Th P final in cec ople have been Contacted concerning the request rATION AND PUBLIC WORKS nn DZZl�
for nal payment&have released this project for such payment. )F PROJECT COMPLETION Cr�
Clearance Conducted By Etta Bacy i D.O.E. Ns: 7171
Regarding contract 117171 for LEFT BANK 54"WATER MAIN RELOCATION as required by the CS#(iGb
WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the
WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works
Department has accepted die project as complete.-----., ---�
� 1 r3
Original Contract Prices: 1 �� $1,318,422.40
3 0
J t Job
Amount of Approved Change Order OCA Ne 1
Revised Contract Amount: _ =� $1,318,422.40
Total Cost Work Completed: �` f
$1,318,422.40
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
Total Deduction Amount: $0.00
Total Cost Work Completed: $1,318,422.40
Less Previous Payments:
Fi I Pay t Due $1,318,422.40
Recom end d for Acceptance Date
Asst. Di ecto , TPW - Infrastructure Design and Construction
- hid - - -- /G
Accepted Date
Asst. Director, WATER DEPARTMENT
4�2
Asst. City Manager Date
Comments: FUND ACCT:P265-475260-6091402212
OFFICIAL RECORD
-0M- Z1—'.EJD CITY SECRETARY
0 C T 2016 "FFT. WORTH,
IaItIBI:
L 1190VI �)
L
OCT 0 3 2016 sa 66) -
City Project Numbers 02212 :
— DOE Number 7171
Contract Name LEFT BANK 54"WATER MAIN RELOCATION Estimate Number 1
Contract Limits Payment Number I
Project Type WATER For Period Ending 7/1/2016
Project Funding
Project Manager Ehia City Secretary Contract Number 117171
Inspectors DICKINSON / WATSON Contract Date
Contractor EMJ CORPORATION Contract Time 365 CD
5525 N.MACARTHUR BLVD.,#400 Days Charged to Date 338 CD
IRVING, TX 75038-2604 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $1,318,422.40
Less %Retained $0.00
Net Earned $1,318,422.40
Earned This Period $1,318,422.40
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day 50.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment S1,318,422.40
Tuesday,July 05,2016 Page 4 of 4
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name LEFT'BANK 54"WATER MAIN RELOCATION
Contract Limits
Project Type WATER
City Project Numbers 02212
DOE Number 7171
Estimate Number 1 Payment Number I For Period Ending 7/1/2016
CD
City Secretary Contract Number 117171 Contract Time 36ED
Contract Date Days Charged to Date 338
Project Manager Ehia Contract is 100.00 Complete
Contractor EMJ CORPORATION
5525 N.MACARTHUR BLVD.,#400
IRVING, TX 75038-2604
Inspectors DICKINSON / WATSON
Tuesday,July 05,2016 Page I of 4
�'F
City Project Numbers 02212 DOE Number 7171
Contract Name LEFT BANK 54"WATER MAIN RELOCATION Estimate Number I
Contract Limits Payment Number 1
Project Type WATER For Period Ending 7/1/2016
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 54"POLYURETHANE COATED&MORTAR 1900 LF $399.68 $759,392.00 1900 $759.392.00
LINED STEEL AWWA C200 WATER PIPE
2 54"POLYURETHANE COATED STEEL PIPE I LS $88,008.00 $88,008.00 1 $88,008.00
FITTINGS
3 CATHODIC PROTECTION SYSTEM FOR STEEL I LS 526,495.00 $26,495.00 I $26,495.00
PIPE
4 72"CASING/TUNNEL LINER PLATE BY OTHER 48 LF $4,250.00 $204,000.00 48 $204,000.00
THAN OPEN CUT
5 CONNECTION TO EXISTING 54"WATER MAIN 2 EA 523,113.00 $46,226.00 2 $46,226.00
6 IMPORTED BACKFILL-CLSM 225 CY $18.50 $4,162.50 225 $4,162.50
7 5'MANHOLE FOR 54"WATERLINE ACCESS I EA $16,000.00 S16,000.00 l $16,000.00
8 6"COMBINATION AIR VALVE ASSEMBLY FOR 4 EA $21,652.00 586,608.00 4 $86,608.00
WATER
9 8"BLOW OFF VALVE&VAULT 2 EA $14,500.00 $29,000.00 2 $29,000.00
10 TEMP ASPHALT PAVING REPAIR 385 LF $20.00 $7,700.00 385 $7,700.00
11 TRENCH SAFETY 1852 LF $1.36 $2,518.72 1852 $2,518.72
