Loading...
HomeMy WebLinkAboutContract 26338 8 Cirf SECREUM D. .E. TLE CONTRACTOR'S � CONTRACT DOCUMENTS AND CONSTRUCTION'S CCff SPECIFICATIONS cuEw DEPARTMENT FOR CITY SECRETARY b CONTRACT NO. cll5 2000 MAIN 21 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROLP 7, CONTRACT 3), PART 9 SEWER PROJECT NO. PS46-070460410310 UNIT I - D.O.E. PROJECT NO. 2956 UNIT 2 - D.O.F.PROJECT NO. 2957 0, O. '? CITY OF FORT WORTH,TEXAS KENNETH BARR BOB TERRELL N MAYOR CITY MANAGER DALE FISSELER, P.E. DIRECTOR,WATER DEPARTMENT HUGO A. MALANGA, P.E. DIRECTOR OF TRANSPORTATION AND PUBLIC WORKS B. DOUGLAS RADEMAKER, P.E, DIRECTOR, DEPARTMENT OF ENGINEERING PREPARED BY Coo tfl H 0 E .SSOCiATES}_INC. FORT WORTH,TEXAS 2000 a a J• CY.RIS ERIC 3RQOK5•� 67657 ell IS ��on� f�rAJA b qua City of Fort Worth, Texas "near andCouncil Communication DATE REFERENCE NUMBER LOG NAME PAGE 10/17/00 **C-18301 1 30M-21 1 of 3 SUBJECT AWARD OF CONTRACT TO CONATSER CONSTRUCTION, INC. FOR MAIN 21 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS GROUP 7, CONTRACT 3 PART 9, UNITS 1 AND 2 RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract with Conatser Construction, Inc. in the amount of $727,833.75 for Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7, Contract 3) Part 9, Units 1 and 2. DISCUSSION: On August 12, 1997 (M&C C-16217), the City Council authorized the City Manager to execute an engineering agreement with Wade & Associates, Inc. to prepare plans and specifications for the reduction of inflow/infiltration in the sanitary Main 21 drainage area. This project is part of the City's Integrated Wet Weather Wastewater Management Program to comply with an administrative order from the U.S. Environmental Protection Agency to eliminate sewer overflows from the City's wastewater collection system. The Unit 1 project consists primarily of the replacement of the following sanitary sewer laterals and main: • L-307 Beginning from a point located 30 feet east and 65 feet north of the New York Avenue/Myrtle Street intersection, northerly 105 feet along New York Avenue, then easterly 1,100 feet, then northerly 710 feet in the alley between Illinois Avenue and New York Avenue; and • L-315 Beginning from the Irma Street/New York Avenue intersection, easterly 600 feet along Irma Street to Evans Avenue; and • L-1475 Located in the alley between Bransford Street and Illinois Avenue, from Magnolia Avenue to Morphy Street; and • Main A Beginning from a point located 100 feet south of the New York Avenue/Oleander Street, southerly 240 feet along New York Avenue, then easterly 650 feet along Magnolia Avenue, then northerly 200 feet then easterly 910 feet. This project was advertised for bid on July 20 and 27, 2000. On August 17, 2000, the following bids were received: City of Fort Worth, Texas "rigor and Coun"'I Communication DATE REFERENCE NUMBER LOG NAME PAGE 10/17/00 **C-18301 30M-21 2 of 3 SUBJECT AWARD OF CONTRACT TO CONATSER CONSTRUCTION, INC. FOR MAIN 21 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS GROUP 7, CONTRACT 3 PART 9, UNITS 1 AND 2 BIDDER AMOUNT TIME OF COMPLETION Conatser Construction, Inc. $403,604.50 140 Calendar Days Whizcon Utilities, Inc. 424,709.00 Jackson Construction, Inc. 426,214.25 Davila Construction, Inc. 473,269.25 R.A. Development, Inc. 482,217.00 William J. Schultz, Inc. d/b/a Circle °C" Construction Company 487,436.00 Kebo Services, Inc. 512,794.55 Southern Paradise Construction, Inc. 513,098.00 Long Construction & Engineering, Inc. 522,557.95 Cleburne Utility Construction Company, Inc. 526,310.75 The Unit 2 project consists primarily of the replacement of the following sanitary sewer laterals: • L-305 Beginning from a point located 70 feet east of the Magnolia Avenue/IH-35 north bound access road intersection, easterly along Magnolia Avenue to New York Avenue; and • L-308 Located in the alley between New York Avenue and Driess Street from Magnolia Avenue to Maddox Avenue; and • L-309 Located in the alley between Driess Street and Stewart Street from Magnolia Avenue to Myrtle Street; and • L-312 Located in the alley between Evans Avenue and Missouri Avenue from Magnolia Avenue to Maddox Avenue. This project was advertised for bid on July 20 and 27, 2000. On August 17, 2000, the following bids were received: BIDDER AMOUNT TIME OF COMPLETION Conatser Construction, Inc. $324,229.25 120 Calendar Days Whizcon Utilities, Inc. 388,708.00 Southern Paradise Construction, Inc. 392,091.00 Davila Construction, Inc. 399,527.75 Long Construction & Engineering, Inc. 421,753.65 William .h Schultz, Inc. d/b/a Circle °C Construction Company 423,761.00 M.E. Burns Construction, Inc. 425,527.50 Rhino Utility Construction, Inc. 435,803.75 list continued on the next page) City of Fort Worth, Texans "01yor And coundt communication DATE REFERENCE NUMBERLOG NAME PAGE 10/17/00 **C-18301 30M-21 3 of 3 SUBJECT AWARD OF CONTRACT TO CONATSER CONSTRUCTION, INC. FOR MAIN 21 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS GROUP 7, CONTRACT 3 PART 9, UNITS 1 AND 2 BIDDER AMOUNT TIME OF COMPLETION R.A. Development, Inc. 438,912.00 Kebo Services, Inc. 447,200.31 The proposed improvements consist of the replacement of 8,430 linear feet of various size sanitary sewer lines ranging in diameter from 8 to 15-inches. The project is located in COUNCIL DISTRICT 8, Mapsco 77K. Since Conatser is the low bidder on both units, construction of both units will begin simultaneously and the contractor shall be allowed a total of 140 calendar days to complete construction of both units as stipulated in the project contract documents. In addition to the contract cost, $52,000.00 (Unit 1: $29,000.00 and Unit 2: $23,000.00) is required for inspection and survey and $38,000.00 (Unit 1: $21,000.00 and Unit 2: $17,000.00) is required for project contingencies. Conatser Construction, Inc. is in compliance with the City's M/WBE Ordinance by committing to 12% M/WBE participation on Unit 1 and 11% M/WBE participation on Unit 2, and documenting good faith effort. Conatser Construction, Inc. has identified several subcontracting and supplier opportunities on the above listed projects, however, the M/WBE's contacted in the areas identified either did not respond or did not submit the lowest bids. The City's goal on this project is 20% for Unit 1 and 18% for Unit 2. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the State Revolving Fund-Sewer. MGJ Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) Mike Groomer 6140 APPROVED Originating Department Head: CITY COUNCIL A.Douglas Rademaker 6157 (from) OCT 17 20M PE42 541200 070420418260 $403,604.50 � }} Additional Information Contact: PE42 541200 070420418270 $324,229.25 city Secretary of the A.Douglas Rademaker 6157 city of Fort Worth,Texas Aug,-15-00 08:45 Wade & Assoc i ates ,.Inc- 817 335 1729 P-02 ADDENDUM NO. 1 TO THE PLANS,SPECIFICATIONS AND CONTRACT DOCUMENTS CITY OF FORT WORTH PROJECT MAIN 21 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 7, CONTRACT 3), PART 9 SEWER PROJECT NO. PS46-070460410310 UNIT 1 -D.O.E. PROJECT NO. 2956 UNIT 2 - D.O.E. PROJECT NO. 2957 UNIT 3- D.O.E. PROJECT NO. 2958 UNIT 4- D.O.E. PROJECT NO. 2959 Prospective bidders are hereby notified of the following changes to the Project Construction Documents: 1, The Part B Proposal City of Fort Worth Minority and Women Business Enterprise Specifications Special Instructions for Bidders for Units 1, 2, 3 and 4 have been revised by the City of Fort Worth M/WBE Office. See attached. oR OK °K 2. The MlWBE Project Goals have been revised for Units 2, 3 and 4 to 18%, 16°x, and 14%, respectively. See attached ficial Instructions for Bidders Forms. Please note these changes and initial the change on the existing MBE/WBE Forms contained in the contract documents. at- o r- 3. 3. In the Part B Proposal Section for Main 21 Part 9, Unit 3, Bid item 9 and item 13 should be based on a price per linear foot basis (L.F.) and not on a per each (EA.) basis as shown. Please reflect this change and initial it on the existing Part B Proposal pages Part 9- Unit 3(3) and (4). This addendum forms apart of the Contract Documents and modifies the original Notice to Bidders. A P 9 signed copy of this addendum shall be attached to the proposal at the time of bid submittal. Bidders shall also acknowledge receipt of the Addendum in the space provided in the Bid Form. Failure to acknowledge receipt of the Addendum may subject bidder to disqualification. SCHEDULED BID DATE: August 17, 2000 DATE ADDENDUM ISSUED: August 14, 2000 P' RECEIPT ACKNOWLEDGED: DEPARTMENT OF ENGINEERING Cones tse►- eohsfr By: 7o h It, Gi Rick Trice, P.E. 8�rt�i ovo Manager, Consultant Services Page 1 08/14/00 Aug(-15-00 08:45 Wade & Associates, Inc. 817 335 1729 P.03 Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3), Part 9, UNIT 1,DOE No.2956 City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY ff the total dollar value of the contract Is $25,000 or more, the M/WBE goal Is applicable. If the total dollar value of the contract is less than$25,000,the MIWBE goal Is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. The objective of the Policy is to increase the use of M/WBE firms to a level comparable to the availability of M/WBEs that provide goods and services directly or indirectly to the City. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. M/WBE PROJECT GOALS The City's MBEA BE goal on this project is 20%of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of $25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal, or; 2. Good Faith Effort documentation,or; 3. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. M/WBE Utilization Form, if goal received by 5:00 p.m.,five(5)City business days after the is met or exceeded: bid opening date,exclusive of the bid opening date. 2.Good Faith Effort Form and MIWBE received by 5:00 p.m.,five(5)City business days after the Utilization Form, if participation is bid opening date,exclusive of the bid opening date. less than stated goal: 3.Good Faith Effort Form if no received by 5:00 p.m.,five(5)City business days after the participation: bid opening date,exclusive of the bid opening date. 4. Prime Contractor Waiver Form: received by 5:00 p.m.,five(5)City business days after the bid opening date,exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS. Any questions,please contact the M/WBE Office at(817) 871-6104. ADDENDUM No.1,Issued 5/14/2000 Rev.6/19/00 Augl-15-00 08:45 Wade & Associates , Inc. 817 335 1729 P.04 Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3),Part 9, UNIT 2,DOE No.2957 Cit of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract Is $25,000 or more, the UIWBE goal Is applicable. If the total dollar value of the contract Is less than$25,000,the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. The objective of the Policy is to increase the use of M/WBE firms to a level comparable to the availability of M/WBEs that provide goods and services directly or indirectly to the City. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. M/WBE PROJECT GOALS The City's MBE/WBE goal on this project is 18%of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal,or; 2. Good Faith Effort documentation,or; 3. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. MANBE Utilization Form,if goal received by 5:00 p.m.,five(5)City business days after the is met or exceeded: bid opening date,exclusive of the bid opening date. 2.Good Faith Effort Form and MlWBE received by 5:00 p.m.,five(5)City business days after the Utilization Form,if participation is bid opening date,exclusive of the bid opening date. less than stated goal: 3. Good Faith Effort Form if no received by 5:00 p.m.,five(5)City business days after the participation: bid opening date,exclusive of the bid opening date. 4.Prime Contractor Waiver Form: received by 5:00 p.m.,five(5)City business days after the bid opening date,exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS. Any questions, please contact the M/WBE Office at(817)871-6104. ADDENDUM No.1,Issued W1412000 Rev.6/19/00 Aug-15-00 08:46 Wade & Associates , Inc. 817 335 1729 P.05 Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3), Part 9, UNIT 3,DOE No.2958 City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is $25,000 or more, the M/WBE goal Is applicable. If the total dollar value of the contract is less than$25,000,the M/WBE goal Is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. The objective of the Policy is to increase the use of M/WBE firms to a level comparable to the avalability of M/WBEs that provide goods and services directly or indirectly to the City. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. M/WBE PROJECT GOALS The City's MBE/WBE goal on this project is 16%of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's MIWBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal,or; 2. Good Faith Effort documentation,or; 3. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. M/WBE Utilization Form,if goal received by 5:00 p.m.,five(5)City business days atter the is met or exceeded: bid opening date,exclusive of the bid opening date. 2.Good Faith Effort Form and M/WBE received by 5:00 p.m.,five(5)City business days after the ` Utilization Form,if participation is bid opening date,exclusive of the bid opening date. less than stated goal: 3. Good Faith Effort Form if no received by 5:00 p.m.,five(5)City business days after the participation: bid opening date,exclusive of the bid opening date. 4. Prime Contractor Waiver Form: received by 5:00 p.m.,five(5)City business days after the bid opening date,exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY-S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS. Any questions, please contact the M/WBE Office at(817)871-6104. ADDENDUM No.1,Issued 8/14/2000 Rev.6/19/00 Auv-15-00 08:46 Wade & Associates, Inc. 817 335 1729 P.06 Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3),Part 9, UNIT 4,DOE No.2959 City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is 525,000 or more,the MMfBE goal is applicable. If the total dollar value of the contract Is less than$25,000,the MIWBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. The objective of the Policy is to increase the use of M/WBE firms to a level comparable to the availability of M/WBEs that provide goods and services directly or indirectly to the City. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. MIWBE PROJECT GOALS The City's MBE/WBE goal on this project is 14%of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal,or; 2. Good Faith Effort documentation,or; 3. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times altocaied, in order for the entire bid to be considered responsive to the specifications. 1.M/WBE Utilization Form,if goal received by 5:00 p.m.,five(5)City business days after the is met or exceeded: bid opening date,exclusive of the bid opening date. 2. Good Faith Effort Form and M/WBE received by 5:00 p.m.,five(5)City business days after the Utilization Form,if participation is bid opening date,exclusive of the bid opening date. less than stated goal: 3. Good Faith Effort Form if no received by 5:00 p.m.,five(5)City business days after the participation: bid opening dais, exclusive of the bid opening date. 4. Prime Contractor Waiver Form: received by 5:00 p.m.,five(5)City business days after the bid opening date,exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S MIWBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS. Any questions,please contact the M/WBE Office at(817)871-6104. ADDENDUM No.1,Issued 6/14/2000 Rev.6/19/00 CONTRACT DOCUMENTS AND SPECIFICATIONS FOR 2000 MAIN 21 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 7, CONTRACT 3), PART 9 SEWER PROJECT NO. PS46-070460410310 UNIT 1 - D.O.E. PROJECT NO. 2956 UNIT 2 - D.O.E. PROJECT NO. 2957 UNIT 3 - D.O.E. PROJECT NO. 2958 UNIT 4 - D.O.E. PROJECT NO. 2959 CITY OF FORT WORTH, TEXAS KENNETH BARR BOB TERRELL MAYOR CITY MANAGER DALE FISSELER, P.E. DIRECTOR, WATER DEPARTMENT HUGO A. MALANGA, P.E. DIRECTOR OF TRANSPORTATION AND PUBLIC WORKS A. DOUGLAS RADEMAKER, RE, DIRECTOR, DEPARTMENT OF ENGINEERING PREPARED BY [UHUE & ASSOCIATES, INC. FORT WORTH, TEXAS 2000 TABLE OF CONTENTS PART A Notice to Bidders Detailed Notice to Bidders Special Instructions to Bidders PART B City of Fort Worth Minority/Women Business Enterprise Specifications Proposal PART C General Conditions Supplementary Conditions PART D > Special Conditions Additional Special Conditions State Revolving Fund (SRF) Requirements PART E Specifications Easements Permits PART F Certificate of Insurance Contractor Compliance with Worker's Compensation Law Bonds a. Payment Bond b. Performance Bond C. Maintenance Bond PART G Contract PART H Plans (Details) Figures lip in m PART A - NOTICE TO BIDDERS DETAILED NOTICE TO BIDDERS ,� SPECIAL INSTRUCTIONS TO BIDDERS NOTICE TO BIDDERS Sealed Proposals for the following: Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7, Contract 3),Part 9 Sewer Project No. PS46-070460410310 UNIT 1 -D.O.E. Project No.2956 UNIT 2 -D.O.E. Project No. 2957 UNIT 3 -D.O.E. Project No. 2958 UNIT 4-D.O.E. Project No. 2959 Including: UNIT 1: The construction of 1,558 L.F. 8-Inch PVC Sanitary Sewer, 603 v L.F. 8-Inch C900 (DR18) PVC Sanitary Sewer Pipe, 100 L.F. 8- Inch Sanitary Sewer By Short Bore, 56 L.F. 8-Inch CL 51 DI Sanitary Sewer By Other Than Open Cut, 19 L.F. 10-Inch CL 51 DI Sanitary Sewer By Short Bore, 20 L.F. 12-Inch CL 51 DI Sanitary Sewer, 706 L.F. 12-Inch PVC Sanitary Sewer, 110 L.F. 12-Inch Sanitary Sewer By Short Bore, 893 L.F. 15-Inch PVC Sanitary Sewer, 19 Manholes,97 Service Reconnects. UNIT 2: The construction of 2,997 L.F. 8-Inch PVC Sanitary Sewer, 20 L.F. 8-Inch CL 51 DI Sanitary Sewer, 432 L.F. C900 (DR18) PVC Sanitary Sewer, 205 L.F. 8-Inch Sanitary Sewer by Short Bore, 70 L.F. 8-Inch CL 51 DI Sanitary Sewer by Other Than Open Cut, 617 L.F. 10-Inch C900 (DR18) PVC Sanitary Sewer, 20 L.F. 10- Inch Sanitary Sewer By Short Bore, 16 Manholes, 180 Service Reconnects UNIT 3: The construction of 50 L.F. 6-Inch PVC Sanitary Sewer, 922 L.F. 8- Inch PVC Sanitary Sewer, 79 L.F. 8-Inch CL 51 DI Sanitary Sewer, 420 L.F. 8-Inch C900 (DR18) PVC Sanitary Sewer, 432 L.F. 12-Inch Pipeline Rehabilitation by CIDP or FAFP, 13 Manholes, 35 Service Reconnects UNIT 4: The construction of 1,370 L.F. 8-Inch PVC Sanitary Sewer, 428 L.F. 8-Inch C900 (DR18) PVC Sanitary Sewer, 85 L.F. 8-Inch CL 51 DI Sanitary Sewer, 235 L.F. 8-Inch Sanitary Sewer By Short Bore, 110 L.F. 8-Inch CL 51 DI Sanitary Sewer By Other Than Open Cut, 181 L.F. 8-Inch to 8-Inch I.D. HDPE Sanitary Sewer by Pipe Enlargement, 17 Manholes, 77 Service Reconnects Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth,Texas, will be received at the Purchasing Office until 1:30 p.m., August 17, 2000, and then publicly opened and read aloud at 2:00 p.m. Drawings, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth,Texas. A fifty dollar($50.00) refundable deposit is required for the first set of documents and additional sets may be purchased for a non-refundable basis for fifty dollars ($50.00). These documents contain additional information for prospective bidders. A pre-bid conference will not be held. For additional information,contact Chris E.Brooks, P.E.,at the offices of Wade &Associates, Inc., (817)451-2820 or John Boyer, DOE Project Manager at the City of Fort Worth, (817) 332- 5474 ext. 37. Advertising Dates: July 20, 2000 July 27, 2000 Fort Worth,Texas DETAILED NOTICE TO BIDDERS Sealed Proposals for the following: Main 21 Drainage Area, Sanitary Sewer System Rehabilitation and Improvements Y (Group 7, Contract 3), Part 9 Sewer Project No. PS46-070460410310 UNIT 1 -D.O.E. Project No. 2956 UNIT 2 -D.O.E. Project No. 2957 UNIT 3 -D.O.E. Project No. 2958 UNIT 4-D.O.E. Project