CONTRACTOR'S SPP~ATIONS ANI) CONTRACT
CONSTRUCTION'S COPY DOCUMENTS FOR 73q
CLIENT DEPARTMENT Sanitary Sewer Rehabilitation
Contract XL VI (46) CONTRACT TANO.Y
„ Part 2
DOE NO. 2713
Sewer Main Replacement
Sewer Project No. PS58-070580172920
in the
City of Fort Worth, Texas
2000
i
BOB TERRELL KENNETH BARR
City Manager Mayor
DALE A. FissELER,P.E.
Director
R
Water Department
Huco A.MALAINCA,P.E. A. DoucLAs RADEMABER, P.E.
Director Director
Transportation and a artment ofEngineering
■ Public Works ORKIA VIKI-0 I
cciff Kl"Cla
01
Gutierrez, Smouse, Wilmut&Assoc., Inc.
3950 Fossil Creek Blvd.
Suite 210
Fort Worth, Texas 76137 rAu i z to
Date
City of Fort Worth, Texas
4Valjor and Council Communication
DATE REFERENCE NUMBER LOG NAME PAGE
3/27/01 **C-18516 1 30) 1 of 2
SUBJECT APPROPRIATION ORDINANCE AND AWARD OF CONTRACT TO WILLIAM J.
SCHULTZ INC. D/B/A CIRCLE "C" CONSTRUCTION COMPANY FOR SANITARY
SEWER REHABILITATION CONTRACT XLVI46 , PART 2
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the City Manager to transfer $508,482.00 from the Water and Sewer Operating Fund to
the Sewer Capital Project Fund; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Sewer Capital Project Fund in the amount of$508,482.00 from available funds; and
3. Authorize the City Manager to execute a contract with William J. Schultz, Inc. d/b/a Circle "C"
)Construction Company in the amount of $453,482.00 for Sanitary Sewer Rehabilitation Contract
XLVI (46), Part 2.
DISCUSSION:
On August 12, 1997 (M&C C-16214), the City Council authorized the City Manager to execute an
engineering agreement with Turner, Collie & Braden, Inc. to prepare plans and specifications for the
reduction of inflow/infiltration in the sanitary sewer Main BR and 279 drainage area. The agreement
was subsequently amended to include the preparation of plans and specifications for Sanitary Sewer
Rehabilitation Contract XLVI (46).
The project consists of the replacement of the following sanitary sewer laterals:
• L-3287 Beginning from the Ramey Avenue/Hughes Street intersection westerly 550 feet,
then northerly 800 feet; and
• L- "A" Located in the alley between Kemble Court on the north and Normandy Road on
the south from Ederville Road, easterly 780 feet; and
• L-3059 Located in the alley between Corto Avenue on the south and Plymouth Avenue on
the north, westerly from Acacia Street 727 feet to Trail Lake; and
• L-1122 Located in the alley between Bryce Avenue on the north and Byers Avenue on the
south from Eldridge Street westerly 447 feet to Pentecost Street, then southerly 351
feet to Collinwood Avenue.
The proposed improvements consist of the replacement of approximately 4,540 linear feet of 8-inch
sewer pipe.
The project was advertised for bid on December 21 and 28, 2000. On January 18, 2001, the following
bids were received:
City of Fort Worth, Texas
IM01yor And CouncilCommunicalflon
DATE REFERENCE NUMBER LOG NAME PAGE
3/27/01 **C-18516 30XLVI 2 of 2
SUBJECT APPROPRIATION ORDINANCE AND AWARD OF CONTRACT TO WILLIAM J.
SCHULTZ INC. D/B/A CIRCLE "C" CONSTRUCTION COMPANY FOR SANITARY
SEWER REHABILITATION CONTRACT XLVI (46), PART 2
Bidder Amount Time of Completion
William J. Schultz Inc. d/b/a Circle "C" $453,482.00 90 Calendar Days
Construction Company
Conatser Construction, Inc. $486,559.50
Southern Paradise Construction, Inc. $499,917.00
Southland Contracting, Inc. $530,603.30
Kebo Services, Inc. $542,719.50
R. A. Development, Inc. $592,621.50
Stocker Enterprises, Inc. $596,857.00
Cleburne Utility Construction Company, Inc. $609,249.50
Burleson Utilities, Inc. $632,426.00
Hall-Albert Construction Company $657,884.50
Sherman Hudson Utility Construction Company $667,121.35
Jackson Construction, Ltd. $681,087.75
In addition to the contract cost, $32,000.00 is required for inspection and survey and $23,000.00 is
provided for project contingencies.
William J. Schultz, Inc. d/b/a Circle "C" Construction Company is in compliance with the City's M/WBE
Ordinance by committing to 18% M/WBE participation. The City's goal on this project is 18%.
The project is located in COUNCIL DISTRICTS 3, 5, and 9, Mapsco 75F, 78R, 79A and 89H.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that upon approval and completion of recommendation No. 1, and
adoption of the attached appropriation ordinance, funds will be available in the current capital budget,
as appropriated, of the Sewer Capital Project Fund.
MG:k
Submitted for City Manager's FUND I ACCOUNT CENTER AMOUNT CITY SECRETARY
Office by: (to)
1&2)PS58 472045 070580172920 $508,482.00 APPROVED
Mike Groomer 6140 2)PS58 541200 070580172920 $476,482.00 CITY COUNCIL
Originating Department Head: 2)PS58 531350 070580172920 $ 32,000.00
A.Douglas Rademaker 6157 (from) MAR 27 2001
3)PS58 541200 070580172920 $453,482.00
Additional Information Contact: 1)PE45 538070 0709020 $508,482.00 t7�i
City Secretary of the
A.Douglas Rademaker 6157 City of Fort Worth,Texas
- n,1,.,.}nrl (Zp�innnna Alm I�L,iZ(1
SANITARY SEWER REHABILITATION
CONTRACT XLVI (46)
SEWER PROJECT NO. PS58-070580172920
PART 2
DOE NO. 2713
SEWER MAIN REPLACEMENT
CITY OF FORT WORTH, TEXAS
TARRANT COUNTY, TEXAS
2000
I hereby state that these Contract Documents were
prepared under my direct supervision and that I am a duly
Licensed Professional Engineer under the laws of the
State of Texas
Ie--r
"��U"W,])r'-3QW �2u
C, . r
Date: Registration No. 76
of TFC
a.................................
pTHELMA FLORES BOXO
p.............................
s, . 76346 a
°,r'•• cis TE ,�/�.�•�
(810 7l0o
SPECIFICATIONS AND CONTRACT
DOCUMENTS FOR
Sanitary Sewer Rehabilitation
Contract XL VI (46)
Part 2
DOE NO. 2713
Sewer Main Replacement
Sewer Project No. PS58-070580172920
in the
City of Fort Worth, Texas
2000
BOB TERRELL KENNETH BARR
City Manager Mayor
DALEA.FissELER,P.E.
Director
Water Department
HUGOA.MALANGA,P.E. A. DOUGLASRADEMAKER, P.E.
Director Director
Transportation and Department of Engineering
Public Works
S/Ld
Gutierrez, Smouse, Wilmut&Assoc., Inc.
3950 Fossil Creek Blvd.
Suite 210
Fort Worth, Texas 76137
Gird{ C
Contractor
,soo w T o
Street Address
City & State
0/7 Z 93 /A63
Telephone
.P17 293 i9 S' 7
Fax
cis c l c �D mss, coni
e-mail
CONTRACT DOCUMENTS
SANITARY SEWER REHABILITATION
CONTRACT XLVI (46)
SEWER PROJECT NO. PS58-070580172920
PART 2
DOE NO. 2713
SEWER MAIN REPLACEMENT
CITY OF FORT WORTH, TEXAS
TARRANT COUNTY, TEXAS
GUTIERREZ, SMOUSE, WILMUT&ASSOC., INC.
3950 FOSSIL CREEK BLVD.
SUITE 210
FORT WORTH, TEXAS 76137
2000
CONTRACT DOCUMENTS
TABLE OF CONTENTS
SECTION A Notice to Bidders
Detailed Notice to Bidders
Special Instructions to Bidders
SECTION B M/WBE Specifications
Proposals Quantities
Bid Proposal Documents
SECTION C General Conditions
SECTION C1 Supplementary Conditions
SECTION D Special Conditions
SECTION E Additional Special Conditions
SECTION F Easement Documents
SECTION G Certificate of Insurance
Performance Bond
Payment Bond
Maintenance Bond
Contractor Compliance With Worker's Compensation Laws
SECTION H Contracts
SECTION I Fort Worth Standard Figures
Soil Borings
NOTICE TO BIDDERS
Sealed proposals for the following:
FOR: SANITARY SEWER REHABILITATION
CONTRACT XLVI(46)
PART 2-DOE NO. 2713
SEWER PROJECT NO. PS58-070580172920
SEWER MAIN REPLACEMENT
The Major items of work on the above project are:
PART 2, DOE#2713:
2,298 L.F. 8" PVC sanitary sewer pipe(all depths), by open cut
417 L.F. 8" DIP sanitary sewer pipe, by other than open cut
338 L.F. 8" DIP sanitary sewer pipe(all depths), by open cut
1,492 L.F. 6"to 8"HDPE sanitary sewer pipe, by pipe enlargement
221 L.F. 12"to 10" HDPE sanitary sewer pipe, by pipe enlargement
23 Ea. Install new standard 4'diameter manholes
Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the
Purchasing Office until 1:30 P.M., January 18, 2001, and then publicly opened and read aloud at 2:00
P.M. in the Council Chambers. Plans, Specifications and Contract Documents for this project may be
obtained at the office of the Department of Engineering in the Municipal Office Building at 1000
Throckmorton Street. One set of documents will be provided to prospective bidders for a deposit of
Forty Dollars ($40.00); such deposit will be refunded if the document is returned in good conditions within
ten (10) days after bids are opened. Additional sets may be purchased on a non-refundable basis for
Forty Dollars($40.00) per set. These documents contain additional information for prospective bidders.
Bid security is required in accordance with Paragraph 2 of the Special Instructions to Bidders.
No Pre-Bid Conference will be held for this project.
Bidders shall not separate, detach, or remove any portion, segment(s), or sheets from the contract
documents at any time. Bidders must complete the proposal section(s) and submit the complete
specifications book or face rejection of bid as non-responsive.
For additional information concerning this project, please contact, Mrs. Thelma Flores Box, P.E.,
Gutierrez, Smouse, Wilmut & Assoc., Inc. at (817)306-1444, or Mr. Mike Domenech, P.E., Project
Manager at(817) 871-6826.
Advertising Dates:
December 21, 2000
December 28,2000
Fort Worth, Texas
1
DETAILED NOTICE TO BIDDERS
Sealed proposals for the following:
FOR: SANITARY SEWER REHABILITATION
CONTRACT XLVI (46)
PART 2-DOE NO. 2713
SEWER PROJECT NO. PS58-070580172920
SEWER MAIN REPLACEMENT
Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the
Purchasing Office until 1:30 P.M. January 18, 2001, and then publicly opened and read aloud at 2:00
P.M. in the Council Chambers. Plans, Specifications and Contract Documents for this project may be
obtained at the office of the Department of Engineering, Municipal Office Building, 1000
Throckmorton Street, Fort Worth, Texas. One set of documents will be provided to prospective bidders
for a deposit of Forty dollars ($40.00).
All bidders will be required to comply with Provisions 5159a of"Vernon's Annotated Civil Statutes" of the
State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as
amended by City Ordinance No. 7400, prohibiting discrimination in employment practices.
Bid security is required in accordance with Paragraph 2 of the Special Instructions to Bidders.
The Major items of work on the above project are:
PART 2, DOE#2713:
2,298 L.F. 8" PVC sanitary sewer pipe(all depths), by open cut
417 L.F. 8" DIP sanitary sewer pipe, by other than open cut
338 L.F. 8" DIP sanitary sewer pipe(all depths), by open cut
1,492 L.F. 6"to 8" HDPE sanitary sewer pipe, by pipe enlargement
221 L.F. 12"to 10" HDPE sanitary sewer pipe, by pipe enlargement
23 Ea. Install new standard 4'diameter manholes
Included in the above will be all other miscellaneous items of construction as outlined in the Plans and
Specifications.
The City reserves the right to reject any and/or all bids and waive any and /or all formalities. AWARD OF
CONTRACT: No bid may be withdrawn until the expiration of ninety (90) days from the date bids are
opened. The award of Contract, if made, will be within ninety (90) days after the opening of bids, but in
no case will the award be made until all the necessary investigations are made as to the responsibility of
the bidder to whom it is proposed to award the Contract.
Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of
the addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not acknowledge
receipt of all addenda may be rejected as being non-responsive. Information regarding the status of
addenda may be obtained by contacting the Department of Engineering at(817) 871-7910.
Any contract or contracts awarded under this Notice to Bidders are expected to be funded in part by a
loan from the Texas Water Development Board. This contract is contingent upon release of funds from
the Texas Water Development Board. Neither the State of Texas nor any of its departments, agencies, or
employees is or will be a party to this Detailed Notice to Bidders or a resulting contract.
1
• Bidders shall not separate, detach or remove any portion, segment or sheets from the contract
document at any time. Bidders must complete the proposal section(s) and submit the complete
specifications book or face rejection of the bid as non-responsive.
In accordance with the City of Fort Worth Ordinance No. 13471, as amended by Ordinance, No.
13781, the City of Fort Worth has goals for the participation of minority business enterprises and
women business enterprises in City contracts. A copy of the Ordinance can be obtained from the
Office of the City Secretary. The bidder shall submit the M/WBE UTILIZATION FORM, PRIME
CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM ("Documentation"), as
appropriate. The Documentation must be received by the contracting department no later than
5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt
from the appropriate employee of the contraction department to whom delivery was made. Such
receipt shall be evidence that the Documentation was received by the City.
This project will be managed and administered by the Wet Weather Management Program Office of the
Department of Engineering.
For additional information, please contact Mrs. Thelma F. Box, P.E., Gutierrez, Smouse, Wilmut&Assoc.,
Inc. at(817)306-1444 or Mr. Mike Domenech, P.E., Project Manager at(817)871-6826.
BOB TERRELL
CITY MANAGER
GLORIA PEARSON
CITY SECRETARY
A. Douglas Rademaker, P.E., Director
DEPARTMENT OF ENGINEERING
By:
o/1/141
Rick Trice, P.E.
Manager, Consultant Services
ADVERTISING DATES:
December 21, 2000
December 28, 2000
Fort Worth, Texas
2
SPECIAL INSTRUCTIONS TO BIDDERS
(WATER DEPARTMENT)
1. PRI QUALIFICATION REQUIREMENT: All Contractors submitting bids are required to be
prequaiified by the Fort Worth Water Department prior to submitting bids. This prequalification
process will establish a bid limit based on a technical evaluation and financial analysis of the
Contractor. It is the bidders'responsibility to submit the following documentation:a current financial
statement, an acceptable experience record, an acceptable equipment schedule and any other
documents the Department may deem necessary,to the Director of the Water Department at least
seven (7)calendar days prior to the date of the opening of bids.
(a) The financial statement required shall have been prepared by an independent certified
public accountant or an independent public accountant holding a valid permit issued by an
appropriate State licensing agency and shall have been so prepared as to reflect the
financial status of the submitting company. This statement must be current and not more
than one(1)year old. In the case that a bidding date falls within the time a new statement
is being prepared,the previous statement shall be updated by proper verification.
(b) For an experience record to be considered to be acceptable for a given project, it must
reflect the experience of the firm seeking qualification in work of both the same nature and
technical level as that of the project for which bids are to be received.
(c) The Director of the Water Department shall be the sole judge as to the acceptability for
financial qualification to bid on any Fort Worth Water Department project.
(d) Bids received in excess of the bid limit shall be considered non-responsive and will be
rejected as such.
(e) The City, in its sole discretion, may reject any bid for failure to demonstrate experience
and/or expertise.
(f) Any proposal submitted by a non-prequalified bidder shall be returned unopened, and if
inadvertently opened, shall not be considered.
(g) The City will attempt to notify prospective bidders whose qualifications (financial or
experience)are not deemed to be appropriate to the nature and/or magnitude of the project
on which bids are to be received. Failure to notify shall not be a waiver of any necessary
prequalification.
2. BID SECURITY: A cashier's check, or an acceptable bidder's bond, payable to the City of Fort
Worth, in an amount of not less than five (5%) percent of the largest possible total of the bid
submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder
fails to execute the Contract Documents within ten (10)days after the contract has been awarded.
To be an acceptable surety on the bond,(1)the name of the surety shall be included on the current
U.S. Treasury list of acceptable sureties, or(2)the surety must have capital and surplus equal to
ten times the limit of the bond. The surety must be licensed to do business in the State of Texas.
The amount of the bond shall not exceed the amount shown on the Treasury list or one-tenth(1/10)
the total capital and surplus.
3. BONDS: A performance bond, a payment bond, and a maintenance bond each for one hundred
(100%)percent of the contract price will be required, Reference C3-3.7.
SI-1
' 4. WAGE RATES: Not less than the prevailing wage rates established by the City of Fort Worth,
Texas, and as set forth in the Contract Documents must be paid on this project.
5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal,the City
reserves the right to adopt the most advantageous construction thereof to the City or to the reject
the Proposal.
6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas.
7. NONRESIDENT BIDDERS: Pursuant to Article 601 g, Texas Revised Civil Statutes,the City of Fort
Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than
the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas
resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract
in the state in which the nonresident's principal place of business is located.
"Nonresident bidder" means a bidder whose principal place of business is not in this state, but
excludes a contractor whose ultimate parent company or majority owner has its principal place of
business in this state.
This provision does not apply if this contract involves federal funds.
The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the
bid to meet specifications. The failure of a nonresident contractor to do so will automatically
disqualify that bidder.
8. PAYMENT: If a bid amount is less than $25,000.00,the contract amount shall be paid within forty-
five (45)calendar days after completion and acceptance by the City.
9. AGE: In accordance with the policy ('Policy')of the Executive Branch of the federal government,
Contractor covenants that neither it nor any of its officers, members, agents, employees, program
participants or subcontractors while engaged in performing this contract, shall, in connection with
the employment,advancement or discharge of employees in connection with the terms,conditions
or privileges of their employment,discriminate against persons because of their age except on the
basis of a bona fide occupational qualification, retirement plan or statutory requirement.
Contractor further covenants that neither it nor its officers, members, agents, employees,
' subcontractors,program participants,or persons acting on their behalf shall specify, in solicitations
or advertisements for employees to work on this contract,a maximum age limit for such employment
unless the specified maximum age limit is based upon a bona fide occupational qualification,
retirement plan or statutory requirement.
Contractor warrants it will fully comply with the Policy and will defend, indemnify and hold City
harmless against any claims or allegations asserted by third parties or subcontractors against City
arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above
referenced Policy concerning age discrimination in the performance of this agreement.
10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990
("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully
discriminate on; the basis of disability in the provision of services to the general public, nor in the
availability,terms and/or conditions of employment for applicants for employment with or employees
of Contractor or any of its subcontractors. Contractor warrants it will fully comply with the ADA's
SI-2
provisions and any other applicable Federal, State and local laws concerning disability and will
defend,indemnify and hold City harmless against any claims or allegations asserted by third parties
or subcontractors against City arising out of Contractor's and/or its subcontractors'alleged failure
to comply with the above referenced Policy concerning disability discrimination in the performance
of this agreement.
11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with the City of Fort Worth
Ordinance, No. 13471, as amended by Ordinance, No. 13781, the City of Fort Worth has goals
forthe participation of minority business enterprises and women business enterprises in City
contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary.
The bidder shall submit the MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER
FORM, and/or the GOOD FAITH EFFORT FORM ("Documentation"), as appropriate. The
documentation must be received no later than 5:00 p.m., five (5)City business days after the bid
opening date. The bidder shall obtain a receipt from the appropriate employee of the managing
department to whom delivery was made. Such receipt shall be evidence that the documentation
was received by the City. Failure to comply shall render the bid nonresponsive.
Upon request,Contractor agrees to provide the Ownercomplete and accurate information regarding
actual work performed by a Minority Business Enterprise (MBE) and/or a Women Business
Enterprise(WBE)on the contract and payment thereof. Contractor further agrees to permit an audit
and/or examination of any books, records or files in its possession that will substantiate the actual
work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent
misrepresentation)and/or the commission of fraud by the Contractorwill be grounds for termination
of the contract and/or initiating action under appropriate federal, state or local laws or ordinances
relating to false statements. Further, any such misrepresentation (other than a negligent
misrepresentation)and/or commission of fraud will result in the Contractor being determined to be
irresponsible and barred from participating in City work for a period of time of not less than three(3)
years.
Revised 7/31/98
SI-3
SECTION B -PROPOSAL
PART 2
TABLE OF CONTENTS
M/WBE Documents
Proposal Quantities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61-6
Bid Proposal Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67-8
ATTACHMENT 1;
rt City of Fort Worth M"T OF Page 1 of;
Minority and Women Business Enterprjq�a Specilkivotows
MBE/WBE UTILIZATKC y JON 24 RM 9 .05
cl, ric
PRIMECOMPA NAME IND DATE
C}IECTNAME PROJECT NUMBER
'S M/WBE PROJECT GOAL: J G> MAVBE PERCENTAGE ACHIEVED:
1=ailure to complete this form, in its entirety with supporting documentation, and received by the Managing
epartment on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will
suit in*the bid being considered non-responsive to bid specifications.
The undersigned bidder agrees to enter intoa formal agreement with the MBE and/or WBE firms for work listed in'this
lis
hedule, conditioned. upon execution of.a contract with the City of Fort Worth. The intentional and/or knowing
representation of facts is grounds for consideration of disqualification and will result in the bid being considered
non-responsive to specifications.
Company Name, Contact Name, Certified Specify All Contracting Specify All Items to be Dollar Amount
Address,and Telephone No. Scope of Work(•) Supplied(*) z-,
U OG u `
FLA
Z
-&a �4j 0,
13605
fir, C J� 'lrry •n
6 r A04-AM Sct�
N q o ck
MJWBEs must be located In the 9(nine)county marketplace or currently doing business In the marketplace at the time of bid.
M
3peclty all areas In which MWBE's are to be utilized and/or items to be supplied:
A complete Ilsting of items to be supplied Is required In order to receive credlt toward the MNVBE goal.
40entlfy each Tier level. Tier.Means the level of subcontracting below the prime contractor/consultant,I.e.,a direct payment
from the prime contractor to a subcontractor Is considered 1"tier,a payment by a subcontractor to
Its supplier Is considered Y''tier.
ss
.,IS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE (5) CITY BUSINESS DAYS AFTER BID
OPENING, EXCLUSIVE OF THE BID OPENING DATE
Rev.GIV98
ATTACHMENT
Page 2 of 2
City of Fort Worth z�
Minority and Women Business Enterprise Specifications t
is MBE/WBE UTILIZATION
ompany Name, Contact Name, Certlfled Specify All Contracting Specify All Items to be Dollar Amount
F Address, and Telephone No. y Scope of Work(•) Supplied(') �s
L) a
x 4
1 500
/ �- `l-�S60 3
i
Didder further agrees to provide, directly to the City upon request, complete and accurate information regarding
al work performed by all subcontractors, including MBE(s) and/or WBE(s) arrangements submitted with this bid.
bidder also agrees to allow an audit and/or examination of any books, records and riles held by their company
will substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized
!r or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for -=
r4ating the contract or debarment from City work for a period of not less than three (3) years and for initiating
under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and
�s a material breach of contract may result in a determination of an irresponsible offeror and barred from }
1pating in City work for a period of time not less than one (1)year.
ALL MBEs and WBEs MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD
ryl
ed Signage Printed Signature
Contact Name and Title (if different)
y Ngane Telephone Number(s)
S Fax Number ,
Te/Zip Code Date
'ORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 6:00 p.m., FIVE(5)CITY BUSINESS DAYS AFTER BID,r 1
OPENING, EXCLUSIVE OF THE BID OPENING DATE R:
Rov.Nl1fa8 ,
PROPOSAL
TO: Mr. Bob Terrell
City Manager
Fort Worth, Texas
FOR: SANITARY SEWER REHABILITATION
CONTRACT XLVI (46)
PART 2 -DOE No. 2713
SEWER PROJECT NO. PS58-070580172920
Pursuant to the foregoing "NOTICE TO BIDDERS", the undersigned has thoroughly examined the plans,
specifications and the site, understands the amount of work to be done, and hereby proposes to do all the
work and furnish all labor,equipment and materials necessary to fully complete all the work as provided in
the plans and specifications and subject to the inspection and approval of the Director, Department of
Engineering of the City of Fort Worth.
Upon acceptance of this proposal by the City Council,the bidder is bound to execute a contract and furnish
Performance, Maintenance Bond,and Payment Bond approved by the City of Fort Worth for performing and
completing the sewer construction work within the time stated and for the following sum, to-wit:
SEWER MAIN REPLACEMENT-CONTRACT XLVI (46), PART 2
PAY APPROX DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT
ITEM QTY UNIT PRICES WRITTEN IN WORDS PRICE BID
1. 2 EA Abandon existing sanitary sewer manholes
.t Dollars
00 p(j
and /!2D Cents per EA $ 3Do $ GQQ
2. 15 EA Remove existing sanitary sewer manholes
.a yLDollars
00 00
and ey,110 Cents per EA $ 0/00 $
3. 2 EA Utility Pre-Construction D-Hole
V&n Dollars
00 00
and 1"d Cents per EA $ 30G $ G Q p
4. 19 EA Standard 4-f o diameter SSSM'H (to 6-foot depth)
Dollars
oG 00
and _91 C Cents per EA $ 1060 $ ZZ,POO
5. 12 VF Extra depth for 4-foot diameter SSMH
Dollars
ed o a
and fit! Cents per VF $o_ $ 940
B-1
PAY APPROX DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT
ITEM QTY UNIT PRICES WRITTEN IN WORDS PRICE BID
6. 3 EA Standard 4-foot diameter si gle drop SSMH (to
6-foot depth) p7-U Ov7 06
-4.44r VOL.. zi1w eO Dollars
and Cents per EA $ 1600 00$ yf O 00
7. 17 VF Extra depth for 4-foot diameter single drop SSMH
O+-p.t ollars
and Cents per VF $ /Zo $ t0 4/40 � G
8. 1 EA Standard 4-foot diameter do ble drop SSMH (to
6-foot depth) one ov» ze
Tyr. onIA-A �_Dollars
00 o O
and /ntJ Cents per EA $ O $
9. 1 VF Extra depth for 4-foot diameter double drop
SSMH
00?u VILY7 A:A I ip Dollars
00 o G
and /riv Cents per VF $ $
10. 1 EA Wastewater Access Device
Dollars
O0 00
and Ce7 per EA $ 35-0 $ J5_0
11. 24 EA Concrete Collar for SSMH
O Dollars
lJ J 00 a G
and /19th Cents per EA $ ?S-0 $ GDDO
12. 23 EA Watertight manhole insert for SSMH
Dint 444.,n 44 ge, Dollars
00 00
and /7"r?i Cents per EA $ /Q O $ 2,?0 0
13. 1 EA Reconnect 8-inch to existing drop,SSMN
0-ma �s..e eirf C� Dollars
and Cents per EA $ /QO D 900 /000 00
14. 417 LF 8-inch DIP Class 51 sanitary sewer pipe by other
than open cut
,thio Z40ry jle4.0 01 Dollars
and IVWO Cents per LF $ Z0.0 $ a�
YD0
B-2
PAY APPROX DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT
ITEM QTY UNIT PRICES WRITTEN IN WORDS PRICE BID
15. 2,298 LF '8-inch PVC sanitary sewer pipe(all depths)
Dollars
and d Cents per LF $4117 3 Z3 S� $ 1003 o D
16. 338 LF 8-inch DIP Class 51 sani ry sewer pipe(all
depths)
Dollars
OG
and irao Cents per LF $ Pp $ yG y O D
17. 1,492 LF "6-inch to 8-inch sanitary sewer rehab by pipe
enlargement
Dollars
OD OD
and /rite Cents per LF $ 38 $
18. 221 LF ""12-inch to 10-inch sanitary sewer rehab by pipe
enlargement
Dollars
and Cents per LF $ 4/0 o Cr $ oaf yG o 0
19. 60 LF '8-inch PVC sanitary sewer pipe by Short Bore
' Dollars
— 0 d 00
and /hp Cents per LF $ $ y8 D D
20. 195 LF Sag adjustment for pipe enlargement
J1.aw.t Dollars
ad _ 00
and Cents per LF $ $
21. 40 EA 4-inch PVC sanitary sewer service taps to PVC
pipe
tl
Dollars
p0 o d
and i Cents per EA $ ZQ0 $
22. 1,103 LF •4-inch PVC sanitary sewer service lines
• '~" " Dollars
po OD
and .0>b Cents per LF $ l+G $
23. 32 EA 4-inch PVC sanitary sewer service taps to HDPE
pipe
• Dollars 00 00
and tet) Cents per EA $ ,�QQ $ 14 QQ Q
'8 Contractor must complete City Approved Product and Method Form on Page B-6
' B-3
PAY APPROX DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT
ITEM QTY UNIT PRICES WRITTEN IN WORDS PRICE BID
24. 17 EA Two Way Lateral Cleanout(non-traffic areas)
ZoryeidDollars
0000
and OV+r, Cents per EA $ ?5-0 $ S9iS p —
25. 24 EA Two Way_Lateral Cleanout(high traffic areas)
ssNe�a/� Dollars
00 o p
and Cents per EA $ $ /0800
26. 613 LF Concrete curb and gutter replacement
..� Dollars
and Cents per LF $ o $
27. 2,348 LF Permanent asphalt pavement repair per Fig.4
.1.r.+0.•�4� Dollars
# v o G 00
and __J"00 Cents per LF $ $ S 2 dl I/
28. 8 LF 4-inch/concrete driveway&sidewalk repair
..tel SAM -41�' Dollars
and &M2 Cents per LF $ �/s^ o o $
r 29. 1 TN DIP fittings forsewer pipe
—46404400 ar, W.