12 SEEDING 6679 SY $1.42 $9,484.18 6679 $9,484.18
13 SWPPP>IACRE I LS $35,428.00 $35,428.00 1 $35,428.00
14 TRAFFIC CONTROL 8 MO $425.00 $3,400.00 8 $3,400.00
Sub-Total of Previous Unit $1,318,422.40 $1,318,422.40
Tuesday,July 05,2016 Page 2 of 4
City Project Numbers 02212 DOE Number 7171
Contract Name LEFT BANK 54"WATER MAIN RELOCATION Estimate Number I
Contract Limits Payment Number 1
Project Type WATER For Period Ending 7/1/2016
Project Funding
Contract Information Summary
Original Contract Amount $1,318,422.40
Chance Orders
Total Contract Price $1,315,422.40
Total Cost of Work Completed $1,318,422.40
Contractor Less %Retained $0.00
AZ� D to J/� � Net Earned $1,318,422.40
Inspection Supervisor
i— Earned This Period $1,318,422.40
Retainage This Period $0.00
Date 9 3 a �(o
Less Liquidated Damages
Pro j t ager
/ Days @ /Day $0.00
Date a 1�t LessPavement Deficiency $0.00
Asst.D e or/TPPW-Infrastructure Design and Construction Less Penalty $0.00
`w" Date �� y (s Less Previous Payment $0.00
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $1,318,422.40
Tuesday,July 05,2016 Page 3 of 4
FoRTWORTH rev 03/05/07
TRANSPORTATION&PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.1
NAME OF PROJECT:Left Bank 54"Water Line Relocation
PROJECT NO.: 2212 CONTRACTOR: EMJ Construction
DOE NO. 7171
PERIOD FROM 07/16/15 TO: 06/17/16 FINAL INSPECTION DATE: 1-Jul-16
WORK ORDER EFFECTIVE 7/16/2015 CONTRACT TIME 180 O WD O CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
H. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS 338 338
PERIOD
PREVIOUS
PERIOD
TOTALS
T338 338
O DATE
*REMARKS
4z XI
2e f
CONTRACYOR DATE IN ECTOR DATE
ENGINEERING DEPART-N ENT
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •FIs: (817)392-7845
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Left Bank 54"Water Line Relocation
PROJECT NUMBER: 2212
DOE NUMBER: 7171
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Water 54" Polyurethane&Mortar Lined C200 1900
FIRE HYDRANTS: VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
ms s' The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fat:(817)392-7845
FORTWORTHRE":02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Nmne of Contractor Project Name
EMJ Construction Left Bank 54"Water Line Relocation
DOE Inspector DOENumber
Kevin Chambers 7171
DOE Inspector Project Manager
D Water ❑Waste Water ❑Storm Drainage ❑Pavement Fred Ehia
Initial Contract Amount Project Difficulty
$1,318,422.40 O Simple (0)Routine O Complex
Final Contract Amount Date
$1,318,422.40 7/1/2016
H)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE M20
1 Submission of Documents 2 Y 3 8
2 Public Notifications 5 Y 4 20
3 Plans on Site 5 Y 4 20
4 Field Supervision 15 Y 4 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 416
BONUS POINTS(25 Maximum)(B)
III)CONTRACTOR'S RATING TOTAL SCORE(T'S) 416
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS] x 100%) 416 / 448 = 93%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS ANVARDED)
Signature DOE Inspector &.&-Signature Contractor
Signature DOE Inspector's Supervisor14.4 419 C;4 i
CONTRACTOR'S COMMENTS
_ TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me,the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Troy L. Jackson,
Vice President Of Jackson Construction, Ltd, known to me to be a credible
person, who being by me duly sworn,upon his oath deposed and said;
That all persons, funis, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
54" Water Main Relocation for Left Bank
BY -'e-4164
roy L. son,Vice President
Subscribed and sworn before me on this date 27th of April, 2016.
