Loading...
HomeMy WebLinkAboutContract 46771-A1 CITY SECRETAW BRACT HO. AMENDMENT No. l TO CITY SECRETARY CONTRACT No. 46771 WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 46771, (the CONTRACT) which was authorized by M&C C-27313 on the 2nd day of June, 2015 in the amount of $ 271, 622 . 00; and WHEREAS, the CONTRACT involves engineering services for the following project : CONSTRUCTION MANAGEMENT SERVICES FOR TRV BRIDGES; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee . NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated May 5, 2016, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $405, 491 . 00. (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $677, 113 . 00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect . EXECUTED and EFFECTIVE as of the date last written by .a signatory, below. City of Fort Worth OFFICIAL RECORD Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 CITY SECRETARY Page 1 of 3 FT.WORTH,TX APPROVED : City of Fort Worth ENGINEER Freese and Nichols, Inc. ZI Fernando Costa Jo4n Dewar Assistant City Manager Vice President DATE: T/1(o DATE: A OV REC MENDED • nd e Har o Director, Tanning & Development Department APPROVED AS TO FORM AND LEGALITY: M&C : C- Zg?i3 Date : Doug as W. Black �Z� r MI6- GG932 Assistant City Attorney ATTEST: `e npfi�50pU0 G ,p S %)0 11 Ar�v "dJk'a,,A1.1r C) g City ecretary % °off" 00000 00 AS ti OFFICIAL RECORD CITY SECRETARY City of Fort Worth FT WORTH,TX Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 3 FUNDING BREAKDOWN SHEET City Secretary No. 46771 Amendment No. 1 Department Fund-Account-Center Amount 0200431 30106-5330500-CO0144 $405, 491 . 00 Total : $405, 491 . 00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 FREESE Innovative approaches Practical results Z Outstanding service rM ?,I I C YOLS_ 4055 International Plaza,Suite 200 • Fort Worth,Texas 76109 • 817-735-7300 • fax 817-735-7491 www.freese.com May 5, 2016 Doug Rademaker Deputy Director—Project Management 1000 Throckmorton St. Fort Worth,TX 76102 Re: Trinity River Vision Bridges—Construction Phase Services Dear Mr. Rademaker: As you requested, attached is an amendment proposal to continue construction phase services for the Trinity River Vision Bridges. This proposal is for services beyond the current contract with the City of Fort Worth, for which effort has been nearly expended. The effort included in this proposal is not for the full project duration, but rather the second phase of construction which is anticipated to last approximately one year. It is anticipated that subsequent authorization(s) will be required to complete the project construction phase. The attached scope includes continued support for submittal reviews, responding to information requests, resolving field issues, and attendance at periodic coordination meetings as well as separate project site visits to observe construction. The work proposed in this amendment will be invoiced based on the actual effort expended, as opposed to lump sum. If you have any questions regarding this proposal, please do not hesitate to contact me. We look forward to the successful construction of this project. Sincerely, Jo in Dewar, P.E., S.E. Project Manager Attachments: Exhibit A—Scope of Services, Level of Effort Spreadsheet EXHIBIT "A" Scope for Engineering Design Related Services for Street Improvements The scope set forth herein defines the amended work to be performed by the ENGINEER in the second phase of construction. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. This phase of the project will be performed on a cost-plus basis. It is anticipated that this authorization will include FNI's services for approximately one year with additional authorization necessary to complete the construction duration. PURPOSE As the Trinity River Vision Bridges continue under construction administered by TxDOT, it is important to keep the design team involved during construction as there are details specific to these designs, which are not typical and critical to achieving the vision of the project. Although TxDOT will continue to manage construction, Freese and Nichols, Inc. (FNI) proposes in the scope below to be available for consultation during construction. WORK TO BE PERFORMED ENGINEER will support the construction phase of the project as follows. 1.1 Construction Support • The ENGINEER shall attend up to 26 bi-weekly Project Design Team meetings throughout construction. • The ENGINEER shall attend up to 52 weekly construction progress meetings. • The ENGINEER shall visit the project site up to 52 times as construction proceeds to observe and report on progress. These site visits shall include a general review of the installation of the bridge elements (rebar, post tensioning, formwork, etc.) for general compliance with project drawings by FNI's structural engineering staff. • The ENGINEER shall visit the project site for a detailed review by construction management staff once weekly for 12 weeks. This will be a more detailed review of constructed bridge elements for conformance with plans. A site visit report will be provided listing any observed potential deficiencies for consideration by TxDOT. • The ENGINEER shall continue review of shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. Such review shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. The ENGINEER will be responsible for logging and tracking all shop drawings submitted, samples and other submittals which are submitted to ENGINEER for approval. Shop drawings not previously included, which may be included in this phase include: Structural • Bridge expansion joints • Bridge deck forms City of Fort Worth,Texas Attachment A PMO Release Date:07.23.2012 Page 1 of 3 • Bridge handrails • Low profile traffic barriers • Post-tensioning jacking sequence for substructure • Deflection data Landscaping and aesthetics • Trees—review size, species conditions, locations and quantities • Shrubs—review size, species conditions, locations and quantities • Vines— review size, species conditions, locations and quantities • Groundcover—review size, species conditions, locations and quantities • Tree Stakes and straps—review samples and submittals • Site furnishings—verify models match spec, verify location • Tree wells—verify planting soil follows spec • Irrigation installation review Electrical • LED lighting commissioning —provide support during commissioning to position and calibrate lights for each of the 3 bridges • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. • The ENGINEER shall attend the "Final"project walk through and assist with preparation of final punch list. ASSUMPTIONS • 78 project meetings are assumed • 18 site visits are assumed. • 52 submittal reviews are assumed. • 52 requests for information are assumed • Four (4) Change Orders are assumed. DELIVERABLES A. Response to Contractor's Request for Information B. Review of Change Orders C. Review of shop drawings D. Record Drawings Additional Services not included in the existing Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if Page 2 of 3 needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • All previous additional services not explicitly included in this amendment. • Shop drawing reviews, record drawings and other scope items identified in the scope of services beyond approximately one year from this amendment execution. Page 3 of 3 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Trinity River Vision Bridges-Construction Phase City Project No.00144 Labor Ea Project Protect $IivcNral Construclbn Geatechn'ral Electrical 5lormwaler Lanescape Document se Task Description Conbol Total Labor TOUT Expense cask H. Director Manager Engineer Manager Engineer ENI—r Engineer ArchRect Subconsuttanl Task Sub TOUT (JFD) (NG) (HM) (aM) (MTbe (DWK) (Ho) (MLM) $pecUlist Cosl T2vel Repmduclbn Cost Ra 5234 5155 $t55 f 20 56 5155 $178 3139 $114 MWBE NonhnVBE 6.0 Conslmclbn Phase aervices 120 570 1016 216 216 BO 8 6 50 156 3351268_S42 SM 52,000 $7,490 $0 3611998 $403,268 6.1 CoistmclunS 6.1.1 Nlen Pro Teamklee0ngs 18 78 $16,302 $21 $21 $16,517 6.1.2 Nl MCorsN 'Team kl"`ti 16 156 24 $32.112 $429 $429 532,501 6.13 Proje Sde Visis 48 104 n 216 60 3]1;52 $6,854 Wa64 $78806 6.1.4 6ubmttal Review 72 416 10 a 8 50 1W $90796 $90796 6.1.5 Regiesl for lnfomu5an 12 101 208 10 521 350156 $59,156 6.1.6 Clen9e Ora¢r Renew 16 1 $16,144 $161M 6.1.] Access ng Oevgn a 16 120 SO 6ubmnvGait SuppoR(RFI,SSe Visits, 62 SWm s 62.1 P+ckteU 330.000 J:-12 62.2 Ekubkal 512,5 00 52,000 52,000 Totals 131 570 1016 216 NJ a 81 50 E—. S 42,600 3 IM-3 7,0.98 1 f S 61.996 S 4W,268 Project Summary TOUT Hous 2224 Total Labor 53512 Total Es rse $51,9W MSEMBE SabCO��F1aN 542,500 N.M BDBBESuI—rsUtar3 $2,0M- 5% Sub Ma 52,225 MBEISBE Paha fan 105°b TOUT Project Cosl 5405,491 DaCltyof FoR WoM,T.- PM01er3B-LevelofEdal Stpple20 PMO hRelease U:A09122 loft LOCATION • Trinity River Vision Bridges Construction ProjectCity . 00144 �f.�• �. ..� :fit � ,i . tit`I.i-,a� � ._ g� �l'.. � ►.�. Y White Settlement Bridge � City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 8/2/2016 -Ordinance No. 22326-08-2016 DATE: Tuesday, August 2, 2016 REFERENCE NO.: **C-27833 LOG NAME: 20TRVCONSTMGMT SUBJECT: Authorize Execution of Amendment No.1 to City Secretary Contract No. 46771 with Freese and Nichols, Inc., in the Amount of$405,491.00 for Construction Management Services for the Trinity River Vision Central City Project Bridges on North Main Street, Henderson Street and White Settlement Road and Adopt Appropriation Ordinance (COUNCIL DISTRICTS 2 and 9) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Intergovernmental Contributions Fund in the amount of$405,491.00; and 2. Authorize the execution of Amendment No. 1 to City Secretary Contract No. 46771 with Freese and Nichols, Inc., in the amount of$405,491.00 for construction management services for Trinity River Vision Central City Project Bridges on North Main Street, Henderson Street and White Settlement Road (Trinity River Vision-Related Expenses eligible for reimbursement from the Tarrant Regional Water District). DISCUSSION: In the summer of 2014 the Texas Department of Transportation (TxDOT) advertised project bids for the construction of the North Main Street, Henderson Street and White Settlement Road bridges in conjunction with the Trinity River Vision Central City Project. TxDOT awarded the construction contract for the three bridges to the Sterling Delaware Holding Company, Inc. (Texas Sterling Construction), in the fall of 2014. Current Bridge Construction Schedules: Badge Location tart .Finish_ _ �__� ,[Henderson Street __W Y all 2014 Fall 2018 hite Settlement Road .Fall 2014 Spring 2018 North Main Street (Summer 2016 Spring 2018 Texas Department of Transportation (TxDOT) agreed to provide construction inspection and geotechnical/materials testing services for the three bridges. The City and its project partners (Tarrant Regional Water District, Tarrant County and Trinity River Vision Authority) agreed to provide construction management services to work with TxDOT to ensure the bridges were constructed in accordance with existing Agreements and project intent. Logname: 20TRVCONSTMGMT Page 1 of 3 Due to the complexity of the combined bridge project, the uniqueness of the bridge design (no similar bridges in the State of Texas) and unusual design elements Staff recommended that the design engineer, Freese and Nichols, Inc. (FNI), be engaged to provide construction management services during the construction period to ensure that the three bridges were constructed in accordance with the design intent. On June 2, 2015, (Mayor and Council Communication (M&C C-27313) the City Council authorized an Engineering Agreement in the amount of$271,622.00 with FNI for construction management services for the three bridges. FNI's Engineering Agreement was based upon a limited defined scope of services and structured to be used on an "as needed" hourly basis to support Staff. FNI's services have been extremely useful in resolving issues pertaining to unusual project elements including the V-pier structures, bridge aesthetics, illumination and project landscaping. Structural items requiring additional detailed review include the V-piers, retaining walls and post tensioning sequencing of the three bridge substructures and superstructures. Other project elements requiring FNI's expertise include the bridge LED lighting systems and maintenance portals. Staff has determined that, due to uniqueness of the bridge designs and challenges identified during the early stages of construction, FNI's scope of services and level of effort needs to be expanded to address unanticipated design and construction issues on an "as needed" basis. FNI has proposed to provide the recommended construction management services on an hourly rate basis and a total fee not to exceed $405,491.00. Staff considers the proposed fee to be fair and reasonable for the scope of service to be performed. Original Contract [$271,622.00 Amendment No. 1 $405,491.00 (Total Contract ($677,113.00 The entire $405,491.00 amount of this contract is considered TRV-related. Having met its $26.6 million commitment to the TRV project, the City will be reimbursed the full amount of$405,491.00 by the Tarrant Regional Water District (TRWD) upon project completion, in accordance with the provisions of the executed Interlocal Agreement between the City and the TRWD (CSC No. 43425). Staff will record a receivable every month for reimbursable expenses, and the TRV Program Manager in the Planning and Development Department will be responsible for collecting the full reimbursement from TRWD upon project completion. Once reimbursement is received, the revenue will be receipted to the Intergovernmental Contributions Fund. M/WBE Office: Freese & Nichols, Inc., is in compliance with the City's M/WBE Ordinance by committing to an additional 10 percent M/WBE participation on this Amendment No. 1. The City's M/WBE goal on this Amendment or extra work is seven percent. The project is located in COUNCIL DISTRICTS 2 and 9 and will benefit the entire City. FISCAL INFORMATION /CERTIFICATION: Logname: 20TRVCONSTMGMT Page 2 of 3 attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Intergovernmental Contributions Fund. The Planning and Development Department will be responsible for the collection of these funds. Pending Description Appropriation`Expenditures/Encumbrances Remaining -- - ---I -- Henderson Street $405,491.00 'Bridge $405,491.00 $0.00 1(30106) FUND IDENTIFIERS (FIDS): TO Fund Department Account Project ProgramActivity Budget Reference # Amount ID ID Year Chartfield 2) 1 30106 0200431 4640001 C00144 CO2680 $405,491.00 11)30106 0200431 C00144 CO2680 $405,491.00 FROM Fund Departmentccoun Project Program ctivity Budget Reference # Amount ID 1A ID Year (Chartfield 2) 12)301061 0200431 15330500 1 C00144 I CO2680 405,491.00 CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Douglas Wiersig (7801) Additional Information Contact: Doug Rademaker (6157) ATTACHMENTS 1. 2016-05-05 TRV Bridges Amend Cover Letter.pdf (CFW Internal) 2. 20TRVC0NSTMGMT 30106 A016R.docx (Public) 3. Freese and Nichols-TRV MWBE Compliance Memo 062116.pdf (CFW Internal) 4. Freese And Nichols EPLS-TRV.pdf (CFW Internal) 5. Freese And Nichols Form 1295-TRV.pdf (Public) 6. TRV Bridge Location Map.pdf (Public) Logname: 20TRVCONSTMGMT Page 3 of 3 CERTIFICATE OF INTERESTED PARTIES ' FORM 1295 101`1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-66932 Freese and Nichols, Inc. Fort Worth,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 06/07/2016 being filed. City of Fort Worth Date Ac n I d: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 46771 Amd#1 Construction Management Services for the TRA Central City Project Bridges N. Main Street, Henderson Street&White Settlement Rd. 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Herchert, Bob Fort Worth,TX United States X Pence, Bob Fort Worth,TX United States X Milrany,Cindy Fort Worth,TX United States X Coltharp, Brian Fort Worth,TX United States X Gooch,Tom Fort Worth,TX United States X Haster,Thomas Fort Worth,TX United States X Payne,Jeff Dallas,TX United States X New,John San Antonio,TX United States X Hatley,Tricia Oklahoma City,OK United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. o a SUSANNE M.n:64 N Sos .,(]t]fl m�eti0N00V IO 111931 )bgnaoe of A ithorized agent of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE Sworn to and subscribed before me,by the said Kelly J. Shriver this the 7th day of June 20 16 to certify which,witness my hand and seal of office. I J I irl� Susanne M. Johnson Notary Signature of officer ad istering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx,us Version V1.0.1021