HomeMy WebLinkAboutContract 26459 EXECUTED :. CITY + COPY } sSECRETAW FORT ORTH CITY SECRETARY CONTRACTNQ O, Jr-1 SPECIFICATIONS AND CONTRACT DOCUMENTS d FOR REPAIR AND REPAINTING OF THE EXISTING 5.5 MG STAGECOACH GROUND STORAGE TANK PROJECT NO: PW77-060770180230 Fort Worth Water Department AUGUST 2000 DAVID R, TOWNSEND �.&�58737 �k,�� City of Fort Worth, Texas "alor and Council Communication DATE REFERENCE NUMBER LOG NAMEPAGE 11/28/00 **C-18364 60PAINT 1 of 2 SUBJECT AWARD OF CONTRACT TO N. G PAINTING, INC. FOR REPAIR AND REPAINTING OF THE STAGECOACH 5.5 MG GROUND STORAGE TANK RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a construction contract with N. G Painting, Inc. for the Repair and Repainting of the Stagecoach 5.5 MG (million gallon) Ground Storage Tank, on the low bid of $531,900. DISCUSSION: As a part of an in-house project, the Water Department designed and prepared plans and specifications for the repair and repainting of the Stagecoach 5.5 MG Ground Storage Tank. It was determined that the tank was badly corroded and in need of repairs and repainting. In addition, alterations to the tank are required to meet Texas Natural Resources Conservation Commission and Occupational Safety and Health Administration requirements. On October 5, 2000, the following bids were received: BIDDER BID AMOUNT ESTIMATED COMPLETION TIME N. G Painting, Inc. $531,900 120 Calendar days Don L. Owens $626,319 Texas Bridge, Inc. $662,900 Corrosion Eliminator $699,922 Champion Coating $702,500 AUI General Contractors $786,712 TMI Coating, Inc. $947,100 Gulf State Protection $956,300 The project is located in COUNCIL DISTRICT 2. N. G. Painting, Inc. is in compliance with the City's M/WBE ordinance by committing to 13% M/WBE participation. The City's goal on this project is 12%. The total authorized amount includes $25,000 for possible change orders and $2,000 for staff support. F I City of Fort Worth, Texas "floor And councilcommunication DATE REFERENCE NUMBER LOG NAME PAGE 11/28/00 **C-18364 60PAINT 2 of 2 SUBJECT AWARD OF CONTRACT TO N. G PAINTING, INC. FOR REPAIR AND REPAINTING OF THE STAGECOACH 5.5 MG GROUND STORAGE TANK FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. MG:k Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) Mike Groomer 6140 APPROVED Originating Department Head: CITY COUNCIL IL Dale Fisseler 8207 (from) N OV 28 zow P160 541200 060160180020 $531,900.00 0 �C Additional Information Contact: l Y""' Gitp seca*wy of the Dale Fisseler 8207 C(Ilf 61 Foe Wim'Texas REPAIR AND REPAINTING OF THE August 2000 EXISTING 5.5 MG STAGECOACH GROUND STORAGE TANK PROJECT NO: PW77-060770180230 Fort Worth Water Department OF David Townsend, P.E. ���� .TF ,� City of Fort Worth Water Department ~DAVID R. TDWNS N ""f 1000 Throckmorton street •-N»•--»••�' Fort Worth, Texas 76102 58737 ®w TABLE OF CONTENTS Notice to Bidders A Special Instructions to Bidders A Proposal B Minority and Women Business Enterprises Specifications B General Conditions C Supplementary Conditions CS y Special Conditions D Special Specifications E 01010 Summary of work 01150 Schedules, Report, Payment 01300 Construction Facilities 01301 Construction Photograph 01310 Project Meeting 01340 Shop-drawing, Product Data 01360 Quality Control 01370 Schedule of Value 01420 Inspection Services 16010 Electrical General Provision 16110 Electrical Raceway 16120 Wire and Cable 16199 Miscellaneous 16210 Electrical Utility Service 16410 Underground 16450 Grounding Systems 16455 Lightning Protection 16900 Instrumentation 01700 Contract Close-out 01710 Cleaning and Adjusting 01711 Seeding of Lawns 02100 Site preparation & Cleaning 02830 Chain Link Fence 03600 Concrete 05500 Metal Fabrications 05515 Vault Door & Ladder Post 05520 Handrail &Railing 09900 Steel Water Tank Painting 09900 Steel Water Tank Painting 09910 Removal of Lead Base Coating 11550 Fall Prevention Systems 15041 Disinfection Certificate of InsuranceBonds F Contract G r PW PART A r- t F PART A- NOTICE TO BIDDERS Sealed proposals for the furnishing of all labor, materials, and equipment necessary for this project, Repair and Repainting of the Existing 5.5 MG Stagecoach Ground Storage Tank, Water Department No. PW77-060770180230 will be received until 1:30 p.m. on the date of the bid opening, at the office of the Purchasing Division located on the east side of the lower level of the Municipal Building, 1000 Throckmorton, Fort Worth, Texas 76102. The Bids will be publicly opened in the City Council Chambers at: 2:00 p.m., Thursday, September28, 2000 and then read aloud. Special Contract Documents, including plans and supplemental detailed specifications,have been prepared for this project and may be obtained from Fort Worth Water Department, 1000 Throckmorton Street,Fort Worth,TX 76102. Monday-Friday-8:00 AM-5:00 PM)Plans will be available after August 29, 2000. Pre-qualification according to Contract Specifications (as listed in the Special Instructions to Bidders) is required; General Contract Documents and General Specifications for Water Department projects, dated January 1, 1978, with the latest revisions, also comprise a part of the Contract Documents for this project and may be obtained at the Fort Worth Water Department, 1000 Throckmorton Street, Fort Worth, Texas 76102. In addition, the Standard Specification for Street and Storm Drain Construction of the City of Fort Worth Transportation and Public Works Department form part of this project, and a copy of this document may be obtained by paying a non-refundable fee of$30.00 at the TPW office in the Municipal Building. A pre-bid conference will be held at 9:30 AM on Thursday, September 14, 2000 at the Fort Worth South Holly Water Treatment Plant SCADA Building located near Fournier Street. Attendance is not mandatory for prospective bidders. Representatives of the Owner and Engineer will be present to discuss the project. Engineer will transmit to all prospective bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. A site visit to the existing Stagecoach Ground Storage Tank will be held after the pre-bid conference. The City reserves the right to reject any or all bids and waive any or all irregularities. No bid may be withdrawn until the expiration of ninety (90) days from the date bids are opened. Bob Terrell Gloria Pearson City Manager City Secretary Publication: August 24, 2000 August 31, 2000 SPECIAL INSTRUCTIONS TO BIDDERS 1. PREQUALIFICATION REQUIREMENTS. All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification process will establish a bid limit based on technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, current financial statement, an acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7) calendar days prior to the date of the opening of bids. a) The financial statement required shall have been prepared by an independent certified public accountant or independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status of the submitting company.This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in the work of both the same nature and technical level as that of the project for which bids are to be received. C) The Director of the Water Department. shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water Department project. d) Bid received in excess of the bid limit shall be considered non-responsive and will be rejected as such. e) The City, in its sole discretion, may reject a bid for failure to demonstrate experience and/or expertise. f) Any proposals submitted by a non-prequalifed bidder shall be returned unopened, and if inadvertently opened, shall not be considered. g) The City will attempt to notify prospective bidders whose qualifications (financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a wavier of any necessary prequalification. A-1 2. BID SECURITY. A cashier's check, or an acceptable bidder's bond, payable to the City of Fort Worth, in the amount of not less than five (5%) percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10) days after the contract has been awarded. To be an acceptable surety on the bond, (1) the name of the Surety Company shall be included on the current U.S. Treasury list of acceptable sureties, or (2) the surety company must have capital and surplus equal to ten times the limit on the bond. The surety must be licensed to do business in the State of Texas. The amount of the bond shall not exceed the amount shown on the U.S. Treasury list or one-tenth (1/10) the total capital and surplus. 3. BONDS. A performance bond, a payment bond, and maintenance bond each for one hundred (100%)percent of the contract price will be required. Reference C3-3.7. 4. WAGE RATES. Not less that the prevailing wage rates established by the City of Fort Worth, Texas, and as set forth in the Contract Documents. Must be paid on this project. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Prior to the award of contract to an out-of-state bidder, the bidder shall be licensed to do business in the State of Texas. For licensing procedures, contact the Texas Secretary of State Offices (Telephone Number 1-512-463-5555 or 1-900-263-0060) 7. NONRESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statues, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower that the lowest bid submitted by a Texas resident bidder by the same amount that a Texas resident would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident `s principal place of business is located. "Nonresident bidder" means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has a place of business in the State of Texas. This provision does not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the contract amount is $25,000 or less, the contract amount shall be paid within forty-five(45)days after the completion and acceptance by the City. A-2 9. AGE: In accordance with the policy ("Policy') of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents, R employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the basis of a bona fide occupational qualification,retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements. Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against the City arising out of the Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of the contract. 10. DISABILITY: In accordance with provisions of the Americans with Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on; the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or employees of the Contractor or any of its subcontractors. Contract warrants it will fully comply with ADA's provision and any other applicable Federal, State, and local laws concerning disability and will defend, indemnify and hold harmless against any claims or allegations asserted by third parties or subcontractors against the City arising out of the Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning disability discrimination in the performance of this contract. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with the City of Fort Worth Ordinance No. 11923 and 13471, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of these Ordinances can be obtained from the Office of the City Secretary. In order for a bid to be considered responsive, the bidder shall submit the MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM ("Documentation") as applicable. The documentation must be received no later than 5:00 PM, five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or Women A-3 Business Enterprise (WBE) on a contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements. Further, any such misrepresentation (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three (3) years. 12. ADDENDA: Bidders wanting further information, interpretation or clarification of the contract documents must make their request in writing to the Fort Worth Water Department Engineering Services, at least 96 hours prior to bid opening. Answers to all such requests will be bound and made a part of the Contract Documents. No other explanation or interpretation will be considered official or binding. Should a bidder find discrepancies in,or omissions from, the Contract Documents, or should the bidder be in doubt as to their meaning, the bidder should at once notify the Fort Worth Water Department Engineering Services, in order that a written addendum may be sent to all bidders. Any addenda issued n will be mailed or be delivered to each prospective bidder. The bid proposal as submitted by the bidder must be so constructed as to include any addenda issued by the Fort Worth Water Department, prior to 24 hours of the opening of bids with appropriate recognition of addenda so noted in the bid proposal. 