AMENDMENT NO. 2 CONTRACT NO Y�(s1 fl /)
TO
AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES BETWEEN THE
CITY OF FORT WORTH AND
ALAN PLUMMER ASSOCIATES, INC.
FOR
DESIGN OF THE CAHOBA DRIVE WATER LINE
STATE OF TEXAS §
COUNTY OF TARRANT §
WHEREAS, on February 23, 1999,the City of Fort Worth, Texas(hereinafter called"CITY"and Alan
Plummer Associates, Inc. (hereinafter called "ENGINEER"), made and entered into City Secretary
Contract No. 24760, which was duly authorized by the City Council by M&C C-17293 on
February 23, 1999, and amended by M&C C-17794 on. December 21, 1999, City Secrotary Contract
No. 25677, and,
WHEREAS, the CITY and ENGINEER desire to amend City Secretary Contract No. 24760.
NOW, THEREFORE, KNOW ALL MEN BY THESE PRESENTS:
That the City of Fort Worth, a municipal corporation situated in Tarrant County,Texas, acting herein
by and through its duly authorized City Manager, hereinafter called "CITY," and Alan Plummer
Associates, Inc., acting herein by and through its duly authorized President, hereinafter called
"ENGINEER," hereby make and enter into the following agreement:
1.
EXHIBIT "A-6," SUPPLEMENTAL SCOPE OF SERVICES is hereby amended by adding the
following:
PART E — ADDITIONAL DESIGN SERVICES FOR THE CAHOBA DRIVE WATER LINE AND
WOODVALE WATER EXTENSION
1. Prepare one plan and profile sheet for a detailed design of an 840-foot long, 16-inch
water line extension of the Cahoba Drive Water Line. The proposed line begins at a tee
on the Cahoba Drive Water Line at the intersection of Navarro Drive and Cahoba Drive
and extends along the IH 820 frontage road.
2. Prepare, at the City's request, a design change for the extension of the Woodvale Water
Extension to extend the 10-inch water line to Vinca Circle to serve seven houses with
new pipeline. The seven houses are currently served by the Woodvale Water System
3. Provide 1,340 linear feet of additional construction staking for the extension of pipeline to
Vince Circle.
4. Additional construction staking procedures along Woodvale Water Extension including
the following:
a. Set offset and grade for cuts on 2,000 linear feet,
b. Obtained centerline profile elevations on remaining 4,800
F'.\Users\share\doc\CONTRACT\MSC\FORTWRTH\318261 MAmendment_2\AMEND-2.doc �C U
5. Revising and reprinting contract documents for agreement with M.E. Burns to complete the
construction project.
2.
EXHIBIT B - COMPENSATION AND PAYMENT SCHEDULE is hereby amended by revising
Paragraph 1.A as follows:
A. The Engineer shall be compensated a total lump sum fee of $202,091.41 as
summarized in Exhibit"B-3." Payment of the total lump sum fee shall be considered full
compensation for the services described in Attachment"A"and Exhibit"A-6"for all labor
materials, supplies and equipment necessary to complete the project.
The revised EXHIBIT "B-3" – DESIGN FEE COST SUMMARY is attached.
3.
All other terms and conditions of City Secretary Contract No. 24760 not amended herein are
unaffected and on time in full force and effect.
EXECUTED in the City of Fort Worth, Texas, this /c gday of &J 2001.
AT TES CITY F FO O TH,, TEXAS
By: By:
loria Pear _ _ a e Groomer
City Secretary Assistant City Manager
APPROV ALAN PLUMMER ASSOCIATES, INC.
A
By: B
Dale A. Fissel r, P.E. James L. Altstaetter, P.E.
Director of Water Department Vice President
APPROVED AS TO FORM AND LEGALITY: ATTEST:
a, 17, —/"'�——
Gary Stei rger
Assistant City Attorney
Secretary
k'6 N 4 C i'�.-=JPU IRED
Contract Authorization
Date lJ�pU 6rnL OQp� U;:KCJ°�D
F\Users\share\doc\CONTRACT\MSCIFORTWRTH\3182610\Amendment_2\AMEND-2 doc I�C p 1Mf }tytI P"t}�� '��j (�\(
R �Jll 4L�S 1H IY�L5I -
EXHIBIT "B-3"
AS REVISED FOR AMENDMENT NO. 1
(SUPPLEMENT TO ATTACHMENT B)
DESIGN FEE COST SUMMARY
Cahoba Drive Water Line
Phase Scope of Services Total Fee M/WBE Percent
Design $ 71,513.00 $14,411.00 20%
General Construction Representation $ 6,960.00 ----- -----
Record Drawings $ 3,790.00 ----- -----
Design Surveying $ 17,060.00 $17,060.00 100%
Original Contract Subtotal: $ 99,323.00 $31,471.00 31.7%
Amendment No. 1 —Task D
Design $ 43,330.00 ----- -----
Field Surveying $ 26,150.00 $22,750.00 870%
Construction Surveying $ 9,340.00 $ 8,125.00 87.0%
Advertising $ 3,000.00 ----- -----
General Construction Rep. $ 6,120.00 ----- -----
Record Drawings $ 1,350.00 ----- -----
Amendment No. 1 Subtotal: $ 89,290.00 $30,875.00 34.6%
Amendment No. 2—Task E
Vinca Circle Extension Design $ 3,467.50 ----- -----
Cahoba Drive Extension Design $ 2,790.00 ----- -----
Construction Staking $ 6,112.25 $ 5,315.00 87.0%
Revise Contract Documents for M.E. Burns $ 1,108.66 ----- -----
Amendment No. 2 Subtotal: $ 13,478.41 $ 5,315.00 39.4%
Total: $202,091.41 $67,661.00 33.5%
'1VFI(ck, Cu i DD
3182610/Exhibit_Mamendmentl.doc 'ZIRUSH
.__0.3,(20/01 TUE 08:28 FAX 817 589 0072 Alan Plummer Assoc 2002
ALAN PLUMINIER
ASSOCIATES, INC.
