Loading...
HomeMy WebLinkAboutContract 26399 CITY SECRETARY CONTRACT NO. =z 6 q AMENDMENT NO. 5 STATE OF TEXAS CITY SECRETARY CONTRACT NO. 22439 COUNTY OF TARRANT WHEREAS, the City of Fort Worth (City) and Parsons Transportation Group, Inc . , (Engineer) made and entered into City Secretary Contract No. 22439 (the Contract) which was authorized by the City Council by M&C C-15824 on the 17th day of December, 1996 ; and WHEREAS, the City of Fort Worth (City) and Parsons Transportation Group, Inc . , (Engineer) made and entered into Amendment No. 1 which was authorized by the City Council by M&C C- 17037 on the 6th day of October, 1998 ; and WHEREAS, the City of Fort Worth (City) and Parsons Transportation Group, Inc . , (Engineer) made and entered into Amendment No. 2 which was authorized by the City Council by M&C C- 17057 on the 20th day of October, 1998 , and WHEREAS, the City of Fort Worth (City) and Parsons Transportation Group, Inc. , (Engineer) made and entered into Amendment No. 3 which was authorized by the City Council by M&C C-17283 on the 23rd day of February, 1999, and WHEREAS, the City of Fort Worth (City) and Parsons Transportation Group, Inc . , (Engineer) made and entered into Amendment No. 4 which was authorized by the City Council by M&C C-17758 on the 161h day of November, 1999 , and WHEREAS, the Contract involves engineering services for the following project : Engineering contract for the design of Corridor Improvements to the Camp Bowie, 7 t Street, Bailey Avenue, University Drive Intersection. WHEREAS, it has become necessary to execute Amendment No. 5 to said Contract to include an increased scope of work and revised maximum fee to revise the design plans to show new sidewalk locations and revised tree sizes for the Camp Bowie, 7th Street, Bailey Avenue, University Drive intersection. The revisions will be done as a change order to the construction contract awarded by TxDOT to Architectural Utilities, Inc . (AUI) . NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract : 1. Article I, of the Contract is amended to include the additional services specified in M&C C-18329 adopted, by the City Council on the 7th day of November, 2000, copy of which is attached hereto and incorporated herein and further specified in the attached letter dated August 11, 2000 . The cost to City for the additional services to be performed by Engineer total $19, 097 . 2 . Article III , of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $354 , 577 . 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect . �K PREY -2- EXECUTED on this the 22 day of , 2000, in Fort Worth, Tarrant County, Texas . ATTEST: CITY OF FOR WOR By Gloria Pea son ike oomer City Secre ary Assistant City Manager APPROVED AS TO FORM CONSULTANT: AND LEGALITY: By, a�Y� e ns P.E. Gary Stei erger V-__ r____'___' ^ea. 9.?rn.�jer Assistant City Attorney Parsons Transportation Group, Inc . 2630 West Freeway, Suite 132 Fort Worth, Texas 76102 Contract Authorization '/'�—,Z_Zy APPROVED: bate (V Hugo M anga, P.E. for Department of Transportation and Public Works NO ED TEXo PARSONS Barton-Aschman Associates, Inc. • A Unit of Parsons Transportation Group, Inc. 2630 West Freeway•Suite 132•Fort Worth•Texas•76102 USA-(817)877-5803•(817)877-3214 fax August 11, 2000 Mr. Dan Walsh, P.E. City of Fort Worth 1000 Throckmorton Fort Worth, Texas 76102 Re: Improvements to University/7th Street/Camp Bowie Intersection Revised Request-Supplemental Agreement No. S Dear Dan, In a July 14 meeting with Phil Weston, Peter Arendt, Philip Poole, and Bonnie Holmes, you asked us to develop an estimate of the cost to make further changes to the landscaping and sidewalks in the construction plans. These changes would increase the size of some trees, alter the locations of some planned trees, revise the irrigation system to match the new planting scheme, and revise the location of the sidewalks in the islands surrounding the intersection. An Engineer's Estimate for the changes in work would also have to be developed. Since the plans were prepared in accordance with conceptual drawings approved by the City and the Landscaping Steering Committee, these changes are beyond the scope of our contract with the City. We estimate that changes will have to be made to the following sheets. Sheet Number Description 10 The quantity tabulations will have to be revised to include revised quantities for sidewalks. 54, 55, 56 The Plan and Profile sheets will have to be revised to show the new sidewalk locations. The Intersection Detail Sheet will have to be revised to show and detail the new walks. 100, 102, Landscaping notes and layouts will have to be revised to take into account the 104 revised tree locations and revised bench locations. 