HomeMy WebLinkAboutContract 47137-FP3 Depart t P&W C st.Services
Do Dat
Project n gerPCanafd�yL ,:-'-T-T—w7-
D.O.E.
i
Risk ManagemenZTWORTH® Cy W� T�Brotherton — -fi
CFA Westerman/Scanne COWRA +CT NO.
The Proceeding people have been Contacted
concerning the request for final payment&have 'ATION AND PUBLIC WORKS
released this project for such payment. ►F PROJECT COMPLETIO4lZ/ /n
Clearance Conducted By Shameka Kennedy 1.r n A 2��� D. Z,No: 7477
Caz,(e/y
Regarding contract 02614 for SENDERA RANCH EAST PHASE 10 as required by the d.90 /7/19
TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
Original Contract Prices: $200,496.00
Amount of Approved Change Orders: Ns
Revised Contract Amount:
Total Cost Work Completed: $200,496.00
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed: $200,496.00
Less Previous Payments: $0.00
Final Pay m $200,4966..009
Recommended foq Acceptance Date
As Director, TP - Infrastructure Design and Construction
Accepted A Date
Directo , TRANSPORTATION) PUBLIC WORKS
t
Asst. City Manager Dble
Comments: C205-541200-207760261483
SEP 1016 OFFICIAL RECORD
CITY SECRETARY
D FT. WORTH, TX
FORTWQRTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name SENDERA RANCH EAST PHASE 10
Contract Limits
Project Type STREET LIGHTING
City Project Numbers 02614
DOE Number 7477
Estimate Number 1 Payment Number 1 For Period Ending 8/9/2016
CD
City Secretary Contract Number Contract Time 196D
Contract Date 9/10/2015 Days Charged to Date 290
Project Manager Jaafari Contract is 100.00 Complete
Contractor CONATSER CONSTRUCTION TXLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors GREGORY / COLLIER
Tuesday,August 09,2016 Page I of4
1�
City Project Numbers 02614 DOE Number 7477
Contract Name SENDERA RANCH EAST PHASE 10 Estimate Number I
Contract Limits Payment Number I
Project Type STREET LIGHTING For Period Ending 8/9!2016
Project Funding
UNIT V:STREET LIGHTING IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total___
1 2"CONDT PVC SCH 80 4451 LF $12.00 $53,412.00 4451 $53,412.00
2 RDWY ILLUM ASSMBLY TY 8,11,D-25,AND D- 30 EA $2,000.00 $60,000.00 30 $60,000.00
30
3 RDWY ILLUM ASSMBLY TY 18,18A,19,AND D- 4 EA $3,200.00 $12,800.00 4 $12,800.00
40
4 LED LIGHTING FIXTURE(137W) 4 EA $800.00 $3,200.00 4 $3,200.00
5 LED LIGHTING FIXTURE(70W) 30 EA $500.00 $15,000.00 30 $15,000.00
6 RDWY ILLUM FOUNDATION TY 4 30 EA $1,000.00 $30,000.00 30 $30,000.00
7 RDWYILLUM FOUNDATION TY 5 4 EA $1,200.00 $4,800.00 4 $4,800.00
8 6-6-6 TRIPLEX ALUM ELEC.CONDUCTOR 3700 LF $3.00 $11,100.00 3700 $11,100.00
9 2-2-2-4 QUADPLEX ALUM ELEC.CONDUCTOR 721 LF $4.00 $2,884.00 721 $2,884.00
10 FURNISHANSTALL ALUM SIGHN EX.POLE 12 EA $500.00 $6,000.00 12 $6,000.00
MOUNT
I I INSTALL ALUM SIGN GROUND MOUNT 2 EA $650.00 $1,300.00 2 $1,300.00
Sub-Total of Previous Unit $200,496.00 $200,496.00
Tuesday,August 09,2016 Page 2 of 4
i
• I
City Project Numbers 02614 DOE Number 7477
Contract Name SENDERA RANCH EAST PHASE 10 Estimate Number I
Contract Limits Payment Number I
i
Project Type STREET LIGHTING For Period Ending 8/9/2016
Project Funding
Contract Jilformation Summat-v
Original CmrtractAmount $200,496.00
Change Orders
Total Contract Price $200,496.00
Date tJ'J t "�V Total Cost of Work Completed $200,496.00
Cp Iac /( Less %Retained $0.00
Net Earned $200,496.00
Date /
Earned This Period $200,496.00
Inspection S P r
Retainage This Period $0.00
Date Less Liquidated Damages
Proje Hager
Days a /Day $0.00
Date 'v� LessPavement Deficiency $0.00
Asst. i ect fPPW-h3frastructure Design andC,Construction Less Penalty $0.00
f/ G✓, � ate 1 z Less Previous Payment $0.00
Direct. Contracting Departmen Plus Material on Hand Less 15% $0.00
Balance Due This Payment $200,496.00
Tuesday,August 09,2016 Page 3 of 4
i
i
1
i
City Project Numbers 02614 DOE Number 7477 j
Contract Name SENDERA RANCH EAST PHASE 10 Estimate Number I
Contract Limits Payment Number 1
Project Type STREET LIGHTING For Period Ending 8!9/2016
Project Funding
i
Project Manager Jaafari City Secretary Contract Number
Inspectors GREGORY / COLLIER Contract Date 9/10/2015 j
Contractor CONATSER CONSTRUCTION TRLP Contract Time 196 CD
5327 WICHITA ST Days Charged to Date 290 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
I
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $200,496.00
Less %Retained $0.00
Net Earned $200,496.00
Earned This Period $200,496.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
PIus Material on Hand Less 15% $0.00
Balance Due This Payment $200,496.00
Tuesday,August 09,2016 Page 4 of 4
July 21, 2016
Mr. Brock Huggins
Conatser Construction TX, L.P.
