HomeMy WebLinkAboutContract 43959-A4 f till I SECRETA 6Y CONTRACT 140. 5 AMENDMENT No. 4 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 43959, (the CONTRACT) which was authorized by M&C C-25942 on the 23rd day of October, 2012 in the amount of $698,700 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $00 which was administratively authorized on September 15, 2013; and Amendment No.2 in the amount of $49, 700 . 00 which was administratively authorized on July 28, 2014 and Amendment No. 4 in the amount of $400,000 . 00 which was authorized by M&C C- 27935 on September 20, 2016; and AREAS, the CONTRACT involves engineering services for the following project: Design oversight and Project Management Services on North Tarrant Express Segment 3A, Interstate 35W from Interstate 820 to Interstate 30 . WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated June 1 , 2016, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $400, 000 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be OFF an amount of $1,548,400 . 00 . MAL RECORD TAh'iv' .C'RF Page -1- 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED : ENGINEER City of Fort Worth Kimley-Horn and Associates, Inc. , Jesus J. Chapa Glenn Gary, P.E . Assistant City Manager Senior Vice-President DATE: �p�� ' ( DATE: 7,p2l_�� APPROVAL RECOMMENDED : z2L�� W Christopher Harder, P.E. Acting Assistant Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: C- 27935 //k Date: September 20, 2016 Douglas W. Black �/ f ` V4 Senior Assistant City Attorney ATTEST: ary ayser g City fecretary f �®���_ OFFICIAL Page -�- Kimley)))Horn June 1, 2016 Mr. John Kasavich, P.E. Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth,TX 76102 Re: City of Fort Worth-North Tarrant Express Segment 3A—Amendment No.4 Budget Modification and Continuation of Services KHA No. 061018113 City Project No. 02011 Dear John: This letter is in reference to a contract between Kimley-Horn and Associates, Inc. (Kimley-Horn) and the City of Fort Worth(the City) dated 12-07-2012 referred to herein as the"Contract". On June 23, 2009, Texas Department of Transportation (TxDOT)entered into a 10-year Agreement with North Tarrant Express Mobility Partners (NTEMP)to identify and construct highway improvements in northeastern part of Tarrant County including portions of the Interstate_ 35W, Interstate 820 and Interstate 183 corridors within the City. This amendment will provide additional engineering and project management.services through FY 2017. Kimley-Horn will continue the services outlined as follows: Task- 1: Program Management (Partially Reimbursable by NTI) 1.1. Project Administration A. BDE Reporting: Complete monthly MIWBE report forms for the City. Submit M/WBE change forms as necessary for any changes in M/WBE status. B. Monthly Invoices: Prepare monthly invoices that meet the CITY invoice format requirements. C. Deliverables: 1. Monthly BDE Reports to CITY 2. Monthly Invoices to CITY D. Process Payments to Developer: 1.Conduct and document meeting with CITY and Developer to discuss and create payment process protocol. 2. Develop standard invoice and backup material in accordance to the CITY's and Developer's requirements. 3. Conduct and document verification meeting with CITY and Developer regarding the standard invoice and backup material. 80176102 Kim ey>>>Hol n Page 2 4. Monthly invoice and backup material: Prepare monthly invoices and backup material to meet Developer format requirements. 1.2. Meetings A. Semi-Monthly CITY Progress Meetings(two times per month): Prepare for, conduct and document semi-monthly project update meetings with the CITY project manager and other CITY staff as required. B. Semi-Monthly Developer Progress Meetings(two times per month): Prepare for, conduct and document semi-monthly project update meetings with the Developer and CITY project manager and other CITY staff as required. C. Stakeholder Meetings: Prepare for, conduct and document stakeholder meetings with CITY and appropriate stakeholders along the 1-35W corridor as required over this contract period. D. Deliverables: 1. Meeting notes and action items for each attending party from each meeting. 1.3. Roadway, Water and Sanitary Sewer Conflict Issue Resolutions A. Coordination with CITY regarding conflicts between the future roadway infrastructure and the CITY's water and sanitary sewer infrastructure that creates a service interruption that the CITY deems not in their best interest therefore warranting a potential realignment of the roadway to avoid the conflict with the water and/or sanitary sewer infrastructure. B. Coordination with Developer and/or TxDOT regarding conflicts between the future roadway infrastructure and the CITY's water and sanitary sewer infrastructure that creates a service interruption thatthe CITY deems not in their best interest therefore warranting a potential realignment of the roadway to avoid the conflict with the water and/or sanitary sewer infrastructure. C. Deliverables: 1. Meeting notes and action items for each attending party from the coordination efforts. Task -2: Conflict Analysis along 1-35W (Fully Reimbursable by NTI) 2.1. 