Loading...
HomeMy WebLinkAboutContract 45872-A1 "i t�, kCRETAW AMNDMENT iso . 1 vtfffRACT NO. TO CITY SECRETARY CONTRACT VVHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 45872 , (the CONTRACT) which was authorized by M&C C-26873 on the 22nd day of July, 2014 in the amount of $208, 150 . 00; and FVREREAJS, the CONTRACT involves engineering services for the following project: Bellaire Drive South and Arborlawn Drive Sanitary Sewer Main Replacements; and VVItEREAS, it has become necessary to execute Amendment No . 1 to the CONTRACT to include an increased scope of work and revised fee. NOWTREREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated June 8, 2016, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $120 , 649 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $328,799 . 00 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. ®FFICOAL RECORD Page E)MCUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED : ENGINEER City of Fort Worth Kimley-Horn and Associates, Inc. , Jesus J. Chapa Tenn Gary, P.E. Assistant City Manager Senior Vice-President 9 s I DATE: �d DATE: �' APPROVAL RECOMMENDED: Christopher Harder, P.E. Acting Assistant Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C : C-27909 and C-27339 Date 3/2 and 9/13, 2016 Douglas W. Black Senior Assistant City Attorney ATTEST: Ma y J. +K s e City Secretary 4 _mac p)V,F, 0eg0AL iI E C 001) 0�9 v319-: Page -2- i i Komley)>)Horn June 8, 2016 Mr. John Kasavich, P.F. Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Sanitary Sewer Interceptor Improvements for Bellaire Dr. S. and Arborlawn Dr. Additional Services—Amendment No. 1 KHA No. 061018129 City Project No. 02321 Dear John: This letter is in reference to a contract between Kimley-Horn and Associates, Inc. (Kimley-Horn)and the City of Fort Worth (the City) dated 08-21-2014 referred to herein as the"Contract. Due to discussions related to the project, the original scope of the sanitary sewer project has changed. During discussions with City Staff, it was decided that due to multiple proposed developments within thesanitary sewer basin, design and construction of the recommended Wastewater Master Plan improvements in this corridor was necessary. Since these improvements were not included in the original contract, the following services will be performed as Amendment No. 1: ITEM 1 — MAS_IER PLAN EVALUATION: $10;580Kimley-Horn (Wafer$0, Serer$10;580) These services involve analyzing the City's Sanitary Sewer MasterPlan through the Bellaire Drive South corridor including: • Evaluation of existing corridor constraints • Analyzing future flow conditions • Providing cost projections for various alignment alternatives • Attending review meetings with City staff • Providing design recommendations regarding the proposed sanitary sewer line configurations through the Bellaire Drive South Corridor u . 801 Cherry Street, Unit 11, Suite • i Kimley)>>Horn Page 2 ITEM 2 — SANITARY SEIIVER RE-DESIGN: $$8;079 Kimley-Horn $i6,04 Stru q-tural Sub $84;119 Total (Water$0, Sewer$84,119) Kimley-Horn will design additional sanitary sewer line segments within the Bellaire Drive South corridor including: • Conceptual Design, feasibility analysis and preparation of opinion of probable construction cost for two (2) alignments for 1,750 linear feet of parallel 48-inch sanitary sewer • Re-Design and Upsizing from previously identified 42-inch sanitary sewer to 60-inch sanitary sewer for approximately 2,650 linear feet • Eight(8) sanitary sewer laterals within the Bellaire Dr. ROW • Two (2)additional sanitary sewer junction structures ITE_ M 3 — CON:STRUGTION PHASE SERVICES: $25950Klmley--Horn (Water:$9, Sewer$25,.95,0) Kimley-Horn will provide the following Construction Phase Services: • Additional bi-monthly progress meetings (up to 16) • Additional shop