HomeMy WebLinkAboutContract 47458-FP2 Depart t T11w Const. Services
D® # Da
Project Manager ALL i
Risk Management S.Canady ' ' RT WORTH, SECT ARY W-Fo�
'
D.O.E. Brotherton -;U RaCT MO'
CFA Westerman/Scanned
The Pro ceding peolk have been Contacted concerning the request CATION AND PUBLIC WORKS
for final payment&have released this project for such payment. )F PROJECT COMPLETION
Clearance Conducted By Etta Bacy �/� Ilk D.O.&N4: 7495
�t zG yo
Regarding contract 117495 for WESTOVER OAKMONT ADDITION LOTS 1&2B as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through
M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete.
Original Contract Prices: $62,268.65
Amount of Approved Change Orders: NQ 1
Revised Contract Amount: $62,268.65
Total Cost Work Completed: $62,268.65
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
Total Deduction Amount: $0.00
Total Cost Work Completed: $62,268.65
Less Previous Payments:
Final Pay e t Due $62,268.65
R 4
Recomm d d for Acceptance Date
Asst. Dire t , TPW - Infrastructure Design and Construction
Accepted Date
Director,
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
Asst. City Manager Date
Comments: FUND ACCT: C205-475220-2067602640
EMAZZ,En KO RTH:I IAORD
AUG 2016 SEARY
C�SD TX ��
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name WESTOVER OAKMONT ADDITION LOTS I&2B
Contract Limits WESTOVER-OAKMONT ADDITION
Project Type PAVING IMPROVEMENT
City Project Numbers 02640
DOE Number 7495
Estimate Number I Payment Number 1 For Period Ending 4/12/2016
CD
City Secretary Contract Number 117495 Contract Time 6IrD
Contract Date 11/9/2015 Days Charged to Date 93
Project Manager Ehia Contract is 101.00 Complete
Contractor JACKSON CONSTRUCTION LTD
5112 SUN VALLEY DRIVE
FORT WORTH, TX 76119
Inspectors RODGERS / BRENZ
Thursday,August 04,2016 Pagel of 4
�T�
City Project Numbers 02640 DOE Number 7495
Contract Name SANITARY SEWER&PAVING IMPROVEMENTS TO SERVE LOTS 1& Estimate Number I
Cataract Limits WESTOVER-OAKMONT ADDITION Payment Number I
Project Type PAVING IMPROVEMENT For Period Ending 4/12/2016
Project Funding
UNIT R:PAVING IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 UNCLASSIFIED EXCAVATION 120 CY $40.00 $4,800.00 120 $4,800.00
2 6"CONCRETE DRIVEWAY 96 SY $95.00 $9,120.00 96 $9,120.00
3 6"CONCRETE PAVEMENT(HOODED LEFT 243 SY $95.00 $23,085.00 243 $23,085.00
LANE)
4 BARRIER FREE RAMP 2 EA $1,800.00 $3,600.00 2 $3,600.00
5 SAWCUT EXISTING PAVMENT&REMOVE 224 LF $5.00 51,120.00 224 $1,120.00
6 LIGHT POLE(INCLUDING CONDUIT&WIRING) I EA $16,043.65 $16,043.65 1 $16,043.65
7 RELOCATE BUS STOP SIGN AND BENCH 1 EA $1,000.00 $1,000.00 I $1,000.00
8 INSTALL TRAFFIC SIGN I EA $500.00 $500.00 1 $500.00
9 TRAFFIC CONTROL 1 LS $2,500.00 $2,500.00 1 $2,500.00
10 EROSION CONTROL 1 LS $500.00 $500.00 1 $500.00
Sub=Total of Previous Unit $62,268.65 $62,268.65
Thursday,May 05,2016 Page 2 of 4
City Project Numbers 02640 DOE Number 7495
Contract Name SANITARY SEWER&PAVING IMPROVEMENTS TO SERVE LOTS 1& Estimate Number 1
Contract Limits WESTOVER-OAKMONT ADDITION Payment Number I
Project Type PAVING IMPROVEMENT For Period Ending 4/12/2016
Project Funding
Contract Information Summary
Original Contract Amount $62,268.65
ChanLe Orders
Total Contract Price $62,268.65
Total Cost of Work Completed
Date 5� $62,268.65
r ntr for Less %Retained $0.00
Net Earned $62,628.65
Date
��pection Su rvis / Earned This Period $62,628.65
$ Jr o/0/" This Period $0.00
Date / /5L Less Liquidated Damages
Pr ' Manager
( & / Days® /Day $0.00
Date++ - LessPavement Deficiency $0.00
Asst Hector TP�W 1-Infrastructure Design and Construction Less Penalty $0.00
V" Date /9114 Less Previous Payment 50.00
Director/Ontracting Depalloent Plus Material on Hand Less 15% $0.00
Balance Due This Payment $62,628.65
Thursday,May 05,2016 Page 3 of 4
City Project Numbers 02640 DOE Number 7495