1-35W(North Loop 820 to 1-30) Schematic Review: Review proposed TxDOT ROW maps and proposed roadway alignment schematics as compared to the existing CITY water and sanitary sewer maps. Identify potential conflicts between_proposed TxDOT ROW, proposed roadway, water and sanitary sewer utilities. 2.2. Site Visits to Conflict Areas: After conflict identification, perform site visit to obtain additional information not shown on maps and schematics. 2.3. Utility Conflict Packet Reviews: A. Assist CITY with conflict packet review. 1. Review 3.0%, 60%,90%,and 100%plan sets. 2. Develop comment logs for each submittal. =oroimijtitoji-i801 - • 1 Ft.Worth,TX 76102 Kimley>Morn Page 3 3. Keep record of all submittals and review schedules. 2.4: Deliverables A. Conflict review logs (30%0, 60%, 90%, and 100% plan sets). B. One full size plan markups for each submittal. 2.5. Meetings A. Attend additional meetings outside of scheduled bi-weekly meetings to resolve any conflicts that may arise and need to be addressed immediately. B. Coordinate any decisions that are made outside of the scheduled bi-weekly meetings. Task -3: Construction Support Services (Fully Reimbursable by NTL) 3.1. Construction Support Services: Provide professional construction phase services for construction of the proposed project for the purpose of providing assistance to CITY during construction. The CITY will provide construction management services and inspection for the project. This scope of services does not include construction phase services related to inspections or testing, applications for payment, disagreements between the CITY and the Contractor, or determination of substantial completion. The following services will be performed for the construction contract of utility relocations during the contract period: A. Preconstruction Meeting: 1.Attend a preconstruction conference for each relocation project. B. On-site Observation 1. Make Site visits at intervals as directed by CITY in accordance with the construction period in order to observe the progress of the Work. 2. Such visits and observations by ENGINEER are not intended to be exhaustive or to extend to every.aspect of Contractor's work in progress. Observations are to be limited to spot checking, selective measurement, and similar methods of general observation of the Work based on ENGINEER'S exercise of professional judgment. Based on Information obtained during such visits and such observations, ENGINEER will evaluate whether Contractor's work is generally proceeding in accordance with the Contract Documents, and ENGINEER will keep CITY informed of the general progress of the Work. The purpose of ENGINEER'S site visits will be to enable ENGINEER to better carry out the duties and responsibilities specifically assigned in this Agreement to ENGINEER, and to provide CITY a greater degree of confidence that the completed Work will conform in general to the Contract Documents. ENGINEER shall not, during such visits or as a result of such_observations of Contractor's work in progress, supervise, direct, or have control over Contractor's work, nor shall ENGINEER have authority over or responsibility for the means, methods, techniques, equipment choice:and usage, sequences, schedules, or procedures of construction selected by Contractor,for safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to comply with laws and regulations applicable to Contractor's furnishing and performing the Work. MiTelameteml 801 - • 0 Kimley>>)Horn Page Accordingly, ENGINEER neither guarantees the performance of any Contractor nor assumes responsibility for any Contractor's failure to furnish and perform its work in accordance with the Contract Documents. C. Progress Meetings:Attend progress meetings based on the construction period and visit the site for observation at that time. D. Shop drawing, samples and.other submittals Review: 1: Review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. 2. Such review, approvals or other action will not extend to means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction or to related safety precautions and programs and shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. 