Loading...
HomeMy WebLinkAboutContract 48135 CITY SECR_ETAW X13 CONTRACT NO. Developer and Project Information Cover Sheet: Developer Company Name: Quail Valley Devco I,LLC Address, State,Zip Code: 8401 N. Central,Expressway, Suite 350,Dallas, TX 75225 Phone&Email: 214-292-3410, cyeager@republicproperlygroup.com Authorized Signatory,Title: Clint Yeager,Vice President Project Name and Brief Walsh Ranch Quail Valley Ph.1B Description: Project Location: Plat Case Number: FP-16-033 Plat Name: Walsh Ranch Quail Valley Phase 1B Mapsco: 761G Council District: 3 City Project Number: 100380 CFA Number: 2016-043 DOE Number: None To be com&edyaffReceived byate: 060 wra 3A &A% G1� ITSpS�i ClT't NN City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Quail Valley Devco I, LLC ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Walsh Ranch Quail Valley Ph. 1B ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ©, Sewer (A-1) ®, Paving (B) M, Storm Drain (B-1) M, Street Lights & Signs (C) M. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section 11, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section lI, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 7 of 11 Cost Summary Sheet Project Name: Walsh Ranch Quail Valley Phase 1B CFA No.: 2016-043 CP No.: 100380 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. A. Water and Sewer Construction 1, Water Construction $ 232,955.00 2.Sewer Construction $ 157,705.00 Water and Sewer Construction Total $ 390,660.00 B. TPW Construction 1.Street $ 592,319.50 2.Storm Drain $ 209,825.00 3.Street Lights Installed by Developer $ 295,430.00 4. Signals $ - TPW Construction Cost Total $ 1,097,574.50 Total Construction Cost(excluding the fees): $ 1,488,234.50 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 7,813.20 D. Water/Sewer Material Testing Fee(2%) $ 7,813.20 Sub-Total for Water Construction Fees $ 15,626.40 E. TPW Inspection Fee(4%) $ 32,085.78 F. TPW Material Testing(2%) $ 16,042.89 G. Street Light Inspsection Cost $ 11,817.20 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 59,945.87 Total Construction Fees: $ 75,572.27 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,488,234.50 Completion Agreement=100%/Holds Plat $ 1,488,234.50 Cash Escrow Water/Sanitary Sewer=125% $ 488,325.00 Cash Escrow Paving/Storm Drain=125% $ 1,371,968.13 Escrow Pledge Agreement=125% 1 $ 1,860,293.13 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Quail Valley Devco I,LLC Jesus J. Chapa Assistant City Manager Name. Clint Yeager Date: Title: Vice Presiden Date: Aj:J �a„ ' Recommended by: ATTEST: (Only if required by Developer) LA Wendy Chi-Babulal, EMBA, P.E. Development Engineering Manager Signature Water Department Name: Z�- 'j, tj , Douglas . Wiersig, P.E. Director Transportation& Public Works Department r Approved as to Form & Legality: ATTEST: of: F C� �L zl P& Richard A. McCracken ary J er Y, a• Assistant City Attorney City Secretary M&C No. >/A Date: gI*4 F.." tzgs : ej1 — OFFICIAL RECORD City of Fort Worth,Texas CITY SECREURY Standard Community Facilities Agreement FT CFA Official Release Date: 10.07.2015 � wORTH� TX Page 9 of 9 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment © Attachment 1 - Changes to Standard Community