Loading...
HomeMy WebLinkAboutContract 47432-CO2 FORTWORTH CITY SECRETi JW� CONTRACT 140. -=k- AUG City Of Fort worth 0sa Change Order Request C Facility and Project Victory Forest Recreation Center City Sec No. 47432 Description: 3100-0800450-5740010-C00130-C04580,39801-0800450- Funding(FID)5740010-C00130-005880,39801-0800450-5740010-C00130- City Proj.No. 00130 No.(s)C04580,30110-0800450-5740010-C00130-C04580,34014- 0800450-5740010-CO0130-CO4980 Contractor.C.Perry Builders,Inc. Change order#F- Date: 8/12/2016 City Project Mgr.J Ronnie Clements City Inspector: Don Isaacs Phone Number:(817)392-8014 1 Phone Number. (817)392-8078 Contract Time (CD) Original Contract Amount--- — -- $5,155,700.00 300 Extras to Date---- ----- $55,955.02 71 Credits to Date --- $0.00 0 Pending Change Orders(in M&C Process)- - — $0.00 0 Contract Cost to Date — — — $5,211,655.02 371 Amount of Proposed Change Order------------ $85,661.78 0 Revised Contract Amount------------- - $5,297,316.80 371 Original Funds Available for Change Orders---- $0.00 Remaining Funds Available for this CO —— - $0.00 Additional Funding(if necessary)— --- $0.00 CHANGE ORDERS to DATE ONCLUD/NG THIS ONE)AS%OF ORIGINAL CONTRACT 1.027468006% MAXALLOWABLECONTRACTAMOUNT(OR/G/NALCONTRACT COST+25%) $6,444,625.00 Q09Ff -f[AF QQ)-R_ Change Order#2 authorizes a change in scope for purchase and installation of the kitchen equipment for a cost of$85,661.78.The total of Change Order#1 and#2 results in a increase to the original contract amount by 1.03%.There are no additional days added to the Contract for this Change Order i fe �01 It is understood and agreed that the acceptance of this Change Order by the contractor consitute n accord and satisfaction and represe r payment in full(both time and money)for all costs arising out of,or incindental to the above C ge Order. Co'ftael'rsGompanyK}aate Corjfractor a[n __ anfradforSgnaturg __0. Dale c C.Perry BuildersInc. din! A°°000� E'MCYlnspeeCot Date, tTFdgr' Date ID'♦ PM ' D _penntendenC, _ _.Date, _ i(eGt�C3(Sentees Manager Die, ar efih6d _ Date_ pertyManag nt:De dment Date C, V -1 TIZ 0s(arif Gi A rndy' Da"te ts_--, -V anager Oa • yc � o ti M&C Number M&C Date Approved PIERRY BUILDERS, INC. 1002 Walker Road Sumrall, MS 39482 _ 6315 Lone Star Lane Aubrey, TX 76227 - Phone: (601) 758-3136 Fax: (601) 758-3106 Phone: (940) 365-9189 Fax: (940) 365-0351 Az _ - Victory Forest Recreation Center _ 3427 Hemphill Street Fort Worth,TX 76110 - -- --- Add for KITCHEN EQUIPMENT cost code escrip ion �-- qty.: uniti cos ! - o a 11.4000 Kitchen equipment - plastic shelving 1 eachl 221.37 $221.37 11.4000 Kitchen equipment- security unit 1 each 1 1,789.30 $1,789.30 11.4000 Kitchen equipment -hand sink 1 eachl 729.15 $729.15 11.4000 Kitchen equipment - reach in refriferator 1 each 3,72727 $3,727.27 11.4000 Kitchen equipment - reach in freezer 1 each 3,541.46 $3,501.46 11.4000 Kitchen equipment-oven 1 each 4,06828 $4,068.28 11.4000 Kitchen equipment- back work counter 1 each 17,174.96 $17,174.96 11.4000 Kitchen equipment - lever waste 2 each 226.79 5453.58 11.4000 Kitchen equipment - overflow tube 2 each 32.51 $65.02 11.4000 Kitchen equipment - pre rinse faucet assembly 1 each 313.16 5313.16 11.4000 Kitchen equipment- add on faucet for pre rinse faucet 1 each 75.21 $75.21 11.4000 Kitchen equipment- wall/splash mount faucet 2 each 291.09 $582.18 11.4000 Kitchen equipment - lever waste 3 each 22679 $680.37 11.4000 Kitchen equipment - overflow tube 3 each 32.51 $97.53 11.4000 Kitchen equipment - undercounter dishwasher 1 each 7,752.12 $7,752.12 11.4000 Kitchen equipment- ice cuber 1 each 3,463.88 53,463.88 11.4000 Kitchen equipment - water filter assembly 1 each 258.70 $258.70 11.4000 Kitchen equipment-front work counter 1 each 7,743.18 $7,743.18 11.4000 Kitchen equipment-48" gas ran etop 1 each 5,99224 $5.992.24 11.4000 Kitchen equipment- exhaust hood 1 each 7,816.81 $7,816.81 11.4000 Kitchen equipment-fire suppression system 1 each 5,311.23 $5,311.23 11.4000 Kitchen equipment - demo mirror 1 eachl 2104.361 $2,104.36 11.4000 Kitchen equipment - utility cart 1 eachl 448.64 $448.64 SUB TOTAL _ ! $74,370.00 _J :OVERHEAD AND PROFIT _ t0%' $7,437.00 INSURANCE 2.00%;; $1,713.24 BOND _ 2.50%; $2,141.64 GRAND TOTAL $85,661.78 :This quote is good for 10 Days j !Please add 0 Days from the time the change order is executed to our T T_ !contract time for this change in scope. homas M. Coggins, Project Manager _iC. Perry Builders, Inc. ; 11002 Walker Road jSumrall Mississippi 39482 ---- - -- --- L--�-- ----- i