Loading...
HomeMy WebLinkAboutContract 26288 AMENDMENT NO. ICITY SECRETARY CONTRACT NO. STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TAR.RANT 8 WHEREAS, the City of Fort Worth (City) and Huitt-Zollars, Inc. , (Engineer) made and entered into City Secretary Contract No. 24774, (the Contract) which was authorized by the City Council by M&C C-17357 on the 30th day of March 1999; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Clear Fork Parallel Relief Sanitary Sewer, Part 2 . WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 29, 2000, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $5,521 .40 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $142, 937.40. 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. } 4-W EXECUTED on this the �day of (FLAX G '� , 2000, in Fort Worth, Tarrant County, Texas . ATTEST: ` � C e l� cahtrect Authorization Nlofia Pearson, City Secretary / Date APPROVAL RECOMMENDED: APPROVED: -fes•'�-C�lC1 LAS. �-�' ,A A� f(� �' A. Douglas Rademaker, P.E. Mike Groomer Director, Department of Assistant City Manager Engineering HUITT-ZOLLARS INC. ENGINE By: Name(-.=J es Paul Kin P.E. Vice President 500 W. 7t' Street Fort Worth, TX 76102-4728 APPROVED AS TO FORM AND LEGALITY: GarySt,einberger a..•J+r 1..BLL I. City At{.;.�LALta 24774 DD V ON v. �jo Huitt-Zollars,Inc./500 W_7th Street/Surte 3C0/Fort Worth,Texas 76102-.4728, Phone(81 7)335-3000/Metro(817)429-1291/Fax(817)335-1025 September 29,2000 Mr. Mike Domenech, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Street Fort Worth, Texas 76102 RE: Amendment No. 1 (UPRR Added Easements) Clear Fork Parallel Relief Sanitary Sewer, Part 2, Main 21 City Secretary No.24774 Sewer Project No. PS46-0704601400250 DOE No.2572 HZI Project No. 03-0631.01 Dear Mr. Domenech: In response to your request for additional services as outlined below, Huitt-Zollars, Inc. is pleased to present this Contract Amendment for the following additional services: Provide all research, field work, computations,drafting and supervision required to create the easement documents(easement forms, metes and bounds descriptions and exhibits) for that portion of the sanitary sewer line designed by RJN Group, Inc. and crossing the UP Railroad property. Services for that portion of the sanitary sewer line designed by Huitt-Zollars, Inc. will be performed under provisions of basic contract. Services will be provided for a fixed fee of$5,521.40(see attached). Following is an updated Project Fee Summary: Contract Item Description Fee Original Contract Notice to Proceed(04/09/00) S 137,416.00 Amendment No. 1 UPRR Added Easements 55,521.40 TOTAL S 142,937.40 Due to the immediate nature of the work requested, an in-house survey crew will be used. If you have any questions, please call. Sincerely, 'till! ,T-ZOLLA S, fNf- AC'C'FPTM Title C,Jar4es Pe President Date JPK:cc I'u,re GUffi� U:� I�UU`�D H\`ro\03063101`Admin�Domenech-092900 Add Fsmts.doc P J �;c 1. U C�•..•�t:l!G�IIc U P �, SURVEY ESTIMATE ADDED EASEMENTS CLEAR FORK SANITARY SEWER FT.WORTH, TEXAS SCOPE: Provide field work, office computations, drafting, and supervision for the creation of an easement for the sanitary sewer main located within the UPRR property and as designed by RJN Group, Inc. FOUR PERSON CREW ESTABLISH CONTROL HRS BOUNDARIES HRS IMPROVEMENTS HRS BENCH LOOP HRS TOPOGRAPHY HRS SET PROPERTY CORNERS HRS 0 HRS $135.00 $0.00 THREE PERSON CREW ESTABLISH CONTROL 8 HRS BOUNDARIES 8 HRS IMPROVEMENTS NRS BENCHLOOP HRS TOPOGRAPHY HRS SET PROPERTY CORNERS HRS TWO PERSON CREW ESTABLISH CONTROL HRS BOUNDARIES HRS IMPROVEMENTS HRS BENCH LOOP HRS TOPOGRAPHY HRS SET PROPERTY CORNERS HRS 0 HRS $95.00 $0.00 clearforkesmtest ONE PERSON GPS CREW ESTABLISH CONTROL HRS GENERALTOPOGRAPHY HRS 0 HRS $140.00 $0.00 TWO PERSON GPS CREW ESTABLISH CONTROL HRS BOUNDARIES HRS GENERALTOPOGRAPHY HRS 0 HRS $160.00 $0.00 THREE PERSON GPS CREW ESTABLISH CONTROL HRS BOUNDARIES HRS GENERALTOPOGRAPHY HRS FAST STATIC CONTROL HRS STATIC CONTROL HRS 0 HRS $185.00 $0.00 TECHNICIAN DATA RESEARCH 8HRS WORKING SKETCH 4 HRS COMPUTATIONS 8 HRS LEGAL DESCRIPTION HRS PLOT CONTOURS HRS DRAFT 8 HRS REVIEW HRS CLERICAL LEGAL DESCRIPTION 2 HRS MISC. CORRESPONDENCE 2 HRS REGISTERED SURVEYOR SITE VISITS 2 HRS SUPERVISION 2 HRS REVIEW 2 HRS Ijjr rr'' e� ' �!"r 11 ITN r LP ms CITY MEETINGS 8 HRS CLIENT MEETINGS HRS clearforkesmtest { T SUBTOTAL $4CJ(I{ CONTINGENCY 10.00% LABOR Dix DIRECT CHARGES DEEDS LS $50.00 POSTAGE/FREIGHT LS $0.00 MILEAGE 0 MI. $0.32 $0.00 LODGING 0 DAYS $70.00 $0.00 MEALS 0 DAYS $30.00 $0.00 DIRECT TOTAL ` GRAND TOTAL a clearforkesmtest