Loading...
HomeMy WebLinkAboutContract 47140-FP1 Depa t o 7 P &W Const.Services DOE# Da Project M nage Iti Risk Management Cana �T WO RT Ho D.O.E. Brotherton - , _7 SECRETAW CFA Westerman/Scanned k,P, - t-,,_ COtdTlt/ICT NO. _101pr0 The Proceeding people have been Contacted concerning the request for final payment& have released this project for such payment. 'ATION AND PUBLIC WORKS F PROJECT COMPLETION Clearance Conducted By Shameka Kennedy n n R D.O.E. Ns: 7499 Regarding contract 117499 for MORNINGSTAR SECTION 5 PHASE I as required by the 4�3# q7)411 TRANSPORTATION& PUBLIC WORKS as approved by Cit} Council on N/A through M&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: $84,511.46 Amount of Approved Change Orders: J§ Revised Contract Amount: Total Cost Work Completed: $84,511.46 Less Deductions: Liquidated Damages: Days a $210.00/Day Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: $84,511.46 Less Previous Payments: $0.00 Final Pay eu a $84,511.46 Recommened r Acceptance Date Asst. Direct r, T W - Infrastructure Design and Construction L f Accepted Date IM Direr or TRANSPORTATION & PUBLIC WORKS Asst. City Manager Dae �7 Comments: C205-541200-203760263083 S AILED t= AUG — 16 OFFICIAL RECORD CITY SECRETARY i rLitiai:- S� F r WORTH TX i FORT WORTH i CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name MORNINGSTAR SECTION 5 PHASE I Contract Limits Project Type STREETLIGHT City Project Numbers 02630 DOE Number 7499 Estimate Number I Payment Number 1 For Period Ending 7/21/2016 CD City Secretary Contract Number 117499 Contract Time 12IED Contract Date Days Charged to Date 271 Contract is 100.00 Complete Project Manager Buckley Contractor BEAN ELECTRICAL,INC 821 E ENON FORT WORTH, TX 76140 Inspectors LAYER / HOUSTON ".n Thursday,July 21,2016 Paget of4 I k i City Project Numbers 02630 DOE Number 7499 Contract Name MORNINGSTAR SECTION 5 PHASE I Estimate Number I Contract Limits Payment Number I Project Type STREET LIGHT For Period Ending 7/21/2016 Project Funding € C l' STREET LIGHTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total I FURNISH/INSTALL GROUND BOX 9 EA $400.00 $3,600.00 9 $3,600.00 2 RDWY ILLUM ASSEMBLY TY I4 EA $1,800.00 $25,200.00 l4 $25,200.00 C 3 RDWY ILLUM ASSEMBLY TY-D6 8 EA $2,250.00 $18,000.00 8 $18,000.00 E 4 FURNISH/1NSTALLRDWY ILLUM 14 EA $856.00 $11,984.00 14 $11,984.00 FOUNDATION 5 FURNISH/INSTALL RDWY ILLUM 8 EA $953.34 $7,626.72 8 $7,626.72 FOUNDATION 6 2 INCH CONDUIT PVC SCH 80 1821 LF $8.00 $14,568.00 1821 $14,568.00 7 6-6-6 TRIPLEX ALUM ELECTRIC CONDUCTOR 1821 CL $1.94 $3,532.74 1821 $3,532.74 Sub-Total of Previous Unit $84,511.46 $84,511.46 i K r i l f E {4F I { f 4 t y Thursday,July 21,2016 Page 2 of 4 f i i City Project Numbers 02630 DOE Number 7499 Contract Name MORNINGSTAR SECTION 5 PHASE I Estimate Number I Contract Limits Payment Number 1 Project Type STREET LIGHT For Period Ending 7/21/2016 Project Funding Contract Information Summaity Original ContractAnrount $84,511.46 ChanLye Orders Total Contract Price $84,511.46 Date .2 1j Total Cost of Work Completed $84,511.46 ntra / J Less %Retained $0.00 8/24 Net Earned $84,511.46 Date Ins ctio✓r a ` o Earned This Period $84,511.46 Retainage This Period $0.00 / Date Less Liquidated Damages oj m a r F Days n /Day $0.00 Pr Date fi LessPavement Deficiency $0.00 As ire or/fPW-Infra tructure Design and Construction Less Penalty $0.00 Date 1S Less Previous Payment $0.00 Director 0ontractingDepartme Plus Material on Hand Less 15% $0.00 Balance Due This Payment $84,511.46 Thursday,July 21,2016 Page 3 of 4 I I I City Project Numbers 02630 DOE Number 7499 Contract Name MORNINGSTAR SECTION 5 PHASE 1 Estimate Number I Contract Limits Payment Number I Project Type STREETLIGHT For Period Ending 7/21/2016 Project Funding Project Manager Buckley City Secretary Contract Number 117499 II Inspectors LAYER / HOUSTON Contract Date Contractor BEAN ELECTRICAL,INC Contract Time 120 CD 821 E ENON Days Charged to Date 271 CD FORT WORTH, TX 76140 Contract is .000000 Complete j CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded 6 !f i Total Cost of Worlc Completed $84,511.46 Less %Retained $0.00 Net Earned $84,511.46 i Earned This Period $84,511.46 