HomeMy WebLinkAboutContract 47070-FP1 Departs e t o TPW Const. Services
CPN#WALElUnd—
D q
Project Manager '�/ �� CITE`SECRETARY ��
Risk Management S. Cv �T WORTHO CONTRACT No.
D.O.E. Brotherton
CFA Westerman/Scanned ❑
The Proceeding people have been Contacted concerning the request 'ATION AND PUBLIC WORKS
for filial p;pm8:
• ent haw released this project fm•such payment. )F PROJECT COMPLETION
Aaf 75/z)
Clearance Conducted By Etta BacY �C�/YLtZ e� City Project Ns: 2642
Regarding contract 117510 for ALLIANCE CENTER NORTH PH 2B as required by the Cs'# 1-1-70701-1-7070
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by Cite Council on N/A through
M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete.
Original Conti-act Prices: $94,348.50
Amount of Approved Change Orders: N.0 1
Revised Contract Amount: $94,348.50
Total Cost Work Completed: $94,348.50
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
Total Deduction Amount: $0.00
Total Cost Work Completed: $94,348.50
Less Previous Payments:
i
Final Payme $94,348.50
Recommen ed for cceptance Date
Asst. Direct r, TP - Infrastructure Design and Construction
Accepted Date
- Director,
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
Asst, City Manager V Date
Comments:
OFFICIAL RECORD
ZMAMM" CITO Y SECRETARY
SEP 2 S 201
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name ALLIANCE CENTER NORTH PH 2B
Contract Limits
Project Type PAVING
City Project Numbers 02642
DOL Number 7510
Estimate Number I Payment Number 1 Fm•Period Ending 8/26/2016
CD
City Secretary Contract Number 117510 Contract Time 5IfD
Contract Date Days Charged to Date 327
Project Manager Long Contract is 100.00 Complete
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors LAYER / MEDELLIN
Wednesday,September 14,2016 Page 1 of 5
City Project Numbers 02642 DOE Number 7510
Contract Name ALLIANCE CENTER NORTH PH 2B Estimate Number I
Contract Limits Payment Number I
Project Type PAVING For Period Ending 8/26/2016
Project Funding
EARTHWORK
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
-------------- -- --- ------- ----- --- -----
I ------------- -- --- ------- -- - -----
I SITE CLEARING I LS $1,500.00 $1,500.00 1 $1,500.00
2 UNCLASSIFIED EXCAVATION BY PLAN 275 CY $10.00 $2,750.00 275 $2,750.00
3 SWPPP 1 LS $1,350.00 $1,350.00 1 $1,350.00
Sub-Total of Previous Unit $5,600.00 $5,600.00
PAVING
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 10"CONC PVMT 567 SY $62.00 $35,154.00 567 $35,154.00
2 8"LIME TREATMENT 615 SY $3.50 $2,152.50 615 $2,152.50
3 HYDRATED LIME 14.21 TN $200.00 $2,842.00 14.21 $2,842.00
4 4"CONC SIDEWALK 945 SF $4.00 $3,780.00 945 $3,780.00
5 SEEDING HYDROMULCH 134 SY $2.00 $268.00 134 $268.00
6 CONSTRUCT CONCRETE HEADER 28 LF $40.00 $1,120.00 28 $1,120.00
7 TRAFFIC CONTROL I LS $1,000.00 $1,000.00 1 $1,000.00
Sub-Total of Previous Unit $46,316.50 $46,316.50
PAVEMENT MA.RK.ING&SIGNAGE
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
-------------- --- - --------- --------
1 4"BRK PVMT MARKING HAS 188 LF $3.00 $564.00 188 $564.00
Sub-Total of Previous Unit $564.00 $564.00
STORM DRAIN
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
-- -------- ----- -- -------------- --- -----
1 21"RCP 5 LF $50.00 $250.00 5 $250.00
