Loading...
HomeMy WebLinkAboutOrdinance 10430 ORDINANCE NO. 1191126 AN ORDINANCE DETERMINING THE NECESSITY FOR AND ORDERING AND PROVIDING FOR THE IMPROVEMENT OF, MISSISSIPPI AVENUE, FROM GLEN GARDEN DRIVE TO EAST ALLEN AVENUE, AND MORPHY STREET, FROM NEW YORK AVENUE TO HILLSIDE PARK DRIVE, AS HEREINAFTER SET FORTH; ORDERING AND APPROVING ESTIMATE OF COSTS; MAKING REVISIONS FOR THE LEVY OF ASSESSMENTS AGAINST ABUTTING PROPERTIES AND THE OWNERS THEREOF FOR A PART OF THE COSTS OF SUCH IMPROVEMENTS; DIRECTING THE CITY SECRETARY TO FILE A NOTICE OF ADOPTION OF THIS ORDINANCE WITH THE COUNTY CLERK OF TARRANT COUNTY, TEXAS; DECLARING THAT THIS ORDINANCE AND ALL SUBSEQUENT PROCEEDINGS RELATING TO SAID STREET IMPROVEMENTS ARE AND SHALL BE IN ACCORDANCE WITH ARTICLE 1105b OF VERNON'S TEXAS CIVIL STATUTES; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Director of Transportation and Public Works for the City of Fort Worth, Texas (hereinafter referred to as the "Director") , has proposed the improvement of, Mississippi Avenue, from Glen Garden Drive to East Allen Avenue, and Morphy Street, from New York Avenue to Hillside Park Drive, which is hereby designated Project No. 67-040204-00, (said improvements being hereinafter referred to as the "Project") ; WHEREAS, the Project shall entail the improvement of the street, avenue, alley, highway, boulevard, drive, public place, square or any portions thereof (hereinafter referred to singly and collectively as the "highway") , and shall be accomplished by filling, grading, raising, paving, repaving, repairing, constructing, reconstructing, realigning, widening, narrowing or straightening said highway, or the curbs, gutters or sidewalks and any appurtenances or incidentals thereto, including drains or culverts; WHEREAS, the City Engineer of the City of Fort Worth has prepared an estimate of the costs of the Project; NOW, THEREFORE: BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. There exists a public necessity for the Project, and it is hereby ordered that Plans and Specifications be prepared for the improvement of the Project and that the Project be carried out and constructed according to the Plans and Specifications, and any changes or amendments thereto. -1- II. The estimated cost of the Project to the City of Fort Worth based on the estimate of the City Engineer is $ 987,610.80. The estimated cost of the Project shall be paid partly by the City of Fort Worth and partly by assessments to the property abutting the Project and the owners thereof. The assessments to the property abutting the Project and the owners thereof shall be levied in accordance with the requirements of TEX. REV. CIV. STAT. A I Article 1105b (hereinafter referred to as "Article 1105b") , and the City CLrter of Fort Worth, Texas, and shall not be more than all the costs of constructing, reconstructing, repairing, and realigning curbs, gutters and sidewalks and nine-tenths (9/10ths) of the cost of the remaining improvements comprising the Project. In any event, said assessments shall not exceed the special benefits to the abutting property and its owners, as enhanced by the Project. The City of Fort Worth shall pay the balance of the cost of the Project not assessed against the property abutting the Project and the owners thereof. The amounts assessed against the abutting properties and the owners thereof shall constitute a first and prior lien upon such properties and a personal liability of the owners thereof and shall be payable upon the acceptance by the City of Fort Worth of the Project after its completion. Said assessments shall be due and payable on or before 30 days after the acceptance by the City of Fort Worth of the Project, except that, if the abutting owner so elects, by complying with the terms hereinafter set forth, said assessments may be paid in installments. Said assessments may be paid in five (5) equal, consecutive annual installments, the first installment to be due and payable no later than thirty (30) days after the acceptance by the City of Fort ��orth of the Project, and each subsequent installment to be due and payable on an annual basis on each consecutive anniversary date of the acceptance