HomeMy WebLinkAboutContract 26503 AMENDMENT NO. 2 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT g WHEREAS, the City of Fort Worth (City) and J.B. Davies, Inc. , (Engineer) made and entered into City Secretary Contract No. 24351, (the Contract) which was authorized by the City Council by M&C C- 17042, on the 13th day of October 1998 and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: t Pavement reconstruction and Water and Sanitary Sewer Replacement on Lipscomb Street (Magnolia to Ingram) ; Lipscomb Street (Hawthorne to Jessamine) ; West Cantey Street (5th to College) ; West Lowden Street (Adams to Hemphill) and South Adams Street (West Jessamine to Elizabeth) WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated November 16, 2000, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $7,280 .00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $133, 685.37. C0QD 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force )and effect./ EXECUTED on this the 9 —& day of 2001, in Fort Worth, Tarrant County, Texas. ATTEST: '.� /� r R- A kfv Contract Authorization Gloria Pearson, City Secretary Date APPROVAL RECOMMENDED: APPROVED: t _ A. Douglas Rademaker, P.E. Mike Groomer Director, Department of Assistant City Manager Engineering J.B. DAVIES, INC. ENGINEER By: Zzadez� Name: Edward L. Green, P.E. , Vice President 1412 West Macmolia Avenue Fort Worth, TX 76104 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney 24351 Iv�U Il �OIrL'L U,J I MWD -2- 0 J.B. DAVIES INC., ENGINEERS & SURVEYORS November 16, 2000 Dena Johnson,P.E. City of Fort Worth Department of Engineering 1000 Throckmorton St. Fort Worth, Texas 76102 Re: 1998 CIP Lipscomb St., W. Cantey St., W. Lowden St., and S. Adams St., Contr. No. 24351, Reference C-17042, DOE No's: 2168, 2169, 2171, 2172, 2173 Request for Contract Amendment Dear Dena, J.B. Davies respectfully requests an amendment to the design contract for the above referenced project for the following service which are outside of the scope of services for the original contract: 1. Storm drainage improvements to the alley south of Cantey Street,between College and S. Adams. During the course of obtaining a right-of-entry agreement for the construction of a lead walk to serve the property located at 1009 W. Cantey,the property owner complained of storm water from the alley "washing beneath his house". Further investigation revealed poor drainage from the alley,resulting from an improperly constructed drop inlet some 300 feet south of Cantey Street. After discussing the problem with Transportation and Public Works Department Mr. George Behmanesh,surveying and a design was completed and included into the project in the form of an addendum to the bid documents. Surveying and Engineering services for this effort amount to: $2,416.00 2. Concrete Street alternative bid. During the preconstruction conference on this project, several contractors posed questions as to why a concrete pavement section was not considered for this project. After discussing the matter with Department of Engineering Mr. Rick Trice, the re-quantification of the street proposal and creation of a bid alternative for concrete pavement with monolithic curb and silicone joint sealant,elimination of curb&gutter, valley gutters, concrete manhole collars with a resulting addendum to the bid documents was completed. Engineering services for this effort amount to: $4,864.00 J.B. Davies has incurred legitimate additional cost involved in the performance of these services. The original overall contract amount including amendment number one to include additional streets amounts as follows: Street&Drainage Water Sewer TOTAL Original Contract Amount: $50,723.39 $19,210.45 $6,874.18 $76,808.02 Amendment#1 Amount: $31,285.71 $18,311.64 $0.00 $49,597.35 Current Contract Amount: $82,009.10 $37,522.09 $6,874.18 $126,405.37 Proposed Amendment#2 $7,280.00 $0.00 $0.00 $7,280.00 Proposed Total $89,289.10 $37,522.09 $6,874.18 $133,685.37 ,ti, �,ECz,vop�G) ff 9 ° 1412 West Magnolia Avenue/Fort Worth,Texas 76104-4249/817-335-3154/Fax 817-870-1503 November 16, 2000 Request of Contract Amendment Please contact me if you have any questions or require further information. Sincerely, Edward L. Green, P.E. Vice President a I',: . W Cof",Y , Y EK.