n V&Sfidt A&e w Dollars o O
00
t and .eHt) Cents per TN $ 2 20 D $ Z Z O D
30. 4 EA Cut& Plug Existing sanitary sewer pipe
_ oasol Dollars
00,
00 o G
and ,pro Cents per EA $ 5-00 $ ZOO O
= 31, 1,935 LF Pre-construction TV inspection of sanitary sewer
.460" Dollars
and d2ig Cents per LF $ J? 00 $ .5-000 S- O O
32. 4,795 LF Post-construction TV inspection of sanitary sewer
Dollars
ap
and A~ Cents per LF $ Z $ 95-90 loci
33. 23 EA Vacuum test SSMH
,M. Z. W 44/, 144 Dollars D D G
and Atd Cents per EA $ $
B-4
PAY APPROX DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT
ITEM QTY UNIT PRICES WRITTEN IN WORDS PRICE BID
34. 2,563 LF Trench safety system for trenches(depth>5')
O'pw Dollars
00 oG
and trate Cents per LF $ / $ t,s"G c7
35. 1 EA 5-foot Storm Drain Pet&Box Structure
4..t ae j a/ Dollars
sa 00
and Cents per EA $ 35100 $ 3.-0 Q
36. 174 SY 4-inch top soil
402 Dollars
_ O� 00
and Cents per SY $ s $ '070
37. 358 LF Solid sod/replacement
ewe Dollars
00 O
and / Cents per LF $ S $ 1 7 Q0
TOTAL SEWER MAIN REPLACEMENT e
It is understood and agreed by the undersigned that the Owner reserves the unrestricted privilege to
reject any or all the foregoing unit prices in this paragraph which it may consider excessive or
unreasonable, or to accept any or all of them as unit prices applicable in the event additions to or
deductions from the work to be performed on this project are ordered by the Owner. Rejection at any
time of such Unit Prices for construction changes shall not otherwise affect the balance of the Bid or
Construction Contract.
B-5
CITY APPROVED PRODUCT * AND APPROVED METHOD ** FORM
*CONTRACTOR SHALL SELECT TYPE OF PIPE TO BE USED
Standard Spec No. Size
EI-31 4" through 30"
EI-25 4" through 15"
EI-27 4" through 15"
EI-28 18" through 27"
E100-2 18" through 48"
Consult with "City of Fort Worth, Texas Standard Product List" to obtain the Generic/Trade
Name and the Manufacturer for the pipes listed above.
*`CONTRACTOR SHALL SELECT PIPE ENLARGEMENT METHOD TO BE USED AND PROVIDE NAME OF
SUBCONTRACTOR FOR INSTALLATION
PIM Method
Name of Subcontractor if Applicable
T.R.S. System
Name of Subcontractor if Applicable
McConnell Method
Name of Subcontractor if Applicable
Expanded System
Name of Subcontractor if Applicable
Note: Only tee service connections will be allowed.
Failure to provide the information required above may result in rejection of bid as non-responsive.
Only products listed above will be allowed for use in this project. Any substitutions shall result in
rejection of bid as non-responsive.
B-6
BID PROPOSAL
Sanitary Sewer Rehabilitation
Contract XL VI(46)
Part 2-Department of Engineering No. 2713
Sewer Main Replacement
Plan Sheets 3 thru 15
It is understood and agreed by the undersigned that the Owner reserves the unrestricted privilege to reject
any or all the foregoing unit prices in this paragraph which it may consider excessive or unreasonable, or to
accept any or all of them as unit prices applicable in the event additions to or deductions from the work to
be performed on this project are ordered by the Owner. Rejection at any time of such Unit Prices for
construction changes shall not otherwise affect the balance of the Bid or Construction Contract. The
selection of the lowest responsive bid shall be based on the total amount bid.
Only products or methods listed on the Current Approved Product List for City of Fort Worth Water
Department Projects will be allowed for use on this project. Approved product lists are available from the
City of Fort Worth Department of Engineering.
Within ten(10)days after acceptance of the Proposal,the undersigned will execute the formal contract and
will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the
faithful performance of the Contract. The attached bid security in the amount of 5% is to become the
property of the City of Fort Worth,Texas, in the event the contract and bond or bonds are not executed and
delivered within the time above set forth, as liquidated damages for the delay and additional work caused
thereby.
The undersigned bidder certifies that he has been furnished at least one set of the General Contract
Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he
has read and thoroughly understands all the requirements and conditions of those General Documents and
the specific Contract Documents and appurtenant plans.
The undersigned assures that its employees and applicants for employment and those of any labor
organization, subcontractors, or employment agency in either furnishing or referring employee applicants
to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as
amended by City Ordinance No. 7400.
This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article
20-04(F)of the Texas Limited Sales, Excise and Use Tax Act. All equipment and materials not consumed
by or incorporated into the project construction,are subject to State sales taxes under house Bill 11,enacted
August 15, 1992. The successful Bidder shall be required to complete the attached Vendor Compliance to
State Law at the time of executing the contract.
The undersigned agrees to begin construction within ten (10) calendar days after issuance of the Work
Order, and to complete all work covered by this Proposal within Ninety(90) calendar days from the date
of the Work Order.
(COMPLETE A OR B BELOW AS APPLICABLE:)
A. The principal place of business of our company is in the State of
Non resident bidders in the State of , our principal place of business, are
required to be percent lower than resident bidders of state law, a copy of statute
is attached.
Non resident bidders in the State of , our principal place of business, are not
required to underbid resident bidders.
B-7
B. The principal place of business of our company or our parent company or majority owner
is in the State of Texas.
Receipt is acknowledged of the following addenda. It is also acknowledged that these addenda have been
considered in this bid proposal.
Addendum No. 1
Addendum No. 2
Addendum No. 3
Respectfully submitted,
I'),M,a,.. 9-SA..0 .rti, LLn 6 4
C.ec /.#* /i4 C CO/9.r rc. c o n
(SEAL) By:
If Bidder is a Corporation Q
Date: / - /B - o i Title
!°n Sox Yo 8 Z p
Address
A'o. / �o. fl, , Ar/y o
City/State
P7 293 /Pa .?
Telephone
60.17 ?93 19S-7
Fax
circ% c19~17. co,"
e-mail
B-8
PART C - GENERAL CONDITIONS
w TABLE OF CONTENTS
NOVEMBER, 1, 1987
M TABLE OF CONTENTS
C1-1 DEFINITIONS
C1-1.1 Definition of Terms C1-1 (1)
C1-1. 2 Contract Documents C1-1 (1)
C1-1.3 Notice to Bidders C1-1 (2)
C1-1.4 Proposal C1-1 (2)
C1-1.5 Bidder C1-1 (2)
C1-1.6 General Conditions C1-1 (2)
C1-1.7 Special Conditions C1-1 (2)
C1-1.8 Specifications C1-1 (2)
C1-1.9 Bond C1-1 (2)
C1-1.10 Contract C1-1 (3 )
C1-1.11 Plans C1-1 (3 )
C1-1.12 City C1-1 (3)
C1-1.13 City Council C1-1 (3)
C1-1.14 Mayor C1-1 (3)
C1-1.15 City Manager C1-1 (3)
C1-1.16 City Attorney C1-1 (3)
C1-1.17 Director of Public Works C1-1 (4)
C1-1.18 Director, City Water Department C1-1 ( 4)
C1-1.19 Engineer C1-1 (4)
C1-1. 20 Contractor C1-1 (4)
C1-1.21 Sureties C1-1 (4)
C1-1.22 The work or Project C1-1 (4)
C1-1.23 Working Day C1-1 (4)
C1-1.24 Calendar Day C1-1 (4)
C1-1.25 Legal Holiday C1-1 ( 4 )
C1-1.26 Abbreviations C1-1 (5)
C1-1.27 Change Order C1-1 (6 )
C1-1. 28 Paved Streets and Alleys C1-1 (6 )
C1-1.29 Unpaved Streets and Alleys C1-1 (6 )
C1-1. 30 City Streets C1-1 (6 )
C1-1.31 Roadway C1-1 (6)
C1-1.32 Gravel Street C1-1 (6 )
C2-2 INTERPRETATION AND PREPARATION
OF PROPOSAL
C2-2.1 Proposal Form C2-2 (1)
C2-2. 2 Interpretation of Quantities C2-2 (1)
C2-2.3 Examination of Contract Documents
and Site C2-2 (2)
C2-2.4 Submitting of Proposal C2-2 (3 )
C2-2.5 Rejection of Proposals C2-2 (3)
C2-2.6 Bid Security C2-2 (3 )
(1)
C2-2. 7 Delivery of Proposal C2-2 (4 )
C2-2. 8 Withdrawing Proposals C2-2 ( 4 )
C2-2. 9 Telegraphic Modification of Proposals C2-2 (4 )
C2-2.10 Public Opening of Proposal C2-2 (4 )
C2-2. 11 Irregular Proposals C2-2 (4 )
C2-2.12 Disqualification of Bidders C2-2 (5 )
C3-3 AWARD AND EXECUTION OF DOCUMENTS
C3-3. 1 Consideration of Proposals C3-3 (1)
C3-3 .2 Minority Business Enterpise
Women-Owned Business Enterprise
compliance C3-3 (1)
C3-3. 3 Equal Employment Provisions C3-3 (1)
C3-3. 4 Withdrawal of Proposals C3-3 (2)
C3-3.5 Award of Contract C3-3 (2)
C3-3. 6 Return of Proposal Securities C3-3 (2)
C3-3. 7 Bonds C3-3 (2)
C3-3. 8 Execution of Contract C3-3 (4)
C3-3. 9 Failure to Execute Contract C3-3 (4)
C3-3.10 Beginning Work C3-3 (4)
C3-3.11 Insurance C3-3 (4)
C3-3.12 Contractor ' s Obligations C3-3 (7)
C3-3.13 Weekly Payroll C3-3 (7)
C3-3.14 Contractor 's Contract Administration C3-3 (7)
C3-3.15 Venue C3-3 (8)
C4-4 SCOPE OF WORK
C4-4.1 Intent of Contract Documents C4-4 (1)
C4-4. 2 Special Provisions C4-4 (1)
C4-4.3 Increased or Decreased Quantities C4-4 (1)
C4-4. 4 Alteration of Contract Documents C4-4 (2)
C4-4.5 Extra Work C4-4 (2)
C4-4. 6 Schedule of Operations C4-4 (3)
C4-4. 7 Progress Schedules for Water and
Sewer Plant Facilities C4-4 (4)
C5-5 CONTROL OF WORK AND MATERIALS
C5-5.1 Authority of Engineer C5-5 (1)
C5-5. 2 Conformity with Plans C5-5 (1)
C5-5.3 Coordination of Contract Documents C5-5 (2)
C5-5. 4 Cooperation of Contractor C5-5 (2)
C5-5.5 Emergency and/or Rectification Work C5-5 (3)
C5-5.6 Field Office C5-5 (3)
C5-5 .7 Construction Stakes C5-5 (3)
C5-5.8 Authority and Duties of Inspectors C5-5 (4)
C5-5.9 Inspection C5-5 (5)
C5-5.10 Removal of Defective and Unauthorized Work C5-5 (5)
C5-5.11 Substitute Materials or Equipment C5-5 (5)
C5-5.12 Samples and Tests of Materials C5-5 (6)
C5-5.13 Storage of Materials C5-5 (6)
C5-5.14 Existing Structures and Utilities C5-5 (7)
C5-5.15 Interruption of Service C5-5 (7)
C5-5.16 Mutual Responsibility of Contractors C5-5 (8)
C5-5 .17 Cleanup C5-5 (8 )
C5-5.18 Final Inspection C5-5 (9 )
(2 )
C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY
C6-6.1 Laws to be Observed C6-6 (1)
C6-6. 2 Permits and Licenses C6-6 (1)
C6-6. 3 Patented Devices, Materials and Processes C6-6 (1)
C6-6. 4 Sanitary Provisions C6-6 (2)
C6-6.5 Public Safety and Convenience C6-6 (2)
C6-6. 6 Privileges of Contractor in Streets,
Alleys, and Right-of-Way C6-6 (3)
C6-6. 7 Railway Crossings C6-6 (4 )
C6-6.8 Barricades, Warnings and Watchmen C6-6 (4)
C6-6. 9 Use of Explosives, Drop Weight, etc. C66 (5 )
C6-6.10 Work Within Easements C6-6 (6)
C6-6.11 Independent Contractor C6-6 (8 )
C6-6.12 Contractor's Responsibility for
Damage Claims C6-6 (8 )
C6-6.13 Contractor's Claim for- Damages C6-6 (10)
C6-6. 14 Adjustment of Relocation of Public
- Utilities, etc. C6-6 (10 )
C6-6.15 Temporary Sewer Drain Connections C6-6 (10)
C6-6.16 Arrangement and Charges of Water
Furnished by City C6-6 (11)
C6-6.17 Use of a Section of Portion of the Work C6-6 (11)
C6-6.18 Contractor's Responsibility for Work C6-6 (11)
C6-6.19 No Waiver of Legal Rights C6-6 (12)
C6-6. 20 Personal Liability of Public Officials C6-6 (12)
C6-6. 21 State Sales Tax C6-6 (12)
C7-7 PROSECUTION AND PROGRESS
C7-7. 1 Subletting C7-7 (1)
C7-7. 2 Assignment of Contract C7-7 (1)
C7-7. 3 Prosecution of the Work C7-7 (1)
C7-7. 4 Limitations of Operations C7-7 (2)
C7-7. 5 Character of Workman and Equipment C7-7 (2 )
C7-7. 6 Work Schedule C7-7 (3)
C7-7.7 Time of Commencement and Completion C7-7 (4 )
C7-7. 8 Extension of time of Completion C7-7 (4)
C7-7. 9 Delays C7-7 (4)
C7-7.10 Time of Completion C7-7 (5)
C7-7.11 Suspension by Court Order C7-7 (6 )
C7-7.12 Temporary Suspension C7-7 (6)
C7-7.13 Termination of Contract due to
National Emergency C7-7 (7)
C7-7. 14 Suspension of Abandonment of the
Work and Annulment of Contract C7-7 (7)
C7-7.15 Fulfillment of Contract C7-7 (9 )
C7-7.16 Termination for Convenience of the Onwer C7-7 (10 )
C7-7. 17 Safety Methods and Practices C7-7 (13)
C8-8 MEASUREMENT AND PAYMENT
C8-8.1 Measurement of Quantities C8-8 (1)
C8-8. 2 Unit Prices C8-8 (1)
(3)
C8-8 . 3 Lump Sum C8-8 (1 ) F
C8-8. 4 Scope of Payment C8-8 (1 )
C8-8.5 Partial Estimates and Retainage C8-8 (2 )
C8-8.6 Withholding Payment C8-8 (3 )
C8-8.7 Final Acceptance C8-8 (3 )
C8-8.8 Final Payment C8-8 (3 )
C8-8. 9 Adquacy of Design C8-8 (4 )
C8-8.10 General Guaranty C8-8 (4 ) r
C8-8.11 Subsidiary Work C8-8 (5 )
C8-8 .12 Miscellaneous Placement of Material C8-8 (5 )
C8-8.13 Record Documents C8-8 (5 )
c
(4)
PART C - GENERAL CONDITIONS
C1-1 DEFINITIONS
- SECTION C1-1 DEFINITIONS
C1-1 . 1 DEFINITIONS OF TERMS : Whenever in these Contract
Documents the following terms or pronouns in place of them are
used , the intent and meaning shall be understood and
interpreted as follows:
C1-1 . 2 CONTRACT DOCUMENTS: The Contract Documents are all of
the written and drawn documents , such as specifications ,
bonds , addenda , plans , etc . , which govern the terms and
performance of the contract . These are contained in the
General Contract Documents and the Special Contract Documents.