Notary ublic
Tarrant,Texas
o""Yra, CARMEN L.ESTEP
Notary Public,State of Texas
Comm.Expires 04-06-2020
•�i1'of
-W9
Notary IR 2410611
RECEIVED
® MAY U 9 2016
M
TM
Document G707 — 1994 EMJ
Consent Of Surety to Final Payment
PROJECT:(Name and address) ARCHITECT'S PROJECT NUMBER: OWNER:
Left Bank-54"Water Main Relocation ARCHITECT:El
Worth Texas CONTRACT FOR:General Construction
CFA/CS#2014-045 CONTRACTOR:
TO OWNER:(Name and address) CONTRACT DATED:August 04,2014 SURETY:
City of Fort Worth and Centergy Retail,LLC
OTHER:❑
In accordance with the provisions ofthe Contract between the Owner and the Contractor as indicated above,the
(Insert name and address of Surety)
Western Surety Company
5565 Glenridge Connector NE,6th Floor,Atlanta,GA 30342
,SURETY,
on bond of
(Insert name and address of Contractor)
EMJ Corporation TX
5525 N.MacArthur Blvd.,Suite 400,Irving,TX 75038
,CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety
of any of its obligations to
(Insert name and address of Owner)
City of Fort Worth and Centergy Retail,LLC
OWNER,
as set forth in said Surety's bond.
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date:May 5,2016
(Insert in writing the month followed by the numeric date and year.)
Western Surety Company
(Surety
(Signature of authorised representative)
Attest: Patricia S.Kleehammer,Attorney-in-fact
(Seal): (Printed name and title)
AIA Document G707'"'—1994.Copyright®1982 and 1994 by The American Institute of Architects.All rights reserved.WARNING:This AIA®Document is
protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIAo Document,or any portion of It,may
result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA
software at 10:05:09 on 05/05/2016 under Order No.9952527211_1 which expires on 04/07/2017,and is not for resale.
User Notes: (1378964556)
vvesternJurety Company
POWER OF ATTORNEY APPOINTING INNIDIVIIDIJAL ATTORNEY-IN-FACT
Know All Men By These Presents,That WESTERN SURETY COMPANY,a South Dakota corporation,is a duly organized and existing corporation
having its principal office in the City of Sioux Falls,and State of South Dakota,and that it does by virtue of the signature and seal herein affixed hereby
make,constitute and appoint
Mark R Brock, Dana F Davis, Patricia S Kleehammer, T Michael Langley, Dana Keith Davis,
Cecil Ray Vaughan III, Individually
of Rossville,GA,its true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign,seal and execute for and on its behalf bonds,
undertakings and other obligatory instruments of similar nature
-In Unlimited Amounts -
and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said
Attorney,pursuant to the authority hereby given,are hereby ratified and confirmed.
This Power of Attorney is made and executed pursuant to and by authority of the By-Law printed on the reverse hereof,duly adopted,as indicated,by
the shareholders of the corporation.
In Witness Whereof,WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate sea]to be
hereto affixed on this 30th day of June,2015.
