Loading...
HomeMy WebLinkAboutContract 47137-FP2 Depart e t TP &W Const.Services i DOE Dat __r !/„ Protect anager ` l 49 CITY SEC(E + ;YI Risk Management Canady �'I,��� CNTRACT Imo. D.O.E. Brotherton - ( T WORTHO CFA Westerman/ScannedV7 Se The Proceeding people have been Contacted concerning the request for final payment& have released this project for such payment. ATION AND PUBLIC WORDS F PROJECT COMPLETIONQ Clearance Conducted By Shameka Kennedy CFA '4e-avv-d Q/2Z��� D.O.E. Ns: 7477 C .0.7-61171 Regarding contract 02614 for SENDERA RANCH EAST PHASE 10 as required by the ass- =031 TRANSPORTATION& PUBLIC WORDS as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: $1,322,056.00 Amount of Approved Change Orders: Ns Revised Contract Amount: Total Cost Work Completed: $1,322,056.00 Less Deductions: Liquidated Damages: Days @$210.00/Day Pavement Deficiencies: i Total Deduction Amount: Total Cost Work Completed: $1,322,056.00 Less Previous Payments: $0.00 Final Pay t e $1,322,056.00 9, zblc Recommede for Acceptance Date Asst. Dire tor, TPW - Infrastructure Design and Construction L pted /� - Date Direct r, TRANSPORTATIO & PUBLIC WORKS Asst. City Manager Date Comments: C205-541200-207760261483 EMAILED SEF 2 2016 OFFICIAL RECORD (� CITY SECRETARY initial: FT.WORTH,TX FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Conti-act Name SENDERA RANCH EAST PHASE 10 Contract Limits Project Type DRAINAGE&PAVING City Project Numbers 02614 DOE Number 7477 Estimate Number I Payment Number I For Period Ending 8/9/2016 CD City Secretary Contract Number Contract Time 196D Contract Date 9/10/2015 Days Charged to Date 290 Project Manager Jaafari Contract is 100.00 Complete Contractor CONATSER CONSTRUCTION TXLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors GREGORY / COLLIER Tuesday,August 09,2016 Page I of 5 C City Project Numbers 02614 DOE Number 7477 Contract Name SENDERA RANCH EAST PHASE 10 Estimate Number I Contract Limits Payment Number I Project Type DRAINAGE&PAVING For Period Ending 8/9/2016 Project Funding UNIT III:DRAINAGE IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 REMOVE RIP RAP 324 SF $3.00 $972.00 324 $972.00 2 REMOVE 24"STORM LINE 32 LF $20.00 $640.00 32 $640.00 3 REMOVEHEADWALK/SET 3 EA $1,000.00 $3,000.00 3 $3,000.00 4 LARGE STONE RIPRAP,DRY 126 SY $75.00 $9,450.00 126 $9,450.00 5 TRENCH SAFETY 2374 LF $1.00 $2,374.00 2374 $2,374.00 6 21"RCP,CLASS III 476 LF $43.00 $20,468.00 476 $20,468.00 7 21"RCP,CLASS IV 154 LF $48.00 $7,392.00 154 $7,392.00 8 24"RCP CLASS III 353 LF $48.00 $16,944.00 353 $16,944.00 9 24"RCP CLASS IV 140 LF $58.00 $8,120.00 140 $8,120.00 10 27"RCP CLASS 111 322 LF $54.00 $17,388.00 322 $17,388.00 11 30"RCP,CLASS III 137 LF $60.00 $8,220.00 137 $8,220.00 12 36"RCP,CLASS III 692 LF $77.00 $53,284.00 692 $53,284.00 13 36"RCP CLASS IV 100 LF $90.00 $9,000.00 100 $9,000.00 14 4'STORM JUNCTION BOX 7 EA $3,000.00 $21,000.00 7 $21,000.00 15 10'CURB INLET 18 EA $2,200.00 $39,600.00 18 $39,600.00 16 15'CURB INLET 2 EA $3,800.00 $7,600.00 2 $7,600.00 17 20'RECESSED INLET 4 EA $4,200.00 $16,800.00 4 $16,800.00 18 27"SLOPED END HEADWALL 1 EA $2,500.00 $2,500.00 1 $2,500.00 19 36"SLOPED END HEADWALL 3 EA $2,500.00 $7,500.00 3 $7,500.00 Sub-Total of Previous Unit $252,252.00 $252,252.00 UNIT IV:PAVING IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total ---- --------------- — - ------ - -- 1 HYDRATED LIME 377 TN $172.00 $64,844.00 377 $64,844.00 2 6"LIME TREATMENT 17853 SY $3.00 $53,559.00 17853 $53,559.00 3 8"LIME TREATMENT 7264 SY $3.25 $23,608.00 7264 $23,608.00 4 6"CONC PVMT 16842 SY $32.50 $547,365.00 16842 $547,365.00 5 8"CONC PVMT 2347 SY $37.50 $88,012.50 2347 $88,012.50 6 10"CONC PVMT 4608 SY $47.50 $218,880.00 4608 $218,880.00 7 4"CONC SIDEWALK 6980 SF $3.00 $20,940.00 6980 $20,940.00 Tuesday,August 09,2016 Page 2 of 5 City Project Numbers 02614 DOE Number 7477 Contract Name SENDERA RANCH EAST PHASE 10 Estimate Number I Contract Limits Payment Number I Project Type DRAINAGE&PAVING For Period Ending 8/9/2016 Project Funding 8 BARRIER FREE RAMP TYPE R-1 23 EA $1,200.00 $27,600.00 23 $27,600.00 9 BARRIER FREE RAMP TYPE U-1 2 EA $1,200.00 $2,400.00 2 $2,400.00 10 BARRIER FREE RAMP TYPE M-2 2 EA $1,200.00 $2,400.00 2 $2,400.00 11 RAISED MARKER TY W 1363 LF $5.00 $6,815.00 1363 $6,815.00 12 RAISED MARKER TY Y 682 LF $5.25 $3,580.50 682 $3,580.50 13 CONNECT TO EXISTING PAVEMENT 6 EA $500.00 $3,000.00 6 $3,000.00 14 REMOVE&RELOCATE STANDARD EOR 6 EA $300.00 $1,800.00 6 $1,800.00 BARRICADE 15 PAVEMENT HEADER 200 LF $25.00 $5,000.00 200 $5,000.00 Sub-Total of Previous Unit $1,069,804.00 $1,069,804.00 Tuesday,August 09,2016 Page 3 of 5 i i i City Project Numbers 02614 DOE Number 7477 Conti-act Name SENDERA RANCH EAST PHASE 10 Estimate Number I I Contract Limits Payment Number I Project Type DRAINAGE&PAVING For Period Ending 8/9/2016 Project Funding t Contract Information Summary i Original ContractAmount $1,322,056.00 Chance Orders j i I Total Contract Price $1,322,056.00 I / Date U ��t'`7�, Total Cost of Work Completed $1,322,056.00 Cont c Less %Retained $0.00 Net Earned $1,322,056.00 Date / Inspection S Earned This Period $1,322,056.00 Retainage This Period $0.00 ' LOX14 Date 6 Less Liquidated Damages � Proj eager Days rr /Day $0.00 ' Date i U LessPavement Deficiency $0,00 Asst. ctor PW-Infrastructure Design and Construction Less Penalty $0.00 Date 11z1 Less Previous Payment $0.00 Direc /6nitracting Departmei Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,322,056.00 Tuesday,August 09,2016 Page 4 of 5 City Project Numbers 02614 DOE Number 7477 Conti-act Name SENDERA RANCH EAST PHASE 10 Estimate Number I Contract Limits Payment Number I Project Type DRAINAGE&PAVING For Period Ending 8/9/2016 Project Funding Project Manager Jaafari City Secretary Contract Number Inspectors GREGORY / COLLIER Contract Date 9/10/2015 Contractor CONATSER CONSTRUCTION TxLP Contract Time 196 CD 5327 WICHITA ST Days Charged to Date 290 CD FORT WORTH, TX 76119 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $1,322,056.00 Less %Retained $0.00 Net Earned $1,322,056.00 Earned This Period $1,322,056.