Facilities Agreement Location Map ® Exhibit A: Water Improvments ❑x Water Cost Estimate © Exhibit A-1: Sewer Improvements ❑X Sewer Cost Estimate Ox Exhibit B: Paving Improvements z Paving Cost Estimate xD Exhibit 13-1: Storm Drain Improvements ❑X Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ❑D Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 10 of 11 ATTACHMENT"I" Changes to Standard Agreement Community Facilities Agreement City Project No. 100380 None City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 10.07.2015 Page 11 of 11 5/5/2016 00 42 43 DAP-BID PROPOSAL Page I of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 1 B UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Unit of Specification Bid Description Unit Price Bid Value No. Measure I Section No. Quantity UNIT I:WATER IMPROVEMENTS 1 0241.1118 4"-12"Pressure PI_u_�L _ _-� _ EA_ 02_41 14 7 _ $550.00 $3,850.00 2 3311.0001 Ductile Iron Water Fittings w/Restraint TON 33 11 11 - 2.4 $3,150.00 _ $7,560.00 3 3311.0161 6"PVC Water Pie _ _ _LF 33 11 12 _ 140 $30.00 _ $4,200.00 4 3311.0261 8"PVC Water Pipe LF 3311 12 3660 $39.00 $142,740.00 5 3311.0264 8"PVC Water Pipe,CLSM_ Backfill _ LF 3311 12 40 _ _$37.00 _ $1,480.00 6 3312.0001 Fire Hydrant - _ _ EA 331240 3 $3,500.00 _ $10,500.00 7 3312.2003 1"Water Service_ - __ EA 33 12 10 _- 35 _ $625.00 -$21,875.00 8 3312.2103 1 1/2"Water Service EA 331.2 10 2 $1,400.00 _ $2,800.00 9 3312.2203 2"Water Service - --EA 331210 _ 1 $1,600.00 $1,600.00 10 3312.3002 6"Gate Valve — EA 33 12 20 _ 1 $900.00 $900.00 11 3312.3003 8"Gate Valve —_-_ EA 331220 22 $1,175.00 $25,850.00 12 3305.0109 Trench Safety_-- LF _ 33-0510 3840 $1.50 - $5,760.00 13 9999.0011 Pressure Test and Cleaning LF -00 00 00 3840 --$1.00 $3,840.00 15 .- ----- -- - - - -------- - .-. 16 _ -- - -- - - - - -- - --- 17 18 19 20 21 22 23 24 25 26 27 28 29 31 32 33 34 35 36 37 38 39 40 41 42- -- - -- - - - - - - - - - - 43 -- - ----- - - - - - - - - 44 45 TOTAL UNIT I:WATER IMPROVEMENTS $232,955.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE 1B Form Version September 1.2015 HZ PROJECT 8303061.02 5/5/2016 004243 D4243 DAP-BID PROPOSAL Page 2 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 1 B UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Unit of Specification Bid No. DescriptionUnit Section No. Quantity Unit Price Bid Value UNIT It:SANITARY S RIM ROVEMENT 1 3331.4115 8"Sewer Pipe LF 33 11 10,33 31 12,33 31 20 ---...-2720- _____$25_.00 _ $68_,_000.00 2 3331.4116 8"Sewer Pipe,CSS Backfill LF 33 11 10,33 31 - _ _ 12,333120 40 $45.00 $1 —.,800.00 3339.1001 4'Manhole -—� -� 33 39 10,33 39 — ^_ 20 15 $4,000.00 $60,000.00 4 3305.0113 Trench Water Stops EA 33 05 15 9 $500.00 $4,500.00 5 3331.3101 4"Sewer Service EA 3331 50 35 $325.00 $11,375.00 6 3305.0109 Trench Safe LF 33 05 10 2760 $1.50 $4,140.00 7 3301.0002 Post-CCTV Inspection LF 33 01 31 _ 2760 $1.50 $4,140.00 8 3301.0101 Manhole Vacuum Testing – EA 3301 30 15 $250.00 $3,750.00 10 - 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 33 32 34 35 36 37 38 - 39 40 41-- 42 - TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $157,705.