2 24"RCP 89 LF $58.00 $5,162.00 89 $5,162.00
3 36"RCP 155 LF $95.00 $14,725.00 155 $14,725,00
4 10'CURB INLET I EA $2,500.00 $2,500.00 1 $2,500.00
5 TRENCH SAFETY 249 LF $4.00 $996.00 249 $996.00
Wednesday,September 14,2016 Page 2 of 5
City Project Numbers 02642 DOE Number 7510
Contract Name ALLIANCE CENTER NORTH PH 2B Estimate Number I
Contract Limits Payment Number I
Project Type PAVING For Period Ending 8/26/2016
Project Funding
Sub-Total of Previous Unit $23,633.00 $23,633.00
ST LIGHT
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
-- ———------—— -----———— ———--——----- -
1
--
1 2"CONDT PVC SCH 80 275 LF $15.00 $4,125.00 275 $4,125.00
2 #2COPPER'IRI-PLEX 20 LF $9.00 $180.00 20 $180.00
3 2-2-2-4 QUADPLEX ALUM ELEC CONDUCTOR 255 LF $6.00 $1,530.00 255 $1,530.00
4 GROUND BOX TYPE B W/APRON 4 EA $650.00 $2,600.00 4 $2,600.00
5 RDWY ILLUM FOUNDATION 1 EA $1,500.00 $1,500.00 1 $1,500.00
6 RDWY ILLUM ASSMBLY I EA $3,000.00 $3,000.00 1 $3,000.00
7 LED LIGTHING FIXTURE I EA $800.00 $800.00 1 $800.00
8 CONTACT ENCLOSURE PAD MOUNT I EA $4,500.00 $4,500.00 1 $4,500.00
----- ------------- -- -- ----------------- --
Sub-Total of Previous Unit $18,235.00 $18,235.00
---- ---------------- --------------------
Wednesday,September 14,2016 Page 3 of 5
City Project Numbers 02642 DOE Number 7510
Contract Name ALLIANCE CENTER NORTH PH 213 Estimate Number I
Contract Limits Payment Number I
Project Type PAVING For Period Ending 8/26/2016
Project Funding
Contract Information Summary
Original Contract Amount $94,348.50
Change Orders
Total Contract Price $94,348.50
�L4 Date
ct—1 c 'V Total Cost of Work Completed $94,348.50
Cnr for Less %Retained $0.00
��— Net Earned $94,348.50
Date 4 O Earned This Period $94,348.50
Inspection Supervisor
Retainage This Period $0.00
Date ` Less Liquidated Damages
Project Manager
qq Days @ /Day $0.00
rw_ ( �� Date p/ LessPavement Deficiency $0.00
Asst. )ct r/T W-Infrastructure Design and Construction Less Penalty $0.00
Date Zy Less Previous Payment $0.00
ctor ontracting Departnren Plus Material on Hand Less 15% $0.00
Balance Due This Payment $94,348.50
Wednesday,Septennber 14,2016 Page 4 of 5
City Project Numbers 02642 DOE Number 7510
Contract Name ALLIANCE CENTER NORTH PH 213 Estimate Number I
Contract Limits Payment Number I
Project Type PAVING For Period Ending 8/26/2016
Project Funding
Project Manager Lang City Secretary Contract Number 117510
Inspectors LAYER / MEDELLIN Contract Date
Contractor CONATSER CONSTRUCTION TXLP Contract Time 50 CD
5327 WICHITA ST Days Charged to Date 327 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $94,348.50
Less %Retained $0.00
Net Earned $94,348.50
Earned This Period $94,348.50
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $94,348.50
Wednesday,September 14,2016 Page 5 of 5
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc.,
general partner of Conatser Construction TX, LP, known to me to be a credible person, who
being by me duly sworn,upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
ACN—PHASE 2B
WATER, STORM DRAIN, SANITARY SEWER,
PAVING& STREET LIGHT IMPROVEMENTS
DOE#: N/A
City Project#: 02642
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
Brock Huggins
Subscribed and sworn to before me this 29`"day of Aug t, 2016.
