Loading...
HomeMy WebLinkAboutContract 45922-FP1 Vepartment ofTPW Const.Servif-es CITY SECRETl4lEY DOE#I . Date ``�� Project Manager5bo �Z• CONTRACT N0. `IJ "2 Risk Management J. Barksdale T WORTH, D.O.E. Brotherton 'Zdt(® CFA Westerman/Scanned ❑ The Proceeding people have been Contacted concerning the request iffION AND PUBLIC WORKS 57q j,0_7 _ C o l`7&q for final payment&have released this project for such payment PROJECT COMPLETION C-5 2 1 s—q !7 Z Clearance Conducted By Etta Bacy D.O.E.Ns: 7253 Regarding contract 45922 for WATER&SANITARY SEWER REHAB CONTRACT 86 UNIT 2 as required by the WATER DEPARTMENT as approved by City Council on 08/05/2014 through M&C C-26910 the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: % C 0. i L`JR) $1,179,403.91 Amount of Approved Change Orders: ,,l AuG 17 2vt �i� $214,921.63 Ns 1,2,3,5 Revised Contract Amount: 1uJ $1,394,32554 Total Cost Work Completed: $1,146,990.93 Less Deductions: Liquidated Damages: 89 Days @ S420.00/Day Pavement Deficiencies: Total Deduction Amount: $37,380.00 Total Cost Work Completed: $1,109,610.93 Less Previous Payments: $1,082,88132 Final Payment Du $26,72961 Recommended f4 A cep ante Date Asst. Director, TP Infrastructure Design and Construction Accepted i�s_ ' Date Asst. Director, WATER DEPARTMENT Asst. City Manager Date Comments: FUND ACCT P253-60170196483&P258-70170196483 E,MAILED AUG N2, 2016 7RECORIOD ?a6.8- 01q(A FOFFICIAL Y AUG 17 2016 Sq�OO� - Cb�V G s -e4 a� City Project Numbers 01964 8 DOE Number 7253 Contract Name Water&Sewer Rehabilitation Contract 86 Estimate Number 27 Contract Limits Unit II Payment Number 27 Project Type Water&Sewer For Period Ending 71132016 Project Funding Project Manager Wong City Secretary Contract Number 45922 Inspectors Rodgers / Crowley Contract Date 8/52014 Contractor P.C.CONTRACTORS,LLC Contract Time 283 CD P.O.BOX 470930 Days Charged to Date 372 CD FORT WORTH, TX 76147 Contract is .000000 Complete PO CITY OF FORT WORTH INVOICE # !2 S°t SUMMARY OF CHARGES Lt" Few Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $1,146,990.93 Less %Retained $0.00 Net Earned $1,146,990.93 WATER DEPARTMENT Earned This Period 564,109.61 ENGINEERING AND FISCAL SERVICES Retainage This Period $420.00 Ca"dPetsat- Less Liquidated Damages Dq7Siure.fbr (L L 89 Days @ $420.00 1 Day $37,380.00 VEffiRltA WCNECK RQC4V YES E3 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $1,082,881.32 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $26,729.61 Friday,July 15,2016 Page 6 of 6 'P ash-- biq�U FORTWORTH r CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name Water&Sewer Rehabilitation Contract 86 Contract Limits Unit 11 Project Type Water&Sewer City Project Numbers 01964 DOE Number 7253 Estimate Number 27 Payment Number 27 For Period Ending 7/15/2016 CD City Secretary Contract Number 45922 Contract Time 28ED Contract Date 81520I4 Days Charged to Date 372 Project Manager Wong Contract is 82.000 Complete Contractor P.C.CONTRACTORS,LLC P.O.BOX 470930 FORT WORTH, TX 76147 Inspectors Rodgers / Crowley Friday,July 15,2016 Page 1 of 6 City Project Numbers 01964 DOE Number 7253 Contract Name Water&Sewer Rehabilitation Contract 86 Estimate Number 27 Contract Limits Unit 11 Payment Number 27 Project Type Water&Sewer For Period Ending 7/15/2016 Project Funding Unit II,Section A Water Improvements Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 3311.0261 8"PVC Water Pipe(CO#1) 3576.679 LF $26.31 $94,102.42 3674 $96,662.94 2 3311.0161 6"PVC Water Pipe(CO#l) 62.0033 LF $24.21 $1,501.10 32 $774.72 3 3312.3003 8"Gate Valve(CO#1) 5.999993 EA $1,506.72 $9,040.31 3 $4,520.16 4 3312.3002 6"Gate Valve(CO#1) 5.00001 EA $1,018.16 $5,090.81 5 $5,090.80 5 3311.0001 Ductile Iron Water Fittin(CO#1) 1.225 TO $6,188.84 $7,581.33 1.22 $7,550,38 6 0241.1510 Salvage Fire Hydrant(CO#1) 5 EA $623.33 $3,116.65 5 $3,116.65 7 3312.0001 Fire Hydrant(CO#1) 5 EA $3,641.40 $18,207.00 5 518,207.00 8 3312.2001 1"Water Service,Meter R(CO#l) 71.99645 EA $47.82 $3,442.87 59 $2,821.38 9 3312.2003 I"Water Service 86.000605 EA $462.54 $39,778.72 59 $27289.86 10 3312.0116 Connection to Existing 4"(CO#1) 5 EA $1,411.97 $7,059.85 3 $4,235.91 11 3304.0101 Temporary Water Services(CO#l)(CO 1.5 LS $12.654.60 $18,981.90 1.5 $18,981.90 #5) 12 3216.0101 Remove and Replace 6"Con(CO#1) 403.0763 LF $14.41 $5,808.33 13 3201.0111 Asphalt Pvmt Repair,Resi(CO#1) 3590.195 LF $36.49 5131,006.22 2400 $87,576.00 14 9999.0003 Geogrid 3379.6343 SY $4.95 $16,729.19 