FORT WORTH. City of Fort Worth CORAeT '
Change Order Request Breakdown
Project Namel Ridglea Urban Village Streetscape Improvements City Sec# 1 46823
Client Project#(s)l 01786
Contractor The Fain Group PM Lissette Acevedo Inspectorl Roy Scharfenberg
Change Order Submittal# Date 7/27/2016
Dept. Planning Water Contract Time
Totals D
Original Contract Amount $274,322.00 $272,646.00 $546,968.00 128
Extras to Date 4
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date -$274i322.00 '$272,646.00 $546,968.00 132
Amount of Proposed Change Order $0:00 $13,298.44 _ = $13,298.44
Revised Contract Amount $274,322.00_ __$285,944.44 - $560,266.44 132
Original Funds Available for Change Orders $13,362.00 $13,362.00
Remaining Funds Available for this CO $0:00 - = $13,362.00- $13,362.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2 43% --
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2591o) $683,710.00-
--
26) Remobilization cost was due to the TxDOT shut down of the project to obtain a utility permit and to allow for ATMOS Energy to relocate a
gas line in conflict. The remobilization occurred on January 25, 2016.
(27)The City requested Fain to excavate an existing 20"water line so that Circle C could get a measurement of the pipe to replace at a later
date.
(28)Additional Equipment-Backhoe was to excavate the 20"line and the plate rentals to cover the opening to open up West Ridge until Circle
C arrived.
(29)The Approach was 1/2 demolish due to the water tie-in location going into the approach. It was best to demo the approach and pour a new
commercial approach to code.
A W,b ,cr�tar�
by 6
o OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
�J
V
FORT WORTH City of Fort Worth
-`'V-- -- Change Order Additions
Project Name Ridglea Urban Village Streetscape Improvements City Sec# 46823
Client Project# 01786
Contractorl The Fain Group PM Lissette Acevedo Inspector Roy scharfenberg
Change Order Submittal# f--2 Date 7/27/2016
ADDITIONS
Qty Unit Unit Cost Total
emo i izabon ater
27 Excavate existing 20'waterline Water 1.00000000 LS $7,610.40
28 Equipment-BackHoe,AdditionalPlating Water 1.00000000 LS $4,271.41
29 Remove ans Replace Drive Approach Water 1.00000000 LS 32,821.88
Planning $0.00
Water $18,718.44
Sub Total Additions $18,718.44
Change Order Additions Page 1 of 1
FORTWORTH City Of Fort Worth
- — Change Order Deletions
Project Name Ridglea Urban Village Streetscape Improvements CitySec# 46823
Client Project# 01786
Contractor The Fain Group PM Lissette Acevedo Inspector Roy Scharfenberg
Change Order Submittal# F---2 Date 7!27!2016
DELETIONS
DESCRIPTIONITEM ty Unit Unit Cost Total
5 5'WIDE ASPHALT PAVEMENT REPAIR,ARTERIAL Water
8 TEMPORARYWATERSERVICES Water 1.00000000 LS 5,000.00 5,
Planning $0.00
Water $5,420.00
Sub Total Deletions $5,420.00
Change Order Deletions Page 1 of 1
M/SBE Breakdown for this Change Order
M/SBE:Sub = _ Type of Service = .= Amount for this CO
Total
Previous Change Orders
AMOUNT,=
Total
CFW Change Order Approval Wa-COApp05 Page 2 of 3
FORT WDRTH@ City of Fort Worth
Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: 2
Change Order No.: Wa-COApp05 Date Started: 2016-08-23
City Sec. No.: 46823 Date Due: ,2016-10-12
Project Name: 01786 - The Ridglea Urban Village Streetscape Project
01786 DOE Numbers:
Project Numbers:
6885
Project Streetscape improvements, stamped concrete colored crosswalks,
Description: ADA ramps, water line adjustments and minor landscaping
Project Manager: Lissette Acevedo City Inspector: Roy Scharfbenger
Contractor: the Fain Group
COUNCIL ACTION (If Required):
M&C Log Name:
M&C Number: M&C Date:
COST AND DAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
Water $ 13,298.44 59601 0600430 5740010 C01786 C( 4
Total Cost: $ 13,298.44 Total Requested Days: 4
Approval Status:
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 10/5/2016
CFW Change Order Approval Wa-COApp05 Page 3 of 3
Approved: Yes
Comments:
User: Noel Sanchez
Date: 2016-08-23 4:13 PM
Approved: Yes
Comments:
User: Lissette Acevedo
Date: 2016-08-24 11:24 AM
Approved: Yes
Comments:
User: Roberto C. Sauceda
Date: 2016-08-30 2:12 PM
Approved: Yes
Comments:
User: John Kasavich
Date: 2016-08-30 4:14 PM
Approved: Yes
Comments:
User: Chris Harder
Date: 2016-08-31 11:22 AM
Approved: Yes
Comments:
User: Doug Black
Date: 2016-08-31 11:09 AM
Approved: Yes
Comments:
User: Jay Chapa
Date: 2016-08-31 4:15 PM
Action Required: