HomeMy WebLinkAboutContract 46739-FP1 Vepartme t T W Const. Services
DO1J#_ )Dat
Project Managera�� S/
Risk Management S. Canady -- tT WO RT Ho co SECRET
D.O.E. Brotherton �.� ` CONTRACT NO.
CFA Westerman/Scanned ❑
The Proceeding people have becu contacted concerning the request ATION AND PUBLIC WORKS
for final payment&haw released this project I'or such payment.
F PROJECT COMPLETION ,DOE 7-'1,59
Clearance Conducted By Etta Bacy /J —A SCity Project Ns: 2571
qz�14 OV# 07311
Regarding contract 117459 for STOCKYARD HOTEL as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through
M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete.
Original Contract Prices: $481,293.00
Amount of Approved Change Orders: $4,500.00 Ns 1
Revised Contract Amount: $485,793.00
Total Cost Work Completed: $485,793.00
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
Total Deduction Amount:
$0.00
Total Cost Work Completed: $485,793.00
i
Less Previous Payments:
Final Paym a $485,793.00
g'Z 7-A
Recom ende for Acceptance Date
Asst. Di ector, PW - Infrastructure Design and Construction
i
i
Accepted Date
Asst. Director,
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
I
Asst. City Manager Date
Comments• �,�D 27,ii-�02J583
��.tll���L LLJl�riill.�>
SEP 2916 OFFICW. IAL RECORD
CITY SECRETARY j
Tn1t�s1 FTdO
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name STOCKYARDS HOTEL
Conti-act Limits RETAINING WALL AND CHANNEL IMPROVEMENTS
Project Type DRAINAGE
City Project Numbers 02571
DOE Number 7459
Estimate Number 1 Payment Number 1 For Period Ending 7/15/2016
CD
City Secretary Contract Number 117459 Contract Time 120 D
Contract Date Days Charged to Date 109
Project Manager Salm Contract is 100.00 Complete
Contractor ARK CONTRACTING SERVICES,LLC
420 SOUTH DICK PRICE ROAD
KENNEDALE, TX 76060
Inspectors LAYER / SCHARFENBERG
Wednesday,September 14,2016 Pagel of4
City Project Numbers 02571 DOE Number 7459
Contract Name STOCKYARDS HOTEL Estimate Number I
Contract Limits RETAINING WALL AND CHANNEL IMPROVEMENTS Payment Number I
Project Type DRAINAGE For Period Ending 7/15/2016
Project Funding
DRAINAGE
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
I SITE CLEARING&DEMOLITION I LS $42,550.00 $42,550.00 1 $42,550.00
2 UNCLASSIFIED EXCAVATION(CO#1) 5891.3043 CY $11.50 $67,750.00 5891.3043 $67,750.00
3 EROSION&SEDIMENT CONTROL I LS $13,200.00 $13,200.00 1 $13,200.00
4 GABION MATTRESS 20 CY $944.00 $18,880.00 20 $18,880.00
5 CONCRETE RIP RAP 6 CY $I,198.00 $7,188.00 6 $7,188.00
6 ROCK RIP RAP 227 CY $114.00 $25,878.00 227 $25,878.00
7 PRECAST MODULAR BLOCK RETAINING 5133 SF $59.00 $302,847.00 5133 $302,847.00
8 UTILITY TRENCH EXCAV,EMBEDMENT& 1 CY $2,200.00 $2,200.00 1 $2,200.00
BACKFILL CONC COLLAR
9 ADJUSTING MANHOLES 1 EA $3,300.00 $3,300.00 1 $3,300.00
10 STORM DRAIN HEADWALL&WINGWALLS 1 EA $2,000.00 $2,000.00 1 $2,000.00
------------- -------- -------------------
Sub-Total of Previous Unit $485,793.00 $485,793.00
-------------- ----- -------------------
Wednesday,September 14,2016 Page 2 of 4
City Project Numbers 02571 DOR Number 7459
Contract Name STOCKYARDS HOTEL Estimate Number I
Contract Limits RETAINING WALL AND CHANNEL IMPROVEMENTS Payment Number I
Project Type DRAINAGE For Period Ending 7/15/2016
Project Funding
Contract Information Summary
Original ContractAmount $481,293.00
Chanlle Orders
Change Order Number 1 $4,500.00
Total Contract Price $485,793.00
DDate 6 2� Total Cost of Work Completed $485,793.00
J
Less %Retained $0.00
TO�� h / Net Earned $485,793.00
Date9//q W��O Earned This Period $485,793.00
Inspection Supervisor
h Retainage This Period $0.00
e �V Less Liquidated Damages
roject anagcr
q I' Days @ l Day $0.00
Date '�/'!�l LessPavement Deficiency $0.00
Asst. erect r/fPW-Infrastructure Design and Construction Less Penalty $0.00
Date Less Previous Payment $0.00
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $485,793.00
Wednesday,September 14,2016 Page 3 of 4
City Project Numbers 02571 DOE Number 7459