13. PRE-BID CONFERENCE: A Pre-Bid Conference will be held at 10:00 AM, August 9, 20002 at the Fort Worth South Holly Water Treatment Plant SCADA Conference Room, 920 Fournier Street, Fort Worth, Texas, 76102. A-4 _# _, -� r 1� C PART B -PROPOSAL (This proposal must not be removed from this book of Contract Documents.) TO: Bob Terrell City Manager Fort Worth, Texas PROPOSAL FOR: The furnishing of all materials, equipment and labor for the installation of a sanitary sewer system and all necessary appurtenances and incidental work to provide a complete and serviceable project designed as: REPAIR AND REPAINTING OF THE EXISTING 5.5 MG STAGECOACH GROUND STORAGE TANK PROJECT NO. PW77-060770180230 Pursuant to the foregoing "Notice to Bidders", the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, and the General Contract Documents and General Specifications for Water Department Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material, which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the City Water Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completion of the said work. Contractor proposes to do the work within the time stated and for the following sums: (Furnish and install, including all appurtenances work, complete in place, for the following items): B-1 BASE BID-REPAIR AND REPAINT EXISTING 5.5 MG Welded Steel RESERVOIR Item Spec. Estimated Unit Unit Bid Amount No. Item Quantity Name of pay item with Unit price in words Price Bid I D-34 1 LS Mobilization. Five thousand Dollars And No Cents $5,000 $5,000 Per Unit 2 D-34 500 SF Repair of Pits and Scaling of Tank Interior and Exterior. Two Dollars $2 $1,000 And No Cents Per Unit 3 D-34 200 LY Repair of Welds Seams of Tank Interior and Exterior. Five Dollars $5 $1,000 And No Cents Per Unit 4 D34 1 L.S City of Fort Worth Molly Logo(12ft by 36ft per plan). Four thousand Dollars $4,000 $4,000 And No Cents Per Unit 5 D-34 800 SY Remove and Replace Roof Plates. One Dollars $1 $800 And No Cents Per Unit 6 D-34 80 LY Remove and Replace Roof Rafters. Ten Dollars $10 $800 And No Cents Per Unit B-2 Base bid Continue Item Spec. Estimated Unit Unit Bid Amount No. Item Quantity Name of pay item with Unit price in words Q h' Price Bid 7 D-34 80 L.F Remove and Replace Roof Girders. Ten Dollars $10 $800 And No Cents Per Unit 8 D-34 I L.S Modify the Existing Overflow per plan. Twenty Thousand Dollars $20,000 $20,000 And No cents Per Unit 9 09900 1 L.S Surface Preparation and Application of Tank Interior D-34 Paint Coating System. Two Hundred Thousand Dollars $200,000 $200,000 And No Cents Per Unit 10 09900 1 L.S Surface Preparation and Application of Tank Exterior D34 Paint Coating System. One Hundred Forty Thousand Dollars $140,000 $140,000 And No Cents Per Unit 11 D-34 1 L.S Non-Hazardous,Non-Municipal Disposal of Special Waste Material From Paint Removal. Two Thousand Dollars $2,000 $2,000 And No Cents Per Unit 12 Sealant of base floor plate and ringbeam and painting. D-34 1 L.S Five Thousand Dollars $5,000 $5,000 And No Cents Per Unit B-3 BASE BID CONTINUE ' Item Spec. Estimated Unit Unit Bid Amount No. Item Quantity Name of pay item with Unit price in words Price Bid 13 D-34 5 EA 36"Roof Vents per plan and specifications. One Thousand Dollars $1,000 $5,000 And No Cents Per Unit 14 D-34 2 EA Remove and replace the Existing manways with 36" (Davit Arm per plan and specs)to meet TNRCC. Three Thousand Dollars $3,000 $6,000 And No Cents Per Unit 15 D-34 1 L.S Remove and replace the Interior ladder of the tank per plan and specs. Two Thousand Dollars $2,000 $2,000 And No Cents Per Unit 16 D-34 2 L.S Install new EIM Valve actuators on the top of inlet and Outlet on valve vault and a sump pump per plan and specs. Ten Thousand Dollars $10,000 $20,000 And No Cents Per Unit 17 D-34 1 L.S Install new reinforced concrete overflow airgap system as indicated on the plan,connect to existing drain line at site,backfill and compact per plan. $20,000 $20,000 Twenty Thousand Dollars And No Cents Per Unit B-4 • BASE BID CONTINUE Item Spec. Estimated Unit Unit Bid Amount No. Item Quantity Name of pay item with Unit price in words Price Bid 18 D-34 2 L.S Remove and Replace the existing concrete valve cover with a pre-cast concrete cover,equip with Bilco Hatch per plan. $5,000 $10,000 Five Thousand Dollars And No Cents Per Unit 19 D-34 1 L.S Remove and replace existing roof hatch per plan. One Thousand Dollars $1,000 $1,000 And No Cents Per Unit ' 20 D-34 1 L.S Instrumentation,Furnish and install surge protector, Intruder alarm, lights in the Vaults, pressure transmitter, level transmitter,chlorine analyzer, install PIT and LIT and SCADA system programming by HSQ per plan and specifications. forty Thousand Dollars $40,000 $40,000 And No Cents Per Unit Quality control&inspection Equipment,Dew meter 21 D34 1 L.S (model 219&219c), Wall mount hygrometer/ Thermometer(model 3313-90), Positector 6000 dry film gage(model FS Memory3), Holiday detector (model M-1),KTA Coating handbook Volume II, spring micrometer training surface with Testex press- o-film replica tape and hard shell carrying case. Per KTA-TATOR Catalog. Four Thousand Dollars $4,000 $4,000 And No Cents Per Unit B-5 BASE BID CONTINUE Item Spec. Estimated Unit Unit Bid Amount No. Item Quantity Name of pay item with Unit price in words Q h' Price Bid 22 D-34 1 LS Remove and replace the North Fence(720 linear feet) with concrete mow strip per plan. Forty Thousand Dollars $40,000 $40,000 w And No Cents Per Unit 23 D-34 1 EA Grading and seeding per plan and specification. One Thousand Dollars $1,000 $1,000 And No Cent Per Unit 24 D-34 I L.S Remove and Replace the existing security gate on the exterior ladder per plan. One Thousand Dollars $1,500 $1,500 And No Cents Per Unit 25 D34 I L.S Additional Disposal for Hazardous of Waste Material from Paint Removal. One Thousand Dollars $1,000 $1,000 And No Cents Per Unit SUBTOTAL AMOUNT BASE BID Five Hundred Thirty One Thousand Nine Hundred DOLLARS And No CENTS CONTRACTOR WILL BE SELECTED ON BASIS OF TOTAL Base BID: HOWEVER, THE CITY RESERVES THE RIGHT TO DELETE THE BID ITEMS PER PROJECT CONSTRUCTION REQUIREMENTS. B-6 Within ten(10)days after receipt of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certifies that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and these specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by the City Ordinance No. 7400. (Complete A or B below, as applicable) _ A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business are required to be percent lower than resident bidders by state law. A copy of the statue is attached. Nonresident bidders in the State of , our principal place of business, are not required to underbid resident bidders. — B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04 (F) of the Texas Limited Sales, Excise and Use Tax Act. All equipment and materials not consumed by or incorporated into the project construction, are subject to State sales taxes under house Bill 11, enacted August 15, 1992. B-7 The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 150 calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. I (we)acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration in preparation of the foregoing bid: Addendum No. 1 (initials) Addendum No. 2 (initials) Addendum No. 3 (initials) Respectfully submitted, (SEAL) If Bidder Is Corporation By tL Title Address t'3 6& x-, YZc 7 A) Telephone '3p B-8 r city of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is $25,000 or more, the M/WBE goal is applicable. If the total dollar value of the contract is less than$25,000,the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority/Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. The objective of the Policy is to increase the use of M/WBE firms to a level comparable to the availability of M/WBEs that provide goods and services directly or indirectly to the City. MIWBE PROJECT GOALS The City's MBE/WBE goal on this project is 12% of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated MfWBE goal,or; 2. Good Faith Effort documentation, or; 3. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. M/WBE Utilization Form: received by 5:00 p.m.,five(5)City business days after the bid opening date,exclusive of the bid opening date. 2. Prime Contractor Waiver Form: received by 5:00 p.m.,five(5)City business days after the bid opening date,exclusive of the bid opening date. 3. Good Faith Effort Form: received by 5:00 p.m.,five(5)City business days after the bid opening date,exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS. Any questions, please contact the MIWBE Office at(817)871-6104. Rev.612198 ATTACHMENT 1C Page 1 of 3 City of Fort Worth Minority and Women Business Enterprise GOOD FAITH EFFORT Prime Company Name Bid Date Project Name Project Number If you have failed to secure M/WBE participation and you have subcontracting and/or supplier opportunities or if r your M/WBE participation is less than the City's project goal,you must complete this form. If the bidder's method of compliance with the M/WBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m.five(5)City business days after bid opening, exclusive of bid opening date,will result in the bid being considered non-responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity (DO NOT LIST NAMES OF FIRMS)which will be used in the completion of this project, regardless of whether it is to be provided by a MlWBE or non-M/WBE. (Use additional sheets, if necessary) List of: Subcontracting Opportunities List of: Supplier Opportunities - — Rev.6,12l9B ATTACHMENT 1B �• Ci of Fort Worth Page 1 of 1 Minority and Women Business Enterprise Specifications AdP Prime Contractor Waiver Prime Company Name Project Name Bid Opening Date Project Number If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is only applicable if both answers are yes. Failure to complete this form in its entirety and be received by the Managing_Department on or Before 5:00 p m., five f5) City business days after bid opening, exclusive of the bid opening date, Will result in the bid being considered non-responsive to bid specifications. Will you perform this entire contract without subcontractors? Yes No If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? Yes No If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and/or WBE(s) on this contract, the payment therefore and any proposed changes to the original MBE(s) and/or WBE (s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or employee of the City.Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1)year. Authorized Signature Printed Signature Title Contact Name (if different) Company Name Contact Telephone Number(s) .� Address Fax Number Rev.6/2/98 ATTACHMENT 1C Page 2 of 3 2.) Did you obtain a current list of M/WBE firms from the City's M/WBE Office? The list is considered in compliance, if it is not more than 3 months old from the date of bid opening. Yes Date of Listing 1 No 3.) Did you solicit bids from M/WBE firms,within the subcontracting and/or supplier areas previously listed,at least ten calendar days prior to bid opening by mail,exclusive of the day the bids are opened? Yes If yes, attach M/WBE mail listing to include name of firm and address and a dated No copy of letter mailed. „ 4.) Did you solicit bids from M/WBE firms,within the subcontracting and/or supplier areas previously listed,at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? ` Yes If yes, attach list to include name of M/WBE firm, ep rson contacted, �No phone number and date and time of contact. 0i NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile dy is used, attach the fax confirmation, which is to provide M/WBE name, date, time, fax number and documentation faxed. NOTE: If a SIC list of M/WBE is ten or less,the bidder must contact the entire list to be in compliance with questions 3 and 4. If a sic list of M/WBE is more than ten, the bidder must contact at least two-thirds of the list but not less than ten to be in compliance with questions 3 and 4. 5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of plans and specifications in order to assist the M/WBEs? Yes No 6.) If M/WBE bids were received and rejected,you must: (1) List the M/WBE firms and the reason(s)for rejection (i.e., quotation not commercially reasonable, qualifications,etc.) and (2) Attach affidavit and/or documentation to support the reason(s) listed below(i.e.. letters, memos, bids,telephone calls, meetings,etc.) r (Please use additional sheets,if necessary,and attach.) Company Name Telephone Contact Person Scope of Work Reason for Rejection Rev ROM ATTACHMENT 1C Page 3 of 3 ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain �. M/WBE participation on this project. 