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE IB Fonn Version September 1,2015 HZ PROJECT 8303061.02 5/5/2016 00 42 43 DAP-BID PROPOSAL Page 3 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 1 B UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Unit of Specification Bid No. Description Measure Section No. Quantity Unit Price Bid Value UNIT III:DRAINAGE IMPR VEMENTS 1 3341.0201 21"RCP,Class III LF 33 41 10 528 $51.00 $26,928.00 2 3341.0205 24"RCP,Class III_ _ LF 33 41 10 780 $58.00 _ $45,240.00 3 3341.0302 30"RCP,Class III - LF 3341 10 340 $78.00 $26,520.00 4 3341.0309 36"RCP,Class III LF 33_41 10 52 _ $85.00 $4,420.00 5 3341.0402 42"RCP,Class III - _ _ LF 3341 10 364 - $100.00 $36,400.00 6 3349.0001 4'Storm Junction Box- EA 33 49 10 1 $4,000.00 $4,000.00 7 3349.0002 5'Storm Junction Box EA 334910 2 $4,750.00 $9,500.00 8 3349.3009 42"Straight Headwall,1 pipe EA 33 49 40 1 $4 000.00 $4,000.00 _ 9 3349.5001 10'Curb Inlet — _ EA 33 49 20 12 $3,000.00 $36,000-00 10 3349.5002 15'Curb Inlet_ - _EA 33 49 20 1 $4,000.00 $4000.00 11 3137.0104 Medium Stone Riprap,dry- .._ S_Y_ 31 37 00 25 $75.00 $1,875.00 12 9999.0003 Factory Storm a Conn_e_ction _EA 00 00 00 19 $250.00 $4,750.00 13 3305.0109 Trench Safe _ _LF 33 05 10 2064 $1.50 ____$3,096.00 14 3301.0002 Post-CCN Inspection- LF 3301 31 2064 $1.50 _$3,096.00 15 16 ------- -- -- - 18 19 --20 21 --- _ 24 25 26 27 -__—_-- 28 31 ----- - - -.._. 32 -- 33- --^-- N---- - - - . _ - -- -- ---_ - - --- -- 35 -36_- -- _ —_ --_ -- -- - --- - _-. --- ---- 37 38 39 40 41-- 43 -43 44 45 TOTAL UNIT III:DRAINAGE IMPROVEMENTS1 $209,825.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS W ALSH RANCH-QUAII.VALLEY-PHASE IB Fo m Vaaim Septanbec 1,2015 HZ PROJECT 8303061.02 r 5/5/20 16 00 42 43 DAP-BID PROPOSAL Page 4 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 1 B UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Unit of Specification Bid No. Description Measure I Section No. Quantity Unit Price Bid Value UNIT N:PAVING IMPROVEMENTS 1 3211.0400 Hydrated Lime _ _TN 32 11 29 276 $175.00 $48,300.00 2 3211.0501 6"Lime Treatment _ ——_ Sy.- 3211 29 13115 $3.50 $45,902.50 3 3213.0101 6"Conc Pvmt -- -- SY 32 13 13 12240 $37.00 —$452,880.00 4 3213.0302 5"Conc Sidewalk SF 32 13 20 2950 $4.50 $13,275.00 5 3213.0501 Barrier Free Ramp,Type R-1EA 32 13 20 12 $1,250.00 $15,000-00 6 3213.0506 Barrier Free Ramp,Type P-1 — _ —E_A_— 32 13 20 3 $1 250.00 $3750.00 7 3217.0501 24"SLD Pvmt Marking HAE(W) _ LF 32 17 2342 $6.00 $252.00 —8 9999.0005 Type III Barricade EA 00 00 00 _ 7 $1,500.00 $10,500.00 9 9999.0006 Street Header LF 00 00 00 205 $12.00 $2,460.00 10 11 12 13 — - ----- -- -- - --._.._—. _ 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 30 29 31 -- 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT IV: PAVING IMPROVEMENTS1 $592,319.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECFRCA TION DOCUMENTS-DEVELOPER AWARDED PROJECTS W ALSH RANCH-QUAIL VALLEY-PHASE 1 B Fomn Version September 1,2015 - HZ PROJECT R303061.02 ` 5' ; 00 42 43 DAP-BID PROPOSAL Page 5 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 1 B UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Unit of Specification Bid No. Description Unit Price Bid Value Measure I Section No. Quantity UNIT V:STREET LIG TING IMPROVEMENTS 1 2605.3011 2"CONDT PVC SCH 40(T) - _ - LF_ 26 05 33 -3055 $11.00 $33,605.00 2 3441.1501 Ground Box Type B --- -_--_ EA 344 1 10 4 $3,000.00 $12,000.00 3 3441.3201 LED Lighting Fixture _ - EA 34 41 20 32 $500.00 $16,000.00 - 4 3441.3301 Rdwy Ilium Foundation TY 1,2,and 4- _EA 344120 — 32 $1,000.00 $32,000.00 5 3441.3350 Furnish/Install Rdway Illum TY 8 Pole — EA 34 41 20 _ 32 $3,750.00 $120,000.00 6 3441.3404 2-2-2-4 Quadplex Alum Elec Conductor LF_ -34 41 20 3055 $15.00 $45,825.00 7 3441.4003 Furnish/Install Alum Sign Ground Mount 3441 30 _ City Std. _ - 12 $500.00 $6,000.00 -8 3441.4006 Install Alum Sign Ground Mount - _ w-EA -34 41 30 12 $2,500.00 $30,000.00 10 12 13 14 15 -- -- --- ---- -- _ 16 17 18 -19 — -- ---- - - - -- ---_ . - -- --- 20 22 21 24 23 25 -- 26 27 28 - 29 31 32 33 34 35 36 37 38 39 40 43 42 44 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $295,430.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE 1B Forth Version September 1,2015 HZ PROJECT 8303061.02 5$/20 l 6 004243/5/2016 0 42 43 DAP-BID PROPOSAL Page 6 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 1 B UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Unit of Specification Bid No. DescriptionUnit Section No. Quantity Unit Price Bid Value UNIT VI:TRAFFIC S11'3NAL IMPROVEMENT 2 4 - 5 -- -- - - 6 8 ---- — 9 ---- _- _ 10 -----— 11 ----_—__-_- -- 12 13 - 14 ------- - - 15 -- 16 -------- -- --- 17 - 18 -------- - - 19 - 20 21 - 22 - 23 24- - --- --- -- -- - - - 25 27 -28_._ _ ------------ -- -- —_- __ —.._ 29 - 30 31 32 33 - 34 35 - ---- 36_ 37 38 39 41 42 -__-- 44 17 45 TOTAL UNIT VI:TRAFFIC SIGNAL IMPR VEMENT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAB.VALLEY-PHASE IB Form Version September 1,2015 HZ PROJECT 8303061.02 y e -mx 00 42 43 DAP-BID PROPOSAL Page 7 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Walsh Ranch-Quail Valley: PHASE 1 B UNIT PRICE BID Bidder's Application —Ir-- Project Item Information Bidder's Proposal Bidlist Item Unit of Specification Bid No. Description Measure Section No. Quantity Unit Price Bid Value _ Bid Summary UNIT I:WATER IMPROVEMENTS $232,955.00 UNIT II:SANITARY SEWER IMPROVEMENTS $157,705.00 UNIT III:DRAINAGE IMPROVEMENTS $209,825.00 UNIT IV:PAVING IMPROVEMENTS $592,319.50 UNIT V:STREET LIGHTING IMPROVEMENTS $295,430.00 UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS Bid Total $1,488,234.50 15%Contingency $223,235.18 Total Construction Bid $1,711,469.68 Contractor agrees to complete WORK for FINAL 0 dais calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS WALSH RANCH-QUAIL VALLEY-PHASE 1B Forth Version September 1,2015 HZ PROJECT 8303061.02 KWARD 08/11/2016 4:31PM \\HZFTWORTH\DISK2\PROJ\R30306102\04-DESIGN\CIVIL\CFA\PHASE 1B\EXHI13ITS\CFA-PHIB-COVER.DWG I I + I Ll � D O 0 G m r -' n y � D II 0 I � Z i 3 ` - O Z,> n �� I D f TN m � � 2 1 N 'U M A Crl I aa) n i 0 I r m 00 w KWARD 08/11/2016 4:29PM \\HZFTWORTH\DISK2\PROD\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1B\EXHIBITS\CFA_PH18-WATR.DWG R FPH D 8" WATER LINE WATER LINE 8" GATE VALVE FIRE HYDRANT GATE VALVE 8" WATER LINE 8" WATER LINE WATER LINE FIRE HYDRANT 8" GATE VALVE WATER LINE 8GATE VALVE " UNE ATE 8" GATE VALVE GA VALVE "�+IrA 8TER �,� " VA VE 0 LINE ELS 4 8" GATE 8 WA TE LINE 8" GATE VALVE 8" GATE VALVE gEE� VALVE