Loading...
HomeMy WebLinkAboutContract 26622 CITY SECRETARY , CONTRACT No. AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and TranSystems Corporation (Engineer) made and entered into City Secretary Contract No.24801 (the Contract)which was authorized by the City Council by M&C C-17302 on the 2"d day of March, 1999; WHEREAS, the Contract involves engineering services for the following project: Engineering Argeement for the Design of the Heron Drive Water Line Extension. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated January 24, 2001,a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $14,925.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $170,445.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. U�F�Cv °,L E�E(C0QDD R. WD) Jg9VUo EXECUTED on this the day of ynob ,2001, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: Dale A. Fisseler, P.E. Mike Groom Director, Water Department Assistant City Manager ENGINEER AT ST: �711 ji9ai .Apv oria Pearson, C ity Secretary 3--2/-1) kip By: Name: Raul ena, III, P.E. Principal TranSystems Corporation Contract Autiiorization APPROVED AS TO FORM AND LEGALITY: Date Gary St—e"ifterger Assistant City Attorney 0-1)1ffl(N,CNA OWED ��v 2Umff Ta4tvSVsTmms CCX?F�2AT/ON /i�,�— January 24, 2001 Ms. Madelene Rafalko City of Fort Worth 1000 Throckmorton Fort Worth, TX 76102 RE: Amendment No. 1 to Heron Drive Water Line Extension PW77-060770154820 Dear Ms. Rafalko: As per the City's request to accommodate extra survey for change of alignment for water line, for a change in scope to include construction staking and the addition of an archaeological survey, :;anSystems is preparing this amendment for additional fee to the original contract. We are requesting an increase in fee of $14,925.00 to cov ff these costs. The additional work is as outlined below: 1. Design Survey: • Field Survey and Data Reduction for realignment from • Lake Haven Circle to Goodnight Circle. $ 2,900.00 2. Construction Staking • 13,500 L.F. water line center line staking with 15 fire hydrants and 50 services. • Centerline at 100' intervals and at PI's, PC's and PT's. • Centerline and elevations for water line from stations 1+00 to 8+00 on Silver Creek Rd. at Live Oak Creek. Fire hydrants marked with offset and grade. $ 8,525.00 3. Archaeological Survey • Secure archaeological survey permit. • Conduct record search. rr,, • Conduct comprehensive on-the-ground pedestrian survey. • Conduct 10-15 shovel tests. Ife �� • Analyze artifacts if found and prepare for permanent curati n.te!io �4 • Prepare written report for submission to Texas Historical Commission. • Revise report, if needed, after review. $ 3,500.00 P:\199\00281\adm\Fee Amend l.doc 500 W. 7th Street,Suite 600 • Fort Worth,Texas 76102 • Phone: (817) 339-8950 Fax: (817) 336-2247 'G&A L Amendment No. 1 $ 14,925.00 Original Contract Fee $155,520.00 TOTAL $170,445.00 It has been a pleasure to work with the City on this project. Thank you for your prompt action on this subject. If you need additional information please let me know. Sincerely, TranSystems Corporation Consultants Wm. Bruce Nelson, P.E. Project Manager ROW P:\199\00281\adm\Fee Amend Ldoc