Contract Name STOCKYARDS HOTEL Estimate Number I
Contract Limits RETAINING WALL AND CHANNEL IMPROVEMENTS Payment Number I
Project Type DRAINAGE For Period Ending 7/15/2016
Project Funding
Project Manager Sahu City Secretary Contract Number 117459
Inspectors LAYER/ SCHARFENBERG Contract Date
Contractor ARK CONTRACTING SERVICES,LLC Contract Time 120 CD
420 SOUTH DICK PRICE ROAD Days Charged to Date 109 CD
KENNEDALE, TX 76060 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $485,793.00
Less %Retained $0.00
Net Earned $485,793.00
Earned This Period $485,793.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $485,793.00
Wednesday,September 14,2016 Page 4 of 4
CONSENT OF
SURETY COMPANY
TO FINAL PAYMENT Bond #CA 4010658
Project: Stockyards Hotel Retaining Wall and Channel Improvements
To (Owner):
Sunbelt-CFX, LLC
P O Box 5566 Contract For: See above
Dothan,AL 36302
Contract Date:
Contractor:
Ark Contracting Services,LLC
In accordance with the provision of the Contract between the Owner and the Contractor as defined above,
the Great American Insurance Company of New York
301 E Fourth Street
Cincinnati,OH 45202
,Surety Company,
on bond of Ark Contracting Services,LLC
420 S Dick Price Road
Kennedale,TX 76060
,Contractor
hereby approves of the final payment to the contractor and agrees that final payment to tine contractor
shall not relieve the Surety Company of any of its obligations to the
Sunbelt-CFX,LLC
P 0 Box 5566
Dothan,AL 36302
,Owner
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 15th day of June,2016.
Great American Insurance Company of New
York
Surety Company
Wit
eke ,Att ney-in-Fact
GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
New York
Administrative Office:301 E 4TH STREET . CINCINNATI,OHIO 45202 . 513-369-5000 . FAX 513-723-2740
The number of persons authorized by
this power of attorney is not more than FIVE No.0 14893
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS:That the GREATAMERICAN INSURANCE COMPANY OF NEW YORK,a corporation
organized and existing under and by virtue of the laws of the State of New York,does hereby nominate,constitute and appoint the
person or persons named below its true and lawful attorney-in-fact,for it and in its name,place and stead to execute on behalf of
the said Company,as surety,any and all bonds,undertakings and contracts of suretyship,or other written obligations in the nature
thereof;provided that the liability of the said Company on any such bond,undertaking or contract of suretyship executed under this
authority shall not exceed the limit stated below.
Name Address Limit of Power
TRACY TUCKER STEVEN TUCKER ALL OF ALL
W.LAWRENCE BROWN BENNETT BROWN FORT WORTH, $100,000,000.00
KEVIN J.DUNN TEXAS
This Power of Attorney revokes all previous powers issued on behalf of the attorney(s)-in-fact named above.
IN WITNESS WHEREOF,the GREATAMERICAN INSURANCE COMPANY OF NEW YORK has caused these presents to be signed
and attested by its appropriate officers and its corporate seal hereunto affixed this 25TH day of JUNE , 2015
Attest GREAT AMERICAN INSURANCE COMPANY OF NEW YORK
ecneu„y w
Assisloul SecnlaqUirisinnnl Senior Dire Ynvirlen!
DAVID C.KITCHIN(877-377-2405)
STATE OF OHIO,COUNTY OF HAMILTON-ss:
On this 25TH day of JUNE 2015 ,before me personally appeared DAVID C.KITCHIN,to me known,
being duly sworn,deposes and says that he resides in Cincinnati,Ohio,that he is a Divisional Senior Vice President of the Bond
Division of Great American Insurance Company of New York,the Company described In and which executed the above instrument;
that he knows the seal;that it was so affixed by authority of his office under the By-Laws of said Company, and that he signed
his name thereto by like authority.
SLW
A Kdft�0 Crib-' � 4`C�/•a;,B'c'u.'
My CoarrlktJon E�iraa 061l1,2020
This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Great
American Insurance Company of New York by unanimous written consent dated May 14,2009.