3318 $16,424.10 15 3213.0401 6"Concrete Driveway (CO#1) 725.0082 SF $4.24 $3,074.03 16 0241.1302 Remove 6"Water Valve 2.9999857 EA $697.67 $2,093.00 3 $2,093.01 17 3292.0100 Block Sod Placement(CO#1) 130.94 SY $4.37 $572.21 87 $380.19 18 3471.0001 Traffic Control(CO#1) 1.5 MO $9,853.20 $14,779.80 1.5 $14,779.80 19 Import Embedment/Backfill CSS(CO#1) 9 CY $65.00 $585.00 20 8"Waterline Lowering(CO#1) 3 EA $4,250.00 $12,750.00 1 $4,250.00 21 Temporary Asphalt Paving Repair(CO#l) 1875 LF $13.50 $25,312.50 1430 519,305.00 22 1"Private Water Service(CO#1) 3 EA $956.00 $2,868.00 23 8"D1 Water(CO#1) 10 LF $62.10 $621.00 10 $621.00 24 1 1/2"Water Service Meter Relocation(CO#1)(CO 10 EA $265.00 $2,650.00 10 $2,650.00 #3) 25 11/2"Water Service(CO#1)(CO#3) 10 EA $1,185.00 $11,850.00 10 $11,850.00 26 2"Water Service Meter Relocation(CO#1)(CO 43) 3 EA $340.00 $1,020.00 2 $680.00 27 2"Water Service(CO 41)(CO#3) 3 EA $1,986.00 $5.958.00 3 $5,958.00 28 INSTALL 8"VALVE(COFW)(CO#3) 1 EA $200.00 $200.00 1 $200.00 29 SALVAGE&INSTALL 4"VALVE ON 2 EA $600.00 $1,200.00 2 $1,200.00 WHITEMORE(CO 43) Friday,July 15,2016 Page 2 of 6 City Project Numbers 01964 DOE Number 7253 Contract Name Water&Sewer Rehabilitation Contract 86 Estimate Number 27 Contract Limits Unit II Payment Number 27 Project Type Water&Sewer For Period Ending 7/15/2016 Project Funding 30 INSTALL 4"C900(CO#3) 27 LF $18.00 $486.00 27 $486.00 Sub-Total of Previous Unit $447,466.24 $357,704.80 Unit II,section B:Sanitary Sewer Improvements Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 3331.4414 36"Sewer Pipe 9.9998091 LF $261.86 $2,618.55 9 $2,356.74 2 3331.4208 12"Sewer Pipe 193.01257 LF $39.78 $7,678.04 174 $6,921.72 3 3331.2104 12"CIPP 419 LF $66.55 $27,884.45 415 $27,618.25 4 3331.0105 12"Sewer Pipe,Point Rep 41.998495 LF $93.05 $3,907.96 5 3331.4212 12"DIP Sewer 599-97437 LF $86.24 $51,741.79 600 $51,744.00 6 3331.4115 8"Sewer Pipe(PVC) 1917.8140 LF $34.20 $65,589.24 755 $25,821.00 7 3331.4119 8"DIP Sewer Pipe 644.04325 LF $66.12 $42,584.14 643 $42,515.16 8 3331.1101 6"to 8"Pipe Enlargement 116.99517 LF $93.23 $10,907.46 121 $11,280.83 9 3331.0103 8"Sewer Pipe,Point Rcpa 12.000377 LF $159.28 $1,911.42 44 $7,008.32 10 3331.2101 6"C1PP 1565 LF $41.14 $64,384.10 1561 $64,219.54 11 3331.0102 6"Sewer Pipe,Point Repa 156.99953 LF $42.32 $6,644.22 12 3331.4108 6"Sewer Pipe 81.001760 LF $45.45 $3,681-53 31 $1,408.95 13 3305.1003 20"Casing By Open Cut 10-000042 LF $239.04 $2,390.41 10 $2,390.40 14 3305.1002 16"Casing By Open Cut 14.000245 LF $163.34 $2.286.80 12 $1,960.08 15 3331.3102 4"Sewer Service,2-Way C 85.999782 EA $734.48 $63,165.12 74 $54,351.52 16 3331.3302 8"Sewer Service,2-way C l EA $992.02 $992.02 17 3331.2201 Service Reconnection,CIP 31 EA $121.00 $3,751.00 29 $3,509.00 18 3339.0003 Wastewater Access Chamber 4 EA $3,406.36 $13,625.44 4 $13,625.44 19 3339.1001 4'Manhole(CO 43) 25.99999 EA $4,138-05 $107,589.26 24 $99,313.20 20 3339.1003 4'Extra Depth Manhole 22.999791 VF $527.40 $12,130.09 17 $8,965.80 21 3339.0001 Epoxy Manhole Liner 38 VF $265.65 $10,094.70 22 3301.0002 Post-CCTV Inspection 5555.7432 LF $1.48 $8,222.50 4874 $7,213.52 23 3301.0001 Pre-CCTV Inspection 2101.4737 LF $4.18 $8,784.16 2231 $9,325.58 24 3305.0002 6"Waterline Lowering I EA $6,393.94 $6,393.94 25 3305.0003 8"Waterline Lowering I EA $6,773.82 $6,773.82 26 3305.0109 Trench Safety 4457.6190 LF $2.10 $9,361.00 749 $1,572.90 27 0241.5001 Abandon Existing Sanitary 47.001191 CY $142-78 $6,710.83 14 $1,998.92 28 0241.2201 Remove 4'Sewer Manhole(CO#3) 21.000078 EA $640.82 $13,457.27 17 $10,893.94 Friday,July 15,2016 Page 3 of 6 City Project Numbers 01964 DOE Number 7253 Contract Name Water&Sewer Rehabilitation Contract 86 Estimate Number 27 Contract Limits Unit 11 Payment Number 27 Project Type Water&Sewer For Period Ending 7/15/2016 Project Funding 29 3305.0112 Concrete Collar 32.999505 EA $302.79 $9,991.92 19 $5,753.01 30 0241.2001 Sanitary Line Grouting 12.999826 CY $286.94 $3,730.17 31 0241.2012 Remove 6"Sewer Line 57.001912 LF $15.69 $894.36 31 $486.39 32 3216.0302 7"Cone Valley Gutter 12.999791 SY $47.75 $620.74 8 $382.00 33 3213.0401 6"Concrete Driveway 472.36639 SF $5.95 $2,810.58 984 $5,854.80 34 3216.0101 Remove and Replace 6"Con 104.93959 LF $18.26 $1,917.11 48 $876.48 35 3213.0301 4"Cone Sidewalk 32.002653 SF $7.54 $241.30 36 3201.0111 Asphalt Pvmt Repair,Resi 3426.8833 LF $36.85 $126,280.65 3026 $111,508.10 37 3212.0302 2"Asphalt Pvmt'I'ype D(CO#3) 