drawing review associated with sanitary sewer laterals. •. Additional record drawing preparation associated with sanitary sewer We recommend that the City increase the budget by$120;649 for these additional services. The following tables summarize our recommended budget revisions,water and sanitary sewer design fees, and revised contract amount: Description Original Amend Revised Fee No. 1 Contract Pre-Engineering $18,455 $10,950 $29,405 Conceptual Engineering $46,540 $23,265 $69,805 Preliminary Construction Plans $45,815 $39;924 $85,739 Final Construction Plans $47,765 $20,560 $68,325 Bid Phase Services $9,575 $9,575 Construction Phase Services $40,000 $25,950 $65,950 Total Project $208,15.0 $120,649 $328,799 801 - 950, Ft.Worth,TX 76102 KYgo I 1 1 ey)))Hol n Page 3 Water Sewer Total Original Contract $0 $208,150 $208,150 Amendment No. 1 $0 $120,649 $120,649 Total $0 $328,799 F$328,799 The following table summarizes the fee for this amendment by Work Phase: Total Work Phase Water Fee Sewer Fee Fee 31 $0 $36,195 $36,195 32 $0 $72,389 $72,389 33 $0 $12,065 $12,065 51 $0 $0 $0 Total $0 $120,649 1 $120,649 The following tables summarize our revisions to the M/WBE percentages: This Amendment Sub-Consultant Fee Jaster-Quintanilla&Associates, Inc. $16,040 (Structural Design Services) Total $16,040 MIWBE Percentage 13.3% Total Contract Description Original Revised Contract Amount $208,150 $328,799 Total Contract M(VVBE $337500 $49,540 Total Contract MIWBE Percentage 16.0.% 15.1% City's MIWBE Goal 8.0% 8.0% 801 i Kin1 ey)))Horn Page We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC Glenn A. Gary, P.E. Sr.Vice President GAG/jck Attachments IIFTVVFP011DatalProjectlFTW UIMIAaM06101812"all a IreSS\PPMPOST NTPIAmendment-No-IISellalre SS-Am-1_LU.doc i i N W N N a0 O Q O V N l0 N V t0 V IO lD N d N N N O w fq!9 O w P H w w t0 w w w w h M (V N M O t2 �- Kw�w N�-tyw w N w w w w X N m I- m O O O 0 0 0 0 0 00 O O O O 0 0 0 0 0 00 0 0 o o Coco 0 0 0 0 0 0 C 0 C V1 w w w N N w m w N N w 69 M N N w b9 b3 e9 N 0 0 w w(q w w w w w w w w w w w w w 63 w fA tr� R !A w a5 U w w O H T G O 00 O O O O O O O O Q w Nww ww w� u'q vi z 7 w w � a 0 z c LU Q o 0 0 0 w w w w H z u W > Q � F2 m m o 0 0 0 0 w w w w ❑ � r g � z 0 0 0 0 0 ow o Q m W w w um Y Q -000 o n o.o o oW o 0 0 0 o 0 0 o 0 0 0 0 0 o o o coo 0 0 0 0 0 0 0 0 0 Q ❑ O N W N N O Q O Q O N MrV QN J r r-: ry mw!mbQf tO 1�D NN Nv wN 1Nl N Lu d w w w f9 mO f9 ONV w w w tNOq w w w w brN9 to O F �O W M N E F- Z W Z S N v N - 0 LL. OO 0. a v L Q z U a w �y m `w ` LU L O LliO M N M N N M - N N l0 W N LN J v C 2 C d LLl ° ro U a� LLf W W M N r O Q1 �' IL U O z m� LU W m^ W o 3 E Q O G z c U L U O H O 0 y U C N c N Q, avi 2 a w C a m Lu w w v Z U E c o N N 10 D M�})m a G m J N G m O to v a C m m v O �.E p C O t0 m�(/� m�U C O O U m') O O a-N Cl o pa ccc3 cW 3c� m E3cry N 2w � v 10 n°! v v bra v v v o W v L° o 0 o ❑❑❑ o ❑ a o v S o .� c = u U o E E m o N c .3 O c a o v uU v QoP c c QU❑ c oa vn ❑g ° -� d t�Nf m=' ❑ 1- t; w v y m o 7 m m m e v U c c . U .0 a s= 0. ) N c p ❑ x o 3 m U g m a E E m E c m z m a v v m'c m c u 2 a a 5 ❑ a rn t 3 U .— m v c7 m a y v v c v 'E O_ -s'Fi E: ❑a m e Ti c c E a v ca u =u o o o c o m v m o = m m .o d t a m E o m m m A w c o cor = c vat 6-co orn[o❑F`- �(p �❑tn F- co�❑cn I- oU QQv! F-ulam =— a U a li U m' o C c m O z Li ci of v ro U Q F 79 U) §[§/ /){ `}/\ Iq [§2nk®# ® ® F ¥! ;-2 ; Q !»§ { ; CL @ C5 ) /)§ � q§ k 2 - w « £ § LLI § a § f < 2 z / / . - j \ LU 7 \k 2 m $a E } o § d ` a $ k $ � \ < * g / \ 03 k ± E§ 2 � • U- 0- CL C kE b f k m ) , % L! �mMm� % $ f § /9§S > �� 64 44 j c _ / \\ \ \LL � @ F- \z m£ § LU D. / � _ e a §y( (n - § \ t(d « : „om ! _ e 'wok � k7s LL co j{!