HomeMy WebLinkAboutContract 46569-CO2 CITY SECRETARY _6 FO RT WO RT H City of Fort Worth CWNACT NO. �U"C (K Change Order Request Project Name:1 Water and Sanitary Sewer Replacement Contract 2009, STM-0 City Sec No.: 1 46569 Project No.(s): P253-609170147983&P258-709170147983 I DOE No. 6771 CityProj.No.:l 01479 Water and sanitary sewer main replacement on W.Cantey Street,Stadium Drive,S. University Drive and N. Commerce Project Description: Street. Contractor:I Conatser Construction TX, LP Change Order# 0 Date: 8/31/2016 City Project Mgr.1 Roberto C.Sauceda City Inspector: I Cowboy Brez Phone Number: 817-392-2387 Phone Number: 817-223-2256 Dept. Water Sewer Totals Contract Time (Calender days) Original Contract Amount $1,366,515.00 $121,365.00 $1,487,880.00 150 Extras to Date 045 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,366,515.00 $121,365.00 $1,487,880.00 195 Amount of Proposed Change Order $36,469.50 3(odY-Tb Ate' 0 lvc� Revised Contract Amount $1,402,984.50 $121,365.00 $1,524,349.50 2 Original Funds Available for Change Orders $41,000.00 $6,100.00 $47,100.00 Remaining Funds Available for this CO $41,000.00 $6,100.00 $47,100.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT I Z,,V foxy Q MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,859,850.00 JUSTIFICATION(REASONS) FOR CHANGE ORDER The change order will provide for new pay items for: • Mobilization and remobilization during TCU home football games to allow traffic to flow along S. University Drive. • Bore of water line services across S. University Drive to allow traffic flow. • Install a stamped concrete driveway on S. University Drive. • Installation of 2-inch water meter service for TCU Physical Plant. Staff concurs with the contractor's request for 60 additional calendar days on the ch Auss W 8 p SEP 15 2016 OFFICIAL RECORD OF CITY SECRETARY 4�y � CITY FORT WORT ° agy SECRETAIV FT.WORTH,TX ter J_ ser, Cgty 5er`. = ; It is understood and agreed tha a accep anc Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company Name Contractor Name Contractor Signature Date Conatser Construction TX,LP Jesse Martinez Inspec Date Pro"ec Manager — Date Assistant Director Water Dept) Date n tru "on SApervisor TPW Dept Date Assi,8ULGftmorng Date Assistant dIty Manager Date 5 LL t 6 -_ Council Action If Required) M&C Number N/A M&C Date Approved City of Fort Worth F, ,.. Change Order Additions Project Name Water and Sanitary Sewer Replacement Contract 2009, STM-0 City Sec No.: 46569 Project No.(s): P253-609170147983&P258-709170147983 = DOE No. 6771 City Proj. No.: 01479 Project Water and sanitary sewer main replacement on W. Cantey Street,Stadium Drive, S. University Drive and N. Commerce Description Street. Contractor Conatser Construction TX,LP Change Order:0 Date: 8/31/2016 City Project Mgr, Roberto C. Sauceda City Inspector Cowboy Brez ADDITIONS ITEM DESGRIPTION DEPT Qty Unit Unit Cost Total 31 2'WIDE ASPHALT PVMT REPAIR,ARTERIAL Water 64.00 LF $50.00 $3,200.00 34 WATER ABANDONMENT PLUG Water 1.00 EA $1,000.00 $1,000.00 45 TRAFFIC CONTROL Water 0.07 EA $8,000.00 $560.00 55 2"TAP TO MAIN Water 1.00 EA $1,800.00 $1,800.00 56 CLASS B BOX Water 1.00 EA $280.00 $280.00 57 2"COOPER SERVICE Water 51.00 LF $68.00 $3,468.00 58 INSTALL CITY PROVIDED METER Water 1.00 LS $1,010.00 $1,010.00 59 Water Line Bored Services under Univeristy Drive Water 600.00 LF $30.00 $18,000.00 60 Mobilization and Remobilization for TCU Football games Water 3.00 EA $6,000.00 $18,000.00 61 Stamped Concrete Driveway Water 21.39 SY $215.50 $4,609.55 62 16 inch Water Line repair Water 1.00 LS $26,481.95 $26,481.95 Water $78,409.50 Sewer Page 2 of 4 Additions Sub Total $78,409.50 FORT WORTH City of Fort Worth Change Order Deletions Project Name Water and Sanitary Sewer Replacement Contract 2009, STM-0 City Sec No.: 46569 Project No.(s): P253-609170147983&P258-709170147983 DOE No. 6771 City Proj. No.: 01479 Project Description Water and sanitary sewer main replacement on W. Cantey Street,Stadium Drive, S. University Drive and N. Commerce Street. Contractor Conatser Construction TX, LP Change Order: EE Date 8/31/2016 City Project Mgr. Roberto C. Sauceda City Inspector: Cowboy Brez DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 3 16 inch DIP Water Pipe Water 58.00 LF $155.00 $8,990.00 7 12 inch PVC Water Pipe Water 70.00 LF $135.00 $9,450.00 8 8 inch DIP Water Pipe Water 20.00 LF $85.00 $1,700.00 14 12 inch Gate Valve Water 3.00 EA $2,600.00 $7,800.00 19 Connection to Exist.4-12 inch water main Water 7.00 EA $2,000.00 $14,000.00 Water $41,940.00 Sewer Page 3 of 4 Deletions Sub Total $41,940.00 MMBE Breakdown for this Change Order MWSE Sub Type of eruic ; Amount f r this GO Total $fl:OQ Previous Change Orders MQU Total : flQO Page 4 of 4