HomeMy WebLinkAboutContract 46343-CO7 FORTWORTU., .r
- �1E Y sECb'i�T�r
GUM- ao.
City Of Fort Worth
Change Order Request
Facility and
Project Terminal Building Renovation Meacham International Airport City Sec No. 46343
Description:
Funding(FID)53902-0550435-5740010-C01527-C08180 City Proj.No. C01527
No.(s)
Contractor:I Imperial Construction Change order#F-7 Date: 8118!2016
City Project Mgr.Alfonso Meza City Inspector: JMikeMilarn
Phone Number:817-392-8274 Phone Number: 817-392-2297
Contract Time
(CD)
Original Contract Amount— --------------------------- $15,872,750.00 407
Extras to Date-- ------------------------------------------ $2,069,006.00 201
Credits to Date-- ---------------------------------------------- $0.00 0
Pending Change Orders(in M&C Process)------------------------------ ------ $0.00 0
Contract Cost to Date---------------------------------------------- --- $17,941,756.00 608
Amount of Proposed Change Order------------------------- ------------------- $69,973.00, 0
Revised Contract Amount-------------------------------------------------------- $18,011,729.00 608
Original Funds Available for Change Orders------------------=------------- $0.00
Remaining Funds Available for this CO------- ---------- ----- $0.00
Additional Funding(if necessary)------- $0.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 13.5%
MAXALLOINABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $19,840,937.50
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Authorize a change in scope to increase the construction contract by$69,973.00 to add import of select fill,export of unsuitable material,steel
above door and window,rubber file flooring to the fitness area,exterior signs,additional cost for the monument sign at the main entrance,
revise fire sprinkler type and finish and additional fencing around the sliding gate.
The total amount of change orders 1,2,3,4,5,6&7 results in an increase of the original contract amount by 13.5%.This change order
includes PC#113,114,116,117,119,120&121.This change order does not include an increase in contract time.
OFFICIAL RV®R®
CITY SECRE71,MY,
FT.WORTH VY
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full(both time and money)for all costs arising out of,or incindental to the above Change Order.
Contractor's Company Name Contractor Name Contractor ignature Date
Imperial Construction '
nspector Date Proje t nager Date
PMD S" edntend t Date ArchiteMal Services anager Date
Pr ct Architect oe Dat Directorl operty Manigqnnt Nepartment Date
7 6
ssistant City A omey Date Assista t City Manager D e
ILIble .fir— ~�6
r
MCEI y i D M&C Number N/A o ec °Oo r fy &C Date Approved N/A
SEP 12 2016 $
0
C17Y OF FORT WORTH
CITY SECRETARY ° ,°
ftgir, Citi Secretary
IPERIAL Proposed Change
COMSTR U C T9 ON
Project: -Meacham Terminal BuildingICI Job Number: 1:71
PC No, F- 113 [Date, 814/2016
Submitted To: Submitted By;
Mike Milam Jennifer Collins
City of Fort Worth-Property Management Imperial Construction, Inc.
401 West 13th Street 4001-20 West,Suite 200
Fort Worth,Texas 76102 Weatherford,Texas 76086
-7 Field Conditions
Import(12).20 CY Loads of Select Fill and Export(7) Loads.
NOTE This proposal is based on clouded changes only in the revised contract documents issued and mentioned above along with current
project conditions.All pricing will be reviewed upon approval for differing site conditions at the time of approval and any additional work
required will be subm'itted under seperate PC
Matrix 1 LS $ 3,820.00 3,820.00
Esti m a ti n g/S u p e rvi si a n/Co ord 1 LS $
Sub Total wrthoufi GC J
Markup:-
nL'
ndi
AM"I O"H"
7
A
--w
Ad3 03
T.Q
The Corifi-act Time will be UNCHANGED by Calendar Days
By signing below,you agree to pay the amount submitted by either contingency fund transfer or issuance of a formal change order to the contract.If
approval of this PC is not received within(5)Calendar days from date submitted,it is subject to change.
Submittsx Approved
7a4q,4 0
Imperifl Vonst ction, Inc. City,,Of Fort Worth- Date
-inn LM rt/—, mn 111-1h,f—d To,-,7,f'OR(,'
I6v- PERIAL Proposed Change
C 0 P4 S TRUU Th 0 N
Project: Meacham Terminal BuildingICI Job Number: 14-0644 J
[PC No: 114 JDate: 8/5/2016
Submitted To: Submitted By:
Mike Milam J-ennif6r Collins
City of Fort Worth-Property Management Imperial Construction,Inc.
401 West 13th Street 400 1-20 West,Suite 200
lFort Worth,Texas 76102 Weatherford,Texas 76086
Reasdn Field
_C ndition
scope/IVlod
Per RFI-123,Add Steel above Door/Window and Brace to Floor Deck Above.This Proposal is based on clouded changes only in the revised contract t documents issued and mentioned above along with current
project conditions.All pricing will be reviewed upon approval for differing site conditions at the time of approval and any additional work
required will be submitted under seperate PC
L -Sub Totai
Ply-16r I Ls- $ 596.00 $ 996.00
Estimating/Supervisibn/Coord 1 LS $
K . .. ..