IREBH RTE LVE 8" GATE 8" WATER ALVE " LINE PAgKLIN_� WAY TE VALVE 1 i GATE VALVE o �MW 8" WATER LINE FIRE HYDRANT—1 8" GATE VALVE vs A o o � FI HYD T a A 8" WA RLI 8" WA ER LINE ® T LI MALS N 12 WAz. PHA E 1 VIA ® / EXHIBIT 'A' WATER LINE NORTH QUAIL VALLEY -PHASE 1 B August 11,2016 IIALSH AVN SCALE: 1" = 160' HIJI1T Z- L-L- RS WA LSH 160 320 RANCHNCH KWARD 08/11/2016 4:32PM \\HZFTWORTH\DISK2\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1B\EXHIBITS\CFA_PH1B_SSWR.DWG LEGEND ss PH 1 B SSWR LINE 4' DIA. MH • PH 1 B SSWR MANHOLE PH1A SSWR LINE 8 PH 1 A SSWR MANHOLE 4' DIA. MH BpAD 4' DIA. MH yL� a s 4' DUI MH Ggg,E� 8' PVC [74' 4' DIA. 4' DIA. MH 4' DIA. MH4' DIA. MH DUI. MH 4' DUI. MH PVC4 DUI. MH ASE 1A C _ 4' DUI. MH PVC 11 PAggLINE WAY ti 4' DUI. MH M 4' DUi. MH ¢ 8a PVC C 8~ PVC c PHASE 1 A 4' DUI. MH ye 8 PVC 4' DUI. MH a 8" PVC PHASE 1 4' DUI. MH PHASE 1A PHASE 1A �- --"" — -- IIALS1y AVBNU ® - PHASE 1A EXHIBIT 'A-1' SANITARY SEWER NORTH QUAIL VALLEY - PHASE 1 B y / August 11,2016 WALSH SCALE: 1" = 160' HUITf M LAARS 0 80 160 320 RwA^NCH a KWARD 08/11/2016 4:30PM \\HZFTWORTH\DISK2\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1B\EXHIBITS\CFA_PH1B_PAVE.DWG +. LEGEND 76m CRETE PAVEMENT WALK BY DEVELOPER 12' WIDE ALLEY 4G�9 �y 5' IDEWAL GREE 0 ti9 �Q t; pAggLINE WAY 5' SIDEWALK WW TYP. �' R vA a ts1 V o � � o 4C 0 b a _ - Z 1 WIDE ." AL IIALSB -AY�1yU��1 EXHIBIT 'B' PAVING NORTH QUAIL VALLEY - PHASE 1 B ® rN August 11,2016 IIALSH AVgNUS SCALE: 1" = 160' HUITT-ZOLM 6 60 160 320 RANCH ti BCOLE 08/11/2016 4:25PM \\HZFTWORTH\DISK2\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1 B\EXHIBITS\CFA_PH1 B_STRM.DWG r. 21" RCP PSET—SC HDWL 24" RCP 21" RCP MR 21" RCP N s 'O 36" RCP 21" RCP ROAD " E � E0 Gg 30" RCP S M 21" RCP 30" RCP I 21" RCP 21" RCP 24" RCP 21" RCP 21" RCP NORTH 21" RCP S M 21" RCP PAgKLINE WAY ' " " i V5 21" RCP 21 RCP 21 RCP i� t �' x ✓ 'A 21" RCP SCALE: 1" = 160' 0' CURB INL0 60 160 320 0 21" RCP o " a 21 RCP 21" RCP y 42„ RCp PHASE 1A � EXHIBIT 'S-1" I Ion STORM DRAIN / _ — — ---- QUAIL VALLEY - PHASE 1 B August 11,2016 a' UE Hu11T ZOLLARS y. �A, m WALSH - "` / RANCH P SCOLE 08/11/2016 4:28PM \\HZFTWORTH\DISK2\PROJ\R30306102\04_DESIGN\CIVIL\CFA\PHASE 1B\EXHI8ITS\CFA_PH1B_LIGHT.DWG LEGEND LED STREET LIGHT QUADRUPLEX ALUMINIUM 2-2-2-4 UD XLP 40A9 PULL BOX �y GgEE PULL BOX QUAD LEX LUMINIUM ,� —2— D XLP 1 PAgKLINE WAY � PULL BOX VIA PULL to BOX A CONTROLLER W/ o TRANSFORMER o PHASE I A 0 a Bbl ~' MALS A BNU� E EXHIBIT 'C' STREET LIGHTS NORTH QUAIL VALLEY - PHASE 1 B / K August 11,2016 WALSH AVB fUB 4 ---� � SCALE: 1" a 160' HUIITMLOAS 6 80 160 320 RANCH BCOLE 08/11/2016 4:19PM \\HZFTWORTH\DISK2\PROJ\R30306102\04_DESIGN\CML\CFA\PHASE 1B\EXHIBITS\CFA_PH1B_SIGN.DWG ` POLE 12 2- NAME BLADES POLE 11 2- NAME BLADES POLE 10 �,� F' POLE 06 2OL NAME BLADES 04 2- NAME BLADES Gg,� 2- NAME BLADES POLE 09 xt1 2- NAME BLADES ggWIVE WAY PA x � POLE 05 0„1 2- NAME BLADES va ra --- - `A POLE 07 c bo 2- NAME BLADES VK y to POLE 01 a POLE OB POLE 02 b 2- NAME BLADES 2- NAME BLADES 2- NAME BLADES ® :. AALSH AVENUEPE 03 - 2- NAME BLADES s /� -- EXHIBIT 'C-1' STREET NAME SIGNS NORTH QUAIL VALLEY - PHASE 1 B August 11,2016 - HLIITT ZSJLI��RS SCALE: 1" = 160' �r' ' 6 80 160 320 RANCH