No. 2959 Including: UNIT 1: The construction of 1,558 L.F. 8-Inch PVC Sanitary Sewer, 603 L.F. 8-Inch C900 (DR18) PVC Sanitary Sewer Pipe, 100 L.F. 8-Inch Sanitary Sewer By Short Bore, 56 L.F. 8-Inch CL 51 DI Sanitary Sewer By Other Than Open Cut, 19 L.F. 10-Inch CL 51 DI Sanitary Sewer By Short Bore, 20 L.F. 12-Inch CL 51 DI Sanitary Sewer, 706 L.F. 12-Inch PVC Sanitary Sewer, 110 L.F. 12-Inch Sanitary Sewer By Short Bore, 893 L.F. 15-Inch PVC Sanitary Sewer, 19 Manholes,97 Service Reconnects. UNIT 2: The construction of 2,997 L.F. 8-Inch PVC Sanitary Sewer, 20 L.F. 8-Inch CL 51 DI Sanitary Sewer,432 L.F. C900 (DR 18) Sanitary Sewer, 205 L.F. 8-Inch Sanitary Sewer by Short Bore, 70 L.F. 8-Inch CL 51 DI Sanitary Sewer by Other Than Open Cut, 617 L.F. 10-Inch C900 (DR18) PVC Sanitary Sewer, 20 L.F. 10-Inch Sanitary Sewer By Short Bore, 16 Manholes, 180 Service Reconnects UNIT 3: The construction"of 50 L.F. 6-Inch PVC Sanitary Sewer, 922 L.F. 8-Inch PVC Sanitary Sewer, 79 L.F. 8-Inch CL 51 DI Sanitary Sewer, 420 L.F. 8- Inch C900 (DR18) PVC Sanitary Sewer, 432 L.F. 12-Inch Pipeline Rehabilitation by CIDP or FAFP, 13 Manholes, 35 Service Reconnects UNIT 4: The construction of 1,370 L.F. 8-Inch PVC Sanitary Sewer, 428 L.F. 8-Inch C900 (DR18) PVC Sanitary Sewer, 85 L.F. 8-Inch CL 51 DI Sanitary Sewer, 235 L.F. 8-Inch Sanitary Sewer By Short Bore, 110 L.F. 8-Inch CL 51 DI Sanitary Sewer By Other Than Open Cut, 181 L.F. 8-Inch to 8-Inch I.D. HDPE Sanitary Sewer by Pipe Enlargement, 17 Manholes, 77 Service Reconnects , Included in the above will be all other items of construction as outlined in the Drawings and Specifications. Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth,Texas, will be received at the Purchasing Office until 1:30 p.m., August 17, 2000, and then publicly opened and read aloud at 2:00 p.m. Drawings, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street,Fort Worth,Texas. A fifty dollar($50.00) refundable deposit is required for the first set of documents and additional sets may be purchased on a non-refundable basis for fifty dollars ($50.00). These documents contain additional information for prospective bidders. All bidders will be required to comply with provision 5159 of "Vemon's Annotated Civil Statutes"of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400(Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. A pre-bid conference will not be held. AWARD OF CONTRACT: The City reserves the right to reject any and/or all bids and waive any and/or all irregularities. No bid may be withdrawn until the expiration of sixty(60)days from the date bids are opened. The award of the contract, if made, will be within sixty (60)days after the opening of bids, but in no case will the award be made until all necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the contract. SUBMISSION OF BIDS: This document is designed as four(4)separate contract documents and shall not be construed as being a single contract. The proposal sections are provided as four(4) individual proposals with four(4) individual M/WBE specifications and are arranged in units to allow prospective bidders to submit bids on one unit, any or all units. Award of contract(s), if made, shall be to the responsive low bidder for each individual unit. If a contractor is the responsive low bidder on two or more units, then a set of contract documents consisting of all applicable units will be created and one single award of contract shall be made. The Contractor shall comply with the City's M/WBE Ordinance on each unit. Construction time on all will run concurrently. For situations involving approved contracts with multiple units, the total allowable construction time period for all the units shall be the same as the unit with the longest construction time period within such contracts. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at (817)871-8100. Bidders shall not separate,detach or remove any portion,segment or sheets from the contract document at any time. Bidders shall submit the complete specifications book or risk rejection of bid. In accordance with City of Fort Worth Ordinance,No. 13471, as amended by Ordinance No. 13781, the City of Fort Worth has goals for the participation of Disadvantaged Enterprise in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The Bidder shall submit the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM("Documentation") as appropriate. The T Documentation must be received by the contracting department no later than 5:00 PM, five(5) business days after bid opening date.The bidder shall obtain a receipt from the appropriate employee of the contracting department to whom the delivery was made. Such receipt shall be evidence that the Documentation was received by the City. The Contracting Department for this project is the Engineering Department. Any contract or contracts awarded under this Notice to Bidders are expected to be funded in part by a loan from the Texas Water Development Board. This contract is contingent upon release of funds from the Texas Water Development Board. Neither the State of Texas nor any of its departments, agencies,or employees is or will be a party to this,Detailed Notice to Bidders or any resulting contract. r For additional information contact Chris E. Brooks, Wade&Associates,Inc.,at(817)451-2820, or Mr. John Boyer,DOE Project Manager,at(817)332-5474 ext. 37. _ Bob Terrell Gloria Pearson City Manager City Secretary Advertisement Dates: Department of Engineering July 20,2000 A. Douglas ademaker, P.E.,Director July 27,2000 ® B / y. I Rick Trice, P.E., Manager Consultant Services Division Fort Worth,Texas SPECIAL INSTRUCTIONS TO BIDDERS (WATER DEPARTMENT) 1. PRE-QUALIFICATION REQUIREMENT: All contractors submitting bids are required to be pre- qualified by the Fort Worth Water prior to submitting bids. This pre-qualification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, an acceptable experience record, an acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7) calendar days prior to the date of the opening of bids. (a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status of the submitting company. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. (b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which the bids are to be received. (c) The Director of the Water Department shall be the sole judge as to the acceptability for qualification to bid on any Fort Worth Water Department project. (d) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. (e) The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/or expertise. (f) Any proposals submitted by a non-pre-qualified bidder shall be returned unopened,and if inadvertently opened,shall not be considered. (g) The City will attempt to notify prospective bidders whose qualifications (financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any necessary pre-qualification. 2. BID SECURITY: A cashier's check or an acceptable bidder's bond payable to the City of Fort Worth in an amount of not less than five percent (5%) of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within tW (10) days after the contract has been awarded. To be an acceptable surety on the bond, (1) the name of the surety shall be included on the current U.S. Treasury, or (2) the surety must have capital and surplus equal to ten times the limit of the bond. The surety must be licensed to do business in the state of Texas. The amount of the bond shall not exceed the amount shown on the treasury list or one-tenth(1/10)the total capital and surplus. 3. BONDS: A performance bond and a payment bond each for one hundred percent(100%) of the contract price will be required,Reference C 3-3.7. 4. WAGE RATES: Not less than the prevailing wage rates established by the City of Fort Worth,Texas,and as set forth in the Contract Documents must be paid on this project. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. r C 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDER: Pursuant to Article 601g, Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. "Nonresident bidder" means a bidder whose principal place of business is not in the State of Texas, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in the State of Texas. This provision does not apply if this contract involves Federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the contract amount is$25,000 or less, the contract amount shall be paid within forty-five (45)calendar days after completion and acceptance by the City. 9. AGE: In accordance with the policy ("Policy") of the Executive branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents, employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the basis of a bona fide occupational qualification,retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirement. Contractor warrants it will fully comply with the policy and will defend, indemnify,and hold City harmless against any claims or allegations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"),Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with,or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal, state, and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement, 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with City of Fort Worth Ordinance, No. 13471, as amended by Ordinance No. 13781, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM, ("Documentation") as appropriate. The documentation must be received no later than 5:00 PM, five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non- responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise(MBE)and/or a Women Business Enterprise (WBE)on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three(3)years. F f r R _ t PART B - PROPOSAL A Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3), Part 9,UNIT 1, DOE No.2956 City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY WP If the total dollar value of the contract is$25,000 or more,the M/WBE goal is applicable. If the total dollar value of the contract is less than$25,000,the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on,a contractual basis. The objective of the Policy is to increase the use of M/WBE firms to a level comparable to the availability of M/WBEs that provide goods and services directly or indirectly to the City. M/WBE PROJECT GOALS The City's MBE/WBE goal on this project is 20%of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of $25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal, or; 2. Good Faith Effort documentation, or; 3. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. M/WBE Utilization Form: received by 5:00 p.m.,five(5)City business days after the bid opening date,exclusive of the bid opening date. 2. Prime Contractor Waiver Form: received by 5:00 p.m.,five(5)City business days after the bid opening date,exclusive of the bid opening date. 3. Good Faith Effort Form: received by 5:00 p.m.,five(5)City business days after the bid opening date,exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS. Any questions, please contact the M/WBE Office at(817) 871-6104. Rev.6/2/98 Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3), Part 9,UNIT 1, DOE No.2956 ATTACHMENT 1A Page 1 of 2 City of Fort Worth Minority and Women Business Enterprise Specifications MBEMBE UTILIZATION CONATSER CONSTRUCTION,Inc. Aumat 17,2000 PRIME COMPANY NAME BID DATE Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7, Contract 3). Part 9—Unit 1 PS46-070460410310 a PROJECT NAME PROJECT NUMBER Crry'S MIWBE PROJECT GOAL: 20% KIWBE PERCENTAGE ACHIEVED: Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m. five(5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. a The undersigned bidder agrees to enter into a formal agreement with the MBE and/or WBE firms for work listed in this Ischedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to specifications. Company Name,Contact Name, Cenified Specify All Contracting Specify All Items to be Dollar Amount Address,and Telephone No. Scope of Work(') Supplied(') ` cc oo ati U Kt- Z ~2 RAY MATERIALS,INC, 1330 HWY 287 SOUTH HAULING AGGREGATES tk ALL ITEMS " IiiAt�SFi .D,T7C 76063 EXCESS EXCAVATION S - I��an-2mo3q �p 3 t �t�. oto RAY REDI-MIX CONCRETE REDI-MIX d 18 WILLOWBEND � 354 �T MANSFIELD,TX 76063 I S 300.Ot7 817-2741034 Z 9, �� 31, 32. CEN-TEX SEEDING 3312 JOYCE DR. HYDROMULCH SEEDING I: p A : 3 ct.' 3 5 s+ 4 FORT WORTH,TX 76116 ✓ l y, coo. QO $17-244-6024 M/WBEs must be located in the 9(nine)county marketplace or currently doing business In the marketplace at the time of bid. (•) Speotfy 311 areas In which MWBE's are to be utilized and/or items to be supplied: �•) A complete listing of items to be supplied is required in order to receive credit toward the M/WBE goal. I(")Identify each Tier level. Tier: Means the level of subcontracting below the prime contractor/consultant,i.e.,a direct payment from the prime contractor to a subcontractor is considered 1't tier,a payment by a subcontractor to its supplier is considered 2n°tier. w THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE(5)CITY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Rev.6/2/98 nom,__ • ---An _r au_._k_—. A • Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3), Part 9, UNIT 1, DOE No.2956 ATTACHMENT 1A Page 2 of 2 City of Fort Worth Minority and Women Business Enterprise Specifications MBEMBE UTILIZATION Company Name,Contact Name, Certified Specify All Contracting Specify All Items to be Dollar Amount Address,and Telephone No. a Scope of Work(•) Supplied(*) 0 S � �'CpdZrie_ Se,►'✓IGeS,Z 'f 1/ iCpsc¢r. o+� T tv�n.: 3L� 37 Sf ._ .__., Po, 4X I'7 3�7 _A 0-F Gents _R,r(:I +erv,, T 7600 a —The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding r3ctual work performed by all subcontractors, including MBE(s) and/or WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that --will substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or PP.mployee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the . or debarment from City work for a period of not less than three(3)years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material rreach of contract may result in a determination of an irresponsible offeror and barred from participating in City work r a period of time not less than one(1)year. 7", E d BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD JERRY CONATSER Aut edignature Printed Signature pitr°�e5ir.�Pvr� le Contact Name and Title(if different) CONATSER CONSTRUCTION_INC_ ompany Namdr.O.Box 15so4 Telephone Number(s) FORT WORTH,TX 76119 PHONE 817-534-1743 Address Fax Number 817-534.45% up `7 . IIS City/State0p Code Date THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE(5)CITY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Rev.6/2/98 PanPc 1 and 7 of Attachment 1 A must hp rRCPivPd by the Mananinn DPnartmPnt Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3),Part 9,UNIT 1,DOE No.2956 ATTACHMENT 1C Page 1 of 3 City of Fort Worth Minority and Women Business Enterprise GOOD FAITH EFFORT CONAIMM CONSTRUCTION.lac. Auaust 17, 2000 Prime Company Name Bid Date -P Main 21 Drainaae Area Sanitary Sewer System Rehabilitation and Improvements(Group 7. Contract 3). Part 9. UNIT 1 PS46-070460410310 Project Name Project Number If you have failed to secure M/WBE participation and you have subcontracting and/or supplier opportunities or if your M/WBE participation is less than the City's project goal,you must complete this form. If the bidder's method of compliance with the M/WBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy " the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. 1 FFailureto complete this form, in its entirety with supporting documentation, and received by the Managing ent on or before 5:00 p.m. five(5) City business days after bid opening, exclusive of bid opening date, lt In the bid being considered non-responsive to bid specifications. V 1.) Please list each and every subcontracting and/or supplier opportunity(DO NOT LIST NAMES OF FIRMS) " which will be used in the completion of this project, regardless of whether it is to be provided by a M/WBE or non-M/WBE. IP (Use additional sheets,if necessary) List of: Subcontracting Opportunities List of: Supplier Opportunities 7 TV INSPFJMON OF 1.II40 PORTABLE TOMET RENTAL WATER&SEWER PIPE&SUPPLIES ASPHALTIC MIXTURES R.P.IIAR SUPPUERS Rav R/�/OR 7 _ o.... enino Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3),Part 9,UNIT 1,DOE No.2956 ATTACHMENT 1C Page 2 of 3 2.) Did you obtain a current list of M/WBE firms from the City's M/WBE Office? The list is considered in compliance, if it is not more than 3 months old from the date of bid opening. Yes Date of Listing e- Z odo No 3.) Did you solicit bids from M/WBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? Yes If yes, attach M/WBE mail listing to include name of firm and address and a dated —No copy of letter mailed. 4.) Did you solicit bids from M/WBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? Yes If yes, attach list to include name of M/WBE firm, ep rson contacted, No phone number and date and time of contact. NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile is used, attach the fax confirmation, which is to provide M/WBE name, date, time, fax number and documentation faxed. NOTE: If a SIC list of M/WBE is ten or less, the bidder must contact the entire list to be In compliance with questions 3 and 4. If a sic list of M/WBE is more than ten,the bidder must contact at least two-thirds of the list but not less than ten to be in compliance with questions 3 and 4. 5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of plans and specifications in order to assist the M/WBEs? /-Yes No 6.) If M/WBE bids were received and rejected, you must: (1) List the M/WBE firms and the reason(s)for rejection (i.e.,quotation not commercially reasonable, qualifications,etc.)and (2) Attach affidavit and/or documentation to support the reason(s) listed below (i.e.. letters, memos, bids, telephone calls, meetings, etc.) Please use additional sheets, if necessary,and attach. Company Name Telephone Contact Person Scope of Work Reason for Re'ection See, a_lfaclie jePeY ADDITIONAL INFORMATION: am Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3),Part 9,UNIT 1,DOE No.2956 ATTACHMENT 1C Page 3 of 3 Please provide additional information you feel will further explain your good and honest efforts to obtain M/WBE participation on this project. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the M/WBE(s) listed was/were contacted in good faith. It is understood that any M/WBE(s) listed in Attachment 1C will be contacted and the rea ns not using them will be verified by the City's M/WBE Office. JERRY CONATSER AuSignature Printed Signature z 9e olesi°de -t Title Contact Name and Title(if different) CONATSPR CONSTRUCTIION,INC. PHONE 817-M4-1743 Company Narf W.BOX 15804 Telephone Nl er(s)817-534-4556 FORT WORTH,TX 76119 Address Fax Number City/statefBp Date Part B PROPOSAL THIS PROPOSAL MUST NOT BE REMOVED FROM THIS BOOK OF CONTRACT rDOCUMENTS. TO: Mr. Bob Terrell City Manager Fort Worth, Texas 2000 Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7, Contract 3), Part 9 Sewer Project No. PS46-070460410310 UNIT 1 -D.O.E. Project No. 2956 Pursuant to the foregoing "Notice to Bidders," the undersigned bidder has thoroughly examined the Contract Documents, including Plans, special Contract Documents, the General Contract - Documents, and General Specifications for Water Department Projects, and the site of the project, understands the amount of work to be done, and hereby proposes to do all the work, furnish all labor, equipment and materials necessary to complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Engineering Department Director of the City of Fort Worth,Texas. The contractor must be pre-qualified in accordance with the Water Department of the City of Fort Worth requirements. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, approved by the City of Fort Worth for the performing and completing of said work within the time stated and for the following sums, to wit: Part 9—Unit 1 (1) Part 9 - Unit 1 Bid - Sanitary Sewer Pipeline Rehabilitation PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES UNIT PRICE TOTAL ITEM QUANTITY WRITTEN IN WORDS AMOUTINT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 1 1,558 L.F. *8-Inch PVC Sanitary Sewer Pipe, All Depths 7Ai✓1u 4've, Dollars Ko Cents $ .51'.00 $ 54,6 30.o0 2 603 L.F. *8-Inch C900 (DR18) PVC Sanitary Sewer Pipe, All Depths TL,L rAq e.'.Af- Dollars kilo Cents $ 38.00 $ 2Z,1g1*-oo 3 100 L.F. 8-Inch Sanitary Sewer By Short Bore (Pipe Material as Specified on Plans) r 14 Dollars �o Cents $ A0,V0 $ 5,ew.00 „ 4 56 L.F. 8-Inch CL 51 DI Sanitary Sewer By Other Than Open Cut _One- 14 U.44dred Dollars k2-0 Cents $ 100. 00 $ c0 5 19 L.F. 10-Inch CL 51 DI Sanitary Sewer By Short Bore 457.aA J7. Dollars l�tD Cents $ So.W $ 1,62-0-00 6 20 L.F. 12-Inch CL 51 DI Sanitary Sewer Pipe, All Depths Ei fhA '✓e_ Dollars ►2n Cents S 85. 00 $ 117ao_ cc * Contractor must complete City Approved Product Form on page PART 9- Unit 1 (9) Part 9 - Unit 1 (2) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 7 706 L.F. *12-Inch PVC Sanitary Sewer Pipe, All Depths Fi *j4 -f t'yeG Dollars vU� Cents $ 55. oo $ .38T 8 110 L.F. 12-Inch Sanitary Sewer By Short Bore (Pipe Material as Specified on Plans) Dollars rt,o Cents $ 7S.oo $ 8,AS'o.eb 9 893 L.F. *15-Inch PVC Sanitary Sewer Pipe, All Depths i Af- Dollars ✓� Cents $ .59-Do $ 10 660 L.F. *Re-route 4" PVC Private Sanitary Sewer Service, including Cleanouts six. Dollars - !2o Cents oo $ �7, /&O-co 11 706 L.F. *4-Inch PVC Sanitary Sewer Service Pipe �WGicJa Dollars Cents $ ZZ-V0 $ 15,532•Co 12 96 EA. 4-Inch Sanitary Sewer Service Connection -rwd 14"Rdi'cd Dollars Cents $ 2.,4o. op $ v * Contractor must complete City Approved Product Form on page PART 9 - Unit 1 (9) Part 9 - Unit 1 (3) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 13 360 L.F. 4-Inch CL 51 DI Sanitary Sewer Service Pipe Tv►�i eu AZtf Dollars n.a Cents $ Z 8. ov $ /0.0 a 14 20 L.F. *6-Inch PVC Sanitary Sewer Service Pipe 71At4441. 4 Ue- Dollars ✓to Cents $ zS.00 $ 500.o0 15 1 EA. 6-Inch Sanitary Sewer Service Connection ` Two 4utttjr-e d Te.,, Dollars no Cents $ 2-1o• oo $ Z10.00 16 15 EA. Construct Standard 4-Foot Diameter Manhole, 6' Depth tine--M crus a.nd IqUe, Dollars N.o Cents $ 1-600-00 $ ZZ,.Soo.o0 17 35 V.F. Extra Depth, 4-Foot Diameter Manhole Dnc L}c.*tde-eon Twtvrk. Dollars l2o Cents $ I ZD.too 18 4 EA. Construct 4-Foot Diameter Drop Manhole, 6' Depth ae. 76csAOd A�j'?,A-><-fluo i!dbollars Cents $ 1,goo' W $ 14LOO.00 * Contractor must complete City Approved Product Form on page PART 9 - Unit 1 (9) Part 9 - Unit 1 (4) JOE PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) .. 19 36 V.F. Extra Depth, 4-Foot Diameter Drop Manhole Dollars yt.v Cents $ l bo. oo $ 5-U.0.0.n 20 10 EA. Install Watertight Manhole Insert -k-ae- Dollars 12o Cents $ 35. oO $ 350.00 21 9 EA. Install Locking Stainless Steel Watertight Manhole Insert One- 14t mdred i/ Dollars rLID Cents $ /go-00 $ l,1e20.00 22 19 EA. Install Concrete Collar for Manholes Two ku.rtdrtd Dollars 1?.o Cents $ zso. 0 $ -7So.00 23 19 EA. Manhole Vacuum Testing Dollars .� Cents $ 50.00 $ 9S0.oo 24 8 EA. Remove Existing Manhole -rwo L c r��_Dollars t'=-O Cents $ 7-00- '0.0 $ J,400. ao Part 9- Unit 1 (5) L PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 25 5 EA. Abandon Existing Manhole FV_c,c r 14u.utdrred Dollars K-a Cents $ 400. on $ Z,000.00 26 8 EA. Cut and Plug Existing Sanitary Sewer Two 4LAycdred Dollars LkL10 Cents $ Zoo. oo $ i,(0oo.00 27 2 TON Ductile-Iron and Grey-Iron Fittings Or,c- 4L'- d red Dollars E ✓to Cents $ too- 00 $ Zoo. 00 28 3,800 L.F. Trench Safety System 0,•,� Dollars LCents $ 1.00 $ 3.Soo.oo 29 1,644 L.F. Pavement Repair, Per Figure 4 bib -Th ee:6 -hdo Dollars Cents $ 37.00 $ 52,too 8 00 L30 219 SY. Concrete Sidewalk and Driveway Replacement Twevi gwehq Dollars Cents $ Z7•oo $ 5913. co L Part 9 - Unit 1 (6) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 31 825 L.F. Concrete Curb and Gutter Replacement Tweh+z� Dollars ►'� Cents $ Zo,00 $ /to,sco, 0,0 32 10 L.F. Concrete Encasement Dollars VLo Cents $ 140.00 $ 100.00 33 772 L.F. Sodding (Bermuda or St. Augustine as Directed) Dollars YL4 Cents $ IT 00 $ t..1-7L. 00 34 880 L.F. Hydromulch (Bermuda or Rye Grass Seed as Directed) Y�►1� Dollars Vt,o Cents $ 1.00 $ gro. 00 35 361 L.F. Seeding (Unhulled Bermuda or Rye Grass Seed) N Dollars sex"-A.'ic Cents $ 0.75 $ 2,70-7:5 36 2,964 L.F. Pre-Construction Cleaning and Television Inspection Tttilo Dollars ►'�o Cents $ 2. 00 $ 54 92.8.00 Part 9 - Unit 1 (7) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES UNIT PRICE TOTAL ITEM QUANTITY WRITTEN IN WORDS AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 37 4,063 L.F. Post-Construction Television Inspection Oyi e- Dollars Cents $ 1. a5 $5 d-18.75 38 2 EA. Exploratory Excavation (D-Hole) .r 14"",4 d Dollars kw Cents $ 4.00. 00 $ 8,00.co PART 9- TOTAL AMOUNT BID UNIT 1: $ 4V 3 4,o 4. SD [Transfer TOTAL BID - UNIT 1 to Part 9 Summary of Bids Sheet] Part 9 - Unit 1 (8) CITY APPROVED PRODUCT FOR * CONTRACTOR SHALL SELECT TYPE OF PIPE TO BE USED: STANDARD SPEC NO. SIZE E 1-31 4" thru 30" El-25 4" thru 15" El-27 4" thru 15" El-28 18" thru 27" E100-2 18" thru 48" Consult the"City of Fort Worth Standard Product List"to obtain the Generic/Trade Name and the Manufacturer for the pipes listed above. Failure to provide the information required above may result in rejection of bid as non-responsive. Only products or methods listed above will be allowed for use in this project. Any substitution shall result in rejection of bid as non-responsive. Part 9—Unit 1 (9) Within ten (10) days after notification by City, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of this Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certifies that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents, and the specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by the City Ordinance No. 7400. The Bidder agrees to begin construction within ten (10) calendar days after issue of the work order, and to complete the contract within one hundred forty (140) calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Non-resident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non-resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. j OB. The principal place of business of our company or our parent company or majority owner is in the State of Texas. Receipt is acknowledged of the following addenda: Addendum No. 1 ✓ Addendum No. 2 Addendum No. 3 Part 9—Unit 1 (10) Respectfully submitted, CONATSER r,ONSTRUCTION,Inc. By �YL51'dB1'1 Title CONATSER CONSTRUCTION,INC. P.O.BOX 15804 FORT WORTH,TX 76119 Address (SEAL) If Bidder is Corporation N Date: u7. 17,zoQo Part 9—Unit 1 (11) Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3), Part 9,UNIT 2, DOE No.2957 City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is$25,000 or more,the M/WBE goal is applicable. If the total dollar value of the contract is less than $25,000,the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. The objective of the Policy is to increase the use of M/WBE firms to a level comparable to the availability of M/WBEs that provide goods and services directly or indirectly to the City. M/WBE PROJECT GOALS 7, `jut #� The City's MBE/WBE goal on this project is�of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of $25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by -, either of the following: 1. Meet or exceed the above stated M/WBE goal,or; 2. Good Faith Effort documentation, or; 3 3. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. M/WBE Utilization Form: received by 5:00 p.m.,five(5)City business days after the bid opening date,exclusive of the bid opening date. 2. Prime Contractor Waiver Form: received by 5:00 p.m.,five(5)City business days after the bid opening date,exclusive of the bid opening date. 3. Good Faith Effort Form: received by 5:00 p.m.,five(5)City business days after the bid opening date,exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS. Any questions, please contact the M/WBE Office at(817)871-6104. Rev.6/2/98 Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3), Part 9,UNIT 2, DOE No.2957 ATTACHMENT 1A City of Fort Worth Page 1 of 2 �- Minority and Women Business Enterprise Specifications MBE/WBE UTILIZATION CONATSER CONSTRUCTION,Inc. Aueust 17,2000 PRIME COMPANY NAME BID DATE Main 21 Drainage Area Sanitary Sewer System Rehabilitation Mand Improvements (Group 7, Contract 3), Part 9—Unit 2 PS46-070460410310 PROJECT NAME _ku 100 — 4'L PROJECT NUMBER ail CrrY'S M/WBE PROJECT GOAL: 2_74k I M/WBE PERCENTAGE ACHIEVED: Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned bidder agrees to enter into a formal agreement with the MBE and/or WBE firms for work listed in this `schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing I misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to specifications. Company Name,Contact Name, Certified Specify All Contracting Specify All Items to be Dollar Amount Address,and Telephone No. Scope of Work(•) Supplied(*) oc aj Z X= NH H RAY MATERIALS,INCL_ HAULING AGGREGATES dt ALL ITEMS 13� -- 7 EXCESS EXCAVATION S E17 2792039 V 300.L42 RAY REDI,MIX 1s WILLOWBEND CONCRETE REDI-MIX MANSFIELD,TX 760" pt ¢4i �Qo.Qip 817-2791039 Ck :TF.SEFAII�IS'i 3312 JOYCE DR _ HYDROMULCH SEEDING FORT WORTH.TX 76116 /S� �,(100. 