HomeMy WebLinkAboutOrdinance 8968,~
ORDINANCE N0, ~ 7 CP
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OP Ederville Road
AND PORTIONS OP SUNDRY OTHE~t STREETS , AVE1Q'VYES AND PUELIC PLACES
IN THE CITY OF FORT WORTH, TEXASa DECLARING THE COIQTRACT WITH
Austin Road Co., & Brown & Blakney IncFOR THE CONSTRUCTION OF
SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMEDy DIRECTING THE
ISSUANCES EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF
SPECIAL ASSESSMENTS LEVIED AFTER GYVING EFFECT TO SUNDRY CREDITS
HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OI° SAID ASSESSI~NTS;
DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE
BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY
COUNCIL OF FORT WORTHS TEXAS9 AND RY FILING THE COMPLETE ORDINANCE
IN APPROPRIATE ORDINANCE RECORDS OF SAID CITYD AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the City of Fort Worths Texasa has heretofore entered into a contract
wrath Austin Road Co., and Brown°& Bl:akney, Inc. a for the maleing and construction of
certain street improvements on the hereinafter described portions of streetsp avenues and
public places in said Citya tom~-it:
Ederville Road From West Property Line of Lot 1-R,
Block 9, Ryanwood North Addition to
East Property Line of Lot 4-R, Block 11,
Ryanwood N6tth Addition, :known and
designated as Project.NO. 029-023174,
Unit 1.
Ederville Road From East Property Line of Lot 17,
Block 3, Hilltop Acres Addition to Sandy
Lane, known and designated as Project
No. 029-023174, Unit II.
Ederville Road From East Property Line of Courtney Oaks
Apartments Addition to Cooks Lane, known
and designated as Project No.~929-023174,
Unit III
Ederville Road From Cooks Lane to ~aair Road, known and
designated as Project N0. 029-023174,
Unit IV-A.
i
~~HEREAS, by sundry proceedings heretofore passad by the City Council of the
City .of Fort Worth, Texas, including Ordinance No. 8582 ~ a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true dwners thereof; and,
'vdHEREAS, the City Council of the City of Fort V~orth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial 3ustice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 8582 , and
WHF.HF.A3, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOb~, THEN~;FORE,
BE IN ORDAINEI? BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and perfomned.
Ii.
{
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed andshall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if arty, are hereby enumerated and itemized as follows:
Ira.
When each of the certificates has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
prices
IVv
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City,
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage s ,, // J~ / (~
PASSED AND APPROVED THIS ~a4~, day of ®V (~UQ~ ,~,~',~ , 19 d.~ ,
APPROVED AS TO FORM AND LEGALITY:
City Attorney
~. ~ ,. ,
PR03ECT NO. 029-023174. UNIT I, EDERVILLE ROAD FROM WEST PROPERTY LINE OF LOT 1-R
BLOCK 9, RYANWOOD NORTH ADDITION TO EAST PROPERTY LINE OF LOT 4-R, BLOCK 11, RYANWOOD
NORTH ADDITION, to be imgroved by construction of seven-inch thick hot-mix asphaltic
concrete pavement on a six-inch thick Bane stabilized .subgrade with seven-inch high
concrete curb and eighteen-inch wide concrete gutter on a forty-eight footjwide roadway.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE
State Department of Highways
& Public Transportation
P. 0. Box 6868
Fort Worth, Texas
76115
SOUTH SIDE
C. Carter Langford 4-R
1417 Pamela Lane
`Fort Worth, Texas
76112
Freddy R. Burklow 3-R
1413 Pamela Lane
Fort Worth, Texas
76112
Laurance L. Priddy 2-R
1409 Pamela Lane
Fort Worth, Texas
76112
Marshall C. Donaho 1-R
1405 Pamela Lane
Fort Worth, Texas
76112
MUSE STREET INTERSECTS
Michael W Shields 1-R
1400 Muse Street
Fort Worth, Texas
76112
531.60'
Interstate Highway I-30
RYANWOOD NORTH ADDITION
11 83.1' Deed Restriction (No Access)
Res. 85.25 Sq. Ft. Driveway $3.18 $271.09
No Assessment
$297.92
11
Res.
11
Res.
11
Res.
