HomeMy WebLinkAboutContract 26576 AMENDMENT NO. 9 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. '5 (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and Turner Collie & Braden, Inc. , (Engineer) made and entered into City Secretary Contract No. 21289, (the Contract) which was authorized by the City Council by MSC C-14962 on the 15th day of August 1995; and subsequently revised by eight previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Mains 126 and 250 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 3, Contract 3) , Part 5. WHEREAS, it has become necessary to execute Amendment No. 9 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated January 29, 2001, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $1,000.00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $560,313.00. LUkD VINP VE{ Geo � _ o 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the ')m day of , 2001,1I in Fort Worth, Tarrant County, Texas. AT I$T: CfShtraot Authorization Gloria Pearsr_ , City Secretary - � �) - 0 / DateH APPROVAL RECOMMENDED: APPROVED: '1-1AA A. Douglas Rademaker, P.E. Mike Groomer Director, Department of Assistant City Manager Engineering TURNER COLLIE & BRADEN, INC. ENGINEER By: Name: Stephen R. James, P.E. Project Manager 1200 Summit Avenue Fort Worth, JL 76102-4409 APPROVED AS TO FORM AND LEGALITY: Q� — Gary Steinberger Assistant City Attorney 22566-9 -2- cr; ly EG)�"�j° PY 1200 Summit Avenue Suite 600 Turner Collie 013raden Inc. Fort Worth,Texas 76102-4409 817 332-8977 Engineers • Planners • Project Managers Fax 817 332-8979 January 29, 2001 Mr. Michael Domenech, P.E. City of Fort Worth Department of Engineering P. O. Box 870 Fort Worth, Texas 76101-0870 Re: Amendment No. 9 Sanitary Sewer Main 126 & 250 Drainage Area Rehabilitation and Sewer Improvements, Part 5 DOE No. 2233 Sewer Project No. PS46-070460410110 TC&B Project No. 45-95680-500 Dear Mr. Domenech: We are providing this letter as our request for compensation to provide additional engineering design services requested by the Department of Engineering. During replacement of sanitary sewer line M-126 on Normandy Road, west of Queen Street (Mapsco 79A), unstable soil conditions were encountered that could not be avoided nor controlled. As the contractor performed the open cut, they experienced large amounts of sub-base material sloughing off from the trench. Upon considering the alternatives, it was thought best to perform a reconstruction of the roadway (a length of 310 LF) in conjunction with the 6" water line replacement(a length of 300 LF) -the water line is severely deteriorated and in need of replacement. The Department of Engineering requested TC&B to provide construction plans for replacement of approximately 310 feet of street pavement and 300 feet of waterline. Our previous fee for this work ($5,900 — Amendment 8) was based on showing all improvements — water and paving — on one plan/profile sheet. After the plans were completed, we were requested to prepare separate plan/profile sheets for the water and paving improvements, and add details to extend the curb 150 feet west on the north side of the road. Our estimated fee to complete this work is $1,000. Please see the Contract Fee Summary below. Q�(��iA�t PECO: °D c4 'c��P"'eMA V �e o�_'�N!!, ,tzbh,h"d �� 1946 E Engineering Excellence for 0 ver One-Half Century Mr. Michael Domenech, P.E. January 29, 2001 Page 2 CONTRACT FEE SUMMARY Contract Item Description Fee Original Contract M&C C-14962 (Cont. #21289) $304,985 Amendment No. 1 Add'] engineering & survey (253 If) $2,900 Amendment No. 2 Add'1 engineering & survey (15,303 If) $143,683 Amendment No. 3 CPS & survey (540 If) $11,800 Amendment No. 4 Waterline replacement& $14,750 Street overlay Amendment No. 5 Misc, align. revisions & add'1 $59,528 engineering& survey Amendment No. 6 Add'l expense for response to City $10,014 comments and to separate plans and specs. for Unit 1 Amendment No. 7 Part 5 Revisions $5,753 Amendment No. 8 Roadway and waterline replacement $5,900 plans (a)Normandy and Queen Subtotal $559,313 Amendment No. 9 Separate roadway and waterline $1,000 replacement plan/profile sheets TOTAL PROJECT $560,313 If you have any questions, please call me at (817) 332-8977. Sincerely, 369V 1" Stephen R. James, P.E. Project Manager N:\FTW\95680500\CORRESP\annend no 9.doc cc: File 2.1 U AL 1 0 Win `%'[5UUQ �inL7)'UG