606.3407 SY $14.94 $9,066.20 1072 $16,015.68 38 3211.0123 8"Flex Base,Type A,GR- 587.10378 SY $14.55 $8,542.36 1274 $18,536.70 39 0241.2102 6"to 8"Sewer Abandonmen 2 EA $338.23 $676.46 40 0241.2104 10"to 12"Sewer Abandonm 8.0000727 EA $412.56 $3,300.51 41 3305.0202 Imported Embedmenr/Backfi 584.00877 CY $144.75 $84,535.27 665.65 $96,352.84 42 3305.0206 Imported Embedment/Backfi 57.994232 CY $45.08 $2,614.38 43 3292.0100 Block Sod Placement 274.85155 SY $7.41 $2,036.65 48 $355.68 44 3231.0121 4'Chain Link,Aluminum 233.98598 LF $12.84 $3,004.38 15 $192.60 45 3231.0412 6'Fences,Wood 274.92782 LF $13.98 $5,218.13 15 $284.70 46 3349.0005 8'Storm Junction Box 2 EA $7,653.25 $15,306.50 47 02413501 Remove Storm Junction Str 1 LS $2,308.63 $2,308.63 43 3341.0606 66"RCP,Class IV 20.000176 LF $453.78 $9,075.63 49 3301.0101 Manhole Vacuum Testing 28.999212 EA $139.59 $4,048.00 50 9999.0001 Gravel Pvmt Trench Repair 64.000803 SY $12.38 $792.33 51 9999.0002 Remove Shed,Replace in Ki 1 EA $7,431.88 $7,431.83 52 9999.0003 Geogrid 653.05305 SY $5.09 53,324.04 639 $3,252.51 53 3471.0001 Traffic Control 4 MO $5.399.97 $21,599.88 4 $21,599.88 54 3125.0101 SWPPP >1 acre I LS $15,825.15 $15,825.15 1 $15,825.15 55 6FT MANHOLE(CO#3) 1 EA $6,650.00 $6,650.00 1 $6,650.00 56 6FT MANHOLE 7 VF $632.00 $4,424.00 7 $4,424.00 57 INSTALL 21"RCP(CO#3) 20 LF $82.00 $1,640.00 15 $1,230.00 58 CONNECT TO EXISTING RCP(CO 43) 1 EA $600.00 $600.00 1 $600.00 59 TRAFFIC CONTROL(CO#3) 1 LS $250.00 $250.00 I $250.00 60 8"C900 SS PIPE(CO#5) 614 LF $37.20 $22,840.80 614 $22,840.80 Sub-Total of Previous Unit $946,859.32 5789,286.13 Friday,July 15,2016 Page 4 of 6 City Project Numbers 01964 DOE Number 7253 Contract Name Water&Sewer Rehabilitation Contract 86 Estimate Number 27 Contract Limits Unit Il Payment Number 27 Project Type Water&Sewer For Period Ending 7/15!2016 Project Funding Contract Information Summary Original Contract Amount S1,179,403.91 Chance Orders Change Order Number 1 $148,147.00 Change Order Number 3 S38,870.49 Change Order Number 2 $1.50 Change Order Number 5 S27,902.64 Total Contract Price $1,394,325.56 Date — Total Cost of Work Completed 51,146,990.93 nt ctor loco Less %Retained 50.00 tt) Date t� Net Earned S1,146,990.93 hLvect S Earned This Period S64,109.61 Retainage This Period $420.00 f n Date D Less Liquidated Damages Pro' ct ager ,(� f 89 Days @ S420.00 /Day S37,380.00 Datet7 . f® � 4 LessPavement Deficiency $0.00 Awl Dire tor/TP/W-Infrastructure Designppand Construction Less Penalty S0.00 ` Datey��a 1. Less Previous Payment S1,082,881.32 Director/Contracting Department Plus Material on Hand Less 15% 50.00 Balance Due This Payment $26,729.61 Friday,July 15,2016 Page 5 of 6 CITY SFCRETAMf �1 FORT WORTH City of Fort Worth CONTRACT M4. .._A Change Order Request Pn�ect Name: Water&Sar lwy Sewer RehabRation Contract 86,Unit 2 City Sec No.: 45922 Pn*ct No.(s): P253.60170196483 and P258-70170196483 DOE No. 7253 CilyProj.No.:J 01964 Project Docriptiml Water&SanBary Sewer Main Replacement on Ohio Garden Rd,Haskell St,Eastwood Ave and Whitmore Avwm. Contractor P.C.Corttrastors,LLC Change Orden ® Date: F 5/15/2016 CkyR*ctMgr.1 Soon Wong City inspects I John Crowley Phone Number 1 817392-8369 Phone Number: 817-944-0975 Dept. Water Sewer Totals Contract Time (Calender days) Original Contract Amount $274,667.90 $904,736.01 $1,179,403.91 150 Extras to Date $167,736.50 $19,282.49 $187,018.99 073 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $442,404.40 $924,018.50 $1,366,422.90 223 Amount of Proposed Change Order $5,061.84 $22,840.80 $27,902.64 060 Revised Contract Amount $447,466.24 $946,859.30 $1,394,325.54 283 Original Funds Available for Change Orders $13,800.10 $27,700.99 $41,501.09 Remaining Funds Available for this CO 1 $8,418.50 $8,418.50 Additional Funding(d necessary) $5,061.84 1 $14,422.30 $19,484.14 CHANGE ORDERS to DATE QNCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 18.22% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,474,254.89 _�� J IFJ.CATION(REASONS) AN FOR CHGE,,ORl7 This change order No.5 supersedes and replaces change order No.4 in its entirety.Subsequent to administrative approval of change order No.4,it was determined that there were insufficient funds available to pay for the additional quantities of 8-inch sewer pipe and temporary water services that were necessary on the project. Staff concurs with the contractor's request for 60 additional calendar days a order. %0 A 30 V16 14 ary L Setae It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. P.C.Contractors,LLC Chase Patterson ins for Date Project mon4ow Date 6�2m_ldr e , a ,/� W� L3 Ass' iteG Dept) Date on to . p . (MW Dept) Datuw zM (, -ZI -Zb( tfo Dat Assistant.City Manager Date Council Action(if Required) M&C Number r—NIA M&C Date Approved NIA Water&Sam 1 « • P253-60170196483 an• P258-70170196483 It • ® M • r Water&Sanitay Sew Main Re0acwtent on Ohio Garden Rd,Haskell St Eastwmd Ave and WWhore Avenue � • _h I� /t• •/fill,• . F raal r ♦ • �Fa'I�R9 Fyn i:. a""`?S'„' C'�;•C�7Ilb�i 1"�,`�--.;-cr-•-� ,R .rn � -� .