WHEREAS, the City of Fort Worth (City) and Huitt-Zollars,
Inc. , (Engineer) made and entered into City Secretary Contract No.
24774, (the Contract) which was authorized by the City Council by
M&C C-17357 on the 30th day of March 1999; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Clear Fork Parallel
Relief Sanitary Sewer, Part 2 .
WHEREAS, it has become necessary to execute Amendment No. 1 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated September
29, 2000, a copy of which is attached hereto and incorporated
herein. The cost to City for the additional design services to be
performed by Engineer total $5,521 .40 .
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $142, 937.40.
3 .
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect. } 4-W
EXECUTED on this the �day of (FLAX G '� , 2000, in Fort
Worth, Tarrant County, Texas .
ATTEST:
` � C e l�
cahtrect Authorization
Nlofia Pearson, City Secretary
/ Date
APPROVAL RECOMMENDED: APPROVED:
-fes•'�-C�lC1 LAS. �-�' ,A A� f(� �'
A. Douglas Rademaker, P.E. Mike Groomer
Director, Department of Assistant City Manager
Engineering
HUITT-ZOLLARS INC.
ENGINE
By:
Name(-.=J es Paul Kin P.E.
Vice President
500 W. 7t' Street
Fort Worth, TX 76102-4728
APPROVED AS TO FORM AND LEGALITY:
GarySt,einberger
a..•J+r 1..BLL I. City At{.;.�LALta
24774
DD
V ON
v. �jo
Huitt-Zollars,Inc./500 W_7th Street/Surte 3C0/Fort Worth,Texas 76102-.4728, Phone(81 7)335-3000/Metro(817)429-1291/Fax(817)335-1025
September 29,2000
Mr. Mike Domenech, P.E.
City of Fort Worth
Department of Engineering
1000 Throckmorton Street
Fort Worth, Texas 76102
RE: Amendment No. 1 (UPRR Added Easements)
Clear Fork Parallel Relief Sanitary Sewer, Part 2, Main 21
City Secretary No.24774
Sewer Project No. PS46-0704601400250
DOE No.2572
HZI Project No. 03-0631.01
Dear Mr. Domenech:
In response to your request for additional services as outlined below, Huitt-Zollars, Inc. is pleased to
present this Contract Amendment for the following additional services:
Provide all research, field work, computations,drafting and supervision required to create the
easement documents(easement forms, metes and bounds descriptions and exhibits) for that
portion of the sanitary sewer line designed by RJN Group, Inc. and crossing the UP Railroad
property.
Services for that portion of the sanitary sewer line designed by Huitt-Zollars, Inc. will be performed under
provisions of basic contract. Services will be provided for a fixed fee of$5,521.40(see attached).
Following is an updated Project Fee Summary:
Contract Item Description Fee
Original Contract Notice to Proceed(04/09/00) S 137,416.00
Amendment No. 1 UPRR Added Easements 55,521.40
TOTAL S 142,937.40
Due to the immediate nature of the work requested, an in-house survey crew will be used.
If you have any questions, please call.
Sincerely,
'till! ,T-ZOLLA S, fNf- AC'C'FPTM
Title
C,Jar4es Pe President
Date
JPK:cc I'u,re GUffi� U:� I�UU`�D
H\`ro\03063101`Admin�Domenech-092900 Add Fsmts.doc
P J �;c 1. U C�•..•�t:l!G�IIc U
P �,
SURVEY ESTIMATE
ADDED EASEMENTS
CLEAR FORK SANITARY SEWER
FT.WORTH, TEXAS
SCOPE: Provide field work, office computations, drafting, and supervision for the creation of an
easement for the sanitary sewer main located within the UPRR property and as designed
by RJN Group, Inc.
FOUR PERSON CREW
ESTABLISH CONTROL HRS
BOUNDARIES HRS
IMPROVEMENTS HRS
BENCH LOOP HRS
TOPOGRAPHY HRS
SET PROPERTY CORNERS HRS
0 HRS $135.00 $0.00
THREE PERSON CREW
ESTABLISH CONTROL 8 HRS
BOUNDARIES 8 HRS
IMPROVEMENTS NRS
BENCHLOOP HRS
TOPOGRAPHY HRS
SET PROPERTY CORNERS HRS
TWO PERSON CREW
ESTABLISH CONTROL HRS
BOUNDARIES HRS
IMPROVEMENTS HRS
BENCH LOOP HRS
TOPOGRAPHY HRS
SET PROPERTY CORNERS HRS
0 HRS $95.00 $0.00
clearforkesmtest
ONE PERSON GPS CREW
ESTABLISH CONTROL HRS
GENERALTOPOGRAPHY HRS
0 HRS $140.00 $0.00
TWO PERSON GPS CREW
ESTABLISH CONTROL HRS
BOUNDARIES HRS
GENERALTOPOGRAPHY HRS
0 HRS $160.00 $0.00
THREE PERSON GPS CREW
ESTABLISH CONTROL HRS
BOUNDARIES HRS
GENERALTOPOGRAPHY HRS
FAST STATIC CONTROL HRS
STATIC CONTROL HRS
0 HRS $185.00 $0.00
TECHNICIAN
DATA RESEARCH 8HRS
WORKING SKETCH 4 HRS
COMPUTATIONS 8 HRS
LEGAL DESCRIPTION HRS
PLOT CONTOURS HRS
DRAFT 8 HRS
REVIEW HRS
CLERICAL
LEGAL DESCRIPTION 2 HRS
MISC. CORRESPONDENCE 2 HRS
REGISTERED SURVEYOR
SITE VISITS 2 HRS
SUPERVISION 2 HRS
REVIEW 2 HRS Ijjr rr'' e� ' �!"r
11 ITN r LP ms
CITY MEETINGS 8 HRS
CLIENT MEETINGS HRS
clearforkesmtest
{ T
SUBTOTAL $4CJ(I{
CONTINGENCY 10.00%
LABOR Dix
DIRECT CHARGES
DEEDS LS $50.00
POSTAGE/FREIGHT LS $0.00
MILEAGE 0 MI. $0.32 $0.00
LODGING 0 DAYS $70.00 $0.00
MEALS 0 DAYS $30.00 $0.00
DIRECT TOTAL `
GRAND TOTAL a