5 The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. E The undersigned certifies that the information provided and the M/WBE(s) listed was/were contacted in good faith. It is understood that any M/WBE(s) listed in Attachment 1C will be contacted and the reasons for not using them will be verified by the City's M/WBE Office. Authorized Signature Printed Signature Title Contact Name and Title (if different) Company Name Telephone Number(s) Address Fax Number City/State/Zip Date Rev', 612M ATTACHMENT 1A PAGE 1 of 2 City of Fort Worth Minority and Women Business Enterprise Specifications MBEIWBE UTILIZATION FORM N.G Painting,Inc. October 5,2000 PRINK COMPANY NAME BID DATE " 5..5 MG Stagecoach Ground Storage Tank PW77-060770180230 PROJECT NAME PROJECT NUMBER 12% CITY-S MNVBE PROJECT GOALMNVBE PERCENTAGE ACHIIEVED Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after the bid opening, exclusive of the bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned bidder agrees to enter into a formal agreement with the MBE and/or WBE firms for work listed in this schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to specifications. ~ Company Name,Contact Name, Certified Specify All Contracting Specify All Items to be Dollar Amount Address,,and Telephone No. ¢ Scope of Work(*) Supplied(*) O Lake Richardson Construction Yes Concrete Concrete works 1 $25,382.00 P.O Box 185577 Fort Worth,Texas 76181 (817)28409746 Custom Fence Yes Fence Security Fence l $17,79.00 around the Site 401 North Rudd Burleson,Texas 76097 (817)295-8811 } Service Excelleence,Inc. Yes Paint Supplies Paint $27,000.00 P.O Box 540444 Dallas,Texas 75354-444 (214) MA BEs must be located,in 9(nine)county marketplace or currently doing business in the marketplace at thei time of bid. :(*)Specify all areas in which771 .MAN BEs are to be uplized and/or items to be stippUed $ x 4 (*)A Complete//sting of items to 6e supplie is"required In order to received iredd toW-0e d the;j41M/BE Gcai r" Identify each Tier level. Tier. Means the level of subcontracting below the,prime contractor/r,,.onsultant,aje, a direct payment from the prime contractor to subcontractor is considered 1"tier, payment by a subcontractor to its supplier ls considered 2nd:tier. THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m.,FIVE(5)CITY BUSINESS DAYS AFTER BID OPENING,EXCLUSIVE OF BID OPENING DATEOPENING Rev.6/2/98 f_�n 4 --A.�-6 A,.wfr,w.,..,« '[ -.-I Ma earalv&fl by rha mAnacsinn Gffnarhment ATTACHMENT 1A PAGE 2 of 2 City of Fort Worth Minority and Women Business Enterprise Specifications 'Company Name,-Contact Name, Certified Specify All Contracting't' *.N ,` .Spei ltems to'be , Dotfar Amount +Address,and Teleptio�le oto; �'`;° Scope of Work(' Supplied(*) u p N a The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE (s) and/or WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three(3)years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one(1)year. ALL MBEs and WBEs MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD X/I CL 1�1�; Nick Gramatikakis Authori ed Signa Printed Signature President Connie Olden/Office Manager Title Contact Name and Title(if different) N.G Painting,Inc_. (830)257-5940 Company Name Telephone Number(s) 313 Mill Run (830 792-4888 Addrom Fax Number Kerrville,Texas 78028 12-6-2000 City/State0p Code Date THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m.,FIVE(5)CITY BUSINESS DAYS AFTER BID OPENING,EXCLUSIVE OF BID OPENING DATEOPENING Rev.6/2/98 Paaes 1 anti 2 of Attachment 1A must be received by the Managing 00partmant ORDINANCE NO. 13471 AN ORDINANCE AMENDING CITY OF FORT WORTH ORDINANCE NO. 11923 BY AMENDING SECTIONS 2, 3, AND AMENDING ATTACHMENT I; PROVIDING A SEVERABILITY CLAUSE; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: SECTION 1. Section 2 of City of Fort Worth Ordinance No. 11923 is hereby amended to read as follows: The ultimate goal of this ordinance is to remedy the effects of past underutilization in the Marketplace by increasing the use of minority and women business enterprises above the present low level to one more comparable to their availability in the Fort Worth Marketplace. The City Manager shall recommend an annual goal for MBE/WBE participation in City procurement activities, based upon the availability within the Marketplace. The goals, based upon availability, shall be thirteen percent (13%) for minority businesses and twelve percent (12%) for women businesses and shall be reviewed as provided for elsewhere herein. These goals are not quotas. SECTION 2. Section 3 of City of Fort Worth Ordinance No. 11923 is hereby amended to read as follows: The provisions of this ordinance shall apply to all contracts awarded by the City, except as may be hereafter specifically exempted. Where contracts involve the expenditure of federal or state funds, the state or federal policy related to MBE/WBE or DBE participation may take precedence over this ordinance. The provisions of this ordinance shall be liberally construed for the accomplishment of its policies and purposes. Specific goals shall be established in the areas of construction, professional services and purchases of other goods and services. A goal may be set on individual projects based on the type of work or services to be performed, or goods to be acquired and the availability of minority and women businesses in the City's Marketplace. SECTION 3. Attachment I to City of Fort Worth Ordinance No. 11923 is hereby amended to read as follows: 1 City Council approved June 2, 1998 16 ATTACHMENT I I. DEFINITIONS 1. "Applicable Contract" means any contract of $25,000 or more for construction projects and professional services and $15,000 or more for purchase agreements, as well as any other contracts that the City Council or City Manager deem appropriate. 2. "Certified" means those firms, within the Marketplace, that have been determined to be a bonafide minority or women business enterprise by either the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TxDOT), highway division. In the event of denial of certification by either of these entities, the City reserves the right to grant its own certification for use in City contracts. 3. "City" means the City of Fort Worth, Texas. 4. "City business day" means Monday through Friday, inclusive, excluding legal holidays. Legal holidays shall be observed as prescribed by the City Council for observance as follows: New Year's Day January 1 M. L. King, Jr. Birthday Third Monday in January Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Thanksgiving Day Fourth Thursday in November Thanksgiving Friday Fourth Friday in November Christmas Day December 25 When one of the above named holidays falls on a Saturday, the holiday shall be observed on the preceding Friday. When one of the above named holidays falls on a Sunday, the holiday shall be observed on the following Monday. 5. "Construction" means the erection, rehabilitation, alteration, conversion, extension, demolition, improvement, remodeling or repair to any real property, including streets, storm drains and facilities providing utility service owned by the City. 6. "Contract" means a binding agreement whereby the City either grants a privilege or is committed to expend or does expend its funds or other resources for or in connection with a) construction of any public improvement, and b) purchase of any services (including professional services). The term includes "purchase order". 7. "Contract Officer" means the person employed by the City to oversee the performance of the contract. 8. "Contracting Department" means the department responsible for payment of contract obligations. 2 City Council approved lune 2, 1998 9. "Contractor" means the Offeror with whom the City has entered into an agreement. Includes the terms 'Vendor" and "Prime Contractor". 10."Coordinator" means the administrator of the MBE/WBE Office. 11."Goal" means the percentage of minority business enterprise and/or women business enterprise participation on an applicable project as determined by the City, based on the availability of such businesses in the marketplace and the subcontracting/supplier opportunities of the project. 12."Good Faith Effort" means having absence of malice or any intentions to deceive, good intentions and sincerity to meet the goal of this ordinance. Documentation submitted by the Offeror to explain why its good and honest efforts did not meet or exceed the stated Goal. Compliance with each of the following steps shall satisfy the Good Faith Effort requirement absent proof of fraud, misrepresentation, or intentional discrimination by the Offeror: 12.1. List each and every subcontracting and/or supplier opportunity for the completion of this project. 12.2. Obtain a current (not more than three (3) months old from the bid open date) list of MBE/WBE subcontractors and/or suppliers from the City's MBE/WBE Office. 12.3. Solicit bids from MBE/WBEs, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened. 12.4. Solicit bids from MBE/WBEs, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened. . Note: A facsimile may be used to comply with either 12.3 or 12.4, but may not be used for both. Note: If the list of MBE/WBEs for a particular subcontracting/supplier opportunity is ten or less, the Offeror must contact the entire list within such area of opportunity to be in compliance with 12.3 and 12.4. If the list of MBE/WBEs for a particular subcontracting/supplier opportunity is more than ten, the Offeror must contact at least two-thirds of the list within such area of opportunity, but not less than ten, to be in compliance with 12.3 and 12.4. 12.5. Provide plans and specifications or information regarding the location of plans and specification to MBE/WBEs. 12.6. Submit affidavit and/or documentation if MBE/WBE bids were rejected on the basis of quotation not being commercially reasonable, qualifications, etc. Documents may be requested to be produced for an in camera i - inspection. 3 City Council approved June 2, 1998 13. "Joint Venture" means an association of two or more persons or businesses to carry out a single business enterprise for profit for which purpose they combine their property, capital, skills, knowledge and management in an agreed to proportionate share. 14. "Managing Department" means the department responsible for overseeing the day to day completion of the contract. 15. "Manufacturer" means one that manufactures a product by hand or machinery suitable for uses; the process of making wares. 16. "Marketplace" means the geographic market area as defined in the Availability and Disparity Study represented by the counties of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall. 17. "Minority" means a citizen of the United States or lawfully admitted permanent resident that is Asian American, American Indian, Black or Hispanic. 18. "Minority Business Enterprise" is defined as a qualified business concern located in the Marketplace or providing proof of doing business in the Marketplace at the time of bid opening or the opening of responses to requests for proposals, meeting the following criteria: a. which is at least 51 percent owned by one or more minority persons, or, in the case of any publicly owned business, at least 51 percent of the stock is owned by one or more minority persons; and b. whose management and daily business operations are controlled by one or more minority persons who own it. 19. "Offeror" means any person, firm, corporation, or partnership that submits a bid or proposal to provide labor, goods or services to the City where funds are expended. The term includes the term bidder and proposer. 20. "Procurement" means the buying, renting, leasing or otherwise obtaining or acquiring any supplies, materials, equipment or services. 21. "Professional Services" means services which require predominantly mental or intellectual labor and skills, includes, but is not necessarily limited to, architects, engineers, surveyors, doctors, attorneys, and accountants. 22. "Project Manager" see Contract Officer. 23. "Purchasing" means the buying, renting, leasing or otherwise obtaining or acquiring any supplies, materials, equipment or services excluding construction and professional services previously defined. 24. "Qualified" means an individual or business entity having previously performed or received training in the work, industry or profession required. 25. "Regular Dealer" is defined as a firm that owns, operates, or maintains a store, a warehouse, or other establishment in which the materials or supplies required r 4 City Council approved June 2, 1998 0 for the contract are bought, kept in stock, and are regularly sold retail or wholesale. 26. "Subcontract" means an agreement between the contractor and another business entity for the performance of work. 27. "Subcontract/Supplier Opportunity" means an area where there is more than one MBE or WBE subcontractor/supplier in the market place. 