Contract Name SANITARY SEWER&PAVING IMPROVEMENTS TO SERVE LOTS I& Estimate Number 1
Contract Limits WESTOVER-OAKMONT ADDITION Payment Number 1
Project Type PAVING IMPROVEMENT For Period Ending 4/1212016
Project Funding
Project Manager Ehia City Secretary Contract Number 117495
Inspectors RODGERS / BRENZ Contract Date 11/9/2015
Contractor JACKSON CONSTRUCTION LTD Contract Time 60 CD
5112 SUN VALLEY DRIVE Days Charged to Date 93 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $62,268.65
Less %Retained $0.00
Net Earned $62,628.65
Earned This Period $62,628.65
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $62,628.65
Thursday,May 05,2016 Page 4 of 4
The
Westovef
Group www.westovergrp.com
We Deliver Real Estate Solutions
556 81h Avenue
Fort Worth,TX 76104
817.886.3000 Main
817.336.1236 Fax
May 12, 2016
Jackson Construction
Attn: Steve Haberstroh
5112 Sun Valley Road
Fort Worth, TX 76119
RE: City Improvements to property located at Oakmont and Chisholm Trail Parkway
Dear Steve:
Please accept this letter as our waiver of liquidated damages fee pursuant to the final
acceptance by the City of Fort Worth, TX.
Sincerely,
Westover Oakmont, LP
By: Westover Oakmont GP, LLC,
Its General Partner
Sam Brous
Manager
SB/gt
City Project Numbers 02640 DOE Number 7495
Contract Name SANITARY SEWER&PAVING IMPROVEMENTS TO SERVE LOTS 1& Estimate Number 1
Contract Limits WESTOVER-OAKMONT ADDITION Payment Number I
Project Type PAVING IMPROVEMENT For Period Ending 4112/2016
Project Funding
Project Manager Ehia City Secretary Contract Number 117495
Inspectors RODGERS / BRENZ Contract Date 11/9/2015
Contractor JACKSON CONSTRUCTION LTD Contract Time 60 CD
5112 SUN VALLEY DRIVE Days Charged to Date 93 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $62,268.65
Less %Retained $0.00
Net Earned $62,628.65
Earned This Period $62,628.65
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $62,628.65
Thursday,May 05,2016 Page 4 of 4
The
Westover
Group www.westovergrp corn
We Deliver Real Estate Solutions
556 8"Avenue
Fort Worth,TX 76104
817.886.3000 Main
817.336.1236 Fax
May 12, 2016
Jackson Construction
Attn: Steve Haberstroh
5112 Sun Valley Road
Fort Worth, TX 76119
RE: City Improvements to property located at Oakmont and Chisholm Trail Parkway
Dear Steve:
Please accept this letter as our waiver of liquidated damages fee pursuant to the final
acceptance by the City of Fort Worth, TX.
Sincerely,
Westover Oakmont, LP
By: Westover Oakmont GP, LLC,
Its General Partner
Sam Brous
Manager
SB/gt
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Troy L. Jackson,
Vice President Of Jackson Construction, Ltd,known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Westover-Oakmont Addition
BY �vt
roy L. J cson, Vice President
Subscribed and sworn before me on this date 25th of May, 2016.
Notary ublic
Tarrant, Texas
CARMEN L. ESTEP
Zo:• c� Notary Pubflc,State of Texas
Comm,Expires 04-06-2020
'nO ,,` Notary!D 2910611
Affidavit of All Bills Paid
STATE OF TEXAS
KNOW ALL MEN BY THESE PRESENTS:
COUNTY OF TARRANT
I, Troy L. Jackson, of the undersigned principal hereby certify that all
obligations, claims and debts due laborers, materialmen, subcontractors,
suppliers, and others incurred in or contingent to the performance of the
work on the project known as Westover-Oakmont Addition in the City of
Fort Worth, Texas have been fully paid.
This affidavit is made for the purpose of obtaining payment from the
City of Fort Worth on above construction work.
Subscribed and sworn to before me this Jackson Construction, Ltd.
Principal
25t ay of May, 2016
By:
No ary Signatu Troy L. Jacks n, Vice P esident
Commission Expires: 04/06/2020
CARMEN L. ESTEP
3:° =Notary Public,Stare of Texas
Comm.Ex ires
�'•...• p 04-06-2020
Notary ID 2910611
FORTWORTHRE":02120/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Jackson Construction LTD Westover-Oakmont Addition.