5327 Wichita St.
Ft.Worth,Texas 76119
Re: Water,Sewer,Paving, Drainage and Street Lights Contract for Sendera Ranch East Phase 10
City Project No.02614
Water Project No. P265-6071502561483
Sewer Project No. P275-707130251483
D.O.E. No. 7477
"X" No.X-23179
Dear Mr. Huggins:
This letter will document that Lennar Homes of Texas Land and Construction,LTD.confirms that
Conatser Construction TX, L.P. has completed the work associated with the above-referenced contract in
an appropriate time frame,subject to completion of any warranty or maintenance work as identified
and required by the City of Fort Worth, and that no liquidated damages will be assessed by Lennar
Homes of Texas Land and Construction, LTD. in connection with the work.
Lennar Homes of Texas Land and Construction, LTD.
Cc: Khal Jaafari,City of Fort Worth
FORTWORTH rev 03/05/07
TRANSPORTATION& PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Sendera Ranch East Phase 10
PROJECT NO.: 2614 CONTRACTOR: Conatser Construction
DOE NO.: -Z f 77
PERIOD FROM:10/19/15 TO: 08/04/16 FINAL INSPECTION DATE: 4-Aug-16
WORK ORD] _R EFFECTIVE: CONTRACT TIME:�% 1 _ _ O� W1D CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS RE,ASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. Final inspection 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29•
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
E
&HOLIDAYS &TOO COLD RLOCATIONS OTHERS* CHARGED DAYS
THIS 4 4
PERIOD
PREVIOUS 286 286
PERIOD
TOTALS 290 290
TO DATE
*REMARKS:
COXTRACTOR. DATE INSPECTOR DATE
ENGINEERING DEPARTMENT
(D The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
y
July 21,2016
Mr, Brock Huggins ;
Conatser Construction TX, L.P.
5327 Wichita St,
Ft.Worth,Texas 76119
Re: Water,Sewer,Paving, Drainage and Street Lights Contract for Sendera Ranch Fast Phase 10
City Project No,02614
Water Project No. P265-6071502561483
Sewer Project No, P275-707130251483
D.O.E,No.7477
'W' No.X-23179
Dear Mr. Huggins:
This letter will document that Lennar Homes of Texas Land and Construction,LTD.confirms that
Conatser Construction TX,L.P.has completed the work associated with the above-referenced contract in
an appropriate time frame,subject to completion of any warranty or maintenance work as identified
and required by the City of Fort Worth,and that no liquidated damages will be assessed by Lennar
Homes of Texas Land and Construction,LTD, in connection with the work.
Lennar Homes of Texas Land and Construction,LTD.
f
Cc: Khal Jaafarl,City of Fort Worth
FORTWORTHREV:8/20/16
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name of Contractor Project Nance
Conatser Construction 787827.9
Inspector City Project Number
Michael Collier - 2614
Conslrticlion Components Project Manager
Q Water 0 Waste Water[] Storm Drainage] Pavement Kahl Jaafari
Initial Contract Amount Projecl Dculh,
$200,496.00 0 Simple Routine 0 Complex
�Fiiial Contract Amount Date
$200,496.00 8/30/2016
II)PERFORMANCE EVALUATION
0-Inadequate I -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 3 60 45
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 418
BONUS POINTS(25 Maxinnun)(B)
TOTAL SCORE(TS) 418
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating(ITS/MS]* 100%) 418 / 448 = 93%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient d0%to<60%=Standard 60%10<80%=Good >_80%_Excellent
Inspector's Comments(INCLUDING E\PLANATION OF BONUS POINTS AWARDED)
Inspector Signature lt�ZLI?J—-#Vf
Z7ntractor Signature t/'✓
Inspector's Supervisor Signature n Sn
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of FortWorth•8851 Camp Bowie West Blvd. •Fort Worth,Thi 76116 • (817)392-8306
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, Vice-President of Conatser Management Group,
Inc., general partner of Conatser Construction TX, LP, known to me to be a credible person, who
being by me duly sworn, upon his oath deposed and said:
That all persons, films, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
SENDERA RANCH EAST, PH 10
WATER, SANITARY SEWER, STORM DRAIN &
LIGHTING IMPROVEMETNS
DOE#: N/A
City Project#: N/A
CITY OF FORT WORTH
STATE OF TEXAS
CON ER CONST UCTION TX, LP
Brock Huggi s
Subscribed and sworn to before me this 18th day of J 16.