of the Project; in the alternative, said assessments may be paid in forty-nine (49) equal consecutive monthly installments, the first installment to be due and payable no later than thirty (30) days after the acceptance by the City of Fort Worth of the Project. Any owner electing to pay the assessment in installments, as provided for herein, as a condition precedent to such election, must execute a promissory note and mechanic's and materialmen's lien contract evidencing the owner's intent to pay the assessment in accordance with the terms of one of the alternatives hereinabove set forth. In any case in which the owner elects to pay the assessment in installments under either of the alternatives specified, the assessment shall bear interest from the date of acceptance of the Project at the rate of eight percent (8%) per annum. Should any installment not be paid on its due date, the City of Fort Worth shall have the option to accelerate the entire unpaid balance of the assessment and declare the same to be immediately due and payable; this and other terms governing any default in the payment of any installment shall be set forth in the mechanic's and materialman's lien contract and shall be uniform among all owners executing the contract. In addition, the City Attorney shall have the authority to authorize terms of payment different than those specified herein when the Director has previously determined that an extreme financial hardship exists. -2- III. Notice shall be given and a hearing shall be held prior to making or levying any assessment against any property abutting the Project or its owners, as required by Article 1105b, Section 9. The notice of the hearing required under said statute shall be published in a newspaper of the City of Fort Worth at least three (3) times, the first publication to be made at least twenty-one (21) days before the hearing date. Written notice shall be personally given to all persons or entities claiming or owning an interest in the property abutting the Project and shall be mailed at least fourteen (14) days before the hearing in the manner specified by Article 1105b, Section 9. Said hearing shall be held before the City Council of Fort Worth, Texas, on the 2ND day of JANUARY , 1990 at 7:00 P.M. IV. The improvements provided for herein shall be made and constructed, notice given, hearing held and assessments made and levied and all proceedings taken and had in accordance with and under the terms of Article 1105b and the Charter of the City of Fort Worth, Texas. V. The City Secretary is directed to prepare, sign and file with the County Clerk of Tarrant County, Texas, a notice of the authorization and approval of the Project and the pendency of the assessment proceedings authorized hereunder. VI. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Books of the City Council and by filing the complete ordinance in the appropriate ordinance records of this city. VII. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASS AND APPROVED THIS DAY OF , 19 APPROVED AS TO FORM AND LEGALITY: A ssis City Attorney Date: -3- 0"fER FILL-I City of Fort Worth, Texas ACCOUNTPJQ•2 TRANtP0RTAT"PU8LWA yor and Council Communication ManLR AOMI DATE REFERENCE suBJECr: AUTHORIZATION OF PROJECT AND PAGE NUMBER "W1 ESTABLISHMENT OF BENEFIT HEARING 3 �J 11-7-89 G-8309 DATE FOR THE ASSESSMENT PAVING OF 1of UE DRIVE TO E. ALLEN AND MORPHY STREET NEW YORK AVENUE TO HILLSIDE PARK DRIVE RECOMMENDATION: It is recommended that the City Council : 1. approve the following bond fund transfer: FROM TO AMOUNT REASON 94-009905-00 67-040204-00 $105,292.84 To provide funds for Special Assessments Mississippi and the property owner's Unspecified Morphy share of the street construction. 