Loading...
HomeMy WebLinkAboutContract 31299 AMENDMENT NO.—6 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. 1 '� (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and TranSystems Corporation Consultants, (Engineer) made and entered into City Secretary Contract No. 28436, (the Contract) which was authorized by the City Council by M&C C-19457 on the 4th day of February 2002, and subsequently revised by five previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Berry Street Streetscape Project from Waits Avenue to Forest Park Blvd. WHEREAS, it has become necessary to execute Amendment No. 6 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated January 5, 2005, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $4, 500 . 00 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $323, 391.20 . AI 02-01 -05PO4 : 22 RCVD < < '�J A L 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the (�)-dl day of ( L 2005, in Fort Worth, Tarrant County, Texas. ATTEST: LLContract Authorization Marty Hendri , City Secretary Date APPROVAL RECOMMENDED: APPROVED: '7 A. Douglas Rademaker, P.E. Marc A. tt Director, Department of Assistan '- City Manager Engineering TRANSYSTEMS CORPORATION CONSULTANTS ENGINEER / By: Name: Joseph Masterson, P.E. Vice-President 500 West Seventh Street Suite 600 Fort Worth, TX 76102 APPROVED AS TO FORM AND LEGALITY: *Garyyyeinberger .Assistant City Attorney i^, .11 r' �, ;!1 K, OjDD TzaivP YS7EMS O/?AT/ON C O N 5 U L T A N T S ADDENDUM No. 6 SUMMARY OF DESIGN FEE January 5, 2005 Mike Domenech Transportation and Public Works City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 RE: Berry Street Reconstruction, Waits to Forest Park Change in Scope — Temporary Construction Easements Dear Mr. Domenech, To expand the scope of the project, we are requesting an additional fee of $4,500.00 dollars. The additional work is outlined below: • Prepare 10 Temporary Construction Easements for 10 separate parcels of land. This amendment does not include plans for construction or cost estimates. Original Contract Fee $262,376.00 Executed Amendment No. 1 (Geotech) $ 6,600.00 Executed Amendment No. 2 (SUE) $ 18,370.20 Executed Amendment No. 3 (Add Y2 block) $ 20,285.00 Executed Amendment No. 4 (Exhibits) $ 2,000.00 Executed Amendment No. 5 (Waits to Greene) $ 9,260.00 Proposed Amendment No. 6 $ 4,500.00 TOTAL $323,391.20 If you have any questions or require additional information please give me a call. Sincerely, TranSyste prporation Consultants I R6ul _ na�tP.E. Principal 500 W. 7th Street, Suite 600, Postal Unit#20 Fort Worth, Texas 76102-4773 Phone: (817)339-8950 Fax: (817)336-2247