WHEREAS, the City of Fort Worth (City) and Halff Associates
Inc. , (Engineer) made and entered into City Secretary Contract No.
Z3(.`a f*74-3, (the Contract) which was authorized by the City Council by
M&C C-37-332 on the I-Tth day of -Mareh, 1991. and subsequently
/``Z7. Z4 Feb�u4ry $
revised by six previous amendments; an
WHEREAS, the Contract involves engineering services for the
following project:
Engineering contract for the design of Main C1C4B Drainage
Area Sanitary Sewer System Rehabilitation and Improvements
(Group 6, Contract 2) , Part &
It
WHEREAS, it has become necessary to execute Amendment No. 7 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1 .
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated September
28, 2000, a copy of which is attached hereto and incorporated
herein. The cost to City for the additional design services to be
performed by Engineer total $14,570. 00 .
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $369,035. 00 .
G� IGORD
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the / 7tk day of 2000, in
Fort Worth, Tarrant County, Texas.
ATTEST: Nb MI;.0 . m a
Contract Au horization
t, Gl+a Pearson, City Secretary/(,,-i7
Date
APPROVAL RECOMMENDED: APPROVED:
16�"`
cia
A. Douglas Rademaker, P.E. Mike Groomer
Director, Department of Assistant City Manager
Engineering
HALFF ASSOCIATES, INC.
ENG
By:
Jerry F. Roberts, P.E.
Name: TX-Gy. - --Lovel�,-P-E-
Vice President
4001 Fossil Creek Blvd.
Fort Worth, TX 76137
APPROVED AS TO FORM AND LEGALITY:
Gary Steinberger
assistant City Attorney
23668-7
tOfH�� � o
■■■ 4000 FOSSIL CREEK BOULEVARD
FORT WORTH,TEXAS 76137
mom H . 1 ff Associates A17 ?47- 422 METRO(£1171429-9975
ONE FAX(8171 232-9784
ENGINEFRS • ARCHITECTS • SCIENTISTS
PLANNERS • SUR%'F.Y0RS
September 28, 2000
1008-1044-00
Mike Domenech, P.E.
City of Fort Worth
Department of Engineering
1000 Throckmorton
Fort Worth, Texas 76102
Re: Revised Amendment No. 7 (M-70, M-30, and Main St. Services)
Main C 1 C413 Drainage Area Sanitary Sewer System
Rehabilitation and Improvements
(Group 6, Contract 2), Part 4
DOE No. 1829
Dear Mr. Domenech:
In response to your request for additional services, as outlined in Attachment A, Halff
Associates is pleased to present this Contract Amendment for the following additional services:
4
Main C1C4B, Part*—Main 70, Main 30 and Main Street Sanitary Sewer Services
1. Engineering $10,200
2. Field Surveying (Gorrondona Associates) $ 2,300
3. Reproduction (Trevino) $ 1,670
4. 10%for MWBE $ 400
TOTAL 514,570
Following is an updated Project Fee Summary:
Contract Item Description _ Fee
Original Contract Notice to Proceed (3/9/98) $317,385
Contract Modification Modification of Services (2/3/99) $0
Amendment No. 1 Part 10 Design/Survev (3/12/99) $9,150
Amendment No. 2 Part 13 Waterline (5/6/99) $3,930
Amendment No. 3 Part 4 Re-Advertisement (6/17/99) $2,900
Amendment No. 4 Part 9, 10, & 4 Modifications (9/1/99) $13,600
Amendment No. 5 -Part 9 Plans °-- Specs T Tpdatc Q") mn
Amendment No. 6 Part 9 & 10 Plans & Spec Update $5,200
Amendment No. 7 M-70. M-30, & Main St. Services 514,570
Total $369,03
ORdA VIC ED
FORT WCRTH - DALLAS • HOUSTON - McALLEN I'M" "
r�
TRANSPORTATION • WATER RESOURCES • LAND DEVELCPMENT - MUNICIPAL - ENVI ON NTFL �. VJ L
MECHANICAL • ELECTRICAL - SURVEYING • GEOGRAPHIC NFORMATION SYSTEMS
ARCHITECTURE LANDSCAPE ARCHITECTURE • PLANNING
Hafff Associates
ENGINEERS • ,ARCHITECTS • SCIENTISTS
PLANNERS • SURVEYORS
Please review the enclosed information and do not hesitate to call me if you have any
questions or require additional information regarding this proposal.
Sincerely,
HALFF ASSOCIATES, INC.
xW �Nel
Michael A. Moya, P.E.
CITY WIRS Ey
Geo W��,+?
MEN
NO ® Halff Associates Inc, . i4000ort rthSCreek
(817)847-1422
ENGINEERS ARCHITECTS SCIENTISTS PLANNERS SURVEYORS Metro(817)429-9975
Fax (817)232-9784
Attachment "A" - Scope of Work
Amendment No. 7
Main C1C4B Drainage Area Sanitary Sewer System Rehabilitation and Improvements
(Group 6,Contract 2), Part III/
Main 70, Main 30 and Main Street Miscellaneous Sanitary Sewer Services
I. Data Collection
A. Meet with City Staff to obtain available plans, utility locator maps, property maps, executed
Fort Worth& Western Railroad Permits, and other related data.
B. Obtain property ownership data from City, County Deed Records and Tarrant Appraisal
District for use in assessing right-of-way needs. Obtain recorded plats and deeds from the
City and Tarrant County Deed Records
C. Visit project site for field (visual) inspection of existing features.
D. Meet with affected property owners to confirm location of services.
E. Conduct field surveys of project area to determine locations of structures, utilities, clean-
outs, etc. (by Gorrondona Associates)
II. Design
A. Concept Design(Main Street Miscellaneous Sewer Services)
1. Develop Base Map of project area using available plat information and field surveys.
2. Prepare Concept Plan of proposed improvements.
3. Submit to City for approval
4. Meet with City to discuss concept plan.
B. Final Design
1. Update Main 30 design plan for construction of crossing (BOTOC) at the Fort Worth &
Western Railroad.
2. Update Main 70 design plan for construction of crossing (BOTOC) at the Fort Worth &
Western Railroad.
3. Prepare plan of proposed Main Street sanitary sewer services (1" = 20' horizontal
scaie).
4. Prepare Bid Documents for construction of Main 70, Main 30 and Main Street
Miscellaneous Sanitary Sewer Services (assumes no easements are required)
5. Prepare estimate of probable construction cost for improve g. r
6. Submit to Citv for final review. ,, € bg �
'■ ■
• ■■■ Halff Associates 000 Fossil Creek Blvd.
Inc *� FortWorth, Texas 76137
(817)847-1422
ENGINEERS ARCHITECTS SCIENTISTS PLANNERS SURVEYORS Metro (817)429-9975
Fax(817)232-9784
7. Address City comments and submit Final Bid Documents for Advertisement.
III. Construction
A. Deliver Bid Documents (40 sets, reproduction by Hugo Trevino).
B. Bidding Assistance (includes: addendum and bid tabulation).
C. Assistance during Construction (includes: attendance at pre-construction conference and at
final inspection).