105, 107, Irrigation plans will have to be revised to accommodate the changes in tree 108 locations. 103 The landscaping detail sheet will have to be revised to remove the concrete block screen wall between the bus shelter and the service station. In all, it appears that 11 drawings will be affected by this change. While some of the changes are minor, new Mylar sheets will have to be plotted, sealed and delivered to TxDOT for issuing to the Contractor. In addition, our staff and our Subconsultant's staff have expended time in meetings to discuss the changes. City of Fort Worth August 1, 2000 Page 2 We have estimated the additional costs to the contract for these changes. Attached is a spreadsheet showing the estimate. The total amounts to $19,097. We request that you process a supplemental agreement to our contract for engineering services in the above amounts. We will await your approval of additional funds before proceeding with plans changes. Sincerely, PARSONS TRANSPORTATION GROUP, INC. qai� �/ Robert W. Jenkins, P.E. Principal Associate Attachment SLprojectsTort Worth\641123\SA_no5.doc r_ UA!,LI fP6 4 30 OOrnto tor- 0 O 0 0 0 0 Q Q U') O O C) CD (D to to to (D O 0 (D a0 of v v Oi N (D O O c 0 to 0 M M to cn M v 0 0 0)O0 O m M r` CO (D (D N N q 60 O (D O z N r CO N (3 O � � r CU Q N = O 00 O CD (D N (D O 0 O N — 'q N N = a Ul _ z aU N N N N 00 H U 0 z 0 N a Q N N N 000 Q a U O N O N Q U O to N O Q U) U O QO O (D � v r U N 7 O (1) c m Z 4oc) N O a) W N W W � c � o c z cn m Q O CF- cu E v c Q w v cu ° f- U ° W O ° w ar W N U U) g c W > m 'm p N j c W Ca O` c C Ucn 7 d m J N a o Qa QW Q Y as m e U p m Zy m N cn '� cn c c cn Q �j W ° °a) CUa`) c rn c m m .c c o ~ LU 0J , CL (n a n 0 0 W 0 a `n ;° 000 � > LU Cc 7 C FAV [57�°Q71T Un L"v J��pUUr UISL'Uo City of Fort Worth, Texas "affor and Council Communication DATE REFERENCE NUMBER LOG NAME TAGE 11/7/00 **C-18329 20PARSONS 1 of 2 SUBJECT CONTRACT AMENDMENT NO. 5 WITH PARSONS TRANSPORTATION GROUP FOR THE CAMP BOWIE, 7TH STREET, UNIVERSITY DRIVE, BAILEY AVENUE INTERSECTION RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Contract Amendment No. 5 with Parsons Transportation Group to provide additional design services for the subject project for a lump sum fee of$19,097. DISCUSSION: On December 17, 1996 (M&C C-15824), the City Council authorized the execution of an engineering services agreement with Parsons Transportation Group to prepare the plans and specifications for corridor improvements at the Camp Bowie, 7th Street, University Drive, Bailey Avenue intersection for a lump sum fee of$171,000. The Texas Department of Transportation (TxDOT) has awarded the construction contract to Architectural Utilities, Inc. The contractor anticipates construction to begin in November 2000. A pre- construction meeting was held with the contractor and TxDOT on October 18, 2000. The intersection improvements have an approximate 195 working day completion timeline. The utility construction for water and sewer main replacements is 100% complete. This amendment will revise the design plans to show new sidewalk locations and revised tree sizes for the Camp Bowie, 7th Street, University Drive, Bailey Avenue intersection. The revision will be done as a change order to the construction contract awarded by TxDOT to Architectural Utilities, Inc. This contract amendment will include the following: • The quantity tabulations will be revised to include revised quantities for sidewalks; and • The plan and profile sheets will be revised to show the new sidewalk locations; and • Landscaping notes and layouts will be revised to take into account the revised tree locations and revised bench locations; and • The irrigation plans will be revised to accommodate the changes in tree locations; and • The landscaping detail sheet will be revised to remove the concrete block screen wall between the bus shelter and the service station. The contract amendment of $19,097 will be funded from the Undesignated Fund Account of Council District No. 7. Staff has reviewed the amendment and believes it is fair and reasonable for the services to be performed. City of Fort Worth, Texas avagor anal coundlCommunication DATE REFERENCE NUMBER LOG NAMEPAGE 11/7/00 **C-18329 20PARSONS 2 of 2 SUBJECT CONTRACT AMENDMENT NO. 5 WITH PARSONS TRANSPORTATION GROUP FOR THE CAMP BOWIE, 7TH STREET, UNIVERSITY DRIVE, BAILEY AVENUE INTERSECTION This project is located in COUNCIL DISTRICTS 7 and 9. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvements Fund. MG:k Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) OPROVED Mike Groomer 6140 CITY COUNCIL Originating Department Head: Hugo Malanga 7801 (from) NOV 7 2000 6C 0111 531200 020111021202 $19,097.00 Ai" �Additional Information Contact: ru.+a/ — City Secretary of the City of Fort Worth,Tem Hugo Malanga 7801