3. Log all shop drawings, samples and other submittals. E. Substitutions: 1. Evaluate and determine the acceptability of up to three(3)substitute or"or-equal" materials proposed by Contractor in accordance with the Contract Documents, but subject to the provisions of applicable standards of the state or the CITY. F. Request for information (RFI): 1. Provide necessary interpretations and clarifications of contract documents, and make recommendations as to the acceptability of the work. ENGINEER will respond to reasonable and appropriate Contractor requests for information and issue necessary clarifications and interpretations of the Contract Documents to CITY as appropriate to the orderly completion of Contractor's work. Any orders authorizing variations from the Contract Documents will be made by CITY. G. Final Project Walk Through: 1.Attend the"Final project walk through and assist with preparation of final punch list. Attend One(1)final site visit to determine if the completed Work of Contractor is generally in accordance with the Contract Documents 2. EN_G[NEER shall not be responsible for the acts or omissions of any Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing orfurnishing the Work. ENGINEER shall not have the authority or responsibility to stop the work of any Contractor 3.2. Record Drawings H. The Developer will prepare Record Drawings for this project. I. Mylar Submittals-Prior to final plan submittal.to the Developer for construction,the ENGINEER will submit a final set of mylar drawings to the CITY for record storage as follows- OR im 801 - - • 0 u n Kim ey>>)Horn Page 1. Water and/or sanitary sewer plans will be submitted as one set of plans. Water and sanitary sewer plans will be separate from paving and drainage plans. Sheets will be standard size(22"x 34")with project numbers(Water/Sanitary Sewer and TPW) prominently.displayed. 2. Signed plan sets will also be submitted as an Adobe Acrobat PDF format(version 6.0 or higher)file. Each PDF file will contain associated sheets of the particular plan set. Singular PDF files for each sheet of a plan set will not be accepted. PDF files will conform to naming conventions as follows: 3: Water and Sewer file name example—"X-35667 org36.pdf"where"X-35667" is the assigned file number obtained from the City of Fort Worth, "—org"designating the file is of an original plan set, "36"will be the total number of sheets in this file 4. Example: X-12755 orgl8.pdf 5. PDF files will be submitted on one (1) Compact Disk, which will become property of and remain with the City of Fort Worth. Floppy disks, zip disks, e-mail flash media will not be accepted. 6. For information on:the proper manner to submit PDF files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number(817)392-8426. File numbers will not be issued to a project unless the City Project number and proper fund codes have been assigned and are in the Department of Transportation and Public Works database. 3.3. Deliverables J. Twelve(12) Progress Meeting Agendas and Notes K. Responses to Contractor's Requests for Information L. Review of shop drawings 801 - • 0 Kimley>Morn Page Budget Modifications The proposed budget modifications reflect the additional funds needed for the continuation of services. The details of the budget modifications can be found in the table below: Description Original Amend. Amend. Amend. Amend. Revised Budget No. 1 No.2 No.3 No.4 Budget Task 1 -Program Management $197,800 $0 ($46,000) $48,200 $200,000 $400,000. Task 2-Conflict Analysis alon 1-35W $148,600 $0 $0 $171,400 $0 $320,000 Task 3-Director $10,000 $0 $0 ($10,000) $0 $0 Communication Task 4-Design Analysis $36,400 $0 $0 �.($6OT4ob) $0 $0. Task 5-Construction Support Services $40,000 $20,000 $46,000 $303,400 $200,000 $609,400 Task 6-Utility Assembly (UA) $19,200 $0 $0 ($-19,200) $0 $0 Review Task 7-Supplemental Design $196,700 ($107,000) $0 ($20,000) $0 $69;700 Task 8-Water and Sanitary $50,000 $0 $0 ($37;400) $0 $12;600 Sewer Design Criteria Task 9-Construction Phase Services (Resident $0 $87,000 $49,700 $0 $0 $136,700 Project Representative) Total $698,700 $0 $49,700 $400,000 $400,000 $1,548,400 The following table summarizes the fee for this amendment by Work Phase: Work Phase Water Sewer Total 31 -Conceptual Design (30%) $60;000 $60,000 $120,000 32-Preliminary Design.(60%) $120,000 $1201000 $240,000 33-Final Design (10%) $20,000 $20,000 $40,000 51 -Survey $0 $0 $0 Total $200,000 $200,0.00 $400,000 801 - - • 0 Kim ey)))1 1u 01Y n Page 7 The following tables summarize our revisions to the M/WBE percentages: This Amendment Sub-Consultant Fee Lamb-Star Engineering, L.P. $44,000 (Construction Phase Services) Total $44,000 M/WBE Percentage 11.0% Total Contract Description Original Revised Contract Amount $1,148,400 $1,548,400 Total Contract M/WBE $193,250 $237,250 Total Contract M/WBE 16.8% 15.3% Percentage City's MIWBE Goal 10.0%a 10.0% With the budget modification, our total contract M/WBE participation is projected to be$237,250 (15.3%). This meets the City's M/WBE participation requirement of 10.0% and Kimley-Hom's commitment of 11.0%. We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Glenn A. Gary, P.E. Sr. Vice President GAG/twk K:TM_UI11111es10610181MPMAmendmei[#41NiE-3A Am-l_Lhr.ddc • • 801 - • 1 Ft.Worth, 76102 • M&C Review Page 1 of 3 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FoRT, Ii COUNCIL ACTION: Approved on 9/20/2016 DATE: 9/20/2016 REFERENCE NO.: **C-27935 LOG NAME: 60NTESEG3AA4-KHA CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 4 to City Secretary Contract No. 43959, an Engineering Agreement with Kimley-Horn and Associates, Inc., in the Amount for $400,000.00 for a Revised Contract Amount of$1,548,400.00 for Design Oversight and Project Management Services for North