28. "Tier" means the level of subcontracting below the prime contractor/consultant, i.e., a direct payment from the prime contractor to a subcontractor is considered 1 st tier, a payment by a subcontractor to its supplier is considered 2"d tier. 29. "Women Business Enterprise" is defined as a qualified business concern located in the Marketplace or provide proof of doing business in the Marketplace at the time of bid opening or the opening of responses to requests for proposals, meeting the following criteria: a. which is at least 51 percent owned by one or more women, or, in the case of any publicly owned business, at least 51 percent of the stock is owned by one or more women; and b. whose management and daily business operations are controlled by one or more women who own it. 11. PROGRAM GOAL A. A Citywide goal for the utilization of minority business enterprises (MBE) and women business enterprises (WBE) shall be reviewed and approved annually by the City Council. 1. The City Manager shall, on or before October 31 of each year, beginning October 31, 1996, conduct an analysis of the availability of MBEs and WBEs and present to the City Council an annual report on MBE/WBE availability and utilization. 2. Based on the availability of MBE/WBEs in the Marketplace and the City's most recent goal attainment and with the advice and counsel of the MWBEAC, the City Manager shall recommend to the City Council a reasonable goal for the remainder of the current fiscal year. 3. The goal shall be expressed in terms of a percentage of the total dollar value of all applicable contracts awarded by the City. Goals shall be established separately for categories of construction, professional services, and purchasing as well as any other categories that the City Council or City Manager deems appropriate. I B. Individual project goal shall be set by the MBE/WBE Office in collaboration with the Contract Officer and Risk Management (where appropriate) prior to solicitation. The project goal shall be reasonable and shall be based upon: 5 City Council approved June 2, 1998 1. Specific subcontracting and/or materials opportunities required to complete the project, and 2. The availability of MBE/WBE in the identified subcontracting and/or materials opportunities in the Marketplace. III. COUNTING MBE/WBE PARTICIPATION A. MBE/WBE participation shall be counted toward meeting Goal in accordance with the following provisions: 1. For the purpose of determining compliance with the goal requirements established in this ordinance, businesses will be counted as MBE or WBE only when they have been certified as such prior to a recommendation for award being made to the City Council. a) Any business listed by an Offeror that is not certified at the time of bid/response opening must file an application for certification within a reasonable time for the City to consider the dollar amount towards meeting the goal. b) If a business described in the immediate subparagraph fails to submit an application for certification within a reasonable time, or if the business is denied certification, the Offeror shall be afforded five (5) City business days to secure additional certified/certifiable MBE/WBE participation, starting the next City business day following the day the written notification was received from the Managing Department. c) Evidence of the additional certified/certifiable MBE/WBE participation shall be delivered to and received by the Managing Department within five (5) City business days after the notification was received by the Offeror, exclusive of the date that the notification was received. 2. Except as provided for in paragraph 3 below, if the Offeror is ruled non- responsive to the requirements of this ordinance, the Managing Department will provide written notification to the Offeror stating the specific basis for the ruling. The Offeror may submit documentation that it will either meet or exceed the stated goal, and may be considered for an award of contract. 3. If the Offeror is ruled non-responsive solely for its failure to identify a subcontract/supplier opportunity and that opportunity is less than three (3%) percent of the total bid, the Offeror may submit documentation that an MBE/WBE will be utilized for that subcontract/supplier opportunity, and may be considered for an award of contract. 4. Documentation required under either paragraph A or B above must be received by the Managing Department within five (5) City business days, exclusive of the date that the Offeror was ruled non-responsive. If the documentation is not .. received within the stated time, the Offeror shall be deemed to have withdrawn its bid. The City will not communicate with another Offeror regarding award of the 6 City Council approved June 2, 1998 contract until five (5) City business days after the original offer has been ruled non-responsive. 5. The Offeror may count toward the goal any tier of MBE or WBE subcontractors and/or suppliers. It is the sole responsibility of the Offeror to report and document all subcontracting and/or supplier participation dollars counted towards the goal, irrespective of tier level. Failure to submit documentation as required in this subparagraph, shall entitle the City to withhold payments until compliance is attained. 6. The Offeror will be given credit toward the goal only when the MBE or WBE subcontractor performs a commercially useful function. An MBE or WBE subcontractor is considered to have performed a commercially useful function when: a) It is responsible for the execution of a distinct element of the work by actually performing, managing and supervising the work involved in accordance with normal business practice; and b) When the firm receives due compensation as agreed upon for the work performed. 7. The Offeror will be given credit toward the MBE/WBE contract goal only when the MBE or WBE supplier performs a commercially useful function. A MBE or WBE supplier is considered to have performed a commercially useful function when the MBE/WBE supplier is a manufacturer or a regular dealer. 8. Regardless of whether an arrangement between the contractor and the MBE/WBE represents standard industry practice, if the arrangement erodes the ownership, control or independence of the MBE/WBE or does not meet the commercially useful function requirement, the Offeror shall receive no credit toward the goal. 9. An Offeror may count toward its goal a portion of the total dollar value of a contract with a joint venture equal to the percentage of MBE or WBE participation in the joint venture. a) The Managing Department must receive the Joint Venture form from the Offeror within five (5) City business days after the date of bid/proposal opening, exclusive of the day of the bid/proposal opening, for certification by the MBE/WBE Office. b) The MBE or WBE involved in the joint venture must be responsible for a clearly defined portion of the work to be performed, equal to a share in the ownership, control, knowledge, management, responsibility, risks, and profits of the joint-venture. B. Except for joint ventures, the prime contractor and any work performed by the prime contractor is not considered for determining compliance with this ordinance. 7 City Council approved June 2, 1998 C. The Offeror may not count toward the goal any agreement with a MBE or WBE that does not meet the requirements of this ordinance. IV. MBE/WBE UTILIZATION REQUIREMENTS A. In addition to the requirements set forth elsewhere, bid conditions and requests for proposals shall include a statement of the MBE/WBE goal established for the project. B. Bid conditions, requests for proposals, and all other specifications for applicable contracts to be awarded by the City shall require that offers make a good faith effort (GFE) to subcontract with or purchase supplies from MBE and/or WBE firms. Such specifications shall require the Offeror to meet or exceed the stated goal or submit documentation of GFE for all applicable contracts to permit a determination of compliance with the specifications. C. Construction and Professional Services contracts and such other contracts which may be competed for under sealed proposal procedures (estimated cost of $25,000 or more) and Purchasing contracts (estimated cost of $15,000 or more) shall be awarded and administered in accordance with the following standards and procedures: 1. Competitive bids for applicable contracts shall include the MBE/WBE specifications in the bid specifications. MBE/WBE specifications consist of the SPECIAL INSTRUCTIONS TO BIDDERS, MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, the GOOD FAITH EFFORT FORM, and, if appropriate, the JOINT VENTURE FORM. a) Competitive bids that equal or exceed the project goal must submit the MBE/WBE UTILIZATION FORM. b) Competitive bids that do not have subcontracting and/or supplier opportunities must submit the PRIME CONTRACTOR WAIVER FORM. c) Competitive bids that have subcontracting and/or supplier opportunities but do not include MBE/WBE participation in an amount which equals or exceeds the project goal, must submit the MBE/WBE UTILIZATION FORM and the GOOD FAITH EFFORT FORM and documentation. d) Competitive bids that have subcontracting and/or supplier opportunities but do not include any MBE/WBE participation must submit the GOOD FAITH EFFORT FORM and documentation. e) The Offeror shall submit the MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation") as appropriate. The managing department must receive the Documentation no later than 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. The Offeror shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the City received the Documentation. 8 City Council approved June 2, 1998 f) The submission of the applicable completed form(s) within the allotted time will be considered when determining the responsiveness of the bid. Failure to comply with the bid specifications, inclusive of the MBE/WBE specifications, shall render the Offeror non-responsive. 2. Other than responses to Requests for Proposals for those professional services defined in Chapter 2254 of the Texas Government Code, responses to Request for Proposals shall include a section which identifies the particular MBE and/or WBE to be utilized in performing the contract. a) Specify as to MBE or WBE, the estimated percentage of the MBE or WBE participation, the type of work to be performed by the MBE or WBE, and such other information as may reasonably be required to determine the responsiveness to the Request for Proposal. b) Responses that do not meet or exceed the utilization goal, as required by the Request for Proposal, must submit a GFE explanation. Failure to include such GFE explanation shall render the response non-responsive. 3. Initial responses to requests for proposals for those professional services defined in Chapter 2254 of the Texas Government Code shall not include a response to the requirements of this ordinance. The City shall comply with the requirements of said Chapter and rank the professional on the basis of demonstrated competence and qualifications. During negotiating the contract with the highest ranked professional, the professional shall respond to this ordinance in the manner specified in paragraph 2(a) above. 4. The GFE documentation shall demonstrate the Offeror's commitment and honest efforts to utilize MBE or WBE. The burden of preparing and submitting the GFE information is on the Offeror and will be evaluated as part of the responsiveness to the bid/proposal. An Offeror who intentionally and/or knowingly misrepresents facts on the documentation submitted will constitute a basis for classification as non-responsive and possible debarment. 5. The contracting department may request the MBE/WBE Office to waive the goal requirements of this subsection, or to reduce the amount of the goal, in accordance with the provisions of the Exceptions and Waivers section. D. The City Manager, with the advice and counsel of the MWBEAC in accord with City of Fort Worth Resolution No. 1148, shall adopt regulations governing the purchase of goods and services under $15,000. V. POST-AWARD COMPLIANCE A. In addition to such other requirements as may be set forth elsewhere, the following shall apply to applicable contracts awarded by the City: 1. Contracts shall incorporate this ordinance by reference, and shall provide that the contractor's violation of this ordinance shall constitute a breach of such contract and result in debarment in accord with the procedures outlined in this ordinance. 