BERTHA GIANULiS Notary Public in Tarrant County,Texas
' Notary Public,State of Texas
Commission Expires
+;= My
SePtem ber 18, 2019
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT ❑
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
Conforms with the American Institute of OTHER
Architects,AIA Document G707
Bond No 0149480
PROJECT:
(name, address)Sendera Ranch East Phase 10
Fort Worth,TX
TO (Owner)
NAR HOMES OF TEXAS LAND AND ARCHITECT'S PROJECT NO:
CONSTRUCTION,LTD AND THE CITY OF FORT
WORTH CONTRACT FOR:
Water,Sanitary Sewer,Street,Storm Drain&Lighting Improvements
for So dera Ranch East Phase 10
(_ TX CONTRACT DATE:
CONTRACTOR: CONATSER CONSTRUCTION TX, L.P.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here Insert name and address of Surety Company)
BERKLEY INSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 , SURETY COMPANY
on bond of (here insert name and address of Contractor)
CONATSER CONSTRUCTION TX, L.P.
5327 Wichita St.
Fort Worth TX 76119-6035 , CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here Insert name and address of Owner)
LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD AND THE CITY OF FORT WORTH
TX , OWNER,
as set forth in the said Surety Company's bond,
IN WITNESS,WHEREOF,
the Surety Company has hereunto set its hand this 15th day of July,2016
BERKLEY INSURANCE COMPANY
Surety Company
Attest:
(Seal): Signature of Authorized Representative
Robb!Morales Attorney-in-Fact
Title
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
No. BI-7280f
POWER OF ATTORNEY
BERKLEY INSURANCE COMPANY
WILMINGTON, DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT, has made,constituted
and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell; Vena DeLene
ct Marshall,Sophinle Hunter, Rabbi Morales, or Kelly A. Westbrook of Aon Risk Services,Southwest,Inc. of Dallas, TX its true
v and lawful Attorney-in-Fact,to sign its name as surety only as delineated below and to execute,seal,acknowledge and deliver any
and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall
r exceed Fifty Million and 00/100 U.S. Dollars(U.S.$50,000,000.00),to the same extent as if such bonds had been duly executed
and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons.
This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
.� without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
o resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010:
H RESOLVED, that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief
Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein
CIS P to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the
" o corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
3 attorney-in-fact and revoke any power of attorney previously granted; and further
' RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
`! manner and to the extent therein stated; and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and
further
RESOLVED, that the signature of any authorized officer and the seat of the Company may be affixed by facsimile to any
power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
h other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as
3 though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company,notwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
'Z IN WITNESS WHEREOF, the Company has cau these presents to be signed and attested by its appropriate officers and its
0 o corporate seal hereunto affixed this ay of L
on
Attest: Berkley Insurance Company
(Seal) By ( By
o Ira S. a erman Je after
o a) Senior Vice President&Secretary e r Preside
Y O
b WARNING, THIS POWER INVALID IF NOT PRINTED ON BLUE"BERKLEY"SECURITY PAPER,.
CL STATE OF CONNECTICUT)
ss:
N o COUNTY OF FAIRFIELD ) /,
Sworn to before me, a Notary Public in the State of Connecticut, this�(7 da of 2015, by Ira S. Lederman and
Jeffrey M.HafRer who are swom tome to be the Senior Vice President and Secre ry�an the Senior Vice Pr"e dent,respectively,of
T Berkley Insurance Company. MARIA C.RUNDBAKEN f/
NOTARY PUBLIC �t t�
< o MY COMMISSION EXPIRES otary Public,State of Connecticut
APRIL 30,2019
co
0 CERTIFICATE
z 'f� I,the undersigned, Assistant Secretary of BERKLEY INSURANCE COMPANY,DO HEREBY CERTIFY that the foregoing is a
true,correct and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded
3 and that the authority of the Attorney-in-Fact set forth therein, who executed the bond or undertaking to which this Power of
Attorney is attached, is in full force and effect as of this date.
Given under my hand and seal of the Company,this 15th day of July A 2016
(Seal)
A41 a
i
FORTWORTHREV:0212210'
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I PROJECT INFORMATION Date: 8/3/2016
Nance of Conb•actor Project Name
Conatser Construction Sendera Ranch east Phase 10
DOE Inspector Project Manager
Michael Collier Kahl Jaafari
DOE Numher ProjeclDifriculb TipeofContract
7477 Q Simple * Routine O Complex R] Water❑� Waste Watero Storm Drainages Pavement
Initial Contract Amount Final Contract Amount
$200,496.00 $200,496.00
H)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector L-1 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities L 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities '
5 Citizen Com Taint Resolution Ll PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs L1 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Tune 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utili Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throclunorton Street•Fort Worth,TZ 76012-6311
(817)392-7941 •Fax:(817)392-7845