-s;�..�- ,�i' .-."F�. I' Y ��-� _,��1: ` ,. 4..._ .. FORT WORTIH City of Fort Worth Change Order Deletions Project Name Water&Sanitary Sewer Rehabilitation Contract 86,Unit 2 City Sec No.: 45922 Project No.(s): P253-60170196483 and P258-70170196483 DOE No. 7253 City Proj.No.: 01964 Project Description Water&Sanitary Sewer Main Replacement on Ohio Garden Rd,Haskell St,Eastwood Ave and Whitmore Avenue. Contractor P.C.Contractors,LLC Change Order. 0 Date 514512016 City Project Mgr. Soon Wong City Inspector. E John Crowley DELETIONS Water Sewer MMBE Breakdown for this Change Order Total Previous Change Orders Total M&C Review Page 1 of 3 Offidal site of the city of Fort worth,Texas CITY COUNCIL AGENDA FoirrAbin COUNCIL ACTION: Approved on 6114/2016-Ordinance No. 22265-06-2016 &22266.06-2016 DATE: 6/14/2016 REFERENCE '.0-27769 LOG 60SS86U2C05PCCONSTFUNDING CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Adopt Appropriation Ordinances in the Combined Amount of$147,903.00 for Increased Project Management Costs on Water and Sanitary Sewer Replacement Contract 86, Unit 2, Located in the Monticello Neighborhood(COUNCIL DISTRICTS 2, 7 and 9) RECOMMENDATION: It is recommended that the City Council adopt the attached appropriation ordinances increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of$65,062.00 from available funds and in the Sewer Capital Projects Fund in the amount of$82,841.00 from available funds for a total amount of$147,903.00 for the purpose of funding Water and Sanitary Sewer Replacement Contract 86, Unit 2. DISCUSSION: On August 5,2014(Mayor and Council Communication (M&C) C-26910)the City Council authorized a contract with P. C. Contractors, LLC, in the amount of$1,179,403.91 for Water and Sanitary Sewer Replacement Contract 86, Unit 2. The contract was subsequently revised by four change orders totaling$187,018.99 as follows: Change Ober No. 1 (M&C C-27172)in the amount of$148,170.00 approved February 3,2015, Change Order No.2 with a net total amount of$1.50 administratively approved April 2,2015, Change Order No.3 in the amount of$38,870.49 administratively approved June 24,2015 and Change Order No.4 with a net total amount of$5.10 administratively approved on January 29,2016. This contract requires additional funding for project management and to to cover costs associated with an administrative change order that provides compensation for additional and increased pay item quantities of eight4nch sanitary sewer pipe and temporary water service that were necessary on the project. In addition, Change Order No. 5 in the amount of$27,903.00 will be issued and will supersede and replace Change Order No.4 in its entirety. The change order will have no impact on the Water Department's operating budget. Appropriations for the Water and Sanitary Sewer Replacement Contract 86 project consist of the following: Existing Additional Future Project Description Appropriations A ro riations Appropriations Total' Engineering $217,513.00 $ 0.00 $0.00 $ 217,513.00 Construction $4125101.00 $ 27 903.00 $0.00 $4125101.00 Project Management,Real Property Acquisitions,inspection,Testing and Conlin noes 681 402.00 $12Q 000.00 $0.00 11 829 305.00 Project Total $5,024,016.00 $147,903.00 $0.00 11 $5171,919.00 "Amounts rounded for presentation purposes. M&C Review Page 2 of 3 Appropriations for the Water and Sanitary Sewer Replacement Contract 86 project by fund will consist of the following: FUND Appropriations Water Capital Projects Fund 59601 $1,761,954.00 Sewer Capital Projects Fund 59607 $3 409 965.00 Pro ect Total $5,171,919.00 In addition to the change order amount, $120,000.00(water. $60,000.00; sewer: $60,000.00) is required for project management, construction staking, material testing and inspection. The project is located in COUNCIL DISTRICTS 2, 7 and 9, Mapsco 62X. This M&C does not request