Tarrant Express Segment 3A, IH-35W from IH- 820 to IH-30 (COUNCIL DISTRICTS 2, 8, and 9) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 4 in the Amount of $400,000.00 to City Secretary Contract No. 43959, an Engineering Agreement with Kimley-Horn and Associates, Inc., for a revised contract in the amount of$1,548,400.00 for the North Tarrant Express Segment 3A, IH-35W from IH-820 to IH-30. DISCUSSION: On June 23, 2009, Texas Department of Transportation (TXDOT) entered into a 10-year Agreement with North Tarrant Express Mobility Partners (NTEMP) to identify and construct highway improvements in northeastern part of Tarrant County including portions of the 1-35W, 1-820, and SH- 183 corridors within the City. TXDOT controls the schedule timeline, the scope and the total cost of this project. These improvements affect the City's water and wastewater infrastructure which must often be rerouted. On October 23, 2012 (M&C C-25942) the City Council Authorized an Engineering Agreement with Kimley-Horn and Associates, Inc., in the amount of$698,700.00, for design oversight and project management services on North Tarrant Express Segment 3A on IH-35W from IH-820 to IH-30. The Agreement was subsequently revised by three amendments totaling $449,700.00 as follows: Amendment No. 1 for a revised scope with no additional cost was administratively authorized September 18, 2013; Amendment No. 2, in the amount of$49,700.00, administratively authorized July 28, 2014 and Amendment No. 3, in the amount of$400,000.00, authorized September 29, 2015 (M&C C-27487). This Amendment No. 4 will provide additional engineering services as NTEMP continues to expand the scope of the highway project. The proposed scope of services consists of: • Project management • Plan reviews of drawings provided by the contractor or other engineers • Construction support services including attend preconstruction meetings, on-site observations, construction progress meetings and shop drawing reviews • Project meetings with the City, stakeholders, contractors, other consultants, and citizens • Conflict analysis along IH-35W Kimley-Horn and Associates, Inc., proposes to provide the additional services for a lump sum fee of $400,000.00. Staff considers the proposed fee to be fair and reasonable for the scope of services proposed. M//WBE OFFICE: Kimley-Horn and Associates, Inc., agrees to maintain its initial M//WBE commitment of 11 percent that it made on the original Agreement and extend and maintain that same M/WBE commitment of 11 percent to all prior amendments up to and inclusive of this Amendment http://apps.cfwnet.org/council_packet/mc review.asp?ID=22795&councildate=9/20/2016 9/21/2016 M&C Review Page 2 of 3 No. 4. Therefore, Kimley-Horn and Associates, Inc. remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. This project will have no impact on the Water Department's operating budget when complete. Of the original contract amount of$698,700.00, NTEMP (as of July 2016) has reimbursed the City $233,702.22. This project is located in COUNCIL DISTRICTS 2, 8, and 9, Mapsco 49F, 49L, 49Q, 49X, 63B, 63F, 63P, 63T and 63X. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that the appropriation is available as directed by M&C G-18375 in the Water/Sewer DPN Fund for the Design Oversight and Project Management Services on North Tarrant Express Segment 3A, IH-35W from IH-820 to IH-30 and that upon approval of the above recommendation, funds will be as depicted in the table below by fund: FUND Current Proposed Total* Appropriations Appropriations Water Capital $2,125,855.00 $0.00 $2,125,855.00 Fund 59601 Sewer Capital $410,850.00 $0.00 $410,850.00 Fund 59607 Water and Sewer Bond $400,000.00 $0.00 $400,000.00 2015A 56007 Water and Sewer Bond $2,175,000.00 $0.00 $2,175,000.00 2016 56005 Project Total 1 $5,111,705.00 $0.00 $5,111,705.00 *Amounts rounded for presentation purposes. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference# Amount ID ID I Year (Chartfield 2) Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: John Carman (8246) Additional Information Contact: John Kasavich (8480) http://apps.cfwnet.org/council_packet/mc review.asp?ID=22795&councildate=9/20/2016 9/21/2016 M&C Review Page 3 of 3 ATTACHMENTS 60NTESEG3AA4-KHA FID Table.pdf 60NTESEG3AA4-KHA Form 1295.pdf 60NTESEG3AA4-KHA Map01.pdf SAM Kimlev Horn and Associates Inc.pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=22795&councildate=9/20/2016 9/21/2016 FIDS for M&C Log Name: 60NTESEG3AA4-KHA Fund identifiers (FIDs) TO Department Proiect Budget Reference# Fund ID Account ID Program Activit Year (Chartfield 2) Amount FROM Department Account Proiect Budget Reference# Fund ID ID Program Activi Year (Chartrield 21 Amount 56005 0600430 5330500 CO2011 C01731 2016 $60,000.00 56005 0600430 5330500 CO2011 C01732 2016 $120,000.00 56005 0600430 5330500 CO2011 C01733 2016 $20,000.00 56005 0700430 5330500 CO2011 C01731 2016 $60,000.00 56005 0700430 5330500 CO2011 C01732 2016 $120,000.00 56005 0700430 5330500 1 CO2011 C01733 2016 $20,000.00