9 City Council approved June 2, 1998 projects of similar size and scope and within the contractor's normal business practice with non MBE or WBE subcontractor's or suppliers; or 3) A MBE or WBE's failure to execute the contractor's standard subcontract form, if entering a subcontract is required by the contractor in its normal course of business, unless such failure is due to: i. A change in the amount of the previously agreed to bid or scope of work; or ii. The contract presented provides for payment once a month or longer and the contractor is receiving payment from the City twice a month; or iii. Any limitation being placed on the ability of the MBE or WBE to report violations of this Ordinance or any other ordinance or violations of any state or federal law or other improprieties to the City or to provide notice of any claim to the contractor's surety company or insurance company. 4) An MBE or WBE defaults in the performance of the executed subcontract. In this event, the contractor shall: i. Request bids from all MBE and/or WBE subcontractors previously submitting bids for the work, ii. If reasonably practicable, request bids from previously non-bidding MBEs and WBEs, and iii. Provide to the M/WBE office documentation of compliance with (i) and (ii) above. 5) Any other reason found to be acceptable by the MBE/WBE Office in its sole discretion. NOTE: The contractor shall submit such documentation as may reasonably be requested by the MBE/WBE Office to support the contractor's request. The time between the request by the MBE/WBE Office for additional documentation and the delivery of such documentation shall not be included within the time period that the MBE/WBE Office is required to respond as stated in subparagraph (a) above. b) If the MBE/WBE Office approves the deletion of a MBE or WBE and replacement by a non-MBE or WBE, such approval shall constitute a post award waiver to the extent of the value of the deleted subcontract. c) If the MBE/WBE Office denies the request for change or deletion, the contractor may appeal the denial to the City Manager whose decision will be final. 11 City Council approved June 2, 1998 r■ 5. Whenever contract, amendments, change orders, or extra work orders are made .a individually or in the aggregate, the contractor shall comply with the provisions of this ordinance with respect to the alternates, amendments, change orders, or extra work orders. a) If the amendment, change order, or extra work affects the subcontract of an MBE or WBE, such MBE or WBE shall be given the opportunity to perform such amendment, change order or extra work. b) If the amendment, change order or extra work is not covered by any s subcontractor performing like or similar work, and the amount of such amendment, change order or extra work exceeds ten percent (10%) of the original contract amount, the contractor shall comply with Article 1, subsections 12.3 and 12.4 of this Attachment 1 (exclusive of the time requirements stated therein) with respect to such amendment, change order, or extra work. 6. If the contractor in its bid included any second or lower tier subcontractor/supplier towards meeting the goal, it is the responsibility of the contractor to report and ' document all subcontracting and/or supplier participation dollars irrespective of tier level. Failure to comply with the City's request to provide the required documentation shall entitle the City to withhold payments (but only to the extent of the subcontractor's payments related to the MBE/WBE participation dollars which are not documented) and/or to reject future bids from the contractor until compliance with this ordinance is attained. 7. Upon completion of the contract and within ten (10) City business days after receipt of final payment from the City, exclusive of the date the contractor receives payment, the contractor shall provide the MBE/WBE Office with the M/WBE FINAL SUMMARY PAYMENT REPORT FORM to reflect the final participation of each subcontractor and/or supplier (including non-M/WBEs) used on the project. Failure to comply with the City's request to provide the required documentation shall entitle the City to reject future bids from the contractor until compliance with this ordinance is attained. 8. In the event a contractor is in non-compliance with either paragraph 6 or 7 above, and such non-compliance is solely the result of an act or omission by an MBE or WBE, the MBE/WBE Office shall consider such in determining what action, if any, to take. VI. EXCEPTIONS AND WAIVERS .. A. If an Offeror is unable to comply with the goal requirements established in the Program Goal section of this ordinance, such Offeror shall submit one of the two forms listed below within the allotted time. 1. A Prime Contractor Waiver Form (Attachment 1 B) is submitted if the Offeror will perform the entire contract without subcontractors or suppliers. 2. A Good Faith Effort Form (Attachment 1C) is submitted if the Offeror has i subcontracting and/or supplier opportunities but was unable to meet or exceed 12 City Council approved June 2, 1998 the project goal. The Offeror will submit requested documentation that demonstrates a good faith effort to comply with the goal requirements as described in the Program Goal section above. B. A contracting department may request the MBE/WBE Office to waive or modify the goal requirements for MBE or WBE by submitting a Departmental Waiver Form, in writing, prior to solicitation of bids or proposals. The MBE/WBE Office may grant such a waiver or reduction upon determination that: 1. The reasonable and necessary requirements of the contract render subcontracting or other participation of business other than the Offeror infeasible; or 2. A public or administrative emergency exists which requires the goods or services to be provided with unusual immediacy; or 3. Sufficient MBE/WBE providing the services required by the contract are unavailable in the marketplace of the project, despite attempts to locate them; or 4. The application of the provisions of this ordinance will impose an unwarranted risk on the City or unduly delay acquisition of the goods or services. C. Whenever the MBE/WBE Office denies a request to waive a goal, the contracting department may appeal that denial to the City Manager whose decision on the request shall be final. VII. PROGRAM ADMINISTRATION A. The City Manager, with the advice and counsel of the MWBEAC in accord with City of Fort Worth Resolution No. 1148, is authorized to establish and implement the regulations set forth in this ordinance. The MBE/WBE Office shall be responsible for the overall administration of the City's MBE/WBE Program, and its duties and responsibilities shall include: 1. Recommending rules and regulations to effectuate this ordinance; 2. Maintaining a current listing of certified MBE and WBE firms for distribution internally and externally on contracts; 3. Providing information and needed assistance to MBE/WBEs to increase their ability to compete effectively for the award of City contracts; 4. Investigating alleged violations of this ordinance and making written recommendations to appropriate City authorities for remedial action when appropriate; 5. Developing and distributing all necessary forms, applications, and documents necessary to comply with this ordinance; 6. Reviewing, on a regular basis, the progress of departments toward achieving the category goals for the utilization of minority and women business enterprises; 13 1City Council approved June 2, 1998 7. Making recommendations to appropriate City staff regarding methods to further the policies and goals of this ordinance; 8. Determining MBE/WBE compliance on contracts before they are submitted to the City Council for award; 9. Maintaining accurate contract performance reporting system; and 10.Compiling a report reflecting the progress in attaining the City's annual goal, quarterly and annually. B. It shall be the responsibility of the contracting department to ensure that bids or proposals emanating from the department adhere to the procedures and provisions set forth in this ordinance. 1. The department director or designee shall assume primary responsibility for achieving the goals of this program and shall review, on a continuing basis, all aspects of the program's operations to assure that the purpose is being attained. 2. The contracting department shall take the following action to ensure that MBEs and WBEs have the maximum opportunity to participate on City contracts: a) A written notification shall be sent to minority and women trade associations, contractor's associations, and minority and women chambers of commerce about the availability of formally advertised contracting opportunities no less than 28 days before bids are due; b) All applicable contract solicitations shall include the requirements contained in this ordinance; c) All contracting opportunities shall be evaluated in an effort to divide the total requirements of a contract to provide reasonable opportunities for MBE/WBE; d) For construction and professional service contracts, establish procedures to ensure that all contractors' invoices are paid twice a month and that subcontractors are paid within five (5) City business days after receipt of payment. A contractor's failure to make payments within five (5) City business days shall authorize the City to withhold future payments from the contractor until compliance with this ordinance is attained. e) Establish guidelines to ensure that a notice to proceed is not issued until signed letters of intent evidencing receipt by the MBE/WBE or executed agreements with the MBE/WBE have been submitted; f) Ensure that all required statistics and documentation are submitted to the MBE/WBE Office as requested; and g) If circumstances prevent the contracting department from meeting the 28-day advertising and notification requirements, the contracting department shall perform extensive outreach to MBE/WBE associations or other relevant organizations to inform them of the contracting opportunity. 14 City Council approved June 2, 1998 VIII. CERTIFICATION The City will recognize MBE/WBE that are certified by the Texas Department of Transportation (TxDOT), highway division or the North Central Texas Regional Certification Agency (NCTRCA). In the event of denial of certification by either of these entities, the City reserves the right to grant its own certification for use in City contracts. IX. CONTRACT MONITORING, AND REPORTING A. The MBE/WBE Office shall monitor compliance with these requirements during the term of the contract. If it is determined that there is cause to believe that a contractor or subcontractor has failed to comply with any of the requirements of this ordinance, or the contract provisions pertaining to MBE/WBE utilization, the MBE/WBE Office shall notify the contracting department and the contractor. The MBE/WBE Office shall attempt to resolve the noncompliance through conciliation. If the noncompliance cannot be resolved, the Coordinator and the contracting department shall submit written recommendations to the City Manager or designee, and if the City Manager concurs with the findings, sanctions shall be imposed as stated in ordinance. B. Whenever the MBE/WBE Office finds, after investigation, that a contracting department has failed to comply with the provisions of this ordinance, a written finding specifying the nature of the noncompliance shall be transmitted to the contracting department, and the MBE/WBE Office shall attempt to resolve any noncompliance through conference and conciliation. Should such attempt fail to resolve the noncompliance, the Coordinator shall transmit a copy of the findings of noncompliance, with a statement that conciliation was attempted and failed, to the City Manager who shall take appropriate action to secure compliance. C. The MBE/WBE Office may require such reports, information, and documentation from contractors, offers, contracting agencies, and the head of any department, division, or office of the City of Fort Worth, as are reasonably necessary to determine compliance with the requirements, within ten (10) days after the notice of noncompliance. D. Contracting departments shall maintain accurate records for each contract awarded, including dollar value, the nature of the goods or services to be provided, the name of the contractor awarded the contract, the efforts it employed to solicit bids from MBE/WBE, identifying for each its dollar value, the nature of the goods or services provided, and the name of the subcontractor. E. The City Manager, with the advice and counsel of the MWBEAC in accord with City of Fort Worth Resolution No. 1148, shall submit an annual report to the City Council on the progress of the City toward the utilization goals established by this ordinance, together with an identification of problems and specific recommendations for improving the City's performance. 