9
133.3' Deed Restriction (No Access)
{
82.3' Deed Restriction (No Access)
80' Deed Restriction (No Access)
i10' C/F Contract
No. 4780
(Assessment Paid)
April 1963)
No Assessment
No Assessment
No Assessment
No Assessment
-1-
+r .
PROJECT NO. 029-023174 UNZT I LConi.
TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS)...........S 271.09
TOTAL COST TO CITY OF FORT WORTH ......................$55,879..63
TOTAL ESTIMATED CONSTRUCTION COST .....................$5G,1S0.72
s
- 2-
PROJECT N0. 029-023-174, UNIT II L EDERVILLE ROAD FROM EAST PROPERTY LINE OF LOT 17,
BLOCK 3, HILL TOP ACRES ADDITION TO SANDY LANE, to be improved by construction of seven-inch
thick hot-mix asphaltic concrete pavement on a six-inch thick Lime stabilized subgrade with
seven-inch high concrete curb and eighteea-inch wide concrete gutter on a forty-eight foot
wide roadway. .Six-inch thick concrete driveways will be constructed where specified.
` BLOCK
OWNER LOT ZONING FRONTAGE
NORTH SIDE W. S. SUBLETT SURVEY
State Department of Highways
& Public Transportation
P. 0. Box 6868
Fort Worth, Texas 76115
Sandy Land 3oint Venture- Tr. 3-A
Unitrek Corporation Trustee Com.
C/0 Charles 0. Griffith, Mgr.
4054 McKinney, Suite 310
Dallas, Texas 75204
RATE AMOUNT
187'
Interstate Highway I-30
1143.16' Adjusted to (Depth Factor)
968.16' Pavement $23.21 $22,470.99
968.16' Curb & gutter 5.54 5,363.61
968.16' Storm Drain 14.24 13,786.60
968.16' Preparation 1.04 1,006.89
of R.O.W.
968.16' Top Soil & 2.00 1,936.32
Seeding
968.16' Street Lights 3.72 3,601.56
& Traffic
Markers
$48,165.97
s
SOUTH SIDE
HILL TOP ACRES EAST
Y. M. C.A. of Fort Worth I 1 170' Existing Facilities
(Eastside Branch) C.F.
1004 Macon Street
Fort Worth, Texas 76102
W. S. SUBLETT SURVEY
Sandy Land Joint Venture- Tr. 3-A
Unitrek Corporation Trustee
C/0 Charles 0. Griffith, Mgr.
4054 McKinney, Suite 310
Dallas, Texas 75204
1191.65' Adjusted to (Depth 'Factor)
ASSESSMENT
No Assessment
No Assessment
1146.65' Pavement $23.21 $26,613.75
1106.65' Curb ~ gutter 5.54 6,130.84
114b.65' Storm Drain 14.24 16,328.30
1146.65' Preparation 1.04 1,192.52
of R.O.W.
1146.65' Top Soil & 2.00 2,293.30
Seeding
1146.65' Street Lights 3.72 4,265.54
6 Traffic
Markers
$56,824.25
-3-
fya.
PR03ECT NO 029-023-174, UNIT II, Cont.
TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS)...........$104,990.22
TOTAL COST TO CITY OF FORT WORTH..........•..•.••••••$ 56,806.48
TOTAL, ESTIMATED CONSTRUCTION COST ....................$161,796.70
s
-4-
PROJECT N0. 029--023-174, UNIT III, EDERVILLE ROAD FROM EAST PROPERTY LINE OF COURTNEX OAKS
A~ARTI~ENTS ADDITION TO COOKS LANE, to be improved by construction of seven-inch thick hot-
mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch
high concrete curb and eighteen-inch wide concrete gutter on a forty-eight foot wide roadway.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE E. S. JOHNSON SURVEY
First Continental ~ Tr. 2-A 1642.27' Adjusted to ( Drainage Easement)
Enterprises, Inc. Com. 1584.53' Pavement $25.98 $41,166.09
P. 0. Box 401468 1584,53' Curb & Gutter 5.54 8,778.30
Dallas, Texas 1584.53' Storm Drain 22.77 36,079.75
75240 1584.53' Preparation 2.80 4,436.b8
of R.O.W.
