Loading...
HomeMy WebLinkAboutContract 26395 CITY SECRETARY �/^ �p CONTRACT NO. cXl�`� - - AbUMMENT NO. 2 STATE OF TEXAS 3 CITY SECRETARY CONTRACT (No M&C Needed) COUNTY OF TARRANT 3 WHEREAS, the City of Fort Worth (City) and Boyle Engineering Corporation (The "Engineer") made and entered into City Secretary Contract No. 24574, (the Contract) which was authorized by the City Council by M&C C-17199 on the 5 day of January, 1999; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of traffic signal and traffic box to be added in 1998 CIP Contract. WHEREAS, it has become necessary to execute Amendment No.2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated October 6, 2000 a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $3, 323.00 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $117, 162 . 00 MCM NCNB o ��GER 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of 4ig in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: a A. Douglas Rademaker, P.E. Mike Groomer Director, Department of Assistant City Manager Engineering Boyle Engineering Corporation ENGINEER AT� T: loria Pear on, City Secretary By: �Z ��Cl�^=i. Name: William W. Webster D m � Lt C AV �-� 309 West 7th Street, Suite 720 :on`�r�Ct Authorization Fort Worth, Tx. 76102 :�ace APPROVED AS TO FORM AND LEGALITY: Gary Stein rger Assistant City Attorney GBI�i E M O 2 10 ROYLE L= 7GbJ 7EER//'7G 4=0F?J=0 NAT/O/'7 CONSULTING ENGINEERS/SURVEYORS Suite 720 309 West 7th Street 817 / 820 - 0010 Fort Worth, TX 76102 FAX 817 / 820 - 0034 Mr. Fred Ehia, PE October 6, 2000 CITY OF FORT WORTH Engineering Department; Consulting Services Division 1000 Throckmorton Street Fort Worth, TX 76102 RE: Avenue J, Livingston Avenue & Pine Street DOE #'s 2265, 2282, 2176 Submittal of Plans Dear Mr. Ehia: As you are aware, there is a conflict with an existing traffic signal pole and box at the northeast corner of Pine Street and Lancaster Avenue. The existing traffic box will be in the proposed pavement. The traffic signal pole will be only two feet from the face of curb after Pine Street has been improved. According to Mr. Mark Mathis, PE, Traffic Engineer for the City of Fort Worth's Traffic Engineering Department, the traffic signal poles should be five feet from the face of curb. We have meet with Mr. Mathis to discuss the conflicts. Attached, please find a copy of the Meeting Minutes. Mr. Mathis said that both the traffic signal box and poles needs to be relocated. Mr. Mathis indicated that he could not spare the staff to design or construct the relocation. The relocation will require laying new conduit across Pine Street, installing a new traffic control box and drilling a new street light pole foundation. Mr. Mathis requested that the existing pole, mast arm and illuminare assembly be relocated to the new foundation. We can prepare the relocation plans if your staff desires. Since this is not included in our Scope of Services, this would require a change order. We have prepared a spreadsheet itemizing the costs associated with this task. We estimate the costs of preparing these plans to be $3,323. We have also included an Opinion of Probable Cost Estimate for Traffic Signal Box and Pole Relocations. If you have any questions, please do not hesitate to contact Mr. Daniel Flores or myself at 820-0010. Thank you. 0l�V�,cc� RECORD (C p (� \\DL33\work\-work\FWCity\F01_101\Word\General\Letters\City l0.doc Boyle Engineering Corporation /rimRe1ser, E ct Manager Attachments Cc: Mr. Mark Mathis, City of Fort Worth Traffic Engineering Department � �rM� "L END V Uo lJ'��ii "I UGbA�b \\DL33\work\-work\FW 110_101\Word\General\Letters\City I O.doc