« \® J 2\#( \\/\ M&C Review Page 1 of 2 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FoRTIVoRTH COUNCIL ACTION: Approved on 9/13/2016 REFERENCE ,., 60BELLAIRESEWERA1REVISED - DATE: 9/13/2016 NO.: C-27909 LOG NAME: KHA CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Amend Mayor and Council Communication C-27839 to Correct the Contract Amendment Amount to $120,649.00 and the Revised Contract Amount to $328,799.00 for Amendment No. 1 to an Engineering Agreement with Kimley-Horn and Associates, Inc., for Bellaire Drive South and Arborlawn Drive Sanitary Sewer Main Replacements, City Secretary Contract No. 45872 (COUNCIL DISTRICT 3) RECOMMENDATION: It is recommended that the City Council amend Mayor and Council Communication C-27839 to correct the contract amendment amount to $120,649.00 and the revised contract amount to $328,799.00 for Amendment No. 1 to an Engineering Agreement with Kimley-Horn and Associates, Inc., for Bellaire Drive South and Arborlawn Drive Sanitary Sewer Main Replacements, City Secretary Contract No. 45872. DISCUSSION: On August 2, 2016, Mayor and Council Communication (M&C C-27839) City Council authorized Amendment No. 1 in the amount of$120,649.00 to City Secretary Contract No. 45872, an Engineering Agreement in the original amount of$208,150.00 with Kimley- Horn and Associates, Inc., for Bellaire Drive South and Arborlawn Drive Sanitary Sewer Main Replacements. In that M&C, the original contract amount was inadvertently listed as $218,150.00 and the revised contract amount was inadvertently listed as $339,299.00 instead of$328,799.00 This M&C rectifies the error. All other content of M&C C-27839 remains in full force and effect. This M&C does not request approval of a contract with a business entity. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funding for this change order exists as outlined in the original Mayor and Council Communication. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference# Amount ID I I ID I Year Chartfield 2 Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: John Carman (8246) http://apps.cfwnet.org/couneil_packet/me_review.asp?ID=22724&councildate=9/13/2016 9/14/2016 M&C Review Page 2 of 2 Additional Information Contact: John Kasavich (8480) ATTACHMENTS http://apps.cfwnet.org/council_packet/mc review.asp?ID=22724&councildate=9/13/2016 9/14/2016 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 8/2/2016 - Ordinance No. 22329-08-2016 DATE: Tuesday, August 2, 2016 REFERENCE NO.: **C-27839 LOG NAME: 60BELLAIRESEWERAI-KHA SUBJECT: Authorize Execution of Amendment No. 1 to City Secretary Contract No. 45872 an Engineering Agreement with Kimley-Horn and Associates, Inc., in the Amount of$121,149.00, for Bellaire Drive South and Arborlawn Drive Sanitary Sewer Main Replacements for a Revised Contract Amount of$339,299.00 and Adopt Appropriation Ordinance (COUNCIL DISTRICT 3) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing the estimated receipts and appropriations in the Sewer Capital Projects Fund in the amount of$121,149.00 from available funds; and 2. Authorize the execution of Amendment No. 1 to City Secretary Contract No. 45872 an Engineering Agreement with Kimley-Horn and Associates, Inc. in the amount of$120,649.00 for Bellaire Drive South and Arborlawn Drive Sanitary Sewer Main Replacements for a revised contract amount of$339,299.00. DISCUSSION: On July 22, 2014 (M&C C-26873), the City Council authorized an Engineering Agreement with Kimley- Horn and Associates, Inc., in the amount of$218,150.00 for Bellaire Drive South and Arborlawn Drive Sanitary Sewer Main Replacements. Amendment No. 1 will provide for the following: • Design for two additional sanitary sewer junction structures for flow control and eight sanitary sewer laterals within the Bellaire Drive South right-of-way. • Design recommendations including rehabilitation of the existing 36-inch and 42-inch sanitary sewer and replacement of the existing 