a. GENERAL CONTRACT DOCUMENTS : The General Contract
Documents govern all Water Department Projects and
include the following items:
PART A - NOTICE TO BIDDERS (Sample) White
PART B - PROPOSAL (Sample) White
PART C - GENERAL CONDITIONS (CITY) Canary Yellow
- (Developer) Brown
PART D - SPECIAL CONDITIONS Green
PART E SPECIFICATIONS E1 White
E2-Golden Rod
E2A-White
PERMITS/EASEMENTS Blue
PART F - BONDS (Sample) White
PART G - CONTRACT (Sample) White
b. SPECIAL CONTRACT DOCUMENTS: The Special Contract
Documents are prepared for each specific project as
a supplement to the General Contract Documents and
include the following items:
PART A - NOTICE TO BIDDERS (Advertisement) Same as
above
PART B - PROPOSAL (Bid)
PART C - GENERAL CONDITIONS
PART D - SPECIAL CONDITIONS
PART E - SPECIFICATIONS
PERMITS/EASEMENTS
PART F - BONDS
PART G - CONTRACT
PART H - PLANS (Usually bound separately)
C1-1 (1 )
C1-1 . 3 NOTICE TO BIDDERS : All of the legal publications
either actually published in public advertising mediums or
furnished direct to interested parties pertaining to the work
contemplated under the Contract Documents constitutes the
notice to bidders.
C1-1 . 4 PROPOSAL: The completed written and signed offer or
tender of a bidder to perform the work which the Owner desires
to have done, together with the bid security, constitutes the
Proposal , which becomes binding upon the Bidder when it is
officially received by the Owner, has been publicly opened and
read and not rejected by the Owner.
C1-1 . 5 BIDDER: Any person , persons , firm, partnership,
company, association, corporation, acting directly or through
a duly authorized representative, submitting a proposal for
performing the work contemplated under the Contract Documents ,
constitutes a bidder. -
C1-1 . 6 GENERAL CONDITIONS : The General Conditions are the
usual construction and contract requirements which govern the
performance of the work so that it will be carried on in
accordance with the customary procedure, the local statutes,
and requirements of the City of Fort Worth ' s charter and
promulgated ordinances.
Wherever there may be a conflict between the General
Conditions and Special Conditions , the latter shall take
precedence and shall govern .
C1-1 . 7 SPECIAL CONDITIONS : Special conditions are the
specific requirements which are necessary for the particular
project covered by the Contract Documents and not specifically
covered in the General Conditions. When considered with the
General Conditions and other elements of the Contract
Documents they provide the information which the Contractor
and Owner should have in order to gain a thorough knowledge of
the project.
C1-1 . 8 SPECIFICATIONS : The Specifications is that section or
part of the Contract Documents which sets forth in detail the
. requirements which must be met by all materials, construction,
workmanship, equipment and services in order to render a
completed and useful project. Whenever reference is made to
standard specifications, regulations, requirements , statutes ,
etc . , such referred to documents shall become a part of the
Contract Documents just as though they were embodied therein.
C1-1 . 9 BOND: The bond or bonds are the written guarantee or
security furnished by the Contractor for the prompt and
C1-1 (2)
faithful performance of the contract and include the
following:
a. Performance Bond (see paragraph C3-3.7 )
b. Payment Bond (see paragraph C3-3 .7)
C. Maintenance Bond (see paragraph C3-3.7 )
d. Proposal or Bid Security (see Special Instructions
to Bidders, Part A and C2-2 .6)
C1-1 . 10 CONTRACT: The Contract is the formal signed agreement
between the Owner and the Contractor covering the mutual
understanding of the two contracting parties about the project
to be completed under the Contract Documents.
C1-1 . 11 PLANS : The plans are the drawings or reproductions
therefrom made by the Owner's representative showing in detail
the location , dimension and position of the various elements
of the project , including such profiles , typical
cross-sections, layout diagrams, working drawings, preliminary
drawings and such supplemental drawings as the Owner may issue
to clarify other drawings or for the purpose of showing
changes in the work hereinafter authorized by the Owner. The
plans are usually bound separately from other parts of the
Contract Documents , but they are a part of the Contract
Documents just as though they were bound therein.
C1-1 . 12 CITY : The City of Fort Worth , Texas , a municipal
corporation, authorized and chartered under the Texas State
Statutes , acting by and through its governing body or its City
Manger , each of which is required by charter to perform
specific duties . Responsibility for final enforcement of
Contracts involving the City of Fort Worth is by Charter
vested in the City Manager . The terms City and Owner are
synonymous .
C1-1 . 13 CITY COUNCIL : The duly elected and qualified
governing body of the City of Fort Worth, Texas.
C1-1 . 14 MAYOR : The officially elected Mayor, or in his
absence, the Mayor Pro tem of the City of Fort Worth, Texas.
C1-1 . 15 CITY MANAGER: The officially appointed and authorized
City Manager of the City of Fort Worth, Texas , or his duly
authorized representative.
C1-1 . 16 CITY ATTORNEY: The officially appointed City Attorney
of the City of Fort Worth, Texas , or his duly authorized
representative.
C1-1 (3)
C1-1. 17 DIRECTOR OF PUBLIC WORKS: The duly appointed official
of the City of Fort Worth, referred to in the Charter as the
City Engineer, or his duly authorized representative.
C1-1 . 18 DIRECTOR , CITY WATER DEPARTMENT: The duly appointed
Director of the City Water Department of the City of Fort
Worth , Texas , or his duly authorized representative ,
assistant, or agents.
C1-1. 19 ENGINEER: The Director of Public Works, the Director
of the Fort Worth City Water Department , or their duly
authorized assistants , agents , engineers , inspectors , or
superintendents , acting within the scope of the particular
duties entrusted to them.
C1-1 . 20 CONTRACTOR : The person , persons , partnership ,
company, firm, association, or corporation, entering into a
contract with the Owner for the execution of the work, acting
directly or through a duly authorized representative. A
sub-contractor is a person, firm, corporation, or others under
contract with the principal contractor, supplying labor and
materials or only labor, for work at the site of the project.
C1-1 . 21 SURETIES: The Corporate bodies which are bound by
such bonds are required with and for the C ontractor . The
sureties engaged are to be fully responsible for the entire
and satisfactory fulfillment of the Contract and for any and
all requirements as set forth in the Contract Documents and
approved changes therein.
C1-1. 22 THE WORK OR PROJECT: The completed work contemplated
in and covered by the Contract Documents , including but not
limited to the furnishing of all labor , materials , tools ,
equipment, and incidentals necessary to produce a completed
and serviceable project. -
C1-1. 23 WORKING DAY : A working day is defined as a calendar
day, not including Saturdays, Sundays , and legal holidays , in w
which the weather or other conditions not under the control of
the Contractor permit the performance of the principal unit of
work for a period of not less than seven ( 7 ) hours between
7 : 00 a .m. and 6 : 00 p.m. , with exceptions as permitted in
paragraph C7-7 .6.
C1-1. 24 CALENDAR DAYS : A calendar day is any day of the week
or month, no days being excepted.
C1-1. 25 LEGAL HOLIDAYS: Legal holidays shall be observed as
prescribed by the City Council of the City of Fort Worth for
observance by City employees as follows :
Cl-1 (4 )
1. New Year ' s Day January 1
2 . M. L. King, Jr. Birthday Third Monday in January
3 . Memorial Day Last Monday in May
4. Independence Day July 4
5. Labor Day First Monday in September
6. Thanksgiving Day Fourth Thursday in November
7. Thanksgiving Friday Fourth Friday in November
ti 8 . Christmas Day December 25
9. Such other days in lieu of
holidays as the City Council
may determine
When one of the above named holidays or a special holiday is
declared by the City Council , falls on Saturday, the holiday
shall be observed on the preceding Friday or if it falls on
Sunday, it shall be observed on the following Monday, by those
employees working on working day operations . Employees
working calendar day operations will consider the calendar
holiday as the holiday.
C1-1. 26 ABBREVIATIONS : Wherever the abbreviations defined
herein appear in Contract Documents , the intent and meaning
shall be as follows:
AASHTO - American Association of MGD - Million Gallons Per
State Highway Transportation Day
Officials
ASCE - American Society of Civil CFS - Cubic Foot per
Engineers Second
LAW - In Accordance With
ASTM - American Society of Min. - Minimum
Testing Materials Mono.- Monolithic
AWWA - American Water Works % - Percentum
Association R - Radius
ASA - American Standards Association I.D. - Inside Diameter
HI - Hydraulic Institute O. D . - Outside
Diameter
Asph. - Asphalt Elev.- Elevation
Ave. - Avenue F - Fahrenheit
Blvd. - Boulevard C - Centigrade
CI - Cast Iron In. - Inch
v CL - Center Line Ft. - Foot
GI - Galvanized Iron St. - Street
Lin. - Linear or Lineal CY - Cubic Yard
lb. - Pound Yd. - Yard
MH - Manhole SY - Square Yard
Max. - Maximum L.F. - Linear Foot
D. I. - Ductile Iron
C1-1 (5 )
C1 -1 . 27 CHANGE ORDER : A " Change Order " is a written
supplemental agreement between the Owner and the Contractor
covering some added or deducted item or feature which may be
found necessary and which was not specifically included in the
scope of the project on which bids were submitted. Increase
in unit quantities stated in the proposal are not the subject
matter of a Change Order unless the increase or decrease is
more than 25% of the amount of the particular item or items in
the original proposal.
All "Change Orders " shall be prepared by the City from
information as necessary furnished by the Contractor.
C1-1. 25 PAVED STREETS AND ALLEYS : A paved street or alley
shall be defined as a street or alley having one of the
following types of wearing surfaces applied over the natural m
unimproved surface:
1. Any type of asphaltic concrete with or without
separate base material.
2. Any type of asphalt surface treatment , not
including an oiled surface , with or without
separate base material.
3. Brick, with or without separate base material.
4. Concrete, with or without separate base material.
5. Any combination of the above.
C1-1. 29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley,
roadway or other sur ace is any area except those defined
above for "Paved Streets and Alleys. "
C1-1. 30 CITY STREETS : A city street is defined as that area
between the right-of-way lines as the street is dedicated.
C1-1. 31 ROADWAY: The roadway is defined as the area between
parallel lines two ( 21 ) feet back of the curb lines or four
W ) feet back of the average edge of pavement where no curb
exists.
C1-1 . 32 GRAVEL STREET: A gravel street is any unpaved street
to which hasbe-en added one or more applications of gravel or
similar material other than the natural material found on the
street surface before any improvement was made.
Cl-1 (6)
a
+mow
SECTION C - GENERAL CONDITIONS
C2-2 INTERPRETATION AND
PREPARATION OF PROPOSAL
SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL
C2-2 . 1 PROPOSAL FORM: The Owner will furnish bidders with
proposal . form, which will contain an itemized list of the
items of work to be done or materials to be furnished and upon
which bid -prices are requested. The Proposal form will state
the Bidder ' s general understanding of the project to be
completed, provide a space for furnishing the amount of bid
security , and state the basis for entering into a formal
contract . The Owner will furnish forms for the Bidder ' s
"Experience Record, " "Equipment Schedule, " and "Financial
Statement, " all of which must be properly executed and filed
with the Director of the City Water Department one week prior
to the hour for opening of bids.
The financial statement required shall have been prepared by
an independent certified public accountant or an independent
public accountant holding a valid permit issued by an
appropriate state licensing agency, and shall have been so
prepared as to reflect the current financial status . This
statement must be current and not more than one (1 ) year old.
In the case that a bidding date falls within the time a new
statement is being prepared, the previous statement shall be
updated by proper verification. Liquid assets in the amount
�. of ten ( 10% ) percent of the estimated project cost will be
required.
For an experience record to be considered to be acceptable for
a given project, it must reflect the experience of the firm
seeking qualification in work of both the same nature and
magnitude as that of the project for which bids are to be
received , and such experience must have been on projects
completed not more than five ( 5 ) years prior to the date on
which are to be received . The Director of the Water
department shall be sole judge as to the acceptability of
experience for qualification to bid on any Fort Worth Water
Department project.
The prospective bidder shall schedule the equipment he has
available for the project and state that he will rent such
additional equipment as may be required to complete the
project on which he submits a bid.
C2-2 . 2 INTERPRETATION OF QUANTITIES: The quantities of work
and materials to be furnished as may Be listed in the proposal
C2-2(1)
w
forms or other parts of the Contract Documents will be
considered as approximate only and will be used for the
purpose of comparing bids on a uniform basis. Payment will be
made to the Contractor for only the actual quantities of work
performed or materials furnished in strict accordance with the
Contract Documents and Plans . The quantities of work to be
performed and materials to be furnished may be increased or
decreased as hereinafter provided , without in any way
invalidating the unit prices bid or any other requirements of
the Contract Documents.
