Loading...
HomeMy WebLinkAboutContract 26547 CITY SECRETARY CONTRACT NO. � AMENDMENT No._3 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering Corporation, (Engineer) made and entered into City Secretary Contract No. 22821, (the Contract) which was authorized by the City Council by M&C C-16053 on the 20th day of July 1997 and subsequently revised by two previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of M-390 Drainage Area Sanitary Sewer System Evaluation and Improvements (Group 6, Contract 1) , Part 2 and Sanitary Sewer Rehabilitation in the M-36SR (Group 5, Contract 2) , Part 4, Drainage Area. WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include specialized design work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated the 22nd day of January 2001, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $14, 900 . 00 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $375, 637. 60. JI FICIAL PECOND CM 7V �1Ef PM y 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. /� .. EXECUTED on this the 9"' t day of 2001, in Fort Worth, Tarrant County, Texas . ATTEST: lh��'" ��c.u�� Contract Authorization Gloria Pearson, City Secretary - -0) Date APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E. LkY Mike Groomer lN' Director, Department of Assistant City Manager Engineering DANNENBAUM ENGINEERING CORP. ENGINEER By: a , A�±'4, Name: James D. DANNENBAUM, P.E. AMIX)MMUNLMSIXU9tIUA24 6421 Camp Bowie Blvd. , Suite 400 Fort Worth, TX 76109 Fort Worth, TX 76116 APPROVED AS TO FORM AND LEGALITY: 2tN�_� Gary Steinberger Assistant City Attorney ENGI.FRM(NO M&C) -2- V MCCIALL KOWD C15y °�` DANNENBAUM ENGINEERING CORPORATION0 6421 CAMP BOWIE BLVD..SUITE 400 FORT WORTH,TEXAS 76116-5421 (811)163-8883 �f January 22, 2001 Mr. Rakesh Chaubey, P.E. Department of Engineering City of Fort Worth 811 Lamar Street Fort Worth, Texas 76102-6311 RE: Main 390 Drainage Area Sanitary Sewer Rehabilitation & Improvements, (Group 6, Contract 1), Part 2, Sewer Project No. PS46-070460410280, D.O.E. No. 1646 Mr. Chaubey: We are providing this letter to request additional compensation for the work beyond the engineering services outlined in the contract for Main 390 Drainage Area between Dannenbaum Engineering Corporation and the City. Amendment No. 3: The additional services are due to revisions of the change on Sheets 30 through 35 to provide a shallow service line in lieu of the chimney services originally designed. Due to the necessity to complete the design extremely quickly, the design will be completed directly upon the original plans sheets. The total additional engineering fee required to make these revisions to the construction documents is $14,900.00. Attached is a summary of the engineering fees for the project including amendments 1, 2 and 3. Please inform us of the City's approval of the contract changes. If you have any questions or need any additional information in the meantime, please do not hesitate to call. Sincerely, ( I N. ( G Brian D. O'Neill, P.E. Project Manager cc: Louis H. Jones, P.E. Gary W. Fisher, P.E. File: 3177-01 L-'LMCIAL, 11 Ud Utl�`9 // �f7W/