Loading...
HomeMy WebLinkAboutContract 26536 AMENDMENT WITH M&C CITY SE CRE ARY AMENDMENT NO. 2 STATE OF TEXAS 3 CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT 3 WHEREAS, the City of Fort Worth (City) and Halff Associates, Inc. (Engineer) made and entered into City Secretary Contract No. 19389 (the Contract) which was authorized by the City Council by M&C C-13568 on the 6 of October, 1992; and WHEREAS, the Contract involves engineering services for the following project : The design of additional water and sanitary sewer line relocations for IH-30 Reconstruction requested by the Water Department WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Section I, of the Contract is amended to include the addition- al engineering services specified in M&C C-18416, adopted by the City Council on 9 day of January, 2001 , and further amplified in a proposal letter dated October 25, 2000, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $22, 000 . 00 2. Section IV, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $479, 000 . 00 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. A� EXECUTED on this the_ day of 2001, in Fort Worth, Tarrant County, Texas. ATTEST: Contract Authorization Gloria Pearson Date City Secretary APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E. J V Mike Groomer Director, Department of Engineering Assistant City Manager HALFF ASSOCIATES, INC. ENGINEER -V� j/ J to By:- %IF - - W Troy nn ell, P , Vice President 4000 Fossil reek Boulevard Fort Worth, Texas 76137 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney 115HICQAL WORD ON WORRY -2- FT. Wo"HIM'' 4000 FOSSIL CREEK BOULEVARD ■■■ FORT WORTH,TEXAS::: (817)847-1422 METRO(817)429-9975Halff Associates FAX(817)232-9784 6137 ENGINEERS • ARCHITECTS • SCIENTISTS PLANNERS • SURVEYORS Fred Ehia, P.E. October 25, 2000 City of Fort Worth AVO 12618 1000 Throckmorton Fort Worth, Texas 76102 Re: Amendment No. 2 - The Study and Design of Water and Sewer Line Adjustments for IH-30 Reconstruction from Summit Avenue to U.S. 287, City Secretary Contract Number 19389 Water Project PW77-060770190010, Sewer Project PS46-070460190010,DOE No. 1770 Dear Mr. Ehia: In response to our previous conversations regarding the referenced contract, Halff Associates is pleased to present this revised Amendment No. 2 for the following items: • Field surveys and design for re-alignment of approximately 125 linear feet of Sanitary Sewer Lateral L-138 crossing under the westbound IH-30 frontage road near Tucker Street. • Field surveys and design for re-alignment of approximately 100 linear feet of Sanitary Sewer Lateral L-1706 in the IH-30 right-of-way, approximately 2,200 feet west of Summit Avenue. • Field surveys and design for re-alignment of approximately 650 linear feet of Sanitary Sewer Lateral L-2474 along Vickery Boulevard, approximately 2,500 feet west of Summit Avenue. • Field surveys and design for re-alignment of approximately 100 linear feet of 8"water line in El Paso Street, approximately 300 feet east of Henderson Street. The justification for Amendment No. 2 is the fact that proposed IH-30 highway improvements were expanded since initiation of the subject contract, and design fees for the additional water and sanitary sewer relocations were not included in the original fee. M/WBE participation on Amendment No. 2 consists of field surveys from Gorrondona and Associates, which constitutes $3,200 of the total $22,000 amendment amount (14.5%). If you have any questions or need any additional information,please do not hesitate to call me at(817) 847-1422. Sincerely, GORRONDONA& ASSOCIATES HALFF ASSOCIATES,INC. Brad J. Go dona, R.P.L.S. J. Russell