approval of a contract with a business entity. FISCAL INFORMATIONICERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances funds will be available in the current capital budget, as appropriated, of the Water Capital Projects Fund and the Sewer Capital Projects Fund. The Fiscal Year 2016 Water and Sewer Operating Budget includes appropriations of$26,068,353.00 for the purpose of providing Pay-As-You-Go funding for Water Capital Projects. After this transfer for Fiscal Year 2016,the balance will be$7,337,017.00. The Fiscal Year 2016 Water and Sewer Operating Budget includes appropriations of$26,300,046.00 for the purpose of providing Pay-As-You-Go funding for Sewer Capital Projects. After this transfer for Fiscal Year 2016,the balance will be $13,744,699.00. Existing Additional Revised Fund Appropriations A ppropriations Appropriations Pro ectTotat' Water Capital Projects Fund 59601 $1,696,892.00 $65 06100 $0.00 $1,761,954.00 Sewer Capital Projects Fund 59607 $3,327,124.00 $82,841.00 $0.00 $3,409,965.00 Project Total $5 024 016.00 $147,903.00 $0.00 $6,171,919.00 *Amounts rounded for presentation purposes. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 59601 0600430 4956001 C01964 C017ZZ 2016 $65,062.00 59601 0600430 5740010 C01964 C01783 2016 $5,062.00 59601 0600430 5330500 C01964 C01785 2016 $60,000.00 59607 0700430 4956001 1 C01964 C017Z2 1 2016 1 1 $82,841.001 59607 0700430 5740010 1 C01964 I C01783 1 2016 1 1 $22 841.00 59607 0700430 5740010 1 C01964 I C01785 2016 1 1 $60,000.001 FROM Fund Department I Account Project Program I Acdvlty Budget Reference# I Amount ID ID Year Charifletd 2 Submitted for City Manager's Office by., M&C Review Page 3 of 3 Jay Chapa (5804) Originating Department Head: John Carman (8246) Additional Information Contact: Soon Wong (8469) ATTACHMENTS 60SS86U2C05PCCONSTFUNDING Map01.pdf 60SS86U2CO5PCCONSTFUNDIN G sewer AO.docx 60SS86U2QO5PCCONSTFUNDING water AO.docx 60SS86U2CO5PCCONSTFUNDINGMapO2.pdf 60SS86U2CO5PCCONSTFUNDINGMap03.pdf 60SS86U2CO5PCCONSTFUNDINGMapO4.pdf CONTRACTOR'S AFFIDAVIT OF BILLS PAID STATE OF TEXAS COUNTY OF TARRANT BEFORE ME. the undersigned authority, on this day-personally appeared Chase Patterson. known to me be credible person and officer of PC Contractors LLC, a Texas Corporation (hereinafter called `'Contractor"), and who, being duly sworn, upon his oath declares and acknowledges as follows: I am the duly authorized agent for the said Contractor which has authorized me to make this affidavit and all of the recitations herein are true and correct. Pursuant to an agreement dated August S. 2014 between City of Fort Worth and PC Contractors LLC, Contractor has supplied materials and performed labor in connection with the construction of improvements upon certain real property owned by the Owner Tarrant. Texas. The said improvements are more particularly described as Water and Sanitary Sewer Rehabilitation Contract 86 Unit II The Contractor hereby certifies that, except as listed below, all obligations for all materials and equipment furnished. for all work labor, and services performed. and for all known indebtedness and claims against the Contractor have been paid in full or have otherwise been satisfied in Rill. EXCEPTIONS: PC Contractors LLC. Bv: P.O. Box 470930 Fort Worth,TX 76147 817-396-0965 * Fax: 888-533-5002 SUBCRIBED AND SWORN to before me this2l!day of J—c_. .�� . 201�. Notary Public or the State Vex NpSARYpUF��'%c MV commission expires: OF••:; plFT ••��� CONSENT OF SURETY OWNER ❑ ARCHITECT ❑ TO FINAL PAYMENT CONTRACTOR ❑ SURETY ❑ Conforms with the American Institute of Architects G707 form OTHER ❑ Bond No: PB115WEIN534 TO OWNER: ARCHITECT'S PROJECT NO.: 01964 (Name and address) City Of Fort Worth 1000 Throckmorton Street CONTRACT FOR: Water&Sanitary Sewer Rehab Fort Worth,TX 76102 PROJECT: CONTRACT DATED: 8/05/2014 (Name and address) Water&Sanitary Sewer Rehabilitation Contract 86 Unit II In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (Insert none and address of Surety) Philadelphia Indemnity Insurance Company One Bala Plaza, Suite 100 Bala Cynwyd, PA 19004 ,SURETY on bond of (Insert nam and address of Contractor) P.C.CONTRACTORS, LLC 102 West Hidden Meadow Court Cresson,TX 76035 ,CONTRACTOR hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (Insert name and address of owner) City Of Fort Worth 1000 Throckmorton Street Fort worth,TX 76102 OWNER as set forth in said Surety's bond. IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: February 5,2016 (Insert in writing the month followed by the numeric dote and year.) Philadelphia Indemnity Insurance Company (Surety) pignantre Attest: (Seal): Printed name and MW 3116 PHILADELPHIA INDEMNITY INSURANCE COMPANY Bond No-. PB11509800534 One Bala Plaza,Suite 100 Bala Cynwyd,PA 19004 Power of Attorney KNOW ALI,PERSONS BY THESE PRESENTS: that PHILADELPHIA INDEMNITY INSURANCE COMPANY(the Company),a corporation organized and existing under the laws of the Commonwealth of Pennsylvania,does hereby constitute and appoint: Jared Young,Fred A.Thetford,Jr.,Tobin Tucker,Tom Young and Fred A.Thetford,III of Contract Bond Agency,LLC. Its true and lawful Attorney(s)in fact with full authority to execute on its behalf bonds,undertakings,recognizances and other contracts of indemnity and writings obligatory in the nature thereof,issued in the course of its business and to bind the Company thereby,in an amount not to exceed 525,000,000 This Power of Attomey is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of PHILADELPHIA INDEMNITY INSURANCE COMPANY at a meeting duly called the I"day of July,2011. RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the Company to: (1) Appoint Attorney(s) in Fact and authorize the Attorney(s) in Fact to execute on behalf of the Company bonds and undertakings,contracts of indemnity and other writings obligatory in the nature thereof and to attach the seal of the Company thereto; and (2) to remove, at any time, any such Attorney-in-Pact and revoke the authority given. And,be it FURTHER RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any such Power of Attorney or certificate relating thereto by facsimile,and any such Power of Attorney so executed and certified by facsimile signatures and facsimile seal shall be valid and biding upon the Company in the future with the respect to any bond or undertaking to which it is attached. IN TESTIMONY WHEREOF,PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 7'-"DAY OF FEBRUARY 2013. 1 2 1 (Seal) Robert D.O'Leary Jr.,President&CEO Philadelphia Indemnity Insurance Company On this 7s day of February 2013,before me came the individual who executed the preceding instrument,to me personally known,and being by me duly sworn said that he is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY;that the seal affixed to said instrument is the Corporate seal of said Company,that the said Corporate Seal and his signature were duly affixed. CoMMoWNrAUH of PENNSYLVAMA NOTARIAL SEA DANIELLE PORATH,Notary PAC Lower Metioo Twpp Mon tgomey Coun M Cotrtdasior Epres March T20tty Notary Public: residing at: Bala Cynwyd,PA (Notary Seal) My commission expires: March 22.2016 1,Craig P.Keller,Executive Vice President,Chief Financial Officer and Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY,do herby certify that the foregoing resolution of the Board of Directors and this Power of Attorney issued pursuant thereto are true and correct and are still in full force and effect.I do further certify that Robert D.O'Leary Jr.,who executed the Power of Attorney as President,was on the date of execution of the attached Power of Attorney the duly elected President of PHILADELPHIA INDEMNITY INSURANCE COMPANY, In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this 5th day of February 20 16 Craig P.Keller,Executive Vice President,Chief Financial Officer&Secretary PHILADELPHIA INDEMNITY INSURANCE COMPANY CONDITIONAL WAIVER AND RELEASE ON PROGRESS PAYMENT Project: CONTRACT 86 WTR& SWR On receipt by the signer of this document of a check PC CONTRACTORS LLC (maker of check)in the sum of $7,983.23 payable to FERGUSON WATERWORKS (payee or payees of check)and when the check has been properly endorsed and has been paid by the bank on which it is drawn, this document becomes effective to release any mechanic's lien right,any right arising from a payment bond that complies with a state or federal statute, any common law payment bond right,any claim for payment,and any rights under any similar ordinance,rule, or statute related to claim or payment rights for persons in the signer's position that the signer has on the property CITY OF FORT WORTH(owner) VARIOUS LOCATIONS,FORT WORTH,TX 76102 (location)to the following extent: INVOICES THROUGH 12/04/1 5 (job description). This release covers a progress payment for all labor, services, equipment, or materials PC CONTRACTORS LLC (person with whom signer contracted) as