BERTHA GIANUUS Notary Public in Tarrant County, Texas
PVgns Notary Public,State of Texas
My Commission Expires
September 18, 2019
i
E
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT ❑
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
conforms with the American Institute of OTHER
Architects,AIA Document 0707
Bond No 0149500
PROJECT:
(name, address)Alliance Center North-Phase 2B
Fort Worth,TX
TO (Owner)
City Project No. 1
CITY OF FORT WORTH AND HILLWOOD ALLIANCE ARCHITECT'S PROJECT NO; 02642
SERVICES,LLC CONTRACT FOR:
1000 Throckmorton eight Improvements,Ft Wase 2B,Water,Paving,Drainage&Street
Fort Worth Tx 7sio2 CONTRACT DATE:
CONTRACTOR: CONATSER CONSTRUCTION TX, L.P.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
there insart name and address of Surety Company)
BERKLEY INSURANCE COMPANY E
475 Steamboat Road
i
Greenwich CT 06830 , SURETY COMPANY
on bond of there insert name and address of Contractor)
CONATSER CONSTRUCTION TX, L.P.
5327 Wichita St.
Fart Worth TX 76119-6035 , CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to there Insert name and address of Owner)
CITY OF FORT WORTH AND HILLWOOD ALLIANCE SERVICES,LLC
1000 Throckmorton
Fort Worth TX 76102
OWNER,
f
3
as set forth in the said Surety Company's bond, k
IN WITNESS,WHEREOF,
k
the Surety Company has hereunto set its hand this 7th day of September,2016
BERKLEY INSURANCE COMPANY
Surety Company
Attest, �� (� 77/j
(Seal): �s Signature of Authorized Representative
p :
Robbi Morales Attorney-in-Fact
Title
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
S
9
No.BI-7280f
POWER OF ATTORNEY F
E BERKLEY INSURANCE COMPANY I
WILMINGTON, DELAWARE
l
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully,
f
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT, has made,constituted
P and appointed, and does by these presents make, constitute and appoint: Ricardo A Reyna; Don E. Cornell; vena DeLene
Marshall;Sophinie Hunter,Robbi Morales,or Kelly A. Westbrook of Aon Risk Services Southwest, Inc. of Dallas, TX its true
ID and lawful Attorney-in-Fact,to sign its name as surety only as delineated below and to execute,seal,acknowledge and deliver any
I and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall
E exceed Fifty Million and 00/100 U.S.Dollars (U.S.S50,000,000.00),to the same extent as if such bonds had been duly executed
v x and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons.
This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
o resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010:
f
B RESOLVED, that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief
Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
> Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein
oU to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the
o corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
0 o attorney-in-fact and revoke any power of attorney previously granted;and further
Q RESOLVED,that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated;and further
o o RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and
-0 Z further
L OJ) RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
15 3 other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as
though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
•i:� person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
0 B ceased to be such at the time when such instruments shall be issued.
IN WITNESS WHEREOF, the Company has causO these presents to be signed and attested by its appropriate officers and its
o 2 corporate seal hereunto affixed this ay of cvd— -
° U Attest; Berkley Insurance Company
-Q
(Sear) By / By
o t; Ira S. a erman Je &eesidelL
r
o Senior Vice President&Secretary e r
O
WARNING:THIS POWER INVALID IF NOT PRINTED ON BLUE`BERKLEY"SECURITY PAPER.
o Q)
STATE OF CONNECTICUT)
E ) ss:
v o
N o COUNTY OF FAIRFIELD )
9 Sworn to before me, a Notary Public in the State of Connecticut, this'J)O da of d ,2015, by Ira S. Lederman and
Jeffrey M.Hafter who are sworn to me to be the Senior Vice President and Secre ,an the Senior V7-�Z�
We dent,respectively,of
T� Berkley Insurance Company, MARIA C.RUNDBAKEN /
NOTARY PUBLIC /�.1�
o MY COMMISSION EXPIRES otary Public, State of Connecticut
APRIL 30,2019
z CERTIFICATE
1,the undersigned,Assistant Secretary of BERKLEY INSURANCE COMPANY,DO HEREBY CERTIFY that the foregoing is a
true, correct and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded
and that the authority of the Attorney-in-Fact set forth therein, who executed the bond or undertaking to which this Power of
Attorney is attached, is in full force and effect as of this date.