Killen, P. PECON cc: Perry Burnett, TxDOT cc FORT WORTH • DALLAS • HOUSTON • McALLEN N. U � 4 0 TRANSPORTATION • WATER RESOURCES • LAND DEVELOPMENT • MUNICIPAL • ENVIRONMENT AL— MECHANICAL • ELECTRICAL SURVEYING • GEOGRAPHIC INFORMATION SYSTEMS ARCHITECTURE LANDSCAPE ARCHITECTURE • PLANNING 46 AMENDMENT NO. 2 TO CONTRACT 19389- DESIGN FEE WORKSHEET -OCTOBER 25, 2000 WATER AND SANITARY SEWER RELOCATIONS FOR THE IH-30 RECONSTRUCTION PROJECT BASIC ENGINEERING DESIGN FEE OPINION OF PROBABLE CONSTRUCTION COST $205,000 DESIGN FEE FROM TSPE CURVE"A" (10.1%) $20,710 15% CONSTRUCTION ADMINISTRATION DEDUCTION -$3,110 TOTAL BASIC FEE $17,600 SPECIAL SERVICES CONSTRUCTION ADMINISTRATION $1,000 DESIGN SURVEYS (M/WBE - GORRONDONA) 1 DAY FOR EACH UNIT @ $800 PER DAY $2,400 REPRODUCTION 40 BLUELINES FOR EACH UNIT @ $5 PER SHEET $200 CONSTRUCTION SURVEYS (M/WBE -GORRONDONA) RE-ESTABLISH CONTROL- 1 DAY $800 TOTAL SPECIAL SERVICES FEE $4,400 TOTAL FEE $22,000 ASSUMPTIONS NO EASEMENTS ARE REQUIRED -ALL WORK IS IN TXDOT OR CITY ROW NO SUBSURFACE INVESTIGATIONS WILL BE DONE-TXDOT WILL PROVIDE BORINGS CNN P'Nmri City of Fort Worth, Texas qV01yor And coun"K Communication DATE REFERENCE NUMBER LOG NAMEPAGE 1/9/01 **C-18416 30HALFF 1 of 2 SUBJECT AMENDMENT NO. 2 TO ENGINEERING AGREEMENT WITH HALFF ASSOCIATES FOR DESIGN OF WATER AND SANITARY SEWER LINE ADJUSTMENTS FOR INTERSTATE HIGHWAY 30 RECONSTRUCTION RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 2 to City Secretary Contract (No. 19389) with Halff Associates, Inc. in the amount of $22,000, thereby increasing the contract amount to $479,000. DISCUSSION: On October 6, 1992 (M&C C-13568), the City Council authorized the City Manager to execute an engineering agreement with Halff Associates, Inc. in the amount of $383,000 to prepare construction plans and contract documents and specifications for adjustments to water and sanitary sewer lines for Interstate Highway 30 (I1-1-30) reconstruction, Contract 213. The Texas Department of Transportation (TxDOT) has requested the Water Department to relocate the additional existing water and sanitary sewer lines along the proposed IH-30, from west of Summit Avenue to U.S. 287 (Contract 2C). Halff Associates, Inc. proposes to perform the additional engineering services for design of water and sanitary sewer lines for a fee of $22,000. Staff considers this fee to be fair and reasonable for the scope of engineering services. It is anticipated that the engineering agreement and construction cost will be reimbursed to the City by TxDOT, except for the cost of any betterment, which shall be at the sole expense of the City and not eligible for reimbursements. Halff Associates, Inc. is in compliance with the City's M/WBE ordinance by committing to an additional 15% M/WBE participation on this amendment. This project is located in COUNCIL DISTRICT 8, Mapsco 76D and 76H. City of Fort Worth, Texas "agor And Coundl Communication DATE REFERENCE NUMBER LOG NAME PAGE 1/9/01 **C-18416 30HALFF 2 of 2 SUBJECT AMENDMENT NO. 2 TO ENGINEERING AGREEMENT WITH HALFF ASSOCIATES FOR DESIGN OF WATER AND SANITARY SEWER LINE ADJUSTMENTS FOR INTERSTATE HIGHWAY 30 RECONSTRUCTION FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budgets, as appropriated, of the Commercial Paper-Water and Sewer Funds. MG:k Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) APPROVED Mike Groomer 6140 CITY COUNCIL Originating Department Head: A.Douglas Rademaker 6157 (from) JAN 9 2001 PS46 531200 070460190010 $ 1,600.00 I�,) Additional Information Contact: PW77 531200 060770190010 $20,400.00 / City Secretary of the A.Douglas Rademaker 6157 City of Fort Worth.ftm