��e ,aE�.� WESTERN SURETY COMPANY
W�Pc N-
»i�o�4
°o►r+oa
aul T.Bmflat,Vice President
State of South Dakota
ss
County of Minnehaha
On this 30th day of June,2015,before me personally came Paul T.Bruflat,to me known,who,being by me duly swom,did depose and say: that he
resides in the City of Sioux Falls,State of South Dakota;that he is the Vice President of WESTERN SURETY COMPANY described in and which executed
the above instrument;that he knows the seal of said corporation;that the seal affixed to the said instrument is such corporate seal;that it was so affixed
pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority,and acknowledges
same to be the act and deed of said corporation.
My commission expires
S. EICM
February 12,2021 ! sofARY PUBLIC+`
SOU1fH D/110�rq i i
r
CERTIFICATE S.Eich,Notary Public
I,L.Nelson,Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in
force,and further certify that the By-Law of the corporation printed on the reverse hereof is still in force. In testimony whereof I have hereunto subscribed
my name and affixed the seal of the said corporation this day of_ MogZ j oJC
�+yaEry WESTERN SURETY COMPANY
W:l4��p�Aalf;a-
a
c3*T`Se 'v ti 4
f:.OJT•._ - 01P r'
''rw?M orP-S
Form F4280-7-2012 L.Nelson,Assistant Secretary
EMJ CONSTRUCTION
August 10, 2016
City of Fort Worth
CFA Administration
1000 Throckmorton St.
Fort Worth, TX 76102
Re: 54"Water Main Relocation For West 7th Development
DOE#: 7171
City Project#02212
To Whom It May Concern:
The purpose of this letter is to acknowledge that EMJ Corporation has been paid in full by
Centergy West 7th LP for the public improvements constructed to serve the 54"Water Main
Relocation at West 7'h Development in Fort Worth, Texas. As a result, we hereby waive,
release, and relinquish all rights to assert any claim or demand for lien in connection with this
project.
Please feel free to contact me with any questions you may have.
Sincerely,
Ray Catlin
Executive Vice President, EMJ Corporation
CC: Christopher Palmore—EMJ Corporation
Robert Kirkland—EMJ Corporation
Taylor Huffman—EMJ Corporation
5525 N. MacArthur Blvd Suite 400 Irving,TX 75038
WWW.EMJCORP.COM
CENTERGY WEST 7TH,LP
8235 Douglas Avenue, Suite 900
Dallas,Texas 75225
August 12,2016
Via email: kevin.chambers@vrxglobal.com
City of Ft.Worth
Project Facilitation Division
1000 Throckmorton St.
Ft.Worth,TX 76102
c/o: Kevin Chambers
VRX
Construction Inspector
Re: Centergy West 1a LP('Developer")relating to relocation of 54"water line to serve Left Bank
Community Facilities Agreement Contract No.46024
CFA 2014-045
DOE#7171
The purpose of this letter is to confirm that Centergy West 71h LP as the developer of the project will
not be filing for liquidated damages against the EMJ contract for not completing the project in the
180 days required per the contract.
Should you have any questions, feel free to contact West Miller at (214) 368-7200. Thank you in
advance for your assistance.
Kind regards,
CENTERGY WEST 7TH,LP,
a Texas limited partnership
By: Centergy West 7th GP, LLC,
a Texas limited liability company, its
general artner
By:
West Miller, President
FORTWORTHREV:02'22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 7/1/2016
Name of Contractor Project Name
EMJ Construction Left Bank 54"Water Line Relocation
DOEInspector Project Manager
Kevin Chambers Fred Ehia
DOENurnber Project Difficulty Type of Contract
7171 O Simple OO Routine O Complex P Water ❑Waste Water ❑Storm Drainage ❑Pavement
Initial Contract Amount Final Contract Amount
$1,318,422.40 $1,318,422.40
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION IPLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions y
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities 3
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
2-
1
1 Change Order Processing Time 3 Communication 3
2 Timliness of Contractor Payments4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector i
Signature DOE Inspector's Supervisor 0'
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
s The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845