-KK
1 3
E.,
------ ----
R
z5�
-8 n
d 1l
A
Rd
A
PExemptP
A
The Contract Time will be UNCHANGED by Calendar Days
By signing below,you agree to pay the amount submitted by either contingency fund transfer or issuance of aformal change order to the contract.If
approval of this PC is not received within(5)Calendar days from date submitted,it is subject to change.
Submitted
X� App
rov
BY, BY:W
46
ImperIkonstfction,Inc. Ity f Fort Worth Date
4001-20[Aw,Suite 200,weatlieiford,7e-vas 76086
PERIALProposed Change
CON ST R UC 1A ON
Project: Meacham Terminal Building ICI Job Number: 14-06
PC No: 116. Date: 8/9/2016
Submitted To: Submitted By:
Mike Milam Jennifer Collins
City of Fort Worth-Property Management Imperial Construction, Inc.
401 West 13th Street 400 1-20 West,Suite 200
Fort Worth,Texas 76102 Weatherford,Texas 76086
Reason: Owner Request
So -� - _ = - = _
Add Regupol Aktiv Rubber Tile Flooring in Fitness L12 as requested by owner.
NOTE This Proposal is based on clouded changes only in the revised contract documents issued and mentioned above along with current
project conditions.All pricing will be reviewed upon approval for differing site conditions at the time of approval and any additional work
required will be submitted under seperate PC.
Description ,. ,r - 4YMfher(!1J_ MaGj _ 9{Q -subJ) Sub-Totaf
- --
One Source 1 LS $ 101560.00 $ 10;560.00
$ -
Sub Total_w -217Z�ZK
ithoi�taGC_Markup
The Contract Time will be UNCHANGED by 0 Calendar Days
By signing below,you agree to pay the amount submitted by either contingency fund transfer or issuance of a formal change order to the contract.If
approval of this PC is not received within(5)Calendar days from date submitted,it is subject to change.
Submitted Approv
f
BY: s A-() BY:
Imperj61 Const ction, Inc. �— C' of Fort Worth Date
4001-20 West,Suite 300,weatheifbrd,Texas 76086
P1AR-1Proposed Change
E R
Project: Meacham Terminal 13uildingICI Job Number: 14-0644
PC No:
117 Date: 8/x.6/2016
Oprion 1
Submitted To: fJennife-r
mitted By:
Mike Milam Collins
City of Fort Worth-Property Management erial Construction,Inc.
401 West 13th Street 1-20 West,Suite 200
Fort Worth,Texas 76102 Weatherford,Texas 76086
Reasari _ Monument Sign Option 1
Monument Sign at Main Entry.Option 1 Composite Metal Panel Design.(Note More Design Details needed to price Option 2 but the
savings would not be that much going with that option.) If not approved within 5 business days,cost and/or schedule may change.
NOTE:This Proposal is based on clouded changes only in the revised contract documents issued and mentioned above along with current
project conditions.All pricing will be reviewed upon approval for differing site conditions at the time of approval and any additional work
required will be submitted undersepergte PC.
$ 2,500.00 $ 2,500.00
Miller-Sierra (Concrete) 1. LS
Plyler(Structural Steel) 1 LS $ 5,879.00 $ 5,879.00
SWCI (Framing) 1 LS $ 4,600.00 $ 4,600.00
Sealant Solutions 1 LS $ 1,425.00 $ 1,425.00
NOW Panels 1 LS $ 10,677.00 $ 10,677.00
ASI Signage 1 LS $ 40,518.00 $ 40,518,00
1 LS $ (50,000.00) $ (50,000.00)
Less Allowance in Contract $ _
SubTotalwlthout GC IVlarkup= . ._
$ $ 15;599
00'
Add 10%lnd�rect OH EQe
= _
17i 59
Subtotal _
Add P&P 8ond1% _ = -
$
Add insuranceS5%
'. >=xempt
Add Sales Tax _ - -
GRAN[7
The Contract Time will be UNCHANGI±D by 0 Calendar Days
ntract.If
By signing below,you agree to pay the amount submitted by either contingency fund transfer or issuance of a formal change order to the co
approval of this PC is not received within(5)Calendar days from dote submitted,it is subject to change.
Submitted Approved
Irperia onstrtlr ion, Inc.
City f ort(North Date
4001--20{yesi.Suite 200,Fi%eatherford,Texas 76086
Zn� PERIAL .Proposed Change
Project: Meacham Terminal Building ICI Job Number: 14-0644
PC No: 119 Date: 8/18/2016
Submitted To: Submitted By:
Mike Milam Jennifer Collins
City of Fort Worth-Property Management Imperial Construction, Inc.
401 West 13th Street 400 1-20 West,Suite 200
Fort Worth,Texas 76102 Weatherford,Texas 76086
lke61dn:= FBO
ScopeJModifcatfonf Description:
Furnish and Install(2) Exterior American Aero Building Signs per meeting between HHS and ASI Signs and attached drawings.Excludes
Access Panels and FBO Parking Directional Sign (Design TBD).
NOTE:This Proposal is based on clouded changes only in the revised contract documents issued and mentioned above along with current
project conditions.All pricing will be reviewed upon approval for differing site conditions at the time of approval and any additional work
required will be submitted under seperate PC.
Description_, Qty, UM Other(A) Lab(B) Mat IC)_ Eq"(D} Sufi"(E) Sub-total_
AS]Signage 1 LS $ 19,770:00 $ 19,770.00
NOW Cutouts in Panels 1 LS $ 414.00 $ 414.00
Waterproofing at Penetrations 1 LS $ 771.00 $ 771.00
Coordination and Supervision 1 LS $ 500:00 $ 500.00
$ -
Total without GC Markup $_ _,1,185:00 $ S00 00.` $ $
Sub 21;455 QO
Adtl.10%IndireetOH 8s Fee Y - - $ . =2;145 50
Add lnsurarfce'15% ., $ 354 02
AdtlSales - Exempt
24;19100;
The Contract Time will be UNCHANGED by 0 Calendar Days
By signing below,you agree to pay the amount submitted by either contingency fund transfer or issuance of a formal change order to the contract.If
approval of this PC is not received within(5)Calendar days from date submitted,it is subject to change,
Submitted Approved
BY: l 4 �n _ BY: 0 "/0 C'('
Imperi onstr fon,Inc. Cit Fort Worth Date
4001-20 fflest,Suite 200,fyeathetford,Texas 76086
� � ' ERIAL Proposed Charge
CONS TRU C ION
Project: Meacham Terminal Building ICI Job Number: 14-0644
PC No: 120R Date: 8/19/2016
Submitted To: Submitted By:
Mike Milam Jennifer Collins
City of Fort Worth-Property Management Imperial Construction,Inc.
401 West 13th Street 400 1-20 West,Suite 200
Fort Worth,Texas 76102 lWeatherford,Texas 76086
Design.Revision
,-
Cost Increase to Revise Sprinkler Heads from Recessed to Concealed with Disks and revise finishes per the attached email from HHS.
NOTE.This Proposal is based on clouded changes only in the revised contract documents issued and mentioned above along with current
project conditions.All pricing will be reviewed upon approval for differing site conditions at the time of approval and any additional work
required will be submitted under seperate PC.
At rUE��??} Sub(
Y
Service Fire 1 LS $ 2,880.00 $ 2,880.00_
$
Sub,TotitTwithout Gs~NtarkuP-"
Add 1090 I�dmect,QH&XFee - _ - $ 288 00
$ 3,168 OD
Add_lnsirance 15%, - $ 474
gdd�ales7ax _ _ Exempt`
BRAND TOTAL _., __ _. . , - . _,.. ;
$ '; 3;24 fl0.
The Contract Time will be UNCHANGED by 0 Calendar Days
By signing below,you agree to pay the amount submitted by either contingency fund transfer or issuance of a formal change order to the contract.If
approval of this PC is not received within(5)Calendar days from date submitted,it is subject to change.
Submitted Approved
B
AOPAn BY:
Y: r 9'
Imperial hstru n, Inc. City of Worth Date
'z
l
4001-20 west,Suite 200,Weatherford,Texas 76086
IZPERIAL
Proposed Change
CON U CT I ON
Project: Meacham Terminal Building ICI Job Number: 14-0644
PC No: 121 Date: 8/18/2016
Submitted To: Submitted By:
Mike Milam Jennifer Collins
City of Fort Worth-Property Management Imperial Construction,Inc.
401 West 13th Street 400 1-20 West,Suite 200
Fort Worth,Texas 76102 Weatherford,Texas 76086
Reason ,. Code/Safety Requirement
Scope%N1od�cationf0escr�ption_ .. = _ . _ = _ _ ``
Per site discussion with CFW(JD),Imperial(JC),and HHS(EC).To address safety concerns,see the attached sketch talked about to
encapsulate the full length of the Sliding Gate(G01). Note:The manufacturer also requires wire mesh be installed to prevent reach through.
NOTE:This Proposal is based on clouded changes only in the revised contract documents issued and mentioned above along with current
iffering site conditions at the time of approval and any additional work
project conditions.All pricing will be reviewed upon approval for d
required will be submitted under seperate PC
Descriptrorr,,, _7_=2t1► ;t1M Qther{Aj Lib{8� >y, Mat{C) Eq{D} _ , ,Sub(E) _ Sub Total
ACME Fence 1 LS $ 6,750.00 $ 6,750.00
Sub Total wtthout GC N[arkufr� $ ,
Add 10%Indirect OH&Fee ., - _ fn
777
Add Insurance 1590 _.: = _ - -
-
d:*
Sales Tex :� =
The Contract Time will be UNCHANGED by 0 Calendar Days
By signing below,you agree to pay the amount submitted by either contingency fund transfer or issuance of o formal change order to the contract.If
approval of this PC is not received within(S)Calendar days from date submitted,it is subject to change.
Submitte 1BY:
roved p
BY: �
Imperia onst ction,Inc. City ort Worth Date
4001-20 West,Suite 200,iYeatherford,Teras 76086