60 917-244-6024 b _ M/wws must be located In the 9(nine)county marketplace or currently doing business in the marketplace at the time of bid. JIM (•) Specify all areas in which MWBE's are to be utilized and/or Items to be supplied: (") A complete listing of items to be supplied Is required in order to receive credit toward the MIWBE goal. ")Identify each Tier level. Tier: Means the level of subcontracting below the prime contractor/consultant,I.e.,a direct payment from the prime contractor to a subcontractor Is considered 1a tier,a payment by a subcontractor to its supplier Is considered 2nd tier. THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE(5)CITY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Rev.6/2/98 Dan*& 1 anti 0 of ettarhmant I e meet ho roraivarl by the Mananinn rtanartmant Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3), Part 9,UNIT 2,DOE No.2957 ATTACHMENT 1A Page 2 of 2 �. City of Fort Worth Minority and Women Business Enterprise Specifications MBEMBE UTILIZATION Company Name,Contact Name, Certified Specify All Contracting Specify All Items to be Dollar Amount Address,and Telephone No. - Scope of Work(') Supplied(') r.> cc U X N H 2 ~_ ;nC S�YJi�ts.-ku. ��«/�,VY1 �rCW� • 31, 32 Otc L;rc S Arlyrnj+'r"',Tj- 11100* - (.419 - o T The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and/or WBE(s) arrangements submitted with this bid. athe bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or :mployee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the .contract or debarment from City work for a period of not less than three(3)years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material )reach of contract may result in a determination of an irresponsible offeror and barred from participating in City work or a period of time not less than one(1)year. ALL MB n WBEs MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD JERRY CONATSER Autho ignature Printed Signature Presi�levl L �'itle Contact Name and Title(if different) CONATSER.CONSTRUCTION,INC. pHONF 217-534-1743 '.ompany Name P.O.BOX 15204 Telephone Number(s)kx 817-534.4556 FORT WORTH,TX 76119 Address Fax Number 1-7 'ity/State/Zip Code Date THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE(5)CITY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Panes 1 and 2 n}Attmr•_hmant 1A mioet),n--I.....A `..s`_ ra-___ _ Rev.fir Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3),Part 9,UNIT 2,DOE No.2957 ATTACHMENT 1 B City of Fort Worth Page 1 of 1 Minority and Women Business Enterprise Specifications Prime Contractor Waiver Main 21 Drainage Area Sanitary Sewer System Prime Company Name Rehabilitation and Improvements (Group 7, Contract 3). Part 9—Unit 2 Project Name August 17, 2000 PS46-070460410310 Bid Opening Date Project Number If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is only applicable if both answers are yes. Failure to complete this form in its entirety and be received by the Managing Department on or before5:00 p.m., five (5) City business days after bid opening, exclusive of the bid opening date, will result in the bid being considered non-responsive to bid specifications. Will you perform this entire contract without subcontractors? Yes No If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? Yes No If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and/or WBE(s) on this contract, the payment therefore and any proposed changes to the original MBE(s) and/or WBE (s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one(1)year. Authorized Signature Printed Signature Title Contact Name (if different) Company Name Contact Telephone Number (s) y Address Fax Number Authorized Signature Company Name Rev.6/2/98 Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3),Part 9,UNIT 2,DOE No.2957 ATTACHMENT 1C Page 1 of 3 City of Fort Worth Minority and Women Business Enterprise GOOD FAITH EFFORT CONATSM CONSTRUCTION Inc. August 17, 2000 Prime Company Name Bid Date Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7. Contract 3). Part 9. UNIT 2 PS46-070460410310 Project Name Project Number If you have failed to secure M/WBE participation and you have subcontracting and/or supplier opportunities or if your M/WBE participation is less than the City's project goal,you must complete this form. If the bidder's method of compliance with the M/WBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days atter bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity(DO NOT LIST NAMES OF FIRMS) which will be used in the completion of this project, regardless of whether it is to be provided by a M/WBE or non- M/WBE. (Use additional sheets, if necessary) List of: Subcontracting Opportunities List of: Supplier ODDortunities TV INSPECTION OF LINES PORTABLE TOILET RENTAL WATER&SEWER PIPE&SUPPLIES ASPHALTIC MIXTURES REBAR SUPPLIERS Rev.6W98 Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3),Part 9,UNIT Z DOE No.2957 ATTACHMENT 1C Page 2 of 3 2.) Did you obtain a current list of M/WBE firms from the City's M/WBE Office? The list is considered in compliance, if it is not more than 3 months old from the date of bid opening. ✓ Yes Date of Listing (o / I9 No 3.) Did you solicit bids from M/WBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? Yes If yes, attach M/WBE mail listing to include name of firm and address and a dated No copy of letter mailed. 4.) Did you solicit bids from M/WBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? ✓°_Yes If yes, attach list to include name of M/WBE firm, ep rson contacted, No phone number and date and time of contact. NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimileis used, attach the fax confirmation, which is to provide M/WBE name, date, time, fax number and documentation faxed. NOTE: If a SIC list of M/WBE is ten or less, the bidder must contact the entire list to be in compliance with questions 3 and 4. If a sic list of M/WBE is more than ten,the bidder must contact at least two-thirds of the list but not less than ten to be in compliance with questions 3 and 4. 5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of 'i plans and specifications in order to assist the M/11VBEs? ✓ Yes No 6.) If M/WBE bids were received and rejected, you must: (1) List the M/WBE firms and the reason(s)for rejection (i.e., quotation not commercially reasonable, qualifications, etc.)and (2) Attach affidavit and/or documentation to support the reason(s) listed below (i.e.. letters, memos, bids, telephone calls, meetings, etc.) Please use additional sheets, if necessary,and attach. Company Name Telephone Contact Person Scope of Work Reason for Rejection e a -A [e ffer ADDITIONAL INFORMATION: i 6..... al"In® Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements(Group 7,Contract 3),Part 9,UNIT 2,DOE No.2957 ATTACHMENT 1C Page 3 of 3 Please provide additional information you feel will further explain your good and honest efforts to obtain M/WBE participation on this project. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the M/WBE(s) listed was/were contacted in good faith. It is understood that any M/WBE(s) listed in Attachment 1C will be contacted th rea not using them will be verified by the City's M/WBE Office. JERRY CONATSER Au i Signature Printed Signature Title Contact Name and Title(if different) CONATSER CONSTRUCTION,INC. PHONE 1117-334.1743 Company Narria0•BOX 15804 Telephone Numb) 817-534-4556 FORT WORTH,TX 76119 Address Fax Number 1 City/StatiNzip Date ¢ Part B PROPOSAL THIS PROPOSAL MUST NOT BE REMOVED FROM THIS BOOK OF CONTRACT DOCUMENTS. TO: Mr. Bob Terrell City Manager Fort Worth, Texas 3 2000 Main 21 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7, Contract 3), Part 9 Sewer Project No. PS46-070460410310 UNIT 2 - D.O.E. Project No. 2957 Pursuant to the foregoing "Notice to Bidders," the undersigned bidder has thoroughly examined the Contract Documents, including Plans, special Contract Documents, the General Contract Documents, and General Specifications for Water Department Projects, and the site of the project, understands the amount of work to be done, and hereby proposes to do all the work, furnish all labor, equipment and materials necessary to complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Engineering Department Director of the City of Fort Worth,Texas. The contractor must be pre-qualified in accordance with the Water Department of the City of Fort Worth requirements. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, approved by the City of Fort Worth for the performing and completing of said work within the time stated and for the following sums, to wit: Part 9—Unit 2 (1) Part 9 - Unit 2 Bid - Sanitary Sewer Pipeline Rehabilitation PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 1 2,997 L.F. *8-Inch PVC Sanitary Sewer Pipe, All Depths —7-h e r-z, Dollars ✓Lfl Cents $ 30- 00 $ 89, 9 t D.o0 2 20 L.F. 8-Inch CL 51 DI Sanitary Sewer Pipe, All Depths -ni i r�u. e i 'f" Dollars Cents $ ST-00 3 432 L.F. *8-Inch C900 (DR18)PVC Sanitary Sewer Pipe, All Depths y Third sik Dollars t ✓t,a Cents $ 3 .00 $ iS, 55z•00 4 205 L.F. 8-Inch Sanitary Seivek By Short Bore (Pipe Material as Specified on Plans) E-i'P44a , Dollars ✓Lo Cents $ go-00 $ 46, o•ao 5 70 L.F. 8-Inch CL 51 DI Sanitary Sewer By Other Than Open Cut Dollars PLO Cents $ 100. 00 $ 7 ow.00 6 617 L.F. 10-Inch C900 (DR18) PVC Sanitary Sewer Pipe, All Depths �r oh c Dollars Cents $ 4/. 