indicated in the attached statement(s) or progress payment request(s), except for unpaid retention, pending modifications and changes, or other items furnished. Before any recipient of this document relies on this document, the recipient should verify evidence of payment to the signer. The signer warrants that the signer has already paid or will use the funds received from this progress payment to promptly pay in full all of the signer's laborers, subcontractors, materialmen, and suppliers for all work, materials,equipment, or services provided for or to the above referenced project in regard to the attached statement(s)or progress payment request(s). Date_• Fer us aterworks#788 Farguson Enterprises, inc. OR its Whalf or as an agent for By Signature) its sups=dlaries aid aft j—tes Cred' f aria er STATE OF TEXAS ' COUNTY OF TARRANT ' BEFORE ME, the undersigned, a Notary Public, on this day personally appeared Janet K Addamz, known to me to be the person and officer whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of said Ferguson, a corporation, or its successors, and that :;hc: executed the same as the act of such corporation for the purposes and consideration therein expressed, and in the capacity stated. Given under my hand and seal of office,this the_ day of 2 d 16. INA Notary Pu , ate o exas �,ttnMM o:•• ! MQR"N TEEL PU Stole of I Comm.E � fires S%.;'•oi i�.� 02-?8•?017 H....,t� Notary 10 12932)85-1 STATE OF TEXAS IINOTICE TO PRIME CONTRACTOR AND BONDING COMPANY GOVERNMENT PROJECT 7196 9002 4000 2500 2939 RETURN RECEIPT Bildrs No: 4308980 01/15/2016 CITY OF FORT WORTH Bildrs No.4308980 PUBLIC WORKS DEPT 7196 9002 4000 2500 2939 1000 THROCKMORTON ST FORT WORTH; TX 76102 RE: 27128- UNDERGROUND UTILITY MATERIAL AND SUPPLIES CONTRACT 86 WTR&SWR,VARIOUS LOCATIONS, FORT WORTH,TX Notice is hereby given pursuant to Tex. Govt. Code§2253.041 that FERGUSON ENTERPRISES, INC.,on its behalf and as an agent for its subsidiaries and affiliates has furnished materials or labor consisting of UNDERGROUND UTILITY MATERIAL AND SUPPLIES and related materials or labor pursuant to an agreement with PC CONTRACTORS LLC,00788"27128, PO BOX 470930, FORT WORTH,TX 76147 for the above-referenced job for CITY OF FORT WORTH, 1000 THROCKMORTON ST, FORT WORTH, TX 76102, PUBLIC WORKS DEPT. The materials were delivered and installed during the month(s) of Oct 015. To date, the amount due and unpaid for such labor and/or materials is$7,451.82, which amount is now claimed by this notice. Attached hereto is a sworn statement of account, which is made a part of this claim for all purposes. A copy of the invoices that represent the materials delivered to the project that have not been paid for, may also be attached. FERGUSON ENTERPRISES, INC., on its behalf and as an agent for its subsidiaries and affiliates 2650 S PIPELINE ROAD E 11 FCC TX 76040 817-267-3900 (Zz4k��� Title: BICA Representative 01/15/2016 BICA 1-800 722-2422 Owner:CITY OF FORT WORTH, 1000 THROCKMORTON ST,FORT WORTH,TX 76102,PUBLIC WORKS DEPT Orig Contr:PC CONTRACTORS,PO BOX 470930,FORT WORTH,TX 76147 Surety:PHILADELPHIA INDEMNITY INSURANCE CO, 1 BALA PLAZA RD#100,BALA CYNWYD PA 19004,Bond#PB115098005 34, BOND DEPT Customer:PC CONTRACTORS LLC,00788*27128,PO BOX 470930,FORT WORTH,TX 76147 Job No:27128 Form Rev:01/12 VR A TE 01/15/2016 STATE OF TEXAS STATE GOVERNMENT FORM Sworn Statement of Account A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness,accuracy, or validity of that document. THE STATE OF CALIFORNIA COUNTY OF SAN BERNARDINO BEFORE ME THE UNDERSIGNED AUTHORITY on this day personally appeared VICTOR RODARTE who upon his/her oath,deposed and stated the following: 1) My name is VICTOR RODA.RTE. I am the Agent of the claimant named in the foregoing Notice, and that I am informed and believe the facts herein to be true, and,on that ground,allege that the facts stated in the foregoing Notice are true. 2) In accordance with a contract with PC CONTRACTORS LLC,00788*27128,PO BOX 470930,FORT WORTH,TX 76147,FERGUSON ENTERPRISES,INC.,on its behalf and as an agent for its subsidiaries and affiliates has furnished ERGROUND UTILITY MATERIAL AND SUPPLIES in conuectio ith the building of the N CT 86 WTR&SWR,VARIOUS LOCATIONS, FORT WORT TX. 3) T amount due and unpaid b C ONTRACTORS LLC,00788*27128 for such materials,after lowing for all just and la 1 sets,payments,and credits known to me is$7,451.82,for which a claim is hereby made. This am o t and correct. r