1584.53' Top Soil & 3.03 4,801.13
Seeding
1584.53' Street Lights 2.66 4,214.85
& Traffic
Markers
SOUTH SIDE
First Continental Tr. 2-A 648.68' Adjusted to (Drainage Easement)
Enterprises, Inc. C-Apt. 590.94' Pavement $25.98 $15,352.62
P. 0. Box 401468 570.94' Curb & Gutter 5.54 3,163.01
Dallas, Texas 590.94' Storm Drain 22.77 13,455.70
75240 590.94' Preparation 2.80 1,654.63
of R.O.W.
590.94' Top Soil & 3.03 1,790.55
Seeding
590.94' Street Lights 2.66 1,571.90
& Traffic
Markers
George Helm & Tr. 2-B 990' Pavement $25.98 $25,720.20
J. H. Williams Res. 980' Curb 6 Gutter 5.54 5,429.20
6200 N. Central Expressway 990' Storm Drain 22.77 22,542.30
Dallas, Texas 990' Preparation 2.80 2,772.00
75206 of R.O.W.
990' Top Soil & 3.03 2,999.70
Seeding
990' Street Lights & 2.66 2.633.40
Traffic Markers
TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) ..............$198,562.01
TOTAL COST TO CITY OF FORT WORTH .........................$ 84,628.60
TOTAL ESTIMATED CONSTRUCTION COST ........................$283,190.61
$99,476.80
$36,988.41
$62,096.80
-5-
PROJECT N0. 029-023174, .UNIT IV-A, EDERVILLE ROAD PROM COOKS L ANE 20 STAIR ROAD, to be
improved by construction of seven-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide con-
crete gutter on a forty-eight foot wide roadway.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
,
NORTH SIDE T. K. HAMBY SURVEY
L. W. & C Scherpbier Tr. 2-B 1,213.33' Adjusted to (Draina ge Easement)
and A. Ph. S P.C. Pabst Com. 1,161.57' Pavement $24.91 $28,934.71
C/0 James L. Brannon, 1,141.57' Curb & Gutter b.95 7,933.91
Attorney 1,161.57' Storm Drain 18.72 21,744.59
2700 Bryan Tower 1,161.57' Preparation 1.91 2,218.60
2001 Bryan Street of R.O.W.
Dallas, Texas 75201 1,161,57' Top Soil & 3.12 3,624.10
Seeding
1,161.57' Street Light s 2.69 3,124.62
& Traffic
Markers
1,161 57' Bridge 25.50 29,620.04
$97,200.57
Randaiwood Investment Tr. 1-A 1,080.3' Adjusted to (Bridge & Drainage Easement)
Company I-Ind. 738' Pavement $24.91 $18,383.58
P. 0. Box 818 698' Curb & Gutte r 6.95 4,851.10
Abilene, Texas 79604 738' Storm Drain 18.72 13,815.36
738' Preparation 1.91 1,409.58
o~ R.O.W.
738' Top Soil & 3.12 2,302.56
Seeding
738' Street Light s 2.69 1,985.22
& Traffic
Markers
738' Bridge 25 50 18,819.00
$61,566.40
Kill J. Elliot & Tr. 1 288.59' No Access (Bridge Embankment)
Tommy Taylor I-Ind.
X001 Brentwood Stair Road
ort Worth, Texas 76112
No Assessment
-6-
,~,-
,..~
.
3
f
PROJECT N0. 029-023174
.UNIT IV-A, Cont.
BLOCK
DOWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE D. C. HARRISON SURVEY
Randalwood Investment Tr. 2-C 1,786.42' Pavement $24.91 $44,499.72
Company Com. 1,766.42' Curb & Gutter 6.95 12,276.62
P. 0. Box 818 1,786.42' Storm Drain 18.72 33,441.78
Abilene, Texas 79604 1,786.42' Preparation 1.91 3,412.06
of R.O.W.
1,786.42' Top Soil & $ 3.12 5,573.b3
Seeding
1,786.42' Street Lights
& Traffic
Markers
1,786.42' Bridge 25.50 45,553.71
$149,562.99
BENTLEY VILLAGE PKWY. INTERSECTS
Randalwood Investment Tr. 2-C 739.05' Pavement $24.91 18,409.74
Company Com. 739.05' Curb & gutter 6.95 5,136.40
P. 0. Box 818 739.05' Storm Drain 18.72 13,835.02
Abilene, Texas 79604 739.05' Preparation 1.91 1,411.59
of R.O.W.