Given under my hand and seal of the Company,this 7 th day of September 2016
(Seal) Al —.
A a
l [ HILLWOOD
PROPERTIES
A PEROT COMPANY`
Joseph C.Schneider
Vice President
817.224.0054
September 7, 2016
Via e-mail: Emanuel.Nieto@fortworthtexas.gov
Emanuel Nieto
City of Fort Worth
8851 Camp Bowie West, 3`d Floor
Fort Worth, TX 76116
Re: Beach Street-Alliance Center North,Phase 2B
DOE No. 7510 (per CFA), City Project No. 02642
Dear Mr.Nieto:
Please be advised that neither AIL Investment, L.P. and Hillwood Alliance Services, LLC will
not be seeking liquidated damages from Conatser Construction TX, L.P. on the above referenced
project.
If you have any questions,please do not hesitate to call me at 817-224-6054
Sincerely,
Joseph C. Schneider
/JCS
cc: Mike Layer, City of Fort Worth
Brock Huggins, Conatser Construction
Jeremiah Patton, Conatser Construction
Patrick A. Smith—Peloton Land Solutions
Kole Weber—Peloton Land Solutions
13600 lkrng4c Porlorar Suilr 2011 Fiuv 11'rn-1h. T.1-7h1'7 Phnur 8l7 114 6000 Fax 817_'_'a 6061 hilhr otlonu
FORTWORTHREV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Name of Contractor Project Nance
Conaster Conatruction TX,L.P Alliance Center North-Phase 213
DOE Inspector DOE Number
Habte Taezaz 7510
DOE hupector Project kfanager
❑Water ❑Waste Water ❑� storm Drainage El Pavement Aaron Lon
htftial Contract Aneount Project Difficult),
$94,348.50 O simple Routine O Complex
Final Contract Amount Date
$94,348.50 9/14/2016
II)PERFORMANCE EVALUATION
0-Inadequate l-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20 j
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 426
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 426
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating(ITS/MS] *100%) 426 / 448 = 95%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Ficellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector a Signature Contractor
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
': The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION _Date: 9/14/2016 _
Name of Contractor Project None
Conatser Construction TX,L.P. Alliance Center North Phase 2B
DOE Inspector Project Manager
Hake Taezaz Aaron Lon
DOE Number Project Difficult), Type of Contract
7510 1 0 Simple Q Routine 0 Complex ❑Water ❑Waste Water Q Storm Drainage Pavement
Initial Con tract Annormt Final Cauract Amount
$94,348.50 1$94,348.50
II)PERFORMANCE EVALUATION
0-Inadequate I -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
I Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector It 12 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities K 3 Applicability of Specifications
4 Display Of Professionalism if 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution y PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs '{ 1 Knowledge And/Or Problem Resolution !if
ADMINISTRATION 2 Availability of Project Manager a
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS _.
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
__ _ TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTH rev 03/05/07
TRANSPORTATION& PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: ALLIANCE CENTER NORTH-PHASE 213
PROJECT NO.: 2642 CONTRACTOR: Conatser Construction L.P.
DOE NO.: 7510
PERIOD FROM:10/05/15 TO: 08/26/16 FINAL INSPECTION DATE: 26-Aug-16
WORK ORDER EFFECTIVE:10/5/2015 CONTRACT TIME: 50 0 WD @)CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS 327 327
PERIOD
PREVIOUS
PERIOD
TOTALS 327 327
TO DATE
*REMARKS:
CONTRACTOR DATE INSPECTOR DATE
ENGINEERING DEPARTIIENT
° The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,T176012-6311
(817)392-7941 •Fax:(817)392-7845