15 City Council approved June 2, 1998 X. DEBARMENT A. An Offeror who intentionally and/or knowingly misrepresents facts shall be determined to be an irresponsible Offeror and barred from participating in City work for a period of time of not less than three (3) years. B. The failure of an Offeror to otherwise comply with this ordinance and which constitutes a material breach of contract as stated herein, may result in the Offeror being determined to be an irresponsible Offeror and barred from participating in City work for a period of time of not less than one (1) year. C. The MBE/WBE Office will send a written statement of facts and a recommendation for debarment to the City Manager. The City Manager, after consultation with the Department of Law, will make the decision regarding debarment and send a certified notice to the Offeror. D. An Offeror that receives notification of debarment may appeal to an Appeal Board, hereinafter created, by giving written notice within ten (10) days from the date of receipt of the debarment notice, to the City Manager of its request for appeal. E. An Appeal Board, consisting of not less than three members appointed by the City Manager with the approval of the City Council, will meet within thirty (30) days from the date of receipt of the request for appeal of debarment, unless Offeror requests an extension of time. The Offeror will be notified of the meeting time and location. F. The Offeror will be afforded an opportunity to appear with Counsel if they so desire, submit documentary evidence, and confront any person that the City presents. G. The Appeal Board will render its decision not more than thirty (30) days of the hearing and send a certified notice to the Offeror. H. If the Appeal Board upholds the original debarment, the Offeror may appeal to the City Council within ten (10) days from the date of receipt of the Appeal Board's decision by giving written notice to the City Manager. I. The appeal will be placed on the City Council agenda within thirty (30) days from receipt of written notice, unless Offeror requests an extension in writing. J. From the date of notification of debarment and during the pendency of any appeal, the City will not consider offers from, award contracts to, renew or otherwise extend contracts with, or contract directly or indirectly through subcontracts with the Offeror pending the Appeal Board's decision. K. Any MBE or WBE subcontractor or supplier who intentionally and/or knowingly misrepresents facts or otherwise violates the provisions of this ordinance may be determined to be irresponsible for a period of time not to exceed one (1) year, and if deemed irresponsible, such MBE or WBE shall not be included in calculating an Offeror's responsiveness. 16 City Council approved June 2, 1998 XI. SEVERABILITY If any provision of this attachment or ordinance, the application thereof to any person or circumstance is held invalid for.any reason in a court of competent jurisdiction, such invalidity shall not affect the other provisions of any other application of this attachment or ordinance which can be given effect without the invalid provision or application, and to this end, all the provisions of this attachment or ordinance are hereby declared to be severable. 17 City Council approved June 2, 1998 PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER 1, 1987 TABLE OF CONTENTS C1-1 DEFINITIONS C1-1 (1) Cl-1.1 Definition of Terms Cl-1 (1) Cl-1.2 Contract Documents C 1-l (2) Cl-1.3 Notice to Bidders CI-1 (2) C1-1.4 Proposal C1-1 (2) C1-1.5 Bidder C1-1 (2) Cl-1.6 General Conditions Cl-1 (2) C1-1.7 Special Conditions C1-1 (2) Cl-1.8 Specifications Cl-1 (2) C1-1.9 Bonds C1-1 (2) C1-1.10 Contract C1-1 (3) C1-1.11 Plans C1-1 (3) C1-1.12 City C1-1 (3) C1-1.13 City Council Cl-1 (3) C1-1.14 Mayor C1-1 (3) C1-1.15 City Manager C1-1 (3) C1-1.16 City Attorney Cl-1 (3) Cl-1.17 Director of Public Works C 1-l (4) Cl-1.18 Director, City Water Department CI-1 (4) Cl-1.19 Engineer CI-1 (4) CI-1.20 Contractor Cl-1 (4) C1-1.21 Sureties C1-1 (4) Cl-1.22 The Work or Project Cl-1 (4) Cl-1.23 Working Day Cl-1 (4) C1-1.24 Calendar Days CI-1 (4) C1-1.25 Legal Holidays CI-1 (4) C1-1.26 Abbreviations C1-1 (5) C1-1.27 Change Order CI-1 (6) C1-1.28 Paved Streets and Alleys C1-1 (6) Cl-1.29 Unpaved Streets or Alleys Cl-1 (6) C1-1.30 City Street CI-1 (6) Cl-1.31 Roadway C 1-l (6) Cl-1.32 Gravel Street Cl-1 (6) C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2 (1) C2-2.2 Interpretation of Quantities C2-2 (1) C2-2.3 Examination of Contract Documents and Site of Project C2-2 (2) C2-2.4 Submitting of Proposal C2-2 (3) (1) C2-2.5 Rejection of Proposals C2-2 (3) _ C2-2.6 Bid Security C2-2 (3) C2-2.7 Delivery of Proposal t C2-2 (4) C2-2.8 Withdrawing Proposals C2-2 (4) C2-2.9 Telegraphic Modifications of Proposals C2-2 (4) C2-2.10 Public Opening of Proposal C2-2 (4) C2-2.11 Irregular Proposals C2-2 (4) C2-2.12 Disqualification of Bidders C2-2 (5) C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3.1 Consideration of Proposals C3-3 (1) C3-3.2 Minority Business Enterprise/Women Business C3-3 (1) Enterprise Compliance C3-3.3 Equal Employment Provisions C3-3 (1) C3-3.4 Withdrawal of Proposals C3-3 (2) C3-3.5 Award of Contract C3-3 (2) C3-3.6 Return of Proposal Securities C3-3 (2) C3-3.7 Bonds C3-3 (2) C3-3.8 Execution of Contract C3-3 (4) Y C3-3.9 Failure to Execute Contract C3-3 (4) C-3-3.10 Beginning Work C3-3 (4) C3-3.11 Insurance C3-3 (4) C3-3.12 Contractor's Obligations C3-3 (7) C3-3.13 Weekly Payrolls C3-3 (7) C3-3.14 Contractor's Contract Administration C3-3 (7) rt C3-3.15 Venue C3-3 (8) C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4 (1) _ C4-4.2 Special Provisions C4-4 (1) C4-4.3 Increased or Decreased Quantities C4-4 (1) C4-4.4 Alteration of Contract Documents C44 (2) C4-4.5 Extra Work C44 (2) C4-4.6 Schedule of Operation C44 (3) C4-4.7 Progress Schedules for Water and Sewer Plant Facilities C44 (4) _ C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 (1) C5-5.2 Conformity with Plans C5-5 (1) C5-5.3 Coordination of Contract Documents C5-5 (2) C5-5.4 Cooperation of Contractor C5-5 (2) C5-5.5 Emergency and/or Rectification Work C5-5 (3) C5-5.6 Field Office C5-5 (3) C5-5.7 Construction Stakes C5-5 (3) (2) C5-5.8 Authority and Duties of City Inspector C5-5 (4) C5-5.9 Inspection C5-5 (5) C5-5.10 Removal of Defective and Unauthorized Work C5-5 (5) C5-5.11 Substitute Materials or Equipment C5-5 (5) C5-5.12 Samples and Tests of Materials C5-5 (6) C5-5.13 Storage of Materials C5-5 (6) C5-5.14 Existing Structures and Utilities C5-5 (7) C5-5.15 Interruption of Service C5-5 (7) C5-5.16 Mutual Responsibility of Contractors C5-5 (8) C5-5.17 Clean-Up C5-5 (8) C5-5.18 Final Inspection C5-5 (9) C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 Laws to be Observed C6-6 (1) C6-6.2 Permits and Licenses C61-6 (1) C6-6.3 Patented Devices, Materials, and Processes C6-6 (1) C6-6.4 Sanitary Provisions C6-6 (2) C6-6.5 Public Safety and Convenience C6-6 (2) C6-6.6 Privileges f Contractor in Streets, Alleys, C6-6 (3) and Right-of-Way C6-6.7 Railway Crossings C6-6 (4) C6-6.8 Barricades, Warnings and Flagmen C6-6 (4) C6-6.9 Use of Explosives, Drop Weight, Etc. C6-6 (4) C6-6.10 Work Within Easements C6-6 (5) C6.6.11 Independent Contractor C6-6 (6) C6-6.12 Contractor's Responsibility for Damage Claims C6-6 (8) C6-6.13 Contractor's Claim for Damages C6-6 (10) Pb C6-6.14 Adjustment or Relocation of Public Utilities, Etc. C6-6 (10) C6-6.15 Temporary Sewer and Drain Connections C6-6 (10) C6-6.16 Arrangement and Charges for Water Furnished by the City C6-6 (11) R' C6-6.17 Use of a Section or Portion of the Work C6-6 (11) C6-6.18 Contractor's Responsibility for the Work C6-6 (11) C6-6.19 No Waiver of Legal Rights C6-6 (12) r C6-6.20 Personal Liability of Public Officials C6-6 (12) C6-6.21 State Sales Tax C6-6 (12) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1) C7-7.2 Assignment of Contract C7-7 (1) C7-7.3 Prosecution of The Work C7-7 (1) C7-7.4 Limitation of Operations C7-7 (2) C7-7.5 Character of Workmen and Equipment C7-7 (2) C7-7.6 Work Schedule C7-7 (3) C7-7.7 Time of Commencement and Completion C7-7 (4) C7-7.8 Extension of Time Completion C7-7 (4) .. (3) C7-7.9 Delays C7-7 (4) C7-7.10 Time of Completion C7-7 (5) C7-7.11 Suspension by Court Order C7-7 (6) C7-7.12 Temporary Suspension C7-7 (6) C7-7.13 Termination of Contract due to National Emergency C7-7 (7) C7-7.14 Suspension or Abandonment of the Work C7-7 (7) and Annulment of the Contract: C7-7.15 Fulfillment of Contract C7-7(9) C7-7.16 Termination for Convenience of the Owner C7-7 (10) -, C7-7.17 Safety Methods and Practices C7-7 (13) (4) W in PART C - GENERAL CONDITIONS C1-1 DEFINITIONS on SECTION C1-1 DEFINITIONS C1-1.1 DEFINITIONS OF TERMS: Whenever in these Contract Documents the following terms or pronouns in place of them are used, the intent and meaning shall be ., understood and interpreted as follows: C1-1.2 CONTRACT DOCUMENTS: The Contract Documents are in all of the written and drawn documents, such as specifications, bonds, addenda, plans, etc., which govern the terms and performance of the contract. These are contained on the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and Include the following Items PR PART A -NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL (Sample) White PART C - GENERAL CONDITIONS (CITY) Canary Yellow - (Developer) Brown PART D- SPECIAL CONDITIONS Green PART E - SPECIFICATIONS E1-White E2-Golden Rod E2A-White PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White PART G- CONTRACT (Sample) White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A-NOTICE TO BIDDERS (Advertisement) same as above PART B -PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D- SPECIAL CONDITIONS PART E- SPECIFICATIONS PERMITS/EASEMENTS PART F -BONDS R PART G-CONTRACT PART H -PLANS (Usually bound separately) C1-1 (1) C1-1.3 NOTICE TO BIDDERS: All of the legal publications either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. �. C1-1.4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal, which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. C1-1.5 BIDDER: Any person, persons, firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents, constitutes a bidder. C1-1.6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes, and requirements of the City of Fort Worth's charter and promulgated ordinances. Whenever there may be a conflict between the General Conditions and the Special Conditions,the latter shall take precedence. . CI-1.7 SPECIAL CONDITIONS: Special conditions are the specific requirements which are necessary for the particular project covered 1;y the Contract Documents and not specifically covered in the General Conditions. When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1.8 SPECIFICATIONS: The Specifications is that section or part of the Contract Documents which set forth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed an useful project. Whenever reference is made to standard specifications, regulations, requirements, statutes, etc., such referred to documents shall become a part of the Contract Documents just as though they were embodied therein. CI-1.9 BONDS: The bond or bonds are the written guarantee or security furnished by the Contractor for prompt and faithful performance of the contract and include the following: a. Performance Bond(see paragraph C3-3.7) b. Payment Bond (see paragraph C3-3.7) C. Maintenance Bond(see paragraph C3-3.7) d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and C2-2.6) C1-I (2) o C1-1.10 CONTRACT: The Contract is a formal signed agreement between the owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. C1-1.11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner's representative showing in detail the location, dimension and position of the various elements of the project, including such profiles, typical cross-sections, layout �. diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner. The plans are usually bound separately from the other parts of the Contract Documents, but they are part of the Contract Documents just as though they were bound therein. C1-1.12 CITY: The City of Fort Worth, Texas, a municipal corporation, authorized and chartered under the Texas State Statutes, acting by and through its governing body or its City Manager, each of which is required by charter to perform specific duties. Responsibility for final enforcement of the Contracts involving the City of Fort Worth is by Charter vested in the City Manager. The terms City and Owner are synonymous. C1-1.13 CITY COUNCIL: The duly elected and qualified governing body of the City of Fort Worth,Texas. C1-1.14 MAYOR: The officially elected Mayor, or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. C1-1.16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. C1-1.17 DIRECTOR OF PUBLIC WORKS: The officially appointed official of the City of Fort Worth, Texas, referred to in the charter as the City Engineer, or his duly authorized representative. C1-1.18 DIRECTOR, CITY WATER DEPARTMENT: The officially appointed Director of the City Water