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $84,511.46 f 4 1 Thursday,July 21,2016 Page 4 of 4 I 1 FORTWORTH rev 03/05/07 TRANSPORTATION& PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Morningstar Section 5 Phase 1 PROJECT NO.: 02630 CONTRACTOR: Bean Electrical DOE NO.: 7499 PERIOD FROM 10/16/15 TO: 07/13/16 FINAL INSPECTION DATE: 20-Jul-16 WORK ORDER EFFECTIVE:10/16/2015 CONTRACT TIME: 120 0 WCQ CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4, 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS 0 0 0 0 271 271 PERIOD PREVIOUS 0 0 0 0 0 0 PERIOD TOTALS 0 0 0 0 271 271 TO DATE *REMARKS: RAC f6k DATE INSPECTOR DATE ENGINEERLNG DEP-1RT11ENT The Cit},of Fort Worth• 1000 Throckmorton Street•Fort Worth,TZ 76012-6311 (817)392-7941 •Fax:(817)392-7845 CONSENT OF OWNER x SURETY COMPANY ARCHITECT ❑ TO FINAL PAYMENT CONTRACTOR ❑ SURETY ❑ OTHER ❑ Bond#4403216 PROJECT: Morningstar-Section 5 Phase 1, (name,address) TO(Owner)FG Aledo Development,LLC ARCHITECT'S PROJECT NO: 3045 Lackland Blvd CONTRACT FOR:construction Fort Worth,TX SUB-CONTRACT DATE: 9/29/2015 76116 SUBCONTRACTOR:Bean Electrical,Inc. C In accordance with the provisions of the Contract between the Contractor and the Sub-Contractor as indicated above,the (here insert name and address of Surety Company) SureTec Insurance Company 1330 Post Oak Blvd.,Ste 1100 Houston, TX 77056 ,SURETY COMPANY, on bond of (here insert name and address of Sub-Contractor) Bean Electrical,Inc. 821 E Enon Fort Worth,TX 76140 ,CONTRACTOR, E t - t hereby approves of the final payment to the Sub-Contractor, and agrees that final payment to the Sub- Contractor shall not relieve the Surety company of any of its obligations to (here insert name and address of Owner) FG Aledo Development,LLC f 3045 Lackland Blvd Fort Worth,TX 76116 ,OWNER, as set forth in the said Surety Company's bond IN WITNESS WHEROF, The Surety Company has hereunto set its hand this 19th day of duly, 2016. L SureTec Insurance mpany Surety Com y ­�_",_1 A0 e —�' Signature Authorized epresentative Attest j ' (seat): Johnny Moss, Attomey-in-Fact Title 5 k NOTE:This fonn b to be used as a eompanton document io AIA DOCUMENT 0706,CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBT AND CLAIMS, Current Edition i AIA DOCUMENT G707*CONSENT OF SURETY COMPANY TO FINAL PAYMENT'APRIL 1970 EDITION*AIA 1970 THEAMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.NW WASHINGTON,D.C.2006 WARNING: Unlicensed pholncopying vlolates U.S.copyright laws and Is subject to legal prosecution. r: 1 IIOA#. 4221049 I SureTec Insurance Company LEMTED POWER OF ATTORNEY %now A17 Men by These Presents, That SURETEC INSURANCE COMPANY (tile "Company"), a corporation duly organized and existing under the laws of the State of Texas,and having its principal office in Houston,Harris County,Texas, does by these presents make,constitute and appoint Tony Fierro,Jay Jordan,Johnny Moss,Steven W.Searcey, Robert J.Shuya,Mistle Beck,Jeremy Barnett,Robert G.Kanuth,Jade Porter,Jennifer Cisneros its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute,acknowledge i and deliver any and all bonds,recoguizances,undertakings or other instruments or contracts of suretyship to include waivers to the conditions of contracts and consents of surety for: Five Million and 001100 Dollars($5,000,000.00) and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President,sealed with the corporate seal of the Company and duly attested by its Secretary,hereby rafifying and confirming all that the said Attorney-in-Fact may do in the premises. Said appointment shall continue in force until 12/31/2016 and is made under and by authority of the following resolutions of the Board of Directors of the SureTec Insurance Company: Be it Resolved that the President,any Vice-President;any Assistant Vice-President,any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company,to execute,aclmowledga and deliver,any and all bonds,recognizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing fbcsimile signature or facsimile seat shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached (Adopted at a meeting held on 20 ofAprii< 1999) In Witness Whereof,SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate seal j to be hereto affixed this Std day of August,A,D. tors SURETEC INSURANCE COMPANY R"AN�Eo g m } YJohnVol Tresident State of Texas ss: County of Harris On this 3rd day of August,A.D, lois before me personally came John Knox Jr.,to me known,who,being by me duly sworn,did depose and say,that he resides in Houston,Texas,that he is President of SURPTEC INSURANCE COMPANY, the company described in and which executed the above instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the Hoard of Directors of said Company;and that he signed his name thereto by like order. i i pA MEXP. %,w- AJacq, elynMaldonado,NotaryPublic My commission expires May 18,2017 1,M.Brent Beaty,Assistant Secretary of SURETEC INSURANCE COMPANY,do hereby certify that the above and foregoing is atrue and correct copy of a Power of Attorney,executed by said Company,which is still in full force and effect;and furthermore,the resolutions of the Board of Directors,set out in the Power of Attorney are in full force and effect +k1 / Given under my hand and the seal of said Company at Houston,Texas this day of i.� L�` ( / .-4 A.D. Bre t Beaty,Assistant eeretary i Any instrument Issued in excess of the penalty stated above Is totally void and without any validity. For verification of the authority of this power you may call(713)892-0800 any business day between 8.00 am and 6:00 pm CST. AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Roy E. Bean, II, President Of Bean Electrical, Inc.,laiown to me to be a credible person, who being by me duly sworn,upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Morningstar Section 5. Phase 1 DOE No 7499, Ci yProj'et No. 02630 BY; Roy E. Bean, II/President Subscribed and sworn before me on this date 26th of July, 2016. CHERYLE R. ESPREE N ary Ru C ?_: n E Notary Public,State of Texas Tarrant Co. State of Texas Ni'FOF��+P�, Comm.Expires 02-29-2020 ''a,,,,,u�� Nolary ID 1890225 FORTWORTH REV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA Name offonh•actor Project Name Bean Electrical,Inc. Morningstar Section 5 Phase 1 DOE Inspector DOE Number Garey Houston 7499 DOE Inspector Projecl Manager ❑Water ❑Waste Water ❑Storm Drainage ❑Pavement Pat Buckley Initial Contract Amount Project Difficully $84,511.46 O Simple OO Routine O Complex Final Contract Amount Date $84,511.46 7/20/2016 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8. Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 20 i t Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 448 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 448 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating(ITS/MS] *100%) 448 / 448 = 100% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector wL' Signature Contractor Signature DOE Inspector's Supervisor CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS ,I t' The City of Fort Words•1000 Throcl=orton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 FG ALEDO DEVELOPMENT, L.L.C. 3045 LACKLAND RD. FORT WORTH, TEXAS 76116 July 18, 2016 Garey Houston Freese and Nichols 4055 International Plaza, Suite 200 Fort Worth, Texas 76109 Re: Morningstar Sections 5, Phase 1 DOE No. 7499, City Project No. 02630 Dear Mr. Houston, There are no liquidated damages for Conatser Construction, DT Utilities or Bean Electrical, Inc. on the above referenced job. Sincerely, -'r) 1,q � Tim H. Fleet Vice President FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 7/20/2016 Name of Contractor Project Nanre Bean Electrical,Inc. Morningstar Section 5 Phase 1 DOE inspector Project Manager Garey Houston Pat Buckley DDE Number Project Difficulty Type of Contract 7499 O Simple O Routine O Complex ❑water ❑waste water ❑Storm Drainage ❑Pavement Initial Contract Amount Final Contract Amount $84,511.46 $84,511.46 II)PERFORMANCE EVALUATION 0-Inadequate I -Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicability of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 3 Communication 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timefi ame III)COMMENTS&SIGNATURES j COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS i TRANSPORTAnON AND PUBLIC WORKS of The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 i