739.05' Top Soil & 3.12 2,305.84
Seeding
739.05' Street Lights 2.69 1,988.04
& ~Yaffic
Markers
739.05' Bridge 25.50 18,845.78
$ 61,932.41
SOUTH SIDE STAIR WOODS ADDITION
Darrel Orebaugh 1 1 96' Pavement 8.55 820.80
8500 Brentwood Stair Road Res. 96' Curb & Gutter 6.95 667.20
Fort Worth, Texas 76112 85.25 Sq, Ft. Driveway 3.18 271.09
$ 1,759.09
D. C. HARRISON SURVEY
D. G. Reames Tr. 2-B 248' Pavement 8.55 2,120.40
5001 Brentwood Stair Road Res. 248' Curb ~ Gutter 6.95 1,723.60
Fort Worth, Texas 76112 $ 3,844.00
-7-
a~i*.
I~
PROJECT N0. 029-023174 UNIT IV-A~ Cont.
BLOCK
OWNER LOT ZONING FRONTAGE
SOUTH SIDE
STAIR ROAD CONNECTZON INTERSECTS
Randalwood Investment Tr. 2-C
Company C-Apt.
P. 0 Box 818
Abilene, Texas 79604
BENTLEY VILLAGE PARKWAY INTERSECTS
Randalwood Investment Tr. 2-C
Company I-Ind.
P. 0. Box 818
Abilene, Texas 79604
Bill J. Elliott & Tr. 1
Tommy Taylor I-Znd.
5001 Brentwood Stafr Road
Fort Worth, Texas 76112
D. C HARRISON SURVEY
RATE AMOUNT ASSESSMENT
296.1° Pavement $24.91
296.1' Curb & gutter 6 95
296.1' Storm Drain 18.72
296.1' Preparation 1.91
of R.O.W.
296.1.' Top Soil & 3.12
Seeding
296.1' Street Lights 2.69
b Traffic
Markers
296.1' Bridge 25.50
$ 7,375.85
2,057,90
5,542.99
565.55
923.83
796.51
7,550.55
$ 24,813.18
1,726.34' Pavement $24.91 $43,003.13
1,646.34' Curb & gutter 6.95 11,442.06
1,726.34' Storm Drain 18.72 32,317.08
1,726 34' Preparation 1.91 3,297..31
of R.O.W.
1,726.34' Top Soil & 3.12 5,386.18
Seeding
1,726.34° Street Lights 2.69 4,643 85
& Traffic
Markers
1,726.34' Bridge 25.50 44,021.67
$144,111.28
T. K. HAMBY SURVEY
505.02' No Access (Bridge & Embankment)
No Assessment
-8-
.~ _
. r:
;~ -
I
PROJECT N0. 029-023I74,
UNIT IV-A, Cont.
BLOCK
'OWNER LOT 20NING FRONTAGE RATE AMOUNT, ASSESSMENT
SOUTH SIDE T. K. HAMBY SURVEY
Ranc~l wood Investment ~ Tr. I-A 877.49' Adjusted to (Bridge & Drainage Easement)
Company I-Ind. 712.49' Pavement $24.91 $17,748.13
P. 0. Box 818 692.49' Curb & Gutter 6..95 4,812 81
Abilene, Texas 79604 712.49' Storm Drain 18.72 13,337.81
712.49' Preparation 1.91 1,360.86
~f R.O.W.