C2-2 . 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT:
Bidders are advised that the Contract Documents on file with
the Owner shall constitute all 'of the information which the
Owner will furnish. All additional information and data which
the owner will supply after promulgation of the formal
contract documents shall be issued in the form of written
addenda and shall become part of the Contract Documents just
as though such addenda were actually written into the original
Contract Documents.
Bidders are required, prior to the filing of proposal, to read
and become familiar with the Contract Documents , to visit the
site of the project and examine carefully all local
conditions , to inform themselves by their own independent
research and investigations, tests , boring, and by such other
means as may be necessary to gain a complete knowledge of the
conditions which will be encountered during the construction
of the project . They must judge for themselves the
difficulties of the work and all attending circumstances
affecting the cost of doing the work or the time required for
its completion, and obtain all information required to make an
intelligent proposal. No information given by the Owner or
any representative of the Owner other than that contained in
the Contract Documents and officially promulgated addenda
thereto, shall be binding upon the Owner. Bidders shall rely
exclusively and solely upon their own estimates ,
investigation, research , tests , explorations, and other data
which are necessary for full and complete information upon
which the proposal is to be based. It is mutually agreed that
the submission of a proposal is prima-facie evidence that the
bidder has made the investigations , examinations and tests
herein required. Claims for additional compensation due to
variations between conditions actually encountered in
construction and as indicated in the Contract Documents will
not be allowed.
The logs of Soil Borings, if any, showing on the plans are for
general information only and may not be correct. Neither the
C2-2(2)
Owner nor the Engineer guarantee that the data shown is
representative of conditions which actually exist.
C2-2 .4 SUBMITTING OF PROPOSAL: The Bidder shall submit his
Proposal on the form furnished by the Owner. All blank spaces
applicable to the project contained in the form shall be
correctly filled in and the Bidder shall state the prices ,
written in ink in both words and numerals , for which he
proposes to do the work contemplated or furnishe the materials
required. All such prices shall be written legibly. In case
of discrepancy between the price written in words and the
price written in numerals, the price most advantageous to the
City shall govern.
If a proposal is submitted by an individual, his or her name
must be signed by him (her) or his (her) duly authorized agent.
If a proposal is submitted by a firm, association , or
partnership, the name and address of each member must be
given , and the proposal must be signed by a member of the
firm, association , or partnership , or by a person duly
authorized . If a proposal is submitted by a company or
corporation, the company or corporate name and business
address must be given , and the proposal signed by an official
or duly authorized agent. The corporate seal must be affixed.
Power of Attorney authorizing agents or others to sign
proposal must be properly certified and must be in writing and
submitted with the proposal.
C2-2. 5 REJECTION OF PROPOSALS: Proposals may be rejected if
they show any alteration of wards or figures, additions not
called for , conditional or uncalled for alternate bids ,
incomplete bids, erasures , or irregularities of any kind, or
MP contain unbalance value of any items . Proposal tendered or
delivered after the official time designated for receipt of
proposal shall be returned to the Bidder unopened.
C2-2 . 6 BID SECURITY: No proposal will be considered unless it
is accompanied by a "Proposal Security" of the character and
in the amount indicated in the "Notice to Bidders" and the
"Proposal. " The Bid Security is required by the Owner as
evidence of good faith on the part of the Bidder, and by way
of a guaranty that if awarded the contract, the Bidder will
within the required time execute a formal contract and furnish
the required performance and other bonds. The bid security of
the three lowest bidders will be retained until the contract
is awarded or other disposition is made thereof . The bid
security of all other bidders may be returned promptly after
the canvass of bids.
C2-2( 3 )
C2-2 . 7 DELIVERY OF PROPOSAL: No proposal will be considered
unless it is delivered , accompanied by its proper Bid
Security, to the City Manager or his representative in the
official place of business as set forth in the "Notice to
Bidders . " It is the Bidder ' s sole responsibility to deliver
the proposal at the proper time to the proper place . The mere
fact that a proposal was dispatched will not be considered.
The Bidder must have the proposal actually delivered. Each
proposal. shall be in a sealed envelope plainly marked with the
word "PROPOSAL," and the name or description of the project as
designated in the "Notice to Bidders. " The envelope shall be
addressed to the City Manager, City Hall, Fort Worth, Texas.
C2-2 . 8 WITHDRAWING PROPOSALS: Proposals actually filed with
the City Manager cannot be withdrawn prior to the time set for
opening proposals . A request for non-consideration of a
proposal must be made in writing , addressed to the City
Manager , and filed with him prior to the time set for the
opening of proposals. After all proposals not requested for
non-consideration are opened and publicly read aloud, the
proposals for which non-consideration requests have been
properly filed may, at the option of the Owner , be returned
unopened.
C2-2 . 9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may
modify his proposal by telegraphic communication at any time
prior to the time set for opening proposals, provided such
telegraphic communication is received by the City Manager
prior to the said proposal opening time, and provided further,
that the City Manager is satisfied that a written and duly
authenticated confirmation of such telegraphic communication
over the signature of the bidder was mailed prior to the
proposal opening time. If such confirmation is not received
within forty-eight (48 ) hours after the proposal opening time,
no further consideration will be given to the proposal.
C2-2 . 10 PUBLIC OPENING OF PROPOSAL: Proposals which have been
properly filed and for which no "Non-consideration Request"
has been received will be publicly opened and read aloud by
the City Manager or his authorized representative at the time
and place indicated in the "Notice to Bidders. " All proposals
which have been opened and read will remain on file with the
Owner until the contract has been awarded. Bidders or their
authorized representatives are invited to be present for the
opening of bids.
C2-2. 11 IRREGULAR PROPOSALS: Proposals shall be considered as
being "Irregular" if they show any omissions , alterations of
form, additions , or conditions not called for, unauthorized
alternate bids, or irregularities of any kind. However, the
C2-2( 4)
Owner reserves the right to waive any and all irregularities
and to make the award of the contract to the best interest of
the City. Tendering a proposal after the closing hour is an
irregularity which cannot be waived.
C2 - 2 . 12 DISQUALIFICATION OF BIDDERS : Bidders may be
disqualified and their proposals not considered for any of ,
but not limited to, the following reason:
a. Reasons for believing that collusion exists among
bidders.
b. Reasonable grounds for believing that any bidder is
interested in more than one proposal for work
contemplated.
C. The bidder being interested in any litigation
against the Owner or where the Owner may have a
claim against or be engaged in litigation against
the bidder.
d. The bidder being in arrears on any existing contract
or having defaulted on a previous contract.
e. The bidder having performed a prior contract in an
unsatisfactory manner.
f . Lack of competency as revealed by the financial
statement, experience record, equipment schedule ,
and such inquiries as the Owner may see fit to make.
g . Uncompleted work which , in the judgment of the
Owner, will prevent or hinder the prompt completion
of additional work if awarded.
h. The bidder not filing with the Owner , one week in
advance of the hour of the opening of proposals the
following:
1. Financial Statement showing the financial
condition of the bidder as specified in Part
"A" - Special Instructions.
2. A current experience record showing especially
the projects of a nature similar to the one
under consideration , which have been
successfully completed by the Bidder.
3 . An equipment schedule showing the equipment
the bidder has available for use on the
project.
The Bid Proposal of a bidder who, in the judgment of the
Engineer , is disqualified under the requirements stated
herein, shall be set aside and not opened.
C2-2(5 )
PART C - GENERAL CONDITIONS
C3-3 AWARD AND EXECUTION OF
DOCUMENTS
SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS:
C3-3 . 1 CONSIDERATION OF PROPOSALS: After proposals have been
opened and rea aloud, the proposals will be tabulated on the
basis of' the quoted prices , the quantities shown in the
proposal , and the application of such formulas or other
methods of bringing items to a common basis as may be
established in the Contract Documents.
The total obtained by taking the sum of the products of unit
prices quoted and the estimated quantities plus any lump sum
items and such other quoted amounts as may enter into the cost
of the completed project will be considered as the amount of
the bid.
Until the award of the contract is made by the Owner, the
right will be reserved to reject any or all proposals and
waive technicalities, to re-advertise for new proposals, or to
proceed with the work in any manner as maybe considered for
the best interest of the Owner.
C3-3 . 2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS
ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner,
upon request , complete and accurate information regarding
actual work performed by a Minority Business Enterprise (MBE)
and or a a Woman-owned Business Enterprise (WBE) on the
- contract and the payment therefor. Contractor further agrees,
upon request by Owner , to allow and audit and/or an
examination of any books, records, or files in the possession
of Contractor that will substantiate the actual work performed
by the MBE or WBE. Any material misrepresentation of any
nature will be grounds for termination of the contract and for
initiating any action under appropriate federal , state or
local laws and ordinances relating to false statements;
further , any such misrepresentation may be grounds for
disqualification of Contractor at Owner ' s discretion for
bidding on future Contracts with the Owner for a period of
time of not less than six (6 ) months.
C3-3 . 3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall
comply with Current City Ordinance prohibiting discrimination
in employment practices.
C3-3 (1)
The Contractor shall post the required notice to that effect
on the project site , and, at his request , will be provided R
assistance by the City of Fort Worth ' s Equal Employment
Officer who will refer any qualified applicant he may have on
file in his office to the Contractor. Appropriate notices may
be acquired from the Equal Employment Officer.
C3-3 . 4 WITHDRAWAL OF PROPOSALS : After a proposal has been
read by the Owner it cannot be withdrawn by the Bidder within
forty-five ( 45 ) days after the date on which the proposals
were opened.
C3-3 . 5 AWARD OF CONTRACT: The Owner reserves the right to
withholdfinal action on the proposals for a reasonable time,
not to exceed forty-five ( 45 ) days after the date of opening
proposals, and in no event will an award be made until after
investigations have been made as to the responsibility of the
proposed awardee.
The award of the contract, if an award is made, will be to the
lowest and best responsible bidder.
The award of the contract shall not become effective until the
Owner has notified the Contractor in writing of such award.
C3-3 . 6 RETURN OF PROPOSAL SECURITIES: As soon as proposed
price totals have been determined for comparison of bids , the
Owner may , at its discretion, return the proposal security
which accompanied the proposals which, in its judgment, would
not be considered for the award . All other proposal
securities , usually those of the three lowest bidders , will be
retained by the Owner until the required contract has been
executed and bond furnished or the Owner has otherwise
disposed of the bids, after which they will be returned by the
City Secretary.
C3-3 .7 BONDS : With the execution and delivery of the Contract
Documents, the Contractor shall furnish to, and file with the
Owner in the amounts herein required, the following bonds:
a. PERFORMANCE BOND : A good and sufficient
performance bond in an amount not less than 100
percent of the amount of the contract, as evidenced
by the proposal tabulation or otherwise ,
guaranteeing the full and faithful execution of the
work and performance of the contract, and for the
protection of the Owner and all other persons
against damage by reason of negligence of the
Contractor , or improper execution of the work or
the use of inferior materials . This performance
C3-3 (2)
bond shall guarantee the payment for all labor ,
materials , equipment, supplies , and services used
in the construction of the work, and shall remain
in full force and effect until provisions as above
stipulated are accomplished and final payment is
made on the project by the City.
b. MAINTENANCE BOND : A good and sufficient
maintenance bond, in the amount of not less than
100 percent of the amount of the contract, as
evidenced by the proposal tabulation or otherwise ,
guaranteeing the prompt , full and faithful
performance of the general guaranty which is set
forth in paragraph C8-8.10.
C. PAYMENT BOND: A good and sufficient payment bond,
in an amount not less than 100 percent of the
amount of the contract , as evidenced by the
proposal tabulation or otherwise , guaranteeing the
prompt, full and faithful payment of all claimants
as defined in Article 5160, Revised Civil Statutes
of Texas , 1925 , as amended by House Bill 344 Acts
56th Legislature, Regular Session, 1959 , effective
April 27 , 1959 , and/or the latest version thereof,
supplying labor and materials in the prosecution of
the work provided for in the contract being
constructed under these specifications. Payment
Bond shall remain in force until all payments as
above stipulated are made.
d. OTHER BONDS : Such other bonds as may be required
by these Contract Documents shall be furnished by
the Contractor.
No sureties will be accepted by the Owner which are at the
time in default or delinquent on any bonds or which are
interested in any litigation against the owner. All bonds
shall be made on the forms furnished by the Owner and shall be
executed by an approved surety company doing business in the
City of Fort Worth , Texas , and which is acceptable to the
owner . In order to be acceptable, the name of the surety
shall be included on the current O . S . Treasury list of
acceptable sureties, and the amount of bond written by any one
acceptable company shall not exceed the amount shown on the
Treasury list for that company. Each bond shall be properly
executed by both the Contractor and Surety Company.
Should any surety on the contract be determined unsatisfactory
at any time by the Owner, notice will be given the Contractor
to that effect and the Contractor shall immediately provide a
C3-3 (3 )
new surety satisfactory to the Owner. No payment will be made
under the contract until the new surety or sureties , as
required, have qualified and have been accepted by the Owner.
The contract shall not be operative nor will any payments be
due or paid until approval of the bonds by the Owner. •
C3-3 . 8 EXECUTION OF CONTRACT: Within ten (10 ) days after the
Owner has by appropriate resolution, or otherwise, awarded the
contract., the Contractor shall execute and file with the Owner
the Contract and such bonds as may be required in the Contract
Documents .
No contract shall be binding upon the owner until it has been
attested by the City Secretary , approved as to form and
legality by the City Attorney, and executed for the Owner by
either the Mayor or City Manager.
C3-3 . 9 FAILURE TO EXECUTE CONTRACT : The failure of the
Awardee to execute the required bond or bonds or to sign the
required contract within ten (10 ) days after the contract is
awarded shall be considered by the Owner as an abandonment of
his proposal , and the Owner may annul the Award. By reason of
the uncertainty of the market prices of material and labor ,
and it being impracticable and difficult to accurately
determine the amount of damages occuring to the Owner by
reason of said awardee' s failure to execute said bonds and
contract within ten ( 10 ) days , the proposal security
accompanying the proposal shall be the agreed amount of
damages which Owner will suffer by reason of such failure on
the part of the Awardee and shall thereupon immediately be
forfeited to the Owner.
The filing of a proposal will be considered as an acceptance
of this provision by the Bidder.
C3-3 . 10 BEGINNING WORK: The Contractor shall not commence
work until authorized in writing to do so by the Owner .
Should the Contractor fail to commence work at the site of the
project within the time stipulated in the written
authorization usually termed the "Work Order" or "Proceed
Order", it is agreed that the Surety Company will , within ten
( 10 ) days after the commencement date set forth in such
written authorization, commence the physical execution of the
contract.