0'0 $ Z5.,Zes-1.a0 * Contractor must complete City Approved Product Form on page PART 9 - Unit 2 (8) Part 9 - Unit 2 (2) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 7 20 L.F. 10-Inch Sanitary Sewer By Short Bore (Pipe Material as Specified on Plans) QK& !fu.y.d re-d Dollars 62 Cents $ /00- 00 $ Z'000- 00 8 860 L.F. *4-Inch PVC Sanitary Sewer Service Pipe Twe Aj 4wp Dollars ✓Lo Cents $ ? Z. 00 $ 1%q Z0.Bo 9 179 EA. 4-Inch Sanitary Sewer Service Connection 7'wo 14u,wdrer( Dollars k-o Cents $ Zoo.00 $ 351 so 0.00 10 350 L.F. 4-Inch CL 51 DI Sanitary Sewer Service Pipe TWta c/%� C,'2 , Dollars nD Cents $ L Ir. 00 $ 91 Foo.00 11 10 L.F. *6-Inch PVC Sanitary Sewer Service Pipe TU+CH. '�er Dollars yt a Cents $ Zs.00 $ Z So.00 12 1 EA. 6-Inch Sanitary Sewer Service Connection -1w /-"deed Tart_ ___ __ Dollars 12D Cents $ Z/0.cc $ Z/0.00 * Contractor must complete City Approved Product Form on page PART 9 - Unit 2 (8) Part 9 - Unit 2 (3) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 13 12 EA. Construct Standard 4-Foot Diameter Manhole, 6' Depth Due- 7Gtsu.5&4cd que, µLLydred Dollars 1�Lo Cents $ 1,500-00 $ l 8,0,00.oto 14 13 V.F. Extra Depth, 4-Foot Diameter Manhole One- 4LtA4.dred Te -L Dollars Cents $ /10-00 $ i. q 30.0n 0 4 EA. Construct 4-Foot Diameter Drop Manhole, 6' Depth bwc7 eusa vJ G' ♦ Nuadred Dollars N-O Cents $ /,goo-00 $ 7"Zoo 16 7 V .F. Extra Depth,4-Foot Diameter Drop Manhole DK,-- 14ka-d rte Sr Dollars PL40 Cents $ /C-0-00 $ 1'/Z0.00 17 16 EA. Install Watertight Manhole Insert -7;1 i!::� 4'ue. Dollars ►'-10 Cents $ 3-5-ton $ 5&0.00 18 16 EA. Install Concrete Collar for Manholes Twn W u.,t dred Dollars ✓LO Cents $ ZSa•Oo $ *'04v. cc Part 9 - Unit 2 (4) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES UNITOTAL ITEM QUANTITY WRITTEN IN WORDS AMOUNT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 19 16 EA. Manhole Vacuum Testing Dollars liLo Cents $ 50.00 $ F100.vo 20 10 EA. Remove Existing Manhole wo 4LUAd✓cd Dollars ✓I.o Cents $ ZOO-00 $ Z,ot3o. cc 21 1 EA. Abandon Existing Manhole �ree, 14WAdred Dollars JILO Cents $ 300.00 $ 300 -W 22 7 EA. Cut and Plug Existing Sanitary Sewer / wo i4wAd✓ed Dollars 1iL0 Cents $ ZOO-00 $ 1.4yo•0o 23 3 TON Ductile Iron and Grey Iron Fittings Oita 4c"d r,Pd Dollars ✓LD Cents $ 100.00 $ 32".00 24 4,066 L.F. Trench Safety System for Depths Greater than 5 Feet ®Hcy Dollars f'Lb Cents $ 1.0to $ !�6 0w4,• 00 Part 9 - Unit 2 (5) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES TOTAL ` ITEM QUANTITY WRITTEN IN WORDS UNIT PRICE AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 25 1,345 L.F. Pavement Repair, Per Figure 4 i r-lr., avr� Dollars ✓to Cents $ 31. co $ 41J.L9�[) 26 194 SY. Concrete Sidewalk and Driveway Replacement Twe4A- 4 S Dollars - ✓ice Cents $ Z7. o-c $ C959-0v 27 175 L.F. Concrete Curb and Gutter Replacement Dollars T ►'i-o Cents $ Z o.oa $ 30 Soo.o0 28 15 L.F. Concrete Encasement T�6 _ Dollars K-o Cents $ to. ,00 $ 150. 00 29 25 L.F. Sodding (Bermuda or St. Augustine as Directed) %-14 ee-#i Dollars Cents $ 15.0jo $ 9-7 5 oo 30 2,700 L.F. Hydromulch (Bermuda or Rye Grass Seed as Directed) A1/o Dollars 5eoe 4i, - 4-ve" Cents $ a '15 $ Z,o Z -.Do Part 9- Unit 2 (6) PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES UNIT PRICE TOTAL 3 ITEM QUANTITY WRITTEN IN WORDS AMOUNT BID (Furnish and install complete in place, including all appurtenant work, the following items.) 31 960 L.F. Pre-Construction Cleaning and Television Inspection Two Dollars T ►Z.c� Cents $ Z .oo $ J,S;�0.ou 32 4,361 L.F. Post-Construction Television Inspection OKE-_ Dollars Cents $ 1.;1 $ 6 466.1515 - 33 2 EA. Exploratory Excavation (D-Hole) 4k.rcdrej Dollars VLo Cents $ 4vo .oto $ Poo-on PART 9 - TOTAL AMOUNT BID UNIT 2: $ BZ4 z zR, Z5 [Transfer TOTAL BID - UNIT 2 to Part 9 Summary of Bids Sheet] Part 9 - Unit 2 (7) CITY APPROVED PRODUCT FOR * CONTRACTOR SHALL SELECT TYPE OF PIPE TO BE USED: STANDARD SPEC NO. SIZE ®—ZIE 1-31 4" thru 30" E1-25 4" thru 15" E1-27 4" thru 15" E1-28 18" thru 27" E100-2 18" thru 48" Consult the"City of Fort Worth Standard Product List"to obtain the Generic/Trade Name and the Manufacturer for the pipes listed above. Failure to provide the information required above may result in rejection of bid as non-responsive. Only products or methods listed above will be allowed for use in this project. Any substitution shall result in rejection of bid as non-responsive. Part 9 —Unit 2 (8) Within ten (10)days after notification by City, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of this Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth,Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certifies that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those _ General Documents, and the specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by the City Ordinance No. 7400. The Bidder agrees to begin construction within ten (10) calendar days after issue of the work order, and to complete the contract within one hundred twenty (120) calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Non-resident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non-resident bidders in the State of , our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner i in the State of Texas. Receipt is acknowledged of the following addenda: Addendum No. 1 Addendum No. 2 Addendum No. 3 Part 9—Unit 2 (9) Respectfully submitted, CONATSER CONSTRUCTION,Inc. 00' 0000' By z ,1,�-' /CS) d -ea it Title CONATSER CONSTRUCTION,INC. P.O.BOX 15804 FORT WORTH,TX 76119 Address (SEAL) If Bidder is Corporation Date: Au . I7 Part 9 —Unit 2 (10) PART 9 SUMMARY OF BIDS UNIT 1 TOTAL AMOUNT BID - $ 40 3. to o 4. S o UNIT 2 TOTAL AMOUNT BID - $ 3 2 q, UNIT 3 TOTAL AMOUNT BID - $ No a r� UNIT 4 TOTAL AMOUNT BID - $ No 31 r-> PART 9-SUMMARY OF BIDS PART C - GENERAL CONDITIONS T PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER, 1, 1987 TABLE OF CONTENTS C1-1 DEFINITIONS C1-1.1 Definition of Terms C1-1 (1) C1-1.2 Contract Documents C1-1 (1) C1-1. 3 Notice to Bidders C1-1 (2) C1-1.4 Proposal C1-1 (2) C1-1.5 Bidder C1-1 (2) C1-1.6 General Conditions C1-1 (2) C1-1.7 Special Conditions C1-1 (2) C1-1.8 Specifications C1-1 (2) C1-1.9 Bond C1-1 (2) C1-1.10 Contract C1-1 (3 ) C1-1.11 Plans C1-1 (3 ) C1-1.12 City C1-1 (3 ) C1-1.13 City Council C1-1 ( 3 ) C1-1.14 Mayor C1-1 ( 3 ) C1-1.15 City Manager C1-1 (3 ) C1-1.16 City Attorney C1-1 (3 ) C1-1.17 Director of Public Works C1-1 (4 ) C1-1.18 Director, City Water Department C1-1 (4 ) C1-1. 19 Engineer C1-1 (4 ) C1-1.20 Contractor C1-1 (4 ) C1-1. 21 Sureties C1-1 (4) C1-1. 22 The Work or Project C1-1 (4) C1-1.23 working Day C1-1 ( 4 ) C1-1.24 Calendar Day C1-1 ( 4 ) C1-1.25 Legal Holiday C1-1 ( 4 ) C1-1. 26 Abbreviations C1-1 (5) C1-1.27 Change Order C1-1 (6 ) C1-1. 28 Paved Streets and Alleys C1-1 (6 ) C1-1.29 Unpaved Streets and Alleys C1-1 (6 ) C1-1.30 City Streets C1-1 (6 ) C1-1. 31 Roadway C1-1 (6 ) C1-1. 32 Gravel Street C1-1 (6 ) C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2 (1) C2-2. 2 Interpretation of Quantities C2-2 (1) C2-2. 3 Examination of Contract Documents and Site C2-2 (2) C2-2.4 Submitting of Proposal C2-2 (3 ) C2-2.5 Rejection of Proposals C2-2 (3 ) C2-2.6 Bid Security C2-2 (3 ) (1) C2-2. 7 Delivery of Proposal C2-2 (4) C2-2.8 Withdrawing Proposals C2-2 (4) C2-2.9 Telegraphic Modification of Proposals C2-2 (4) C2-2.10 Public Opening of Proposal C2-2 (4 ) C2-2.11 Irregular Proposals C2-2 (4) C2-2.12 Disqualification of Bidders C2-2 (5) C3-3 AWARD AND EXECUTION OF DOCUMENTS C3-3.1 Consideration of Proposals C3-3 (1) C3-3.2 Minority Business Enterpise Women-Owned Business Enterprise compliance C3-3 (1) C3-3.3 Equal Employment Provisions C3-3 (1) C3-3.4 Withdrawal of Proposals C3-3 (2) C3-3.5 Award of Contract C3-3 (2) C3-3.6 Return of Proposal Securities C3-3 (2) C3-3.7 Bonds C3-3 (2) C3-3.8 Execution of Contract C3-3 (4 ) C3-3.9 Failure to Execute Contract C3-3 (4) C3-3.10 Beginning Work C3-3 (4 ) C3-3.11 Insurance C3-3 (4) C3-3.12 Contractor 's Obligations C3-3 (7) C3-3.13 Weekly Payroll C3-3 (7) C3-3.14 Contractor ' s Contract Administration C3-3 (7) C3-3.15 Venue C3-3 (8 ) C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4 (1) C4-4.2 Special Provisions C4-4 (1 ) C4-4. 3 Increased or Decreased Quantities C4-4 (1) C4-4.4 Alteration of Contract Documents C4-4 (2) C4-4.5 Extra Work C4-4 (2) C4-4.6 Schedule of Operations C4-4 (3) C4-4. 7 Progress Schedules for Water and Sewer Plant Facilities C4-4 (4) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 (1) C5-5. 2 Conformity with Plans C5-5 (1) C5-5. 3 Coordination of Contract Documents C5-5 (2) C5-5. 4 Cooperation of Contractor C5-5 (2) C5-5.5 Emergency and/or Rectification Work C5-5 (3 ) C5-5.6 Fidld Office C5-5 (3 ) C5-5. 7 Construction Stakes C5-5 (3 ) C5-5.8 Authority and Duties of Inspectors C5-5 (4) C5-5.9 Inspection C5-5 (5) C5-5.10 Removal of Defective and Unauthorized Work C5-5 (5) C5-5.11 Substitute Materials or Equipment C5-5 (5) C5-5.12 Samples and Tests of Materials C5-5 (6) C5-5.13 Storage of Materials C5-5 (6) C5-5.14 Existing Structures and Utilities C5-5 (7) C5-5.15 interruption of Service C5-5 (7) C5-5.16 Mutual Responsibility of Contractors C5-5 (8) C5-5.17 Cleanup C5-5 (8) C5-5.18 Final Inspection C5-5 (9) (2) w C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 Laws to be Observed C6-6 (1) C6-6. 2 Permits and Licenses C6-6 (1) C6-6. 3 Patented Devices, Materials and Processes C6-6 (1) C6-6.4 Sanitary Provisions C6-6 (2) C6-6.5 Public Safety and Convenience C6-6 (2) C6-6.6 Privileges of Contractor in Streets, Alleys, and Right-of-Way C6-6 (3) C6-6.7 Railway Crossings C6-6 (4) ' C6-6.8 Barricades, Warnings and Watchmen C6-6 (4) C6-6.9 Use of Explosives, Drop Weight, etc. C6-6 (5) C6-6.10 Work Within Easements C6-6 (6) C6-6.11 Independent Contractor C6-6 (8) C6-6.12 Contractor ' s Responsibility for Damage Claims C6-6 (8) C6-6.13 Contractor ' s Claim for Damages C6-6 (10) C6-6.14 Adjustment of Relocation of Public Utilities, etc. C6-6 (10) C6-6.15 Temporary Sewer Drain Connections C6-6 (10) C6-6.16 Arrangement and Charges of Water Furnished by City C6-6 (11) C6-6.17 Use of a Section of Portion of the Work C6-6 (11) C6-6.18 Contractor's Responsibility for Work C6-6 (11) C6-6.19 No Waiver of Legal Rights C6-6 (12) C6-6.20 Personal Liability of Public Officials C6-6 (12 ) C6-6.21 State Sales Tax C6-6 (12) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1) C7-7.2 Assignment of Contract C7-7 (1) C7-7. 