 $52,500.00 23 3305.0109 Trench Safety LF 33 05 10 4514 $1.50 $6,771.00 24 3301.0002 Post-CCTV Inspection LF 3301 31 4514 $1.50 $6,771.00 25 _s 26._. 27 2t3 . 2-9 30 31 32 33 34 35 36 37 38 39 40 42 43 44 45 TOTAL.UNIT III:DRAINAGE IMPROVEMEN19 $797,068.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE 1P Form Version September 1,2015 HZ PROJECT 8303061.02 ,.........;.:.. 00 42 43 DAP-BID PROPOSAL Page 4 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 1A UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Unit of Specification Bid No. Description Measure I Section No. Quantity Unit Price Bid Value UNIT IV:PAVING IMPR VEMENT 1 0241.0100 Remove Sidewalk SF 0241 13 4014 $2.00 $8,028.00 2 0241.1000 Remove Conc Pvmt SY 0241 15 17 $25.00 $425.00 3 9999.0001 7.5"Conc Pvmt SY 32 13 13 20500 $42.00 $861,000.00 4 3211.0400 Hydrated Lime(42 Ibs/sy) TN 321129 450 $175.00 $78,750.00 5 3211.0502 8"Lime Treatment SY 32 11 29 21460 $4.00 $85,840.00 6 3213.0302 5"Conc Sidewalk SF 32 13 20 63078 $4.50 $283,851.00 7 3213.0504 Barrier Free Ramp,Type M-2 EA 32 13 20 6 $1,250.00 $7,500.00 8 3213.0506 Barrier Free Ramp,Type P-1 EA 32 13 20 40 $1 250.00 $50,000;00 —__ 9 3217 0501 24'SLD Pvmt Marking HAE(W) LF 32 17 23 1170 $6.00 $7,020.00 10 9999.0005 Type III Barricade EA 00 00 00 13 _$1,500.00 $_19,500.00 11 9999.0006 Street Header LF 00 00 00 420 $12.00 $5,040.00 12 9999.0007 6"Unreinforced Conc Pvmt SY 00 00 00 558.5 $30.00 $16,755.00 13 14 15 16 17 18 19 __ 20 21 22 23 24 25 26 27 28 29 _ 30 31 - 32 33 34 35. 36 37 - 38 39 40 41 42 43 44 45 TOTAL UNIT IV:PAVING IMPROVEMENT $1,423,709.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS W ALSH RANCH-QUAIL VALLEY-PHASE 1P Form Version September 1,2015 HZ PROJECT R303061.02 5/22016 004243 DAP-BID PROPOSAL Page 5 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 1A UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Unit of Specification Bid N Description Measure Section I Quantity Unit Price Bid Value UNIT V:STREET LIGHTING IMPROVEMENTS 1 2605.3011 2"CONDT PVC SCH 40(T) LF 26 05 33 4087 $11.00 $44,957.00 2 3441.1501 Ground Box Type B EA 3441 10 13 $3,000.00 $39,000.00 3 3441.3201 LED Lighting Fixture EA 3441 20 20 $500.00 $10,000.00 4 3441.3301 Rdwy Ilium Foundation TY 1,2,and 4 EA 3441 20 20 $1,000.00 $20,000.00 5 3441.3350 Fumish/Install Rdway Ilium TY 8 Pole EA 34 41 20 20 $3,750.00 $75,000.00 6 3441.3404 2-2-2-4 Quadplex Alum Elec Conductor LF 3441 20 4087 $15.00 $61,305.00 7 3441.4003 Fumish/Install Alum Sign Ground Mount EA 3441 30 City Std. 2 $500.00 $1,000.00 8 3441.4006 Install Alum Sign Ground Mount EA 3441 30 2 $2,500.00 $5,000.00 9 10 11 12 13 14 15 16 17 18 19 21 - 22 — 23 24 25 26 27 28 29 30 31 32 A 33 34 35 36 37 38 39 40 41 42 43 44 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS1 $256,262.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE 1' Form Version September 1,2015 HZ PROJECT R303061.02 5/2/2016 00 42 43 DAP-BID PROPOSAL Page 6 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 1A UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Description Unit of Specification Bid Unit Price Bid Value No. I Measure Section No. Quantity UNIT VI:TRAFFIC SIGNAL IMPROVEMENT 1 2 3 4 5 G 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT VI:TRAFFIC SIGNAL IMPR VEMENT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE I Form Venion September 1,2015 HZ PROJECT R303061.02 5/2/2016 on 42 43 DAP-BID PROPOSAL Page 7 o1`7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 1A UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Unit of Specification Bid No Description Measure Section No. Quantity Unit Price Bid Value Bid Summary UNIT I:WATER IMPROVEMENTS $375,9133.50 UNIT II:SANITARY SEWER IMPROVEMENTS $_283,750.00 UNIT III: DRAINAGE IMPROVEMENTS _ $797,068.00 UNIT IV: PAVING IMPROVEMENTS $1,423,709.00 UNIT V: STREET LIGHTING IMPROVEMENTS $_2.5_6,262.00 UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS Bid Total $3,136,722.50 15%Contingency $470,508.38 Total Construction Bid $3,607,230.88 Contractor agrees to complete WORK for FINAL P dais calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE I Form Version September 1,2015 HZ PROJECT 8303061.02 I TOLD WEATHERFORD ROA6 { PROJECT SITE 1�� y o � NORTH CL _STATE INTER E 20 . - .20 LID INTERSTATE 30 4 O LOCATION MAP o N.T.S. / N 0 m 0 M O M K 0 O K CL / N Y (/1 d 0 O N / < COVER SHEET QUAIL VALLEY - PHASE 1A o Judy 26,2016 N N r W HL]ITTZJL J o WALSH 0 RANCH �uj �S cg Y LL. �S 3 a N J a ~ ate W = ZJ �' _ — W J Q 7'5'.' T ° 9 _—__.___ — W J Q = u -J — 6Z It L�u C14 z t.ScT3 _N C C14 L o m_ N top x x w w O i W U 2 t 0 W �!! O ^ m C LL / O LLJ Q l0 (n M (If _ zi 0 2 C-4 t _ w W Eut O O O N \ . � x x i \ N N W W / \ ^ N to \ n \ _ \ Q to 0 LLJ U m . � � � Z � y L O w « % F 2 W q � � � \ w > W —J � \ k » ( ~ q / § � § & loco o ) \ k \ Q z & § 2 \ k m \ 0 ) ' 2 9 / i y k k J W ® k -j k k % \ � � U 3 7 ƒ a � \ �� � . �� / ��� � � ■ � � ` � . ~ %o%o � � | ( � \ sviscll- L O w CV) « 2 L $ � , � � % w � LUw K 141 X � .� uiw > n w -J « � � <z � 3 k - C14 2 � . ( C*4 \ � \ b N J # ƒ C4 \ tZ \ � _ ■ � � \ Ali �■� _ \ Q \ cr / a. . / _ § Q A $ & / \ a a a 0 0 0 @ m x C,4 � C Z , - - � j 0 3A/7 � . LL r' LU a. N �2 mWWer Lu 0%D � > CT, 3 LU J aD Qa co 3 CJ <z ri 3a 0 c� N F N O a Z J a e vc co N w a 0 Y Q i O Q W ° W m Q i W Q �j o CL J 2 i ai W �u 2 2 a a (L 9 0 0 0 st) � � Cl: Ic 1c 0 a�a� co O LAJ to I ' t ' t n J 0 w J ° U m v� i � ;=• —!fir'� ,�i� Q LU ------ �i T -- _ W Q W a co % Q to >- N 8 PVC l f- >- cD m W J �+ , i 2 Q J W Z j CL e co 1 < Q. sW i CL 00 Qo in in CL 00 a , _ \\\\\\ � 0° Go z o U \ \ rA-d m N �F \ X \ \ W i O �i �� ao X 40 0 ao D w g �\ ��Ld °I � O zci f0 M co 0 2 CL 7 \ Q co C.4 R \ W Q = tn = aD / . _ W W �° / / >K a0 / X W W � O n O Q a0 � z LLJ t0 / • N m W N n Li 0 9s OUO j.41 ` T �g �W i LL. a Ig''" — — do O W � r` r J Q � a VV W CE UlU Z a ? _ U) � 3�i Q a 3 2 cc M coot N o 1 00 O 3 m U a U ° 7Q- U U sN W 04 F W on a. O J a 2 Z N ? m LLJ Ix 2 U > O U ^ � L o 4 Z ° 2 m ck: o O '� W 3 U = a o C-4 O X J = W O rn • J M O \ l \ 0 3N� � U. § § o w q \ a ct § § 3t It 0 Q ('4 CN a t� - L m LU (L A , $ C-4 CO) m b z w k Q W2 > � » k k a -j / I « Q O "3u A U 3 /_ E _ z co % co k k k C-14 5 m � 6 q b y m ® C k o K � 2 7 b _ \ \ k 2 LLJ Q It / Q k 2 M � ƒ Q § Ld / \ I = k� ci / * \ CN cx _ § mop/ mop / a ul _ _ CN ) _ mop cr 0 o � 2 ) § k k b k % ` \ It % ) « ® - » CN _ _ 2 d & ± d � \ �� 3 / \ a i TAN% roc � NEB I 0 N J m = Lu _ o � � I opzwN LU � Q 0 hU i cU) <z I as � N � o N CK N Q m 0 2 N Z U Ali J � I a a L b m 4 Un) W a W J a cii o Q N U \ 61 a I I z . LU � U m N b w ^ I CL °n cr a. o Z t II a 11 Y V) U O N II m o I I _ W cq N. to ° I � N I w I I I� I m yJlbfy L r W N rW = to �� \ mUJIL a ~ N � r° mzwcm � d J � ✓ W CL CY ,Z 2 W <4 Q 3a io e wig n�Eb I _ O N CL� I o U W N � m N I :,:(: V � _ Z a a M I a x `J U ct 4 w (n J O I uj Q z U ► I I z � IU) Z U I EL o I z 2 o co I 2 CL ° I N U E- Lu 3 ~ W a 21 n O � CL I I 'j = a V O Ct CL CL I I I o = �°u CL I I o or _ U C) Z I IN to I N I W f a J i O m i LU J Cg � _ ciao Q - N ® J d J Q LLJ > � Y � J N O <z cn 3a N J J � to W a MATCH LINE — — co ao — — o THIS SHEET M H II s � : O p M Z Li U •. z Y J LO w a_ w O CL x Q J � � Q � z W �O v a2 00 cr C, - W W o w to a o Y O J i 2 U CL d �1 p I., U a 3 O W W LZi1 W Q _ CIO O 3 j U � cn j Goo In co n N i t0 N ,�. MATCH LINE — -- ° — —` THIS SHEET W J ° i i — cn ca V � (to ml- WA WQ: a � J �C U) > 'UK Q J p p = hV j O lz N O C3 N m J O p (o o _ MATCH LINE _ - o F THIS SHEET ,� J = d O R 0 M a m W Z W cn m a �Pp J m o m j � J a � J � a J_ U s z 0 w o Z I OL C.4 � � Qp o ul p o x0 a PO m ° N Wzi a I ja rx 2 2 m Z t W p p J a oI � La O'N a F N °a N N 1 MATCH LINE _ _ j W THIS SHEET J O U m