712.49' Top Soil & 3.12 2,222.97
Seeding
712.49' Street Lights 2.69 1,916.60
& Traffic
Markers
712.49' Bridge 25.50 18,168.50
$59,567.68
L. W. & C. Scherpbier & Tr. 2-A 1,213.54' Adjusted to (Drainage Easement)
A. Ph. & P.C. Patist CR-Apt. 1,161.78' Pavement $24.91 $28,939.94
C/0 James L. Brannon, 1,151.78' Curb & gutter 6.95 8,004.87
Attorney 1,161.78' Storm Drain 18.72 21,748.52
2700 Bryan Tower 1,161.78' Preparation 1.91 2,219.00
2001 Bryan Street of R.O.W,
Dallas, Texas 75201 1,161.78' Top Soil & 3.12 3,624.75
deeding
1,161.78' Street Lights 2.69 3,125,19
& Traffic
Markers
1,161.78' Bridge 25.50 29,625.39
$97,287.66
* TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS)........ .$ 701, 645.26
* TOTAL COST TO CITY OF FORT WORTH ................... .$ 311, 768.02
* TOTAL ESTIMATED CONSTRUCTION COST ...................$1,013,413.28
* - Includes Unit IV-B, Bridge over
Cottonwood Creek in Unit IV-A
ALL UNITS:
TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS).........$1,005,468.58
TOTAL COST TO CITY OF FORT WORTH ....................$ 509,Oa2.73
TOTAL ESTIMATED CONSTRUCTION COST ...................$1,514,551.31
-~-
WIA fR Aflfxl
*~~ pity ~of wort W®~-th, ~e.~a~
C17Y MAMAGER.Z ~/~,ry ~o ~ ,/~ ~j (~ rn ~ ,~1~j (~ ~y~-~ ~ n ,dry/
/1CCdU11TING 2 ~ V'11 IIAi ® U WV l/ IL~ ~1./~ (W~~II.i (L~ ~1../®U I/ lV~ lli1V~~~~.W ~~®
J4~5PU
~'~1~T10"'_ . _
yrvo4K:
DATE REFERENCE SUBJECT r iivcu. rnirat.LVt PAGE
NUMBER Ederville Road Units 1,2,3, & 4A 2
11/10/83 **FP-1853 (Warren Lane to Stair Road) 1of
Final Council action is requested on the subject project.
~;.~
_ ~
=~
Project Description
Project Name:
Project Number:
Contract Number:
Contractor:
Contract Awarded
Work Order Dated
Work Order Effective On or Before
Work Began:
Contract Time Began:
Project Substantially Complete and
Final Inspection Made:
Punch List Completed:
Contractor Affidavit Received:
Contract Time Provided
Contract Time Used:
Project Cost
Original Bid Price:
Final Contract Price
Partial Payments Previously .Made:
Amount: { ~,~, -,
Final Payment Due: ~~. `
Ederville Road Units 1,2,3, & 4A
(Warren Lane to Stair Road)
029-023174
12500
Austin Road Company
June 1, 1982, (M&C C-6339)
July 26, 1982
August 2, 1982
July 20, 1982
July 20, 1982
July 21, 1983
August 12, 1983
September 27, 1983
170 Working Days
170 Working Days
$1,096,655.35
$1,079,584.64
12
$1,025,605.41
$ 53,979.23
Deviation from Bid Price
Final measured quantities at contract unit prices yield an earned total price
for this contract of; $1,079,584.64 which is $17,070.71 (1.56%) under the bid
price. The underrun is the result of differences between quantities estimated
for the contract documents and quantities actually used to complete the work.
Financing
Sufficient funds are available for the recommended final payment to be made
from the Project No. 029-023174-00 account.
Compliance with Specifications
The project has been completed in accordance with the requirements of the
contract.
1 f i/~
.:;~'
r+
DATE REFERENCE
NUMBER SUBJECT
Ederville Road Units 1,2,3, &
4A PAGE f
-2 2
~
11/10/83
**FP-1853 Warren Lane to Stair Road
t ~ '
---°r_~ _
Recommendation
It is recommended that the above project be accepted by the adoption of an
ordinance and final payment of $53,979.23 be made to Austin Road Company.
DAI:js
F
APPROVED BY
c
` ITY COUI~C~fL
.~
!~~ ~~~
0#
a~
~
try
~~
SUBMITTED FOR THE DISPOSITION BY'COUNCIL. PROCESSED BY
CITY MANAGER'S
OFFICE 'BY ^ APPROVED
-~ ^ OTWER (DESCRIBE)
ORIGINATVNG Gar L. Santerre
DEPARTMENT HEAD• y
CITY SECRETARY
I •
FOR ADDITIONAL INFORMAT.Ip'N• Massey
WWlilril Ext. 7910 ~~/!/ ~ DATE
CONTACT
`~"~
_°