RESOLVED. That the Divisional President,the several Divisional Senior Vice Presidents,Divisional Vice Presidents and Divisional
Assistant Vice Presidents,or any one of them,be and hereby is authorized, from time to time, to appoint one or more Attorneys-in-Fact
to execute on behalf of the Company,as surety,any and all bonds, undertakings and contracts of suretyship,or other written obligations
in the nature thereof;to prescribe their respective duties and the respective limits of their authority;and to revoke any such appointment
at any time.
RESOLVED FURTHER:That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant
Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of eithergiven for the execution of any bond,
undertaking,contract of suretyship,or other written obligation in the nature thereof,such signature and seal when so used being hereby
adopted by the Company as the original signature of such officer and the original seal of the Company, to be valid and binding upon the
Company with the same force and effect as though manually affixed.
CERTIFICATION
1,STEPHEN C.BERAHA,Assistant Secretary of Great American Insurance Company of New York,do hereby certify that
the foregoing Power of Attorney and the Resolutions of the Board of Directors of May 14,2009 have not been revoked and are
now in full force and effect.
�(,(S
Signed and sealed this 15th day of 3une 2016 nL 4Mnda, • —
Auislanl SeaYlaq•
51185E(06/15)
AFFIDAVIT
STATE OF Texas
COUNTY OF Tarrant
Before me,the undersigned authority,a notary public in the state
and county aforesaid,on this day personally appeared Mary Beth
Stephens,Treasurer Of Ark Contracting Serivices, LLC, known to me to be
a credible person, who being by me duly sworn,upon his oath deposed
and said;
That all persons,firms, associations,corporations,or other
organizations fin-nishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Stockyards Hotel, Fort Worth,Texas
BY
�Iary Beth 9-te-pAcdAhs,Tr urer
Subscribed and sworn before me on this date 10th of June,2016.
vamki��Q
TANA STEPHENS
Notary Public,State of Texas
Comm.Expires 02-07-2020
' F of t�}:
'Inno% N010fy ID 12640343.5
FORTWORTHREV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Nance ofConhactw• Project Maine
Construction Stockyards Hotel Channel Improvements
DOE Inspector DOE Number
Roy Scharfenberg 7459
DOE Inspector Project Manager
❑ Water ❑ Waste Water fd Storm Drainage ❑ Pavement Sahu Gopal
Initial Contract Amount Project Difficulty
$481,293.00 0 Simple o Routine O Complex
Final Con tract Amount Date
$485,793.00 07.06.16
11)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 N
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 N
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 368
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 368
IIn CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 368
Rating([TS/MS]* 100%) 368 / 368 = 100%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Fxcellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector 126, ignature Contractor
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION -.- _— Date: 29.16
Name of Contractor Project Name
Ark Contracting Stockyards Hotel Retaining Wall and Channel Improv.
DOE Lrspector Projecl Manager
Roy Scharfenberg - Gopal Sahu
DOENum-& lNojeclDiffrculty Type of Contract
7459 A Simple o Routine o Complex El Water o Waste Water o Storm Drainage El Pavement
I tttal Contract Amount T -Final Contract Amount
� .IS5, 9'00- —.1---- ,-- -
$485,793.00 J
II)PERFORMANCE EVALUATION
0-Inadequate I -Deficient— 2-Standard 3-Good 4-Excellent _
ELEMENT RATING ELEMENT - RATING
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector_ Y - - 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector _ _2 -Clarity&Suffic_iency of
3 Accuracy of Measured Quantities -- - -_t _3 Applicability of Specifications
4 Display Of Professionalism _ _ _«f 4 Accuracy of Plan Quantities ___ _
5 Citizen Complaint Resolution y- ^� _ PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1_Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time _ _ _ _ _ 3 Communication_ �_
2 Timliness of Contractor Payments �- 4 Resolution of Utility Conflicts
T Bid Opening to Pre-Con MeetingTimeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor -
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS 1
TRANSPORTATION AND PUBLIC WORKS
� ? The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
i
FORTWORTH
rev 03/05/07
TRANSPORTATION& PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.: I
NAME OF PROJECT: Stockyards Hotel Channel Improvements
PROJECT NO.: CPN:2571 CONTRACTOR: Ark Construction
DOE NO.: 7459
PERIOD FROM:07/13/15 TO: 10/29/15 FINAL INSPECTION DATE: 20-Jul-16
WORK ORDER EFFECTIVE: CONTRACT TIME: 0 WD 0 CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1, 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS 109 109
PERIOD
PREVIOUS 109 109
PERIOD
TOTALS 109 109
TO DATE
*REMARKS:
CONT DATE MSPECTOW DATE
_ ENGINEERING DEP-1RTldENT
SEA The City of Fort Worth•1000 Throckmorton Street•Fort Worth,Thi 76012-6311
d
(817)392-7941 •Fax:(817)392-7845