2. declare the necessity for and order the improvements to Mississippi Avenue, Glen Garden Drive to East Allen Avenue, and Morphy Street , New York Avenue to Hillside Park Drive; 3. authorize the assessment of a portion of the cost of the Mississippi Avenue and Morphy Street improvements against the owners of the abutting property; 4. approve the estimate of costs and amounts to be assessed as stated in the Engineer's Estimate; 5. establish January 2, 1990, as the date of the benefit hearing; 6. authorize the preparation of assessment rolls and notification of property owners in accordance with the provisions of Article 1105b of Vernon's Texas Civil Statutes; and 7. adopt an ordinance reflecting the City Council ' s authorization and approval of Items 2 through 6 above, and other applicable requirements of Article 1105b, Vernon's Texas Civil Statutes. DISCUSSION: The 1986-88 Capital Improvement Program approved in March, 1986, included funds for the improvement of Mississippi Avenue and Morphy Street. Mississippi Avenue was reconstructed in 1972. Property owners on the assessment rolls were credited for existing life of the HMAC pavement by 50%, concrete driveway approaches 60%, and curb and gutter 60%, per assessment paving policy. DATE REFERENCE SUBJECT: AUTHORIZATION OF PROJECT AND PAGE NUMBER ESTABLISHMENT OF BENEFIT HEARING 2 3 11-7-89 G-8309 DATE FOR THE ASSESSMENT PAVING OF Of MISSISSIPPI AVENUE, GLEN GARDEN DRIVE TO E. ALLEN AND MORPHY STREET NEW YORK AVENUE TO HILLSIDE PARK DRIVE The streets are located in the Near Southeast target area. CDBG funds will provide 15% of the construction cost. These streets are located in Council District No. 8. PROJECT DESCRIPTION: STREET LIMITS WIDTH/FEET ROW WIDTH/FEET Mississippi Avenue Glen Garden Drive 36 and 40 Variable to East Allen Avenue Morphy Street New York Avenue 26 43 to Hillside Park Drive PROPOSED IMPROVEMENTS: Mississippi Avenue, from Glen Garden Drive to East Allen Avenue, is proposed to be improved by constructing a six-inch thick reinforced concrete pavement with a seven-inch high attached concrete curb on a six-inch thick lime stabilized subgrade, so that the finished roadway will vary from thirty-six feet to forty feet wide on a variable right-of-way. Four-inch thick concrete sidewalks and six-inch thick concrete driveway approaches will be constructed where shown on the plans. Morphy Street, New York Avenue to Hillside Park Drive, is proposed to be improved by constructing a six-inch thick reinforced concrete pavement with seven-inch high attached concrete curb on a six-inch thick lime stabilized subgrade so that the finished roadway will be twenty-six feet wide on a forty-three foot right-of-way. ENGINEER'S ESTIMATE OF COST FOR STREET IMPROVEMENTS: Based on the Engineer' s cost estimate, the base assessment rates before adjustments have been established as follows: Mississippi Avenue 6 inch thick reinforced concrete pavement (40' wide) $45.48/L.F. 6 inch thick reinforced concrete pavement (36' wide) $40.96/L.F. 7 inch high attached concrete curb $ 2.81/L.F. 6 inch thick concrete driveway approaches $ 2.85/S.F. 4 inch thick concrete sidewalks $ 2.50/S.F. DATE REFERENCE SUBJECT: AUTHORIZATION OF PROJECT AND PAGE NUMBER ESTABLISHMENT OF BENEFIT HEARING 3 3 11-7-89 G-8309 DATE FOR THE ASSESSMENT PAVING OF of MISSISSIPPI AVENUE, GLEN GARDEN DRIVE TO E. ALLEN AND MORPHY STREET NEW YORK AVENUE TO HILLSIDE PARK DRIVE Morphy Street 6 inch thick reinforced concrete pavement (26' wide) $24.96/L.F. 7 inch high attached concrete curb $ 2.51/L.F. The assessment rates result in the following division of cost: Mississippi Morphy Property Owner's share of cost $102,545.84 (11%) $ 2,747.00 ( 3%) City's share of the cost $793,190.76 (89%) $89,127.20 (97%) Total estimated cost $895,736 $91,87TM. FINANCING: Sufficient funds are available as follows for transfers: FUND PROJECT NO. PROJECT NAME AMOUNT Special Assessment 009905-00 Special Assessments $105,292.84 Fund 94 Unspecified Upon approval and completion of Recommendation No. 1, sufficient funds will be available as follows: FUND PROJECT NO. PROJECT NAME AMOUNT Street Improvement 040204-00 Mississippi Avenue $105,292.84 Fund 67 and Morphy Street Financing for the City ' s share of the construction cost will be established at the time of contract award. APPROVED BY DAI:d CITY COUNCIL NOV 7 1989 Cay secmwt of the City of 1portwarth.T"" SUBMITTED FOR THE CITY MANAGER'S DISPOSITION BY COUNCIL: PROCESSED BY OFFICE BY: William Wood ❑ APPROVED ORIGINATING ❑ OTHER (DESCRIBE) DEPARTMENT HEAD: Gary Santerre CITY SECRETARY FOR ADDITIONAL INFORCATIQN ted Ordinance Noy `' CONTACT: un ay 8063 dop DATE