C3-3 . 11 INSURANCE: The Contractor shall not commence work
under this contract until he has obtained all the insurance
required under the Contract Documents, and such insurance has
been approved by the Owner. The prime Contractor shall be
responsible for delivering to the Owner the sub-contractors '
C3-3 (4 )
certificate of insurance for approval. The prime contractor
shall indicate on the certificate of insurance included in the
documents for execution whether or not his insurance covers
sub-contractors . It is the intention of the Owner that the
insurance coverage required herein shall include the coverage
w of all sub-contractors.
a. COMPENSATION INSURANCE : The Contractor shall
maintain , during the life of this contract ,
Workers ' Compensation Insurance on all of his
employees to be engaged in work on the project
under this contract, and for all sub-contractors:
In case any class of employees engaged in hazardous
work on the project under this contract is not
protected under the Workers ' Compensation Statute,
the Contractor shall provide adequate employer ' s
general liability insurance for the protection of
such of his employees not so protected.
b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The
Contractor shall procure and shall maintain during
the life of this contract Contractor ' s
• Comprehensive General Liability Insurance ( Public
Liability and Property Damage Insurance) in an
amount not less than $ 500 , 000 covering each
occurrence on account of bodily injury, including
death, and in an amount not less than $500 , 000
covering each occurrence on account of property
damage with $2,000 ,000 umbrella policy coverage.
C. ADDITIONAL LIABILITY: The Contractor shall
furnish insurance as separate policies or by
additional endorsement to one of the
above-mentioned policies , and in the amount as set
forth for public liability and property damage, the
following insurance:
1. Contingent Liability ( covers General
Contractor ' s Liability for acts of
sub-contractors) .
2. Blasting, prior to any blasting being done.
3. Collapse of buildings or structures adjacent
to excavation ( if excavations are to be
performed adjacent to same) .
4. Damage to underground utilities for $500,000.
C3-3 (5)
1
5. Builder ' s risk (where above-ground structures
are involved) . '
6. Contractual Liability ( covers all
indemnification requirements of Contract) .
d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY
DAMAGE: The Contractor shall procure and maintain ,
during the life of this Contract, Comprehensive
Automobile Liability insurance in an amount not
less than $ 250 , 000 for injuries including
accidental death to any one person and subject to
the same limit for each person an amount not less
than $500 , 000 on account of one accident , and
automobile property damage insurance in an amount
not less than $100 ,000.
e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The
insurance required under the above paragraphs shall
provide adequate protection for the Contractor and
his sub-contractors , respectively, against damage
claims which may arise from operations under this
contract, whether such operations be by the insured
or by anyone directly or indirectly employed by
him, and also against any of the following special
hazards which may be encountered in the performance
of the Contract.
f. PROOF OF CARRIAGE OF INSURANCE: The Contractor
shall furnish the Owner with satisfactory proof of
coverage by insurance required in these Contract
Documents in amounts and by carriers satisfactory
to the Owner . ( Sample attached. ) All insurance
requirements made upon the Contractor shall apply
to the sub- contractor , should the Prime
Contractor ' s insurance not cover the
sub-contractor ' s work operations.
g. LOCAL AGENT FOR INSURANCE AND BONDING : The
insurance and bonding companies with whom the
Contractor ' s insurance and performance, payment,
maintenance and all such other bonds are written
shall be represented by an agent or agents having
an office located within the city limits of the
C3-3 (6 )
City of Fort Worth, Tarrant County, Texas . Each
such agent shall be a duly qualified, one upon whom
{ service of process may be had , and must have
authority and power to act on behalf of the
insurance and/or bonding company to negotiate and
settle with the City of Fort Worth, or any other
claimant, any claims that the City of Fort Worth or
other claimant or any property owner who has been
damaged , may have against the Contractor ,
insurance, and/or bonding company. If the local
insurance representative is not so empowered by the
insurance or bonding companies, then such authority
must be vested in a local agent or claims officer
residing in the Metroplex, the Fort Worth-Dallas
area. The name of the agent or agents shall be set
forth on all of such bonds and certificates of
insurance.
C3-3 . 12 CONTRACTOR' S OBLIGATIONS : Under the Contract, the
Contractor shall pay for all materials , labor and services
when due.
C3-3 . 13 WEEKLY PAYROLL: A certified copy of each payroll
covering payment of wages to all person engaged in work on the
project at the site of the project shall be furnished to the
Owner ' s representative within seven ( 7 ) days after the close
of each payroll period. A copy or copies of the applicable
minimum wage rates as set forth in the Contract Documents
shall be kept posted in a conspicuous place at the site of the
project at all times during the course of the Contract .
Copies of the wage rates will be furnished the Contractor, by
the Owner; however, posting and protection of the wage rates
shall be the responsibility of the Contractor.
C3-3 . 14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor,
whether a person , persons , partnership , company , firm ,
association , corporation or other who is approved to do
business with and enters into a contract with the City for
construction of water and/or sanitary sewer facilities, will
have or shall establish a fully operational business office
within the Fort Worth-Dallas metropolitan area . The
Contractor shall charge, delegate, or assign this office (or
he may delegate his Project Superintendent ) with full
authority to transact all business actions required in the
performance of the Contract. This local authority shall be
made responsible to act for the Contractor in all matters
pertaining to the work governed by the Contract whether it be
administrative or otherwise and as such shall be empowered,
thus delegated and directed, to settle all material, labor or
other expenditures, all claims against the work or any other
C3-3 (7)
matter associated such as maintaining adequate and appropriate A
insurance or security coverage for the project . Such local
authority for administration of the work under the Contract
shall be maintained until all business transactions executed
as part of the Contract are complete.
Should the Contractor ' s principal base of operations be other
than in the Fort Worth-Dallas metropolitan area, notification
of the Contractor ' s assignment of local authority shall be
made in writing to the Engineer in advance of any work on the
project, all appropriately signed and sealed, as applicable,
by the Contractor ' s responsible officers with the
understanding that this written assignment of authority to a
local representative shall become part of the project Contract
as though bound directly into the project documents . The
intent of these requirements is that all matters associated
with the Contractor ' s administration, whether it be oriented
in furthering the work, or other, be governed direct by local
authority. This same requirement is imposed on insurance and
surety coverage. Should the Contractor's local representative
fail to perform to the satisfaction of Engineer, the Engineer,
at his sole discretion , may demand that such local
representative be replaced and the Engineer may, at his sole
discretion , stop all work until a new local authority
satisfactory to the Engineer is assigned . No credit of
working time will be for periods in which work stoppages are
in effect for this reason.
C3-3 . 15 VENUE : Venue of any action hereinunder shall be
exclusively in Tarrant County, Texas.
C3-3 (8)
M
■
PART C - GENERAL CONDITIONS
C4-4 SCOPE OF WORK
SECTION C4-4 SCOPE OF WORK
C4-4 . 1 INTENT OF CONTRACT DOCUMENTS : It is the definite
intention of these Contract Documents to provide for a
complete, useful project which the Contractor undertakes to
construct or furnish , all in full compliance with the
requirements and intent of the Contract Documents . It is
definitely understood that the Contractor shall do all work as
provided for in the Contract Documents, shall do all extra or
special work as may be considered by the Owner as necessary to
complete the project in a satisfactory and acceptable manner.
The Contractor shall, unless otherwise specifically stated in
these Contract Documents, furnish all labor, tools, materials,
machinery, equipment , special services , and incidentals
necessary to the prosecution and completion of the project.
C4-4 . 2 SPECIAL PROVISIONS : Should any work or conditions
which are not thoroughly and satisfactorily stipulated or
covered by General or Special Conditions of these Contract
Documents be anticipated, or should there be any additional
A proposed work which is not covered by these Contract
Documents, then "Special Provisions" covering all such work
will be prepared by the Owner previous to the time of
receiving bids or proposals for such work and furnished to the
Bidder in the form of Addenda. All such "Special Provisions"
shall be considered to be a part of the Contract Documents
just as though they were originally written therein.
C4-4 . 3 INCREASED OR DECREASED QUANTITIES: The Owner reserves
the right to alter the quantities of the work to be performed
or to extend or shorten the improvements at any time when and
as found to be necessary, and the Contractor shall perform the
work as altered, increased or decreased at the unit prices.
Such increased or decreased quantity shall not be more than 25
percent of the contemplated quantity of such item or items.
When such changes increase or decrease the original quantity
of any item or items of work to be done or materials to be
furnished by the 25 percent or more, then either party to the
contract shall upon written request to the other party be
entitled to a revised consideration upon that portion of the
work above or below the 25 percent of the original quantity
stated in the proposal ; such revised consideration to be
determined by special agreement or as hereinafter provided for
"Extra Work. " No allowance will be made for any changes in
anticipated profits nor shall such changes be considered as
C4-4 (1)
i
waiving or invalidating any conditions or provisions of the
Contract Documents.
Variations in quantities of sanitary sewer pipes -in depth
categories , shall be interpreted herein as applying to the
overall quantities or sanitary sewer pipe in each pipe size,
but not to the various depth categories.
C4-4. 4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the
Owner reserves the right to make such changes in the Contract
Documents and in the character or quantities of the work as.
may be necessary or desirable to insure completion in the most
satisfactory manner, provided such changes do not materially
alter the original Contract Documents or change the general
nature of the project as a whole. Such changes shall not be
considered as waiving or invalidating any condition or
provision of the Contract Documents.
C4-4 . 5 EXTRA WORK: Additional work made necessary by changes
and alterations of the Contract Documents or of quantities or
for other reasons for which no prices are provided in the
Contract Documents, shall be defined as "Extra Work" and shall
be performed by the Contractor in accordance with these
Contract Documents or approved additions thereto; provided,
however, that before any extra work is begun a "Change Order"
shall be executed or written order issued by the Owner to do
the work for payments or credits as shall be determined by one
or more combination of the following methods:
a. Unit bid price previously approved.
b. An agreed lump sum.
C. The actual reasonable cost of (1) labor, (2) rental
of equipment used on the extra work for the time so
used at Associated General Contractors of America
current equipment rental rates ; ( 3 ) materials
entering permanently into the project, and (4 )
actual cost of insurance , bonds , and social
security as determined by the Owner , plus a fixed
fee to be agreed upon but not to exceed 10% of the
actual cost of such extra work. The fixed fee is
not to include any additional profit to the
Contractor for rental of equipment owned by him and
used for the extra work. The fee shall be full and
complete compensation to cover the cost of
superintendence, overhead , other profit, general
and all other expense not included in (1 ) , ( 2 ) ,
( 3 ) , and ( 4 ) above. The Contractor shall keep
accurate cost records on the form and in the method
C4-4 (2 )
suggested by the Owner and shall give the Owner
access to all accounts , bills , vouchers , and
records relating to the Extra Work.
No "Change Order" shall become effective until it has been
approved and signed by each of the Contracting parties.
No claim for Extra Work of any kind will be allowed unless
ordered in writing by the Owner . In case any orders or
instructions , either oral or written, appear to the Contractor
to involve Extra Work for which he should receive
compensation, he shall make written request to the Engineer
for written orders authorizing such Extra Work , prior to
beginning such work.
Should a difference arise as to what does or does not
constitute Extra Work, or as to the payment thereof , and the
Engineer insists upon its performance, the Contractor shall
proceed with the work after making written request for written
orders and shall keep an accurate account of the actual
reasonable cost thereof as provided under method ( Item C ) .
Claims for extra work will not be paid unless the Contractor
shall file his claim with the Owner within five ( 5 ) days
before the time for making the first estimate after such work
is done and unless the claim is supported by satisfactory
vouchers and certified payrolls covering all labor and
materials expended upon the said Extra Work.
The Contractor shall furnish the Owner such installation
records of all deviations from the original Contract Documents
as may be necessary to enable the Owner to prepare for
permanent record a corrected set of plans showing the actual
installation.
The compensation agreed upon for ' extra work' whether or not
iniitiated by a ' change order ' shall be a full, complete and
final payment for all costs Contractor incurs as a result or
relating to the change or extra work, whether said costs are
known, unknown, foreseen or unforeseen at that time, including
without limitation, any costs for delay , extended overhead,
- ripple or impact cost, or any other effect on changed or
unchanged work as a result or the change or extra work.
C4-4 . 6 SCHEDULE OF OPERATIONS: Before commencing any work
under this contract, the Contractor shall submit to the Owner
and receive the Owner ' s approval thereof , a "Schedule of
Operations , " showing by a straight line method the date of
commencing and finishing each of the major elements of the
contract . There shall be also shown the estimated monthly
cost of work for which estimates are to be expected. There
C4-4 (3 )
shall be presented also a composite graph showing the
anticipated progress of construction with the time being
plotted horizontally and the percentage of completion plotted
vertically. The progress charts shall be prepared on 8-1/2" x
11 " sheets and at least five black or blue line prints shall
be furnished to the Owner.
C4-4 . 7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT
FACILITIES: Within ten ( 10 ) days prior to submission of
first monthly progress payment , the Contractor shall
prepare and submit to the Owner for approval six copies of
the schedule in which the Contractor proposes to carry on
the work, the date of which he will start the several major
activities ( including procurement of materials, plans, and
equipment) and the contemplated dates for completing the
same. The schedule shall be in the form of a time schedule
Critical Path Method (CPM) network diagram. As the work
progresses, the Contractor shall enter on the diagram the
actual progress at the end of each partial payment period
or at such intervals as directed by the Engineer. The
Contractor shall also revise the schedule to reflect any
adjustments in contract time approved by the Engineer.
Three copies of the updated schedule shall be delivered at
such intervals as directed by the. Owner.
As a minimum, the construction schedule shall incorporate
all work elements and activities indicated in the proposal
and in the technical specifications.
Prior to the final drafting of the detailed construction
schedule, the Contractor shall review the draft schedule
with the Engineer to ensure the Contractor's understanding
of the contract requirements.
The following guidelines shall be adhered to in preparing
the construction schedule:
a. Milestone dates and final project completion
dates shall be developed to conform to time
constraints , sequencing requirements and
completion time.
b. The construction process shall be divided into
activities with time durations of approximately
fourteen (14 ) days and construction values not to
exceed $50 , 000 . Fabrication , delivery and
submittal activities are exceptions to this
guideline.
C4-4 (4 )
C. Durations shall be in calendar days and normal
holidays and weather conditions over the duration
of the contract shall be accounted for within the
duration of each activity.
d. One critical path shall be shown on the
construction schedule.
e. Float time is defined as the amount of time
between the earliest start date and the latest
start date of a chain of activities of the CPM
construction schedule. Float time is not for the
exclusive use or benefit of either the Contractor
or the Owner.
f. Thirty days shall be used for .submittal review
unless otherwise specified.
The construction schedule shall as a minimum be divided
into general categories as indicated in the Proposal and
Technical Specifications and each general category shall be
broken down into activities in enough detail to achieve
activities of approximately fourteen (14) days duration.