DOE Inspector DOE Number
Urn brenz 7495
DOE Inspector Project Manager
❑ Water Q Waste Water[] Storm DrainageQ Pavement Fred Ehia
nitial Contracl Amount Project Dffllculty
$90,371.00 O Simple ® Routine Q Complex
Final Contract Amount Date
$90,371.00 5/2/2016
in PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) IMAX SCORE SCORE
1 Submission of Documents 2 Y 2 8 4
2 Public Notifications 5 Y 20 25
3 Plans on Site 5 Y 5 20 25
4 Field Supervision 15 Y 15 60 225
5 Work Performed 15 Y 15 60 225
6 Finished Product 15 Y 15 60 225
7 Job Site Safety 15 Y 15 60 225
8 Traffic Control Maintenance 15 Y 15 60 225
9 Daily Clean Up 5 Y 5 20 25
10 Citizen's Complaint Resolution 5 Y 5 20 25
11 Property Restoration 5 Y 5 20 25
12 After Hours Response 5 Y 5 20 25
13 Project Completion 5 Y 20 25
TOTAL ELEMENT SCORE(A) 1304
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 1304
IIn CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating(ITS/MS]*100%) 1304 / 448 — 291%
Performance Category Excellent
<2W,=Inadequate 20%to<40%=Deficient 40%to<60%—Standard 60%to<80%—Good _>80%_excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector Signature Contractor '✓
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
TRANSPOR'T'ATION AND PUBLIC WORKS
The City of Fort Worth-1000 Throtkmorton Street-Fort Worth,TX 76012-6311
(817)392-7941 -Fax:(817)392-7845
FORTWORTH RE 02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 19=016
Name of Contractor Project Name
Jackson Contraction LTD Westover-Oakmont Addition
Elnspector Project Manager
kim brenz FRED AREA
DOE Number Project Difficulty Type of Contract
7495 0 Simple Q Routine Q Complex ❑ water Q Waste water❑ Storrn DralnageQ Pavement
Initial Contract Amount Final Contract Amount
$90,371.00 $90,371.00
In PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATpJG
(0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
I Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowled a of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 41. 4 Accuracy of Plan Quantities
5 Citizen Com laint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting tip Valve Crews,Labs 1 Knowled a And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Mara er
1 Change Order Processing Time 3 Communication 3
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
IIn COMMENTS&SIGNATURES
COMMENTS
Signature Contractor _
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS GOOD JOB
TRANSPORTATION AND PUBLIC WORKS
(a The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311
(817)392-7941 -Fax:(817)392-7845
F®RTWORTH,
TRANSPORTATION AND PUBLIC WORKS
STATEMENT OF CONTRACT TIME
STATEMENT#
FINAL STATEMENT# 1 DOE T495
NAME OF PROJECT: sanitary sewer&paving OakMOM Addition. Contractor jaclug
YEAR:j 2016
PROJECT NO.: FINAL INSPECTION DATE
#0264 1 WD CD
CONTRACT TIME 60 I X
PERIOD FROM: 1 411/2016 TO: I 4112/2016 BEG - Mouth I IDEMMMENJ(Y/N)I `Y
WORK ORDER EFFECTIVE: 1 111112016 1 BEG /n Y I MID 1 n 155.076
DAY OF MONTH DAYS REASON FOR DAY OF MONTH DAYS REASON FOR
CHARGED DAYS CREDITED CHARGED DAYS CREDITED
1 Fri 1 16 Fri
2 Sat 1 17 Sat
3 Sun 1 18 Sun
4 Mon 1 19 Mon
5 Tue 1 20 Tue
6 Wed 1 21 Wed
7 Thu 1 22 Thu
8 Fri 1 23 Fri
9 Sat 1 24 Sat
10 Sun 1 25 Sun
11 Mon 1 26 Mon
12 Tue 1 27 Tue
13 Wed 0 NA 28 Wed
14 Thu 0 NA 29
15 Fri 0 NA 30
31
NA Wkn&Hol Wea Ud Oth
Not Applicable SAT,SUN,and WEATHER UTILITIES OTHERS DAYS TOTAL DAYS
HOLIDAYS RELOCATE CHARGED
THIS PERIOD 0 0 0 0 12 12
PREVIOUS PERIOD 0 81 81
ITOTAL TO DATE 0 0 0 0 93 93
REMARKS:
THIS CONTRACT COMPLETE 4/12/2016
Signature: Signature:
(Print Name� (Print Name)
co""AG7oR DAIS STICCOR DALE