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days a $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,322,056.00 Tuesday,August 09,2016 Page 5 of 5 July 21,2016 Mr. Brock Huggins Conatser Construction TX, L.P. 5327 Wichita St. Ft.Worth,Texas 76119 Re: Water,Sewer, Paving, Drainage and Street Lights Contract for Sendera Ranch East Phase 10 City Project No.02614 Wafter Project No.P265-6071502561483 Sewer Project No. P275-707130251483 D.O.E. No. 7477 "X" No.X-23179 Dear Mr. Huggins: This letter will document that Lennar Homes of Texas Land and Construction, LTD.confirms that Conatser Construction TX, L.P. has completed the work associated with the above-referenced contract in an appropriate time frame,subject to completion of any warranty or maintenance work as identified and required by the City of Fort Worth,and that no liquidated damages will be assessed by Lennar Homes of Texas Land and Construction, LTD. in connection with the work. Lennar Homes of Texas Land and Construction, LTD. Cc: Khal Jaafari,City of Fort Worth FORTWORTH rev 03/05/07 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Sendera Ranch East Phase 10 PROJECT NO.: 2614 CONTRACTOR: Conatser Construction DOE NO.: `] 11 PERIOD FROM:10/19/15 TO: 08/04/16 FINAL INSPECTION DATE: 4-Aug-16 WORK ORDER EFFECTIVE:10/19/2015 CONTRACT TIME: 19(p WKO CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. Final inspection 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS * CHARGED DAYS THIS 4 4 PERIOD PREVIOUS 286 286 PERIOD TOTALS 290 290 TO DATE *REMARKS: CO TRACTOR DATE INSPECTOR DATE _ ENGINEERING DEPARTiMENT The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 F,,�► 1 (817)392-7941 •Fax:(817)392-7845 FORTWORTHREV.8/20/16 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA Name of Contractor Project Name Conatser Construction Sandera Ranch East Phase 10 Inspector Cih,Project Number Michael Collier 2614 ComMuc/ion Coniponen/s Project Manager ❑ Water❑ Waste Water❑✓ Storm Drainage❑✓ Pavement Kahl Jaafari Itilial Contract Amount Project Dtfculty $1,322,056.00 O Simple Routine O Complex Final ContractAmount Dale $1,322,056.00 8/30/2016 II)PERFORMANCE EVALUATION 0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE I Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 1 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 418 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 418 I11)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS] x 100%) 418 / 448 = 93% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good _>80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Inspector Signature Contractor Signature `" v Inspector's Supervisor Signature CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•8851 Camp Bowie West Blvd.•Fort Worth,TX 76116•(817)392-8306 FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I PROJECT INFORMATION Date: 8/3/2016 Name of Contractor Project Name Conatser Construction Sendera Ranch east Phase 10 DOE Inspector Project Manager Michael Collier Kahl Jaafari DOE Number Project D IC1141, T)Ve of Contract 7477 Simple QQ Routine O Complex ❑ water❑ waste water0 Storm Drainagep] Pavement Initial Contract Amoant Final Contract Amount $1,332,056.00 $1,322,056.00 I1)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS I Availability of Inspector 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicability of Specifications 4 Display Of Professionalism t ( 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution L PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe �{ III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor U` INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS t � The Cit},of Fort Wordi•1000 Throckmorton Street•Fort Worth,TK 76012-6311 (817)392-7941 •Fax:(817)392-7845