42-inch sanitary sewer with 60-inch sanitary sewer. • Cost projections for the various alignment alternatives. •Analysis of the future flow projections from the Wastewater Master Plan. • Construction phase services including additional shop drawing review and record drawing preparation. In addition to the amendment amount, $500.00 is required for project advertisement. This project will have no impact on the Water Department's operating budget. M/WBE OFFICE: Kimley-Horn and Associates Inc., is in compliance with the City's BDE Ordinance by Logname: 60BELLAIRESEWERAI-KHA Page I of 3 committing to an additional 12 percent on this Amendment No. 1. The project is located in COUNCIL DISTRICT 3, Mapsco 89A. FISCAL INFORMATION I CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. The Fiscal Year 2016 Sewer Operating Budget includes appropriations of$26,300,046.00 for the purpose of providing Pay-As-You-Go funding for Sewer Capital Projects. After this transfer for Fiscal Year 2016, the balance will be $12,037,000.00. Appropriations for the Bellaire Drive South and Arborlawn Drive Sanitary Sewer Main Improvements project by Fund will consist of the following: Existing Additional Future Project FUND jAppropriations jAppropriations Appropriations Total* Sewer Capital Projects $218,150.00 $121,149.00 $4,235,000.00 $4,574,299.00 Fund E 1 a l 159607 F ectl 3 $218,150.00 $121,149.00 $4,235,000.00 $4,574,299.00 *Numbers rounded for presentation purposes. FUND IDENTIFIERS (FIDs): TO Fund Department ccount Project Program ctivity Budget Reference # Amount ID ID Year (Chartfield 2) 1 59607 0700430 4956001 CO2321 C017ZZ 2016 $121,149.00 1 59607 0700430 5330500 CO2321 C01731 2016 $36,195.00 1 59607 0700430 5330500 CO2321 C01732 2016 $72,389.00 1)596071 0700430 5330500 CO2321 C01733 2016 $12,065.00 1)596071 0700430 5540101 CO2321 C01781 2016 $500.00 FROM Fund Department Accouni Project ProgramActivity Budget Reference # Amount ID ID Year Chartfield 2 59607 0700430 5330500 CO2321 C01731 2016 $36,195.00 2)596071 0700430 5330500 CO2321 C01732 2016 $72,389.00 2)-596071 0700430 5330500 CO2321 I C01733 2016 $121065.00 CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: John Carman (8246) Additional Information Contact: John Kasavich (8480) ATTACHMENTS Logname: 60BELLAIRESEWERA I-KHA Page 2 of 3 C-a gs3q CERTIFICATE OF INTERESTED PARTIES FORM 129[J loll Complete Nos.1-4 and 6 if there are interested parties, OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2016-8816 Kimley-Horn and Associates, Inc. Dallas,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 02/03/2016 being filed. City of Fort Worth,Texas Date Acknowledged: 1 --1 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the goods or services to be provided under the contract. City Project No.02321 Design,bidding and construction phase services for sanitary sewer interceptor improvements along Bellaire Drive South and Arboriawn Drive in Fort Worth,Texas. 4 Nature of interest(check applicable) Name of Interested Party City,State,Country(place of business) Controlling Intermediary Wilson,Mark Dallas,TX United States X Schiller, Mike Dallas,TX United States X Peed,Brooks Dallas,TX United States X Atz,John Dallas,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear,or affirm,under penalty of perjury,that the ab ov disclosure is true and correct. `%kyPp SARAH MARIE UNDERIYOOD S,Notoiy Public,State of Texas Comm.Expires 06-241.2018 Nofary ID 128308838 Signature of authorized age�rn of contracting business entity AFFIX NOTARY STAMP/SEAL ABOVE �f Sworn to and subscribed before me,by the saki �►'► 2. �J -� y i this the '� day of 20_1 W _,to certify which,witness my hand and seal of office. '��0 ULI\-L Signature of olficer administering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state,tx.us Version V1.0,34416