3 Prosecution of the Work C7-7 (1) C7-7.4 Limitations of Operations C7-7 (2) C7-7.5 Character of Workman and Equipment C7-7 (2) C7-7.6 Work Schedule C7-7 (3) C7-7.7 Time of Commencement and Completion C7-7 (4) C7-7.8 Extension of time of Completion. C7-7 (4) C7-7.9 Delays C7-7 (4) C7-7.10 Time of Completion C7-7 (5) C7-7.11 Suspension by Court Order C7-7 (6 ) C7-7.12 Temporary Suspension C7-7 (6) C7-7.13 Termination of Contract due to National Emergency C7-7 (7) C7-7.14 Suspension of Abandonment of the Work and Annulment of Contract C7-7 (7) C7-7.15 Fulfillment of Contract C7-7 (9) C7-7.16 Termination for Convenience of the Onwer C7-7 (10 ) C7-7.17 Safety Methods and Practices C7-7 (13 ) C8-8 MEASUREMENT AND PAYMENT C8-8.1 Measurement of Quantities C8-8 (1) C8-8. 2 unit Prices C8-8 ( 1) (3 ) C8-8.3 Lump Sum C8-8 (1) C8-8. 4 Scope of Payment C8-8 (1) C8-8.5 Partial Estimates and Retainage C8-8 (2) C8-8.6 Withholding Payment C8-8 (3 ) - C8-8. 7 Final Acceptance C8-8 (3 ) C8-8.8 Final Payment C8-8 (3) C8-8.9 Adquacy of Design C8-8 (4) C8-8.10 General Guaranty C8-8 (4) T C8-8.11 Subsidiary Work C8-8 (5 ) C8-8.12 Miscellaneous Placement of Material C8-8 (5) C8-8.13 Record Documents C8-8 (5 ) (4) PART C - GENERAL CONDITIONS C1-1 DEFINITIONS SECTION C1-1 DEFINITIONS Cl-1 . 1 DEFINITIONS OF TERMS : Whenever in these Contract Documents the followling terms or pronouns in place of them are used , the intent and meaning shall be understood and interpreted as follows: C1-1. 2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents , such as specifications , bonds , addenda , plans , etc . , which govern the terms and performance of the contract . These are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and include the following items: PART A - NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL (Sample) White PART C - GENERAL CONDITIONS (CITY) Canary Yellow (Developer) Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS E1-White E2-Golden Rod E2A-White PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White PART G - CONTRACT (Sample) White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) Same as above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT PART H - PLANS (Usually bound separately) C1-1 (1 ) i C1-1 . 3 NOTICE TO BIDDERS : All of the legal publications either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. C1-1 . 4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal , which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. C1-1 . 5 BIDDER : Any person , persons , firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents , constitutes a bidder. C1-1 . 6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes , and requirements of the City of Fort Worth ' s charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions , the latter shall take precedence and shall govern. C1 -1 . 7 SPECIAL CONDITIONS : Special conditions are the _ specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions . When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1 . 8 SPECIFICATIONS: The Specifications is that section or part of the Contract Documents which sets forth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed and useful project. Whenever reference is made to standard specifications, regulations, requirements , statutes , etc. , such referred to documents shall become a part of the Contract Documents just as though they were embodied therein. C1-1 . 9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and Cl-1 (2 ) faithful performance of the contract and include the following: a. Performance Bond (see paragraph C3-3.7) b. Payment Bond (see paragraph C3-3. 7) C, Maintenance Bond (see paragraph C3-3.7) d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and C2-2. 6) C1-1. 10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. C1-1. 11 PLANS: The plans are the drawings or reproductions t ere rom made by the Owner' s representative showing in detail the location, dimension and position of the various elements of the project , including such profiles , typical cross-sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner. The plans are usually bound separately from other parts of the Contract Documents , but they are a part of the Contract Documents just as though they were bound therein. C1-1 . 12 CITY : The City of Fort Worth, Texas , a municipal corporation , authorized and chartered under the Texas State Statutes , acting by and through its governing body or its City Manger , each of which is required by charter to perform specific duties . Responsibility for final enforcement of Contracts involving the City of Fort Worth is by Charter vested in the City Manager. The terms City and Owner are synonymous. C1-1 . 13 CITY COUNCIL : The duly elected and qualified governing body of the City of Fort Worth, Texas. C1-1 . 14 MAYOR: The officially elected Mayor , or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. C1-1. 15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth, Texas , or his duly authorized representative. C1-1.16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas , or his duly authorized representative. C1-1 (3 ) C1-1 . 17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of the City of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized representative. C1-1 . 18 DIRECTOR, CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth , Texas , or his duly authorized representative , assistant, or agents. C1-1. 19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department , or their duly authorized assistants , agents , engineers , inspectors , or superintendents, acting within the scope of the particular duties entrusted to them. C1-1 . 20 CONTRACTOR : The person , persons , partnership , company, firm, association, or corporation , entering into a contract with the Owner for the execution of the work, acting directly or through a duly authorized representative . A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor , supplying labor and - materials or only labor, for work at the site of the project. C1-1. 21 SURETIES : The Corporate bodies which are bound by such bonds are required with and for the Contractor . The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. C1-1. 22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents , including but not limited to the furnishing of all labor , materials , tools , equipment, and incidentals necessary to produce a completed and serviceable project. C1-1. 23 WORKING DAY: A working day is defined as a calendar day, not including Saturdays, Sundays , and legal holidays , in which the weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven ( 7 ) hours between 7 : 00 a.m. and 6 : 00 p.m. , with exceptions as permitted in paragraph C7-7.6. C1-1 . 24 CALENDAR DAYS : A calendar day is any day of the week or month, no days being excepted. C1-1 . 25 LEGAL HOLIDAYS : Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows: Cl-1 (4 ) 1. New Year ' s Day January 1 2. M. L. King, Jr. Birthday. Third Monday in January 3. Memorial Day Last Monday in May 4. Independence Day July 4 5. Labor Day First Monday in September 6. Thanksgiving Day Fourth Thursday in November 7. Thanksgiving Friday Fourth Friday in November 8. Christmas Day December 25 9. Such other days in lieu of holidays as the City Council may determine When one of the above named holidays or a special holiday is declared by the City Council , falls on Saturday, the holiday shall be observed on the preceding Friday or if it falls on Sunday, it shall be observed on the following Monday, by those employees working on working day operations . Employees working calendar day operations will consider the calendar holiday as the holiday. C1-1. 26 ABBREVIATIONS : Wherever the abbreviations defined herein appear in Contract Documents , the intent and meaning shall be as follows: AASHTO - American Association of MGD - Million Gallons Per State Highway Transportation Day Officials ASCE - American Society of Civil CFS - Cubic Foot per Engineers Second LAW - In Accordance With ASTM - American Society of Min. - Minimum Testing Materials Mono.- Monolithic AWWA - American Water Works % - Percentum Association R - Radius ASA - American Standards Association I.D. - Inside Diameter HI - Hydraulic Institute O. D . - Outside Diameter Asph. - Asphalt Elev.- Elevation Ave. - Avenue F - Fahrenheit Blvd. - Boulevard C - Centigrade CI - Cast Iron In. - Inch CL - Center Line Ft. - Foot GI - Galvanized Iron St. - Street Lin. - Linear or Lineal CY - Cubic Yard lb. - Pound Yd. - Yard MH - Manhole SY - Square Yard Max. - Maximum L.F. - Linear Foot D.I. - Ductile Iron C1-1 (5 ) C1 -1 . 27 CHANGE ORDER : A " Change Order " is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was nbt specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25% of the amount of the particular item or items in the original proposal. All "Change Orders " shall be prepared by the City from information as necessary furnished by the Contractor. C1-1 . 28 PAVED STREETS AND ALLEYS: A paved street or alley shall be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatment , not including an oiled surface , with or without separate base material. 3 . Brick, with or without separate base material. 4. Concrete, with or without separate base material. 5. Any combination of the above. C1-1 . 29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or other surface is any area except those defined above for "Paved Streets and Alleys. " C1-1 . 30 CITY STREETS : A city street is defined as that area between the right-of-way lines as the street is dedicated. C1-1 . 31 ROADWAY: The roadway is defined as the area between parallel lines two ( 21 ) feet back of the curb lines or four ( 41 ) feet back of the average edge of pavement where no curb exists. C1-1 . 32 GRAVEL STREET: A gravel street is any unpaved street to which has been a ed one or more applications of gravel or _ similar material other than the natural material found on the street surface before any improvement was made. C1-1 (6 )