ENVIRONMENTAL ENGINEERS•DESIGNERS•SCIENTISTS
JAMES L.ALTSTAETTEP,RE.
JEFFREY E.CAFFEYY,RE. 318-2610
STEPHEN J.COONAN.P.E.
PEGGY W GLASS.Ph.D. March 20,2001
DAVID A GUDAL P.E.
A.LEE HEAD,111.PE.
BETTY L.JORDAN.RE. Ms. Madelene Rafalko
CLETUS a MARTIN.RE. Engineering Services
LORETTA E.MOKRY Fort Worth Water Department
MARK A.PERKINS.RE. 1000 Throckmorton
ALAN H.PLUMMER,JR-RE.,DEE Fort Worth,Texas 76102
RICHARD H.SMITH,RE.
ALAN RJUCKER RE. Re: City of Fort Worth
PJONATHANYOUNG.Ph.D..RE. Water Department Project No.PW77-060770153220
Cahoba Drive Water Line and Woodvale Water Extension
Summary of Requests for Additional Fees for Extra Work
Dear Ms. Rafalko:
This letter serves as a summary of the work performed or to be performed for the additional fees
we have requested for the Cahoba Drive Water Line and the Woodvale Water Extension
projects. In a letter dated September 21,2000,we requested the following additional fees:
Cahoba Drive Water Line:
Design of an 840-foot long, 16-inch water line extension of the Cahoba Drive Water Line.
The amount of fee requested for this item was$3,467.50.
Woodvale Water Extension:
Design of an addendum item detailing an additional 1340 feet of pipe. The amount of fee
requested for this item was$4,716.00. This amount included construction staking fees of
$1,926.00 for the additional length.
Since September,we have performed additional work as follows:
Additional Construction Staking for Woodvale Water Extension:
The fees for construction staking for Woodvale Water Extension were based on the
surveyor staking the centerline for the pipeline by locating the points of inflection. At the
request of the City inspectors,Garcia and Associates provided additional staking services.
These services included:
Setting offset and grades for cuts on 2,000 linear feet= $2,530.00
7524 MOSIE0.VIEW COURT Obtaining centerline profile elevations on 4,800 linear feet= $ 1,656.25
SUITE 100
FORT WORTH.TEXAS 76118.7110
PHONE 817-184.1714
METRO 817.589-1116 F:\PROJECTS\318\2610\DOC\rafalko-LIO.doc ACk
.v,V1 iun uo:"L9 FAX 817 589 0072 Alan Plummer Assoc Q003
Ms. Madelene Rafalko
Page 2
March 20, 2001
The total amount for the additional construction staking is$4,186.25.
Revise Contract Documents for M.E.Bums:
The fees for revising the contract documents for M.E.Burns Construction,Inc.to complete
the project are detailed as follows:
Design Engineer-6.5625 Hours @$80.00= $ 525.00
Contract Document and Specification Reproduction(7 sets)_ $ 387.08
Plan Set Reproduction(7 sets)_ $ 196.58
The reproduction costs include a 15 percent markup. The total fees for revising the contract
documents is$1108.66
The total amount of additional fees requested for all the above items is$13,478.41.
We appreciate your consideration of this matter. If you have any questions,please contact me at
817-284-2724.
Sincerely yours,
ALAN PLUMM,ERR ASSOCIATES,INC.
Lam.
Jeffrey E. Caffey,P.E.
JEC/vlw
cc: Mr. S. Frank Crumb,P.E,,City of Fort Worth Water Department
Mr.David Townsend,P.E.,City of Fort Worth Water Department
Mr.Alan R. Tucker,P.E.,Alan Plummer Associates,Inc.,Fort Worth,Texas
F:\PROJECTS\318\2610\DOC'rafalko L10.doc