For each general category, the construction schedule shall
identify all trades or subcontracts whose work is
represented by activities that follow the guidelines of
this Section.
For each of the trades or subcontracts , the construction
schedule shall indicate the following procurements ,
construction and preacceptance activities and events in
their logical sequence for equipment and materials.
1 . Preparation and transmittal of submittals.
2. Submittal review periods.
3 . Shop fabrication and delivery.
4 . Erection or installation.
5. Transmittal of manufacturer ' s operation and
maintenance instructions.
6 . Installed equipment and materials testing.
7. Owner ' s operator instruction (if applicable) .
8 . Final inspection.
C4-4 (5 )
■
9 . Operational testing.
10. Final inspection.
If , in the opinion of the Owner , work accomplished falls
behind that scheduled , the Contractor shall take such
action as necessary to improve his progress. In addition,
the Owner- may require the Contractor to submit a revised
schedule demonstrating his program and proposed plan to
make up lag in scheduled progress and to insure completion
of the work within the contract time. If the Owner finds
the proposed plan not acceptable , he may require the
Contractor to increase the work force, the construction
plant and equipment , the number of work shifts or the
overtime operations without additional cost to the Owner.
Failure of the Contractor to comply with these requirements
shall be considered grounds for determination by the Owner
that the Contractor is failing to prosecute the work with
such diligence as will insure its completion within the
time specified.
C4-4 ( 6)
r
..
PART C - GENERAL CONDITIONS
C5-5 CONTROL OF WORK AND
MATERIALS
SECTION C5-5 CONTROL OF WORK AND MATERIALS
C5-5. 1 AUTHORITY .OF ENGINEER: The work shall be performed to
the satisfaction of the Engineer and in strict compliance with
the Contract Documents . He shall decide all questions which
arise as to the quality and acceptability of materials
furnished , work performed , rate of progress of the work,
overall sequence of the construction,' interpretation of the
Contract Documents , acceptable fulfillment of the contract,
compensation, mutual rights between Contractor and Owner under
these Contract Documents , supervision of the work, resumption
of operations, and all other questions or disputes which may
arise . Engineer will not be responsible for Contractor ' s
means , methods , techniques , sequences or procedures of
construction, or the safety precaution and programs incident
thereto, and he will not be responsible for Contractor ' s
failure to perform the work in accordance with the contract
documents.
He shall determine the amount and quality of the work
completed and materials furnished , and his decisions and
estimates shall be final. His estimates in such event shall
be a condition to the right of the Contractor to receive money
due him under the Contract . The Owner shall have executive
authority to enforce and make effective such necessary
decisions and orders as the Contractor fails to carry out
promptly.
In the event of any dispute between the Engineer and
Contractor over the decision of the Engineer on any such
matters , the Engineer must, within a reasonable time, upon
written request of the Contractor, render and deliver to both
the Owner and Contractor, a written decision on the matter in
controversy.
C5-5 . 2 CONFORMITY WITH PLANS : The finished project in all
cases shall conform with lines , grades , cross-sections ,
finish , and dimensions shown on the plans or any other
requirements otherwise described in the Contract Documents .
Any deviation from the approved Contract Documents required by
I the Engineer during construction will in all cases be
determined by the Engineer and authorized by the Owner by
Change Order.
I C5-5 (1)
I
C5-5 . 3 COORDINATION OF CONTRACT DOCUMENTS: The Contract
Documents are made up of several sections , which , taken
together , are intended to describe and provide for a complete ss
and useful project, and any requirements appearing in one of
the sections is as binding as though it occurred in all
sections. In case of discrepancies , figured dimension shall
govern over scaled dimensions , plans shall govern over
specifications, special conditions shall govern over general
conditions and standard specifications, and quantities shown
on the plans shall govern over those shown in the proposal.
The Contractor shall not take advantage of any apparent error
or omission in the Contract Documents , and the Owner shall be
permitted to make such corrections or interpretations as may
be deemed necessary for the fulfillment of the intent of the
Contract Documents . In the event the Contractor discovers an
apparent error or discrepancy, he shall immediately call this
condition to the attention of the Engineer. In the event of a
conflict in the drawings, specifications, or other portions of
the Contract Documents which were not reported prior to the
award of Contract, the Contractor shall be deemed to have
quoted the most expensive resolution of the conflict.
C5-5 . 4 COOPERATION OF CONTRACTOR: The Contractor will be
furnished with three sets of the Contract Documents and shall
have available on the site of the project at all times one set
of such Contract Documents.
The Contract shall give to the work the constant attention
necessary to facilitate the progress thereof and shall
cooperate with the Engineer , his inspector , and other _
Contractors in every possible way.
The Contractor shall at all times have competent personnel
available to the project site for proper performance of the -
work. The Contractor shall provide and maintain at all times
at the site of the project a competent , English-speaking
superintendent and an assistant who are fully authorized to ..
act as the Contractor ' s agent on the work . Such
superintendent and his assistant shall be capable of reading
and understanding the Contract Documents and shall receive and
fulfill instructions from the Owner , the Engineer , or his
authorized representatives . Pursuant to this responsibility
of the Contractor, the Contractor shall designate in writing
to the project superintendent, to act as the Contractor ' s
agent on the work. Such assistant project superintendent
shall be a resident of Tarrant County, Texas and shall be
subject to call, as is the project Superintendent, at any time
of the day or night on any day of the week on which the
Engineer determines that circumstances require the presence on
the project site of a representative of the Contractor to
C5-5 (2)
adequately provide for the safety or convenience of the
traveling public or the owners of property across which the
project extends or the safety of property contiguous to the
project routing.
The Contractor shall provide all facilities to enable the
Engineer and his inspector to examine and inspect the
workmanship and materials entering into the work.
C5-5 . 5 EMERGENCY AND/OR RECTIFICATION WORK: When , in the
opinion of the Owner or Engineer, a condition of emergency
exists related to any part of the work, the Contractor, or the
Contractor through his designated representative , shall
respond with dispatch to a verbal request made by the Owner or
Engineer to alleviate the emergency condition . Such a
response shall occur day or night, whether the project is
scheduled on a calendar-day or on a working-day basis.
Should the Contractor fail to respond to a request from the
Engineer to rectify any discrepancies , omissions , or
corrections necessary to conform with the requirements of the
project specifications or plans , the Engineer shall give the
Contractor written notice that such work or changes are to be
performed. The written notice shall direct attention to the
discrepant condition and request the Contractor to take
remedial action to correct the condition. In the event the
Contractor does not take positive steps to fulfill this
written request , or does not show just cause for not taking
the proper action, within 24 hours , the City may take such
remedial action with City forces or by contract. The City
shall then deduct an amount equal to the entire costs for such
remedial action, plus 25% , from any funds due the Contractor
on the project.
I
C5-5 . 6 FIELD OFFICE: The Contractor shall provide, at no
extra compensation, an adequate field office for use of the
Engineer , if specifically called for. The field office shall
be not less than 10 by 14 feet in floor area, substantially
constructed , well heated , air conditioned, lighted, and
weather-proof , so that documents will not be damaged by the
elements .
C5-5 . 7 CONSTRUCTION STAKES: The City, through its Engineer,
will furnish the Contractor with all lines , grades , and
measurements necessary to the proper prosecution and control
of the work contracted for under these Contract Documents , and
lines , grades and measurements will be established by means of
stakes or other customary method of marking as may be found
consistent with good practice.
C5-5 (3 )
These stakes or markings shall be set sufficiently in advance
of construction operations to avoid delay . Such stakes or
markings as may be established for the Contractor ' s use or
guidance shall be preserved by the Contractor until he is
authorized by the Engineer to remove them. Whenever, in the
opinion of the Engineer , any stakes or markings have been
carelessly or willfully destroyed, disturbed, or removed by
the Contractor or any of his employees , the full cost of
replacing such stakes or marks plus 25% will be charged
against the Contractor, and the full amount will be deducted
from payment due the Contractor.
C5-5 . 8 AUTHORITY AND DUTIES OF CITY INSPECTORS : City
Inspectors will be authorized to inspect all work done and to
be done and all materials furnished. Such inspection may
extend to all or any part of the work, and the preparation or
manufacturing of the materials to be used or equipment to be
installed. A City Inspector may be stationed on the work to
report to the Engineer as to the progress of the work and the
manner in which it is being performed, to report any evidence
that the materials being furnished or the work being performed -
by the Contractor fails to fulfill the requirements of the
Contract Documents , and to call the attention of the
Contractor to any such failure or other infringements. Such
inspection or lack of inspection will not relieve the
Contractor from any obligation to perform the work in
accordance with the requirements of the Contract Documents.
In case of any dispute arising between the Contractor and the
City Inspector as to the materials or equipment furnished or
the manner of performing the work, the City Inspector will
have authority to reject materials or equipment to suspend
work until the question at issue can be referred to and be
decided by the Engineer . The City Inspector will not ,
however, be authorized to revoke , alter, enlarge, or release
any requirement of these Contract Documents, nor to approve or
accept any portion or section of the work, nor to issue any
instructions contrary to the requirements of the Contract
Documents . He will in no case act as superintendent or
foreman or perform any other duties for the Contractor , or
interfere with the management or operation of the work. He
will not accept from the Contractor any compensation in any
form for performing any duties . The Contractor shall regard
and obey the directions and instructions of the City Inspector
or Engineer when the same are consistent with the obligations
of the Contract Documents , provided, however , should the
Contractor object to any orders or instructions of the City
Inspector.., the Contractor may within six days make written
appeal to the Engineer for his decision on the matter in
controversy.
C5-5 (4 )
C5-5 . 9 INSPECTION: The Contractor shall furnish the Engineer
with every reasonable facility for ascertaining whether or not
the work as performed is in accordance with the requirements
of the Contract Documents. If the Engineer so requests , the
Contractor shall , at any time before acceptance of the work,
remove or uncover such portion of the finished work as may be
directed. After examination, the Contractor shall restore
said portions of the work to the standard required by the
Contract •Documents.
Should the work exposed or examined prove acceptable, the
uncovering or removing and replacing of the covering or making
good of the parts removed shall be paid for as extra work, but
should be work so exposed or examined prove to be
unacceptable , the uncovering or removing and the replacing of
all adjacent defective or damaged parts shall be at the
Contractor ' s expense. No work shall be done or materials used
without suitable supervision or inspection.
C5-5 . 10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: All work,
materials , or equipment which has been rejected shall be
remedied or removed and replaced in an acceptable manner by
the Contractor at his own expense. Work done beyond the lines
and grades given or as shown on the plans, except as herein
specifically provided, or any Extra Work done without written
authority, will be considered as unauthorized and done at the
expense of the Contractor and will not be paid for by the
Owner . Work so done may be ordered removed at the
Contractor ' s expense. Upon the failure on the part of the
Contractor to comply with any order of the Engineer made under
the provisions of this paragraph, the Engineer will have the
authority to cause defective work to be remedied or removed
and replaced and unauthorized work to be removed, and the cost
thereof may be deducted from any money due or to become due to
the Contractor . Failure to require the removal of any
defective or unauthorized work shall not constitute acceptance
of such works.
C5 - 5 . 11 SUBSTITUTE MATERIALS OR EQUIPMENT : If the
Specifications , law, ordinance, codes or regulations permit
Contractor to furnish or use a substitute that is equal to any
material or equipment specified, and if Contractor wishes to
furnish or use a proposed substitute , he shall, prior to the
preconstruction conference , make written application to
ENGINEER for approval of such substitute certifying in writing
that the proposed substitute will perform adequately the
functions called for by the general design, be similar and of
equal substance to that specified and be suited to the same
use and capable of performing the same function as that
specified; and identifying all variations of the proposed
C5-5 (5 )
substitute from that specified and indicating available
maintenance service . No substitute shall be ordered or
installed without the written approval of Engineer who will be
the judge of the equality and may require Contractor to
furnish such other data about the proposed substitute as he
considers pertinent . No substitute shall be ordered or
installed without such performance guarantee and bonds as
Owner may require which shall be furnished at Contractor ' s
expense. Contractor shall indemnify and hold harmless Owner
and Engineer and anyone directly or indirectly employed by -
either of them from and against the claims , damages, losses
and expenses ( including attorneys fees) arising out of the use
of substituted materials or equipment.
C5-5 . 12 SAMPLES AND TESTS OR MATERIALS: Where, in the opinion
of the Engineer, or as called for in the Contract Documents ,
tests of materials or equipment are necessary, such tests will
be made at the expense of and paid for direct to the testing
agency by the Owner unless otherwise specifically provided.
The failure of the Owner to make any tests of materials shall
be in no way relieve the Contractor of his responsibility of
furnishing materials and equipment fully conforming to the
requirements of the Contract Documents. Tests and sampling of
materials , unless otherwise specified , will be made in
accordance with the latest methods prescribed by the American
Society for Testing Materials or specific requirements of the
Owner. The Contractor shall provide such facilities as the
Engineer may require for collecting and forwarding samples and
shall not , without specific written permission of the
Engineer, use the materials represented by the samples until
tests have been made and the materials approved for use. The
Contractor will furnish adequate samples without charge to the
Owner.
In case of concrete , the aggregates , design minimum, and the
mixing and transporting equipment shall be approved by the
Engineer before any concrete is placed, and the Contactor
shall be responsible for replacing any concrete which does not
meet the requirements of the Contract Documents. Tests shall
be made at least 9 days prior to the placing of concrete ,
using samples from the same aggregate, cement, and mortar
which are to be used later in the concrete. Should the source
of supply change, new tests shall be made prior to the use of
the new materials .
C5-5 . 13 STORAGE OF MATERIALS: All materials which are to be
used in the construction operation shall be stored so as to -
insure the preservation of the quality and fitness of the work.
When directed by the Engineer, they shall be placed on wooden
platforms or other hard, clean durable surfaces and not on the
C5-5 (6 )
f
ground, and shall be placed under cover when directed. Stored
materials shall be placed and located so as to facilitate
prompt inspection.
C5-5 . 14 EXISTING STRUCTURES AND UTILITIES: The location and
dimensions shown on the Plans relative to existing utilities
are based on the best information available. Omission from, or
the inclusion of utility locations on the Plans is not to be
considered as the nonexistence of, or a definite location of,
existing underground utilities . The location of many gas
mains , water mains , conduits , sewer lines and service lines
for all utilities , etc . , is unknown to the Owner , and the
Owner assumes no responsibility for failure to show any or all
such structures and utilities on the plans or to show them in
their exact location. It is mutually agreed that such failure
will not be considered sufficient basis for claims for
additional compensation for Extra Work or for increasing the
pay quantities in any manner whatsoever, unless an obstruction
encountered is such as to necessitate changes in the lines and
grades of considerable magnitude or requires the building of
special works, provision for which is not made in the Contract
Documents , in which case the provision in these Contract
Documents for Extra Work shall apply..
R,
It shall be the Contractors responsibility to verify locations
of adjacent and/or conflicting utilities sufficiently in
advance of construction in order that he may negotiate such
local adjustments as necessary in the construction process to
provide adequate clearances . The Contractor shall take all
necessary precautions in order to protect all existing
utilities , structures and service lines. Verification of
existing utilities, structures and service lines shall include
notification of all utility companies at least forty eight
(48 ) hours in advance of construction including exploratory
excavation if necessary . All verification of existing
utilities and their adjustment shall be considered as
subsidiary work.
C5-5.15 INTERRUPTION OF SERVICE:
a. Normal Prosecution: In the normal prosectuion of
work where the interruption of service is necessary,
the Contractor , at least 24 hours in advance, shall
be required to:
1. Notify the Water Department ' s Distribution
o Division as to location, time, and schedule of
service interruption.
I
C5-5 (7)
2. Notify each customer personally through
responsible personnel as to time and schedule
of the interruption of their service, or
3. In the event that personal notification of a
customer cannot be made, a prepared tag form
shall be attached to the customer ' s entrance
door knob . The tag shall be durable in
composition, and in large bold type shall say:
"NOTICE"
Due to Utility Improvement in
your neighborhood, your (water)
(sewer) service will be inter-
rupted on between
the hours of and
This inconvenience will be as
short as possible. _.
Thank you,
Contractor
Address Phone
b. Emergency: In the event that an unforeseen service
interruption occurs , notice shall be as above,but
immediate.
C5-5 . 16 MUTUAL RESPONSIBILITY OF CONTRACTORS: If , through
acts or neglect on the part of the Contractor , any other
Contractor or any sub-contractor shall suffer loss or damage -
on the work, the Contractor agrees to settle with such other
Contractor or sub-contractor by agreement or arbitration. If
such other Contractor or sub-contractor shall assert any claim
against the Owner on account of any damage alleged to have
been sustained, the Owner will notify the Contractor , who
shall indemnify and save harmless the Owner against any such
claim.
C5-5 . 17 CLEAN-UP: Clean-up of surplus and/or waste materials
accumulated on the job site during the prosecution of the work
under these Contract Documents shall be accomplished in
keeping with a daily routine established to the the
satisfaction of the Engineer . Twenty-fours fours after
written notice is given to the Contractor that the clean-up on
the job site is proceeding in a manner unsatisfactory to the
Engineer , if the Contractor fails to correct the
CS-5 (8)
unsatisfactory procedure, the City may take such direct action
as the Engineer deems appropriate to correct the clean-up
deficiencies cited to the Contractor in the written notice,
and the costs of such direct action, plus 25% of such costs ,
shall be deducted from monies due or to become due to the
Contractor.
Upon the completion of the project as a whole as covered by
these Contract Documents , and before final acceptance and
final payment will be made, the Contractor shall clean and
remove from the site of the project all surplus and discarded
materials , temporary structures, and debris of every kind. He
shall leave the site of all work in a neat and orderly
condition equal to that which originally existed. Surplus and
waste materials removed from the site of the work shall be
disposed of at locations satisfactory to the Engineer. The
Contractor shall thoroughly clean all equipment and materials
installed by him and shall deliver over such materials and
equipment in a bright , clean , polished and new appearing
condition . No extra compensation will be made to the
Contractor for any clean-up required on the project.
C5-5 . 18 FINAL INSPECTION: Whenever the work provided for in
and contemplated under the Contract Documents has been
satisfactorily completed and final cleanup performed, the
Engineer will notify the proper officials of the Owner and
request that the Final inspection be made. Such inspection
will be made within 10 days after such notification . After
such final inspection, if the work and materials and equipment
are found satisfactory, the Contractor will be notified in
writing of the acceptance of the same after the proper
resolution has been passed by the City Council . No time
charge will be made against the Contractor between said date
of notification of the Engineer and the date of f inal
inspection of the work.
C5-5 (9)
PART C - GENERAL CONDITIONS
4 C6-6 LEGAL RELATIONS AND PUBLIC
RESPONSIBILITY
SECTION C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY
C6-6.1 LAWS TO BE OBSERVED: The Contractor shall at all times
observe and comply with all Federal and State Laws and City
ordinances and regulations which in any way affect the conduct
of the work or his operations, and shall observe and comply
with all orders , laws, ordinances and regulations which exist
or which may be enacted later by bodies having jurisdiction or
authority for such enactment. No plea of misunderstanding or
ignorance thereof will be considered. The Contractor and his
Sureties shall indemnify and save harmless the City and all of
its officers , agents, and employees against any and all claims
or liability arising from or based on the violation of any
such law, ordinance, regulation, or order, whether it be by
himself or his employees.
C6-6. 2 PERMITS AND LICENSES: The Contractor shall procure all
permits and licenses, pay all charges, costs and fees, and
give all notices necessary and incident to the due and lawful
prosecution of the work.
C6-6 . 3 PATENTED DEVICES MATERIALS AND PROCESSES: If the
Contractor is required or desires to use any design, device,
material , or process covered by letter, patent, or copyright,
he shall provide for such use by suitable legal agreement with
the patentee or owner of such patent , letter, or copyrighted
design . It is mutually agreed and understood that without
exception the contract prices shall include all royalties or
cost arising from patents, trade-marks, and copy rights in any
way involved in the work. The Contractor and his sureties
shall indemnify and save harmless the Owner from any and all
claims for infringement by reason of the use of any such
patented design , device , material or process , or any
trade-mark or copy right in connection with the work agreed to
be performed under these Contract Documents , and shall
indemnify the Owner for any cost, expense, or damage which it
may be obliged to pay by reason of such infringement at any
time during the prosecution of the work or after completion of
the work, provided, however, that the Owner will assume the
responsibility to defend any and all suits brought for the
infringement of any patent claimed to be infringed upon by the
design , type of construction or material or equipment
specified in the Contract Documents furnished the Contractor
by the Owner , and to hold the Contractor harmless on account
of such suits.
r
C6-6 (1)
r
■
C6-6 . 4 SANITARY PROVISIONS : The Contractor shall establish
and enforce among his employees such regulations in regard to
cleanliness and disposal of garbage and waste as will tend to `
prevent the inception and spread of infectious or contagious
diseases and to effectively prevent the creation of a nuisance
about the work on any property either public or private, and
such regulations as are required by Law shall be put into
immediate force and effect by the Contractor . The necessary
sanitary conveniences for use of laborers on the work ,
properly secluded from public observation , shall be
constructed and maintained by the Contractor and their use
shall be strictly enforced by the Contractor . All such
facilities shall be kept in a clean and sanitary condition,
free from objectionable odors so as not to cause a nuisance.
All sanitary laws and regulations of the State of Texas and
the City shall be strictly complied with.
C6-6 . 5 PUBLIC SAFETY AND CONVENIENCE: Materials or equipment
stored about the work shall be so placed and used, and the
work shall at all times be so conducted , as to cause no
greater obstruction or inconvenience to the public than is
considered to be absolutely necessary by the Engineer. The
Contractor is required to maintain at all times all phases of
his work in such a manner as not to impair the safety or
convenience of the public, including, but not limited to, safe
and convenient ingress and egress to property contiguous to
the work area. The Contractor shall make adequate provisions
to render reasonable ingress and egress for normal vehicular
traffic, except during actual trenching or pipe installation
operations , at all driveway crossings . Such provisions may
include bridging, placement of crushed stone or gravel or such
other means of providing proper ingress and egress for the
property served by the driveway as the Engineer may approve as
appropriate. Such other means may include the diversion of
driveway traffic, with specific approval by the Engineer. If
diversion of traffic is approved by the Engineer at any
location, the Contractor shall make arrangements satisfactory
to the Engineer at any location, the Contractor shall make
arrangements satisfactory to the Engineer for the diversion of
traffic , and shall , at his own expense, provide all materials -
and perform all work necessary for the construction and
maintenance of roadways and bridges for such diversion of
traffic. Sidewalks must not be obstructed except by special
permission of the Engineer.
The materials excavated and the construction materials such as
pipe used in the construction of the work shall be placed so
as not to endanger the work or prevent free access to all fire
hydrants, fire alarm boxes , police call boxes , water valves ,
C6-6 (2 )
gas valves , or manholes in the vicinity. The Owner reserves
the right to remedy any neglect on the part of the Contractor
as regards to public convenience and safety which may come to
its attention , after twenty-four hours notice in writing to
the Contractor , save in cases of emergency when it shall have
the right to remedy any neglect without notice , and in either
case, the cost of such work done or materials furnished by the
Owner or by the City shall be deducted from monies due or to
become due to the Contractor.
The Contractor , after approval of the Engineer, shall notify
the Fire Department Headquarters, Traffic Engineer, and Police
Department , when any street or alley is requested to be closed
1 or obstructed or any fire hydrant is to be made inaccessible,
and, when so directed by the Engineer, shall keep any street,
streets, or highways in condition for unobstructed use by fire
f apparatus . The Contractor shall promptly notify the Fire
Department Headquarters when all such obstructed streets ,
alleys, or hydrants are again placed back in service.
Where the Contractor is required to construct temporary
bridges or make other arrangements for crossing over ditches
or streams , his responsibility for accidents in connection
with such crossings shall include the roadway approaches as
well as the structures of such crossings.
The Contractor shall at all times conduct his operation and
the use of construction machinery so as not to damage or
destroy trees and shrubs located in close proximity to or on
the site of the work. Wherever any such damage may be done,
the Contractor shall immediately satisfy all claims of
property owners, and no payment will be made by the Owner in
settlement of such claims. The Contractor shall file with the
Engineer a written statement showing all such claims adjusted.
C6-6 . 6 PRIVILEGES OF CONTRACTOR IN STREETS, ALLEYS, AND
RIGHT-OF-WAY: For the performance of the contract , the
Contractor will be permitted to use and occupy such portion&
of the public streets and alleys , or other public places or
other rights-of-way as provided for in the ordinances of the
City , as shown in the Contract Documents , or as may be
specifically authorized in writing by the Engineer . A
reasonable amount of tools , materials , and equipment for
construction purposes may be stored in such space, but no more
than is necessary to avoid delay in the construction
operations . Excavated and waste materials shall be piled or
stacked in such a way as not to interfere with the use of
spaces that may be designated to be left free and unobstructed
and so as not to inconvenience occupants of adjacent property.
If the street is occupied by railway tracks, the work shall be
C6-6 (3 )
carried on in such manner as not to interfere with the
operation of trains, loading or unloading of cars , etc. Other
contractors of the Owner may, for all purposes required by the
contract, enter upon the work and premises used by the
Contractor and shall be provided all reasonable facilities and
assistance for the completion of adjoining work . Any
additional grounds desired by the Contractor for his use shall
be provided by him at his own cost and expense.
C6-6. 7 RAILWAY CROSSINGS: When the work encroaches upon any
right-of-way of any railway, the City will secure the
necessary easement for the work. Where the railway tracks are
to be crossed , the Contractor shall observe all the
regulations and instructions of the railway company as to the
methods of performing the work and take all precautions for
safety of property and the public. Negotiations with the
railway companies for permits shall be done by and through the
City. The Contractor shall give the City notice not less than
five days prior to the time of his intentions to begin work on
that portion of the project which is related to the railway
properties . The Contractor will not be given extra or
additional compensation for such railway crossings unless
specifically set forth in the Contract Documents.
C6-6 . 8 BARRICADES, WARNINGS AND WATCHMEN: Where the work is
carried on in or adjacent to any street , alley, or public
place, the Contractor shall at his own expense furnish, erect,
and maintain such barricades , fences , lights and danger
signals , shall provide such watchmen, and shall take all such
other precautionary measures for the protection of persons or
property and of the work as are necessary. Barricades and
fences shall be painted in a color that will be visible at
night. From sunset to sunrise the Contractor shall furnish
and maintain at least one easily visible burning light at each
barricade. A sufficient number of barricades shall be erected
and maintained to keep pedestrians away from, and vehicles
from being driven on or into, any work under construction or
being maintained. The Contractor shall furnish watchmen and
keep them at their respective assignments in sufficient
numbers to protect the work and prevent accident or damage.
All installations and procedures shall be consistent with the
provisions set forth in the "1980 Texas Manual on Uniform
Traffic Control Devices for Streets and Highways" issued under
the authority of the "State of Texas Uniform Act Regulating
Traffic on Highways " , codified as Article 6701d Veron's Civil
Statutes, pertinent sections being Section Nos. 27 , 29 , 30 and
31.
C6-6 (4 )
The Contractor will not remove any regulatory sign ,
instructional sign, street name sign, or other sign which has
been erected by the City. If it is determined that a sign
N must be removed to permit required construction , the
Contractor shall contact the Transportation and Public Works
department , Signs and Markings Division ( phone number
8780-8075 ) , to remove the sign. In the case of regulatory
signs, the Contractor must replace the permanent sign with a
temporary sign meeting the requirements of the above
referenced manual and such temporary sign must be installed
prior to the removal of the permanent sign. If the temporary
sign is not installed correctly or if it does not meet the
required specifications , the permanent sign shall be left in
place until the temporary sign requirements are met. When
construction work is completed to the extent that the
permanent sign can be re-installed, the Contractor shall again
contact the Signs and Markings Division to re-install the
permanent sign and shall leave his temporary sign in place
until such re-installation is completed.
The Contractor will be held responsible for all damage to the
work or the public due to failure of barricades , signs ,
fences , lights , or watchmen to protect them. Whenever
evidence is found of such damage to the work the Engineer may
order the damaged portion immediately removed and replaced by
the Contractor at the Contractor ' s own expense . The
Contractor ' s responsibility for the maintenance of barricades,
signs, fences and lights, and for providing watchmen shall not
cease until the project shall have been completed and accepted
by the Owner.
No compensation , except as specifically provided in these
Contract Documents, will be paid to the Contractor for the
work and materials involved in the constructing , providing,
and maintaining of barricades , signs, fences , and lights or
for salaries of watchmen , for the subsequent removal and
disposal of such barricades , signs , or for any other
incidentals necessary for the proper protection, safety, and
convenience of the public during the contract period, as this
work is considered to be subsidiary to the several items for
which unit or lump sum prices are requested in the Proposal.
C6-6 . 9 USE OF EXPLOSIVES , DROP WEIGHT, ETC. : Should the
a Contractor elect to use explosives, drop weight, etc. , in the
prosecution of the work, the utmost care shall be exercised at
all times so as not to endanger life or property . The
Contractor shall notify the proper representative of any
public service corporation , any company, individual , or
utility, and the Owner, not less than twenty-four hours in
C6-6 (5 )