HomeMy WebLinkAboutContract 26566 AMENDMENT NO. 3 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and Dunaway Associates, Inc. , (Engineer) made and entered into City Secretary Contract No. 21808, (the Contract) which was authorized by the City Council by M&C C-15707 on the 23th day of April 1996 and subsequently revised by two previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Water Main Rehabilitation Contract II. WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated January 17, 20011 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $11,830.00. 2. Article III, Section D, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $108,399.94. LINY 3. All other provisions of the Contract Which are not expressly amended herein shall remain in full forceandeffect. EXECUTED on this the ��y of fz&U 2001, in Fort Worth, Tarrant County, Texas. AT T: i1D _)GLIIe�� Contract Authorization Gloria Pears n, City Secretary Date APPROVAL RECONIIdENDED: APPROVED: A. Douglas Rademaker, P.E. Mike Groomer Director, Department of Assistant City Manager Engineering DUNAMAY ASSOCIATES, INC. ENGINEER 6a —BY: `, N e Cs DeOtte P.E. R.P.L.S. Vice President 1501 Merrimac Circle, Suite 100 Fort Worth, TR 76107-6572 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney 21808 -2- DUNAWAY ASSOCIATES, INC. ENGINEERS • PLANNERS • SURVEYORS DAI No.9601600 January 17, 2001 Ms. Dena Johnson, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Fort Worth,Texas 76102 Reference: Amendment No.3 Water Rehabilitation Contract II Water Department Project No. PW 77-060770140500 D.O.E. Project No.2755 Dear Ms.Johnson: Dunaway Associates, Inc. (DAI) is pleased to present this Amendment No. 3 for the following additional services that were beyond our original scope of services: • Survey and design for the addition of approximately 570 linear feet of 20-inch water line and at the University Street bridge near Rockwood Park A summary of the proposed budget for this revised amendment is as follows: Additional survey for the bridge access roads and north bound bridge columns. Design of appropriate thrust blocking &support detail by a structural engineer. Redesign of approximately 570 linear feet of 20-inch diameter water line at the University Street bridge near Rockwood Park from a river crossing construction installation to a aerial bridge attachment on the north bound lanes bridge, and design of re-route for approximately 30 linear feet of 8-inch retaining wall sub- drain. Fee Summary: Civil Design Fee: 600 LF @$10.00/LF= $ 6,000.00 Survey:600 LF @$3.00/LF= $ 1,800.00 10%of sub-consultant $ 180.00 Structural Design $ 3,500.00 10%of sub-consultant $ 350.00 Subtotal $ 11,830.00 %FILf 1501 MERRIMAC CIRCLE • SUITE 100 • FORT WORTH,TEXAS 76107-6572 • (817)335.1121 • METRO(817)429-2135 • FAX(817)335-7437 • Amendment No. 3 January 17, 2001 Page 2 A summary of the total project fees is as follows: Contract Description Fee Original Contract Survey,design,studies, permitting,contract...........$ 33,997.44 documents for four water line crossings totaling 340 linear feet Amendment No. 1 Redesign of 218 linear feet of water line due to......$ 57,572.50 TxDOT changes,studies, research, survey, design,coordinations,and preparation of contract documents for 1,400 linear feet of 36-inch diameter water line Amendment No. 2 Coordination,studies,and research.........................$ 5,000.00 of 570 linear feet of water line& 30 linear feet of drain line Amendment No.3 Survey and design of 570 linear feet of ...................$ 11,830.00 water line&30 linear feet of drain line TOTAL PROJECT $................................................................................ .$10$3244 Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this revised proposal and our proposed MIWBE utilization for the referenced project. Very truly yours, DUNAWAY ASSOCIATES, INC. Brian Darby, P.E. Associate 9601600_Ltr_DJohnsonAmend## 011701_BSD.doc cc: Mr.Doo Kim,P.E.—City of Fort Worth,Water Department �U a FowWouti MEMORANDUM TO: A. Douglas Rademaker,Director, DOE and Mike Groomer, Assistant City Manager FROM: Dena Johnson, DOE DATE: January 29, 2001 RE: AMENDMENT NO. 3 TO WATER MAIN REHABILITATION CONTRACT II DOE NO. 2755, WATER PROJECT NO. PW77-060770140500 This amendment will compensate Dunaway Associates, Inc. for the additional civil design, struc- tural design and survey services to be provided on the contract to address the following: The original design provided for the installation of a 20 inch water transmission main underneath the west fork of the Trinity River on the west side of the University Street bridge between Rock- wood Park Drive and River Park. Subsequent to commencing with construction, it was determined that the water main could not be constructed (despite numerous attempts by the contractor) as designed because the extreme hard- ness of a layer of solid rock which was encountered along the southern alignment of the proposed main prevented sheet piling (which would have allowed for installation underneath the river) from being driven into the river bottom. The existence of the solid layer of rock was unknown prior to beginning construction of the project. After reviewing several alternatives, it was decided that the water main should be suspended along the northbound bridge structure of University Street. Dunaway Associates, Inc. will provide plans and specifications for the new alignment. Dunaway Associates, Inc., has submitted a proposal letter in the amount of$11,830.00 for the ad- ditional services to be provided thereby increasing the contract fee from $96,569.94 to $108,399.94. I believe this fee is fair and reasonable for the additional services to be provided. Dena Johnson cc: Berdena Hamilton Dan Pepon WEMO 2733 ENGINEERING DEPARTMENT THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311 (817) 871-7941 * FAX (817) 871-7854 Printed on recycled paper