Department of the City of Fort Worth, Texas, or his duly authorized representative, assistant,or agents. CI-1.19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department, or their duly authorized assistants, agents, engineers, inspectors, or superintendents, acting within the scope of the particular duties entrusted to them. C1-1.20 CONTRACTOR: The person,person's,partnership,company, firm, association, or corporation, entering into a contract with the Owner for the execution of work, acting C1-1 (3) OR directly or through a duly authorized representative. A sub-contractor is a person, firm, corporation, supplying labor and materials or only labor, for the work at the site of the project. C1-1.21 SURETIES: The Corporate bodies which are bound by such bonds as are required with and for the Contractor. The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. C1-1.22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents, including but not limited to the furnishing of all labor, materials, tools, equipment, and incidentals necessary to produce a completed and serviceable project. C1-1.23 WORKING DAY: A working day is defined as a calendar day, not including Saturdays, Sundays, and legal holidays, in which weather or other conditions not under i the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven (7) hours between 7:00 a.m. and 6:00 p.m., with exceptions as permitted in paragraph C7-7.6 C1-1.24 CALENDAR DAYS: A calendar day is any day of the week or month, no days being excepted. C1-1.25: LEGAL HOLIDAYS: Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows: 1. New Year's day January 1 2. M.L. King, Jr. Birthday Third Monday in January 3. Memorial Day Last Monday in May 4. Independence Day July 4 5. Labor Day First Monday in September i 6. Thanksgiving Day Fourth Thursday in November 7. Thanksgiving Friday Forth Friday in November 8. Christmas Day December 25 9. Such other days in lieu of holidays as the City Council may determine When one of the above named holidays or a special holiday is declared by the City Council, falls on a Saturday, the holiday shall be observed on the preceding Friday, or if it falls on Sunday, it shall be observed on the following Monday, by those employees working on working day operations. Employees working calendar day operations will consider the calendar as the holiday. C1-1.26 ABBREVIATIONS: Whenever the abbreviations defined herein appear in the Contract Documents,the intent and meaning shall be as follows: Cl-1 (4) AASHTO - American Association of State MGD - Million Gallons Highway Transportation Officials per Day ASCE - American Society of Civil CFS - Cubic Foot per Engineers Second - - LAW In Accordance With Min. Minimum ASTM - American Society of Testing Mono. - Monolithic Materials % - Percentu - m AWWA American Water Works R Radius Association I.D. - Inside Diameter ASA - American Standards Association O.D. - Outside Diameter HI Hydraulic Institute Elev. Elevation Asph. - Asphalt F - Fahrenheit Ave. - Avenue C - Centigrade Blvd. - Boulevard In. - Inch CI - Cast Iron Ft. - Foot CL - Center Line St. - Street GI - Galvanized Iron CY - Cubic Yard Lin. - Linear or Lineal Yd. - Yard lb. Pound SY Square yard MH - Manhole L.F. - Linear Foot Max. - Maximum D.I. - Ductile Iron C1-1.27 CHANGE ORDER: A "Change Order" is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25%of the amount of the particular item or items in the original proposal. All "Change Orders" shall be prepared by the City from information as necessary furnished by the Contractor. C1-1.28 PAVED STREETS AND ALLEYS: AY aved street or alley shall be defined as P a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatment, not including an oiled surface, with or without separate base material. 3. Brick, with or without separate base material. 4. Concrete, with or without separate base material. r 5. Any combination of the above. C1-1 (5) C1-1.29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or other surface is any area except those defined for"Paved Streets and Alleys." C1-1.30 CITY STREET: A city street is defined as that area between the right-of-way lines as the street is dedicated. C1-1.31 ROADWAY: The roadway is defined as the area between parallel lines two (2') back of the curb lines or four (`4) feet back of the average edge of pavement where - no curb exists. C1-1.32 GRAVEL STREET: A gravel street is an unimproved street to which has been added one or more applications of gravel or similar material other than the natural material found on the street surface before any improvement was made. C1-1 (6) 1' 1� SECTION C -GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 PROPOSAL FORM: The Owner will furnish bidders with Proposal form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder's general understanding of the project to be completed, provide a space for furnishing the amount of bid security, and state the basis for entering into a formal contract. The Owner will furnish forms for the Bidder's "Experience Record," "Equipment Schedule," and "Financial Statement," all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for opening of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status. This statement must be current and no more than one (1)year old. In the case that bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of ten(10)percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a,given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received, and such experience must have been completed not more than five (5) years prior to the date on which Bids are to be received. The Director of the Water Department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. C2-2.2 INTERPRETATION OF QUANTITIES: The quantities of work and materials to be furnished as may be listed in the proposal forms or other parts of the Contract PM Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans. The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided, without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. C2-2(1) . C2-2.3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that the Contract Documents on file with the Owner shall constitute all of the information which the Owner will furnish. All additional information and data which the Owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. Bidders are required, prior to filing of proposal, to read and become familiar with the Contract Documents, to visit the site of the project and examine carefully all local conditions, to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during construction of the project. They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time required for its completion, and obtain all information required to make an intelligent proposal. No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the Owner. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigation, examinations and tests �. herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, on the plans are for general information only and may not be correct. Neither the Owner nor the Engineer guarantee that the data shown is ^' representative of conditions which actually exist. C2-2.4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be correctly filled in and the Bidder shall state the prices,written in ink in both words and numerals, for which he proposes to do work contemplated or furnish the materials required. All such prices shall be written legibly. In case of discrepancy between price written in words and the price written in numerals, the price most advantageous to the City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and address of each member of the firm, association,or partnership, or by person duly authorized. If a proposal is submitted by a company or corporation, the company or corporation name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power C2-2(2) - �` of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. r C2-2.5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures, additions not called for, conditional or uncalled for PF alternate bids, erasures, or irregularities of any kind, or contain unbalanced value of any items. Proposal tendered or delivered after the official time designated for receipt of proposal shall be returned to the Bidder unopened. C2-2.6 BID SECURITY: No proposal will be considered unless it is accompanied by a "Proposal.Security" of the character and the amount indicated in the "Notice to Bidders" and the "Proposal." The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is made thereof. The bid security of all other bidders may be returned promptly after the canvass of bids. C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the City Manager or his representative in the official place of business as set forth in the "Notice to Bidders." It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidder must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marker with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the City Manager,City Hall,Fort Worth, Texas. C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for opening proposals. A request for non-consideration must be made in writing, addressed to the City Manager, and filed with him prior to the time set for opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non- consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C2-2.9 TELEGRAHIC MODIFICATIONS OF PROPOSALS: Any Bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time,no further consideration will be given to the proposal. C2-2(3) C2-2.10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and for which no "Non-consideration Request" has been received will be publicly opened and read aloud by the City Manager or his authorized representative at the time Mo and place indicated in the "Notice to Bidders." All proposals which have been opened and read will remain on file with the Owner until the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. C2-2.11 IRREGULAR PROPOSALS: Proposals shall be considered as "Irregular" if they show any omissions, alterations of form, additions, or conditions not called for, unauthorized alternate bids, or irregularities of any kind. However, the Owner reserves the right to waive any all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which can not be waived. C2-2.12 DISQUALIFICATION OF BIDDERS: Bidders may be disqualified and their proposals not considered for any of,but not limited to,the following reasons: a) Reasons for believing that collusion exists among bidders. b) Reasonable grounds for believing that any bidder is interested in more than one proposal for work contemplated. c) The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d) The bidder being in arrears on any existing contract or having defaulted on a previous contract. e) The bidder having performed a prior contract in an unsatisfactory manner. w f) Lack of competency as revealed by financial statement, experience statement, equipment schedule, and such inquiries as the Owner may see fit to make. g) Uncompleted work which, in the judgment of the Owner, will prevent or hinder the prompt completion of additional work if awarded. h) The bidder not filing with the Owner, one week in advance of the hour of the opening of proposals the following: 1. Financial Statement showing the financial condition of the bidder as specified in Part"A"- Special Instructions 2. A current experience record showing especially the projects of a nature similar to the one under consideration, which have been successfully completed by the Bidder. 3. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of the bidder who, in the judgment of the Engineer, is disqualified under the requirements stated herein, shall be set aside and not opened. C2-2(4) PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS SECTION 0-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3.1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices,the quantities shown in the proposal, and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of the unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the ward of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as may be considered for the best interest of the Owner. C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, upon request, complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a Woman-owned Business Enterprise (WBE) on the contract and the payment therefor. Contractor further agrees, upon request by the Owner, to allow and audit and/or an examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal, state or local laws and ordinances relating to false statements; further, any such misrepresentation may be grounds for disqualification of Contractor at Owner's discretion for bidding on future Contracts with the Owner for a period of time of not less than six(6)months. C3-3.3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with Current City Ordinances prohibiting discrimination in employment practices. The Contractor shall post the required notice to that effect on the project site, and at his request, will be provided assistance by the City of Fort Worth's Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3.4 WITHDRAWAL OF PROPOSALS: After a proposal has been read by the Owner, it cannot be withdrawn by the Bidder within forty-five (45) days after the date on which the proposals were opened. C3-3 (1) C 3-3.5 AWARD OF CONTRACT: The Owner reserves the right to withhold final action on the proposals for a reasonable time, not to exceed forty-five (45) days after the date of opening proposals, and in no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee. The award of the contract, if award is made, will be to the lowest and best responsive bidder. The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3.6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals have been determined for comparison of bids,the Owner may, at its discretion, return the proposal security which accompanied the proposals which, in its judgment, would not be considered for the award. All other proposal securities, usually those of the three lowest i bidders, will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will be returned by the City Secretary. ; C3-3.7 BONDS: With the execution and delivery of the Contract Documents, the Contractor shall furnish to, and file with the owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND: A good and sufficient performance bond in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the full and faithful execution of the work and performance of the contract, and for the protection of the Owner and all other persons against damage by reason of negligence of the Contractor, or improper execution of the work or use of inferior materials. This performance bond shall guarantee the payment for all labor, materials, equipment, supplies, and services used in the construction of the work, and shall remain in full force and effect until provisions as above stipulated are accomplished and final payment is made on the project by the City. b. MAINTENANCE BOND: A good and sufficient maintenance bond, in d the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful performance of the general guaranty which is set forth in paragraph C8-8.10. C. PAYMENT BOND: A good and sufficient payment bond, in the `t amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful payment of all claimants as defined in Article C3-3 (2) 5160, Revised Civil Statutes of Texas, 1925, as amended by House Bill 344, Acts 56'h Legislature, Regular Session, 1959, effective April 27, 1959, and/or the latest version thereof, supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these specifications. Payment Bond shall remain in force until all payments as above stipulated are made. d. OTHER BONDS: Such other bonds as may be required by these Contract Documents shall be furnished by the Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the Owner. All bonds shall be made on the forms furnished by the Owner and shall be executed by an approved r` surety company doing business in the City of Fort Worth, Texas, and which is acceptable to the Owner. In order to be acceptable, the name of the surety shall be included on the current U.S. Treasury list of acceptable sureties, and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that company. Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be given the Contractor to that effect and the Contractor shall immediately provide a new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties, as required, have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments be due or paid until approval of the bonds by the Owner. C3-3.8 EXECUTION OF CONTRACT: Within ten (10) days after the Owner has appropriate resolution, or otherwise, awarded the contract, the Contractor shall execute and file with the Owner, the Contract and such bonds as may be required in the Contract Documents. No Contract shall be binding upon the Owner until it has been attested by the City P ' Secretary, approved as to form and legality by the City Attorney, and executed for the Owner by either the Mayor or City Manager. C3-3.9 FAILURE TO EXECUTE CONTRACT: The failure of the Awardee to execute the required bond or bonds or to sign the required contract within ten (10) days after the contract is awarded shall be considered by the owner as an abandonment of his proposal, and the owner may annual the Award. By reason of the uncertainty of the market prices-of material and labor, and it being impracticable and difficult to accurately determine the amount of damages occurring to the owner by reason of said awardee's failure to execute said bonds and contract within ten (10) days, the proposal security accompanying the proposal shall be the agreed amount of damages which the Owner will C3-3 (3) C4-4.4 ALTERATION OF CONTRACT DOCUMENTS: By Change order, the owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provided such changes do not materially alter the original Contract Documents or change the general nature of the project as a whole. Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents. C4-4.5 EXTRA WORK: Additional work made necessary by changes and alterations of the Contract Documents or of quantities or for other reasons for which no.prices are provided in the Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract Documents or approved additions thereto; provided however, that before any extra work is begun a "Change order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods: MW a. Unit bid price previously approved. b. An agreed lump sum. C. The actual reasonable cost of(1) labor, (2)rental of equipment used on the extra work for the time so used at Associated General Contractors of America current equipment rental rates, (3)materials entering permanently into the project, and(4) actual cost of insurance, bonds, and social security as determined by the Owner, plus a fixed fee to be agreed upon but not to exceed 10 percent of the actual cost of such extra work. The fixed fee is not to include any additional profit to the Contractor for rental of equipment owner by him and used for extra work. The fee shall be full and complete compensation to cover the cost of superintendence, overhead, other profit, general and all other expense not included in (1), (2), (3), and (4) above. The Contractor shall keep accurate cost records on the form and in the method suggested by the Owner and shall give the Owner access to all accounts,bills,vouchers, and records relating to the Extra Work. No "Change Order" shall become effective until it has been approved and signed by each .� of the Contracting Parties. No claim for Extra Work of any kind will be allowed unless ordered in writing by the Owner. In case any orders or instructions, either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation, he shall make written request to the Engineer for written orders authorizing such Extra Work,prior to beginning such work. C4-4 (2) PP on Should a difference arise as to what does or dose not constitute Extra Work, or as to the payment thereof, and the Engineer insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof as provided under method (Item Q. Claims for extra work will not be paid unless the Contractor shall file his claim with the Owner within five (5) days before the time for making the first estimate after such work is done and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon said Extra Work. The Contractor shall furnish the Owner such installation records of all deviations from W the original Contract Documents as may be necessary to enable the Owner to prepare for permanent record a corrected set of plans showing the actual installation. The compensation agreed upon for "Extra Work" whether or not initiated by a "Change Order" shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or extra work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or extra work. C4-4.6 SCHEDULE OF OPERATION: Before commencing any work under this contract, the Contractor shall submit to the Owner and receive the Owner's approval thereof, a "Schedule of Operations," showing by a straight line method the date of commencing and finishing each of the major elements of the Contract. There shall be also shown the estimated monthly cost of work for which estimates are to be expected. There shall be presented also a composite graph showing the anticipated progress of construction with the time being plotted horizontally and percentage of completion plotted vertically. The progress charts shall be prepared on 8-1/2" x 11" sheets and at least five black or blue line prints shall be furnished to the Owner. C44.7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: Within ten (10) days prior to submission of the first monthly progress payment, the Contractor shall prepare and submit to the owner for approval six copies of the schedule in which the Contractor proposes to carry on activities (including procurement of materials, plans, and equipment) and the contemplated dates for completing the same. The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses, the Contractor shall enter on the diagram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by the Engineer. Three copies of the updated schedule shall be delivered at such intervals as directed by the Engineer. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specifications. .r C4-4 (3) �T release any requirement of these Contract Documents, nor to approve or accept any portion or section of the work, nor to issue any instructions contrary tot he requirement s of the Contract Documents. The City Inspector will in no case act as superintendent or foreman or perform any other duties for the Contractor, or interfere with the management or operation of the work. He will not accept from the Contractor any compensation in any - form for performing any duties. The Contractor shall regard and obey the directions and instructions of the City Inspector or Engineer when the same are consistent with the obligations of the Contract Documents of the Contract Documents, provided, however, should the Contractor object to any orders or instructions or the City Inspector, the Contractor may within six days make written appeal to the Engineer for his decision on the matter in Controversy. C5-5.9 INSPECTION: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining whether or not the work as performed is in accordance with the requirements of the Contract Documents. If the Engineer so requests, the Contractor shall, at any time before acceptance of the work, remove or uncover such portion of the finished work as may be directed. After examination, the Contractor shall ! restore said portions of the work to the standard required by the Contract Documents. Should the work exposed or examined prove acceptable, the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but should Work so exposed or examined prove to be unacceptable, the uncovering or removing and replacing of all adjacent defective or damaged parts shall be at the Contractor's expense. No work shall be done or materials used without suitable supervision or inspection. C5-5.10 REMOVAL OF EDEFCTIVE AND UNAUTHORIZED WORK: All work, materials, or equipment which has been rejected shall be remedied or removed and replaced in an acceptable manner by the Contractor at this expense. Work done beyond the lines and grades given or as shown on the plans, except as herein specially provided, or any Extra Work done without written authority,will be considered as unauthorized and done at the expense of the Contractor and will not be paid for by the Owner. Work so done may be ordered removed at the Contractor's expense. Upon the failure on the part of a the Contractor to comply with any order of the Engineer made under the provisions of this paragraph, the Engineer will have the authority to cause defective work to be remedied or removed and replaced and unauthorized work to be removed, and the cost thereof may be deducted from any money due or to become due tot he Contractor. Failure to require the removal of any defective or unauthorized work shall not constitute acceptance of such work. C5-5.11 SUBSTITUTE MATERIALS OR EQUIPMENT: If the Specifications, law, ordinance, codes or regulations permit Contractor to furnish or use a substitute that is equal to any material or equipment specified, and if Contractor wishes to furnish or use a proposed substitute, he shall, prior to the preconstruction conference, make written application to ENGINEER for approval of such substitute certifying in writing that the C5-5 (4) �`