FERGUSON EN ,INC.,o its behalf nd as an agent for its subsidiaries and affiliates s y: L� Agent 2650 S PIPELINE ROAD EULESS,TX 76040 817-267-3900 SUBSCRIBED AND SWORN TO(OR AFFIRMED)BEFORE me on this 15 day of January,2016,by VICTOR RODA.RTE, proved to me on the basis of satisfactory evidence to be the person(s)who appeared before me. Seal: ESSIEJONES Signature: M. I Commission*2079271 =16 A NOTARY LTC a -s Notary Public•C211dw daa D z San Bernardino County My Comm.Expires Aug 23,201 B Bildrs No:4308980 S FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Water do Sewer Rehab Contract 86 Unit 2 PROJECT NUMBER: 1964 DOE NUMBER: 7253 WATER PIPE LAID SIZE TYPE OF PIPE LF FIRE HYDRANTS: VALVES(16"OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSrrM: NEW SERVICES: s�WER PIPE LAID SIZE TYPE OF PIPE LF SDR 26 60 PVC '\ 31 sft-rcming 2r L-- -9teel-° Swtl•C-� q i6L Steel -&2-- C900 8" PVC 614 PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW IR 11 S: TRANSPORTATION AND PUBLIC WORDS The City of Fort Worth- 1000 Thcncl mortoa Street•Fort Wordh,TX 76012-6311 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Water&Sewer Rehab Contract 86 Unit 2 PROJECT NUMBER 1964 DOE NUMBER 7253 WATER PIPE LAID SIZE TYPE OF PIPE LF C'900 $" PVC 3674 C900 6" PVC 32 ply ? t) FIRE HYDRANTS: 5 VALVES(16"OR LARGER) 0 PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: SEWER PIPE LAID SIZE TYPE OF PIPE LF SDR 26 36" PVC 9 SDR 26 12" PVC 174 CIPP 12" Fiberglass (,? J = - 415 SDR 35 8" PVC (plus point repairs) 799 Iron 12" DIP 600 Iron 8" DIP 643 Pipe Burst 6"to all HDPE 121 CIPP 6" Fiberglass 1561 PIPE ABANDONED SIZE TYPE OF PIPE LF DB.NSITIFS: NEW SERVICES: TRANSPORTATION_AND PUBLIC WORKS The City of Port worth"1000 Thmctmoroaa Street•Fort Work TX 76022-6311 FORTWORTH REV:=0107 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR CONTRACTOR&PROJECT DATA Name 0fCMftK10r Nmne P.C.Contractors LLC Water&Sewer Rehab Contract 86 Part 2 DOEImpector DOENumber John Crowley 7253 I'R,R'evf Project 11anager 0 Water 0 Waste Water 0 Storm Drainage❑ Pavement Soon Wong l Initial ConrractAmount P—j—f nig"ttla. `'tea $1,179,403,91 Q Simple QQ Routine Q Complex r tnal Contract Amount Date $1,394.325.54 7/2012016 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-E.%;cellent ELEMENT WEIGHT(.:) APPLICABLE(1'/N) RATING(0.4) MA.X SCORE SCORE 1 Submission of Documents 2 Y 1 8 2 2 Public Notifications 5 Y 1 20 5 3 Plans on Site 5 Y 1 20 5 4 Field Supervision 15 Y 60 5 Work Performed 15 Y 2 60 30 6 Finished Product 15 Y 2 60 30 7 Job Site Safety 15 Y 2 60 30 8 Traffic Control Maintenance 15 Y 1 60 15 9 Daily Clean Up 5 Y 1 20 5 10 Citizen's Complaint Resolution 5 Y 2 20 10 11 Property Restoration 5 Y 2 20 10 12 After Hours Response 5 Y 2 20 10 13 Project Completion 5 Y 20 TOTAL ELEMENT SCORE(A) 152 BONUS POINTS(25 Mwimum)(B) TOTAL SCORE(TS) 152 III)CONTRACTOR'S RATING Maxim=Score(MS)=448 or sum of applicable element score maximums which= 448 Rating(ITS/MS] - 100%) 152 / 448 = 34% Performance Category Deficient <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good 2:80%=Excellent Inspector's comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector Signature Contractor Signature DOE Inspectors Superb isor CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS @ The City of Fort Worth•1000 Throck-morton Street-Fort Worth,TX 76012,6311 (817) 392-7941 •Fax:(817)392-7845 FORTWORTH. TRANSPORTATION AND PUBLIC WORMS STATEMENT OF CONTRACT TIME STATEMENT# FINAL STATEMENT# 27 F DOE 7253 NAME OF PROJECT: Contract 86 part 2 Contractor I P.C.Conhactors YEAR; 2016 PROJECT NO.: FINAL INSPECTION DATE 1864 1 WD CD CONTRACT TIME 263 I R PERIOD FROM: 1,--fig. TO: I g:M:62M BEG - M=M I lmvzLonu2q 0 N) WORK ORDER EFFECTIVE: 12ti1,'tR14 1 BEG 1 n MID I nj n 131.49L DAY OF MONTH DAYS REASON FOR DAY OF MONTH DAYS REASON FOR CHARGED DAYS CREDITED CHARGED DAYS CREDITED 1 Fri 0 NA 16 2 Sat 0 NA 17 3 Sun 0 NA 18 4 1 Mon 0 NA 18 5 Tue 0 NA 20 6 Wed 0 NA 21 7 Thu 0 NA 22 8 Fri 0 NA 23 8 Sat 0 NA 24 10 Sun 0 NA 25 11 Mon 0 NA 26 12 Tue 0 NA 27 13 Wed 0 NA 28 14 Thu 0 NA 28 15 Fri 0 NA 30 31 NA Wkn&Hol Wea Utl Oth Not AppbcWA* SAT,SUN,and ViTATHER UTILITIES OTHERS DAYS TOTAL DAYS HOLIDAYS RELOCATE CHARGED THIS PERIOD O 0 0 0 0 0 PREVIOUS PERIOD 0 372 372 TOTAL TO DATE 0 0 0 0 372 372 REMARKS: Substar6W Completion was adveved on December 7,2015...time was stopped effective on the same day. swutwc sk 'omm aoirr ucm Um x 11 6 Q CITY SECRETARY P