Loading...
HomeMy WebLinkAboutContract 47144-FP2 Depart ent of TP&W Const. Services a'- � DOE# D o Dat vj 1r� �.i ,�Te Y a r r Project anager`f C CONTRACT L r Risk Management Canady� NO D.O.E. Brotherton r RT WO RT Ho CFA Westerman/Scanned The Proceeding people have been Contacted concerning the request for final payment& have released this project for such payment. TATION AND PUBLIC WORKS OF PROJECT COMPLETION Clearance Conducted By Shameka Kennedy �/n7!/16 D.O.E. Ne: 7500 C cog4gl Regarding contract 117500 for MORNINGSTAR SECTION 6 PHASE las requited by the CSfie y7145 TRANSPORTATION& PUBLIC WORKS as approved by City Council on N/A through 1\'I&C N/A the director of the TRANSPORTATION& PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: $533,727.74 Amount of Approved Change Orders: Ne Revised Contract Amount: Total Cost Work Completed: $533,727.74 Less Deductions: Liquidated Damages: Days a $210.00/Day Pavement Deficiencies: Total Deduction Amount: i Total Cost Work Completed: $533,727.74 I Less Previous Payments: $0.00 I Final P ent Due $533,727.74 Recomm d d for Acceptance Date Asst. Dire for TPW - Infrastructure Design and Construction Accepted V Date jW. Dir tor, TRANSPORTATION & PUBLIC WORKS / S44 Asst.ltlity Manager Date Comments: C205-541200-203760264183 I - AUG 2016 OFFICIAL RECORD � t>aa: - CITE'SECRETARY FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name MORNINGSTAR SECTION 6 PHASE 1 Contract Limits Project Type PAVING City Project Numbers 02641 DOL Number 7500 Estimate Number I Payment Number I For Period Ending 7/21/2016 CD City Secretary Contract Number 117500 Contract Time 80;D Contract Date Days Charged to Date 271 Contract is 100.00 Complete Project Manager Buckley Contractor CONATSER CONSTRUCTION T%LP 5327 WICHITA ST PORT WORTH, TX 76119 Inspectors LAYER / HOUSTON Thursday,July 21,2016 Page I of 4 City Project Numbers 02641 DOE Number 7500 Contract Name MORNINGSTAR SECTION 6 PHASE 1 Estimate Number I Contract Limits Payment Number I Project Type PAVING For Period Ending 7/21/2016 Project Funding PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No, Quaoity Total Quanity Total 1 6"CONC PVMT 11071 SY $33.00 $365,343.00 11071 $365,343.00 2 6"LIME TREATMENT 11790.617 SY $3.00 $35,371.85 11790.617 $35,371.85 3 HYDRATED LIME 176.8592 TN $175.00 $30,950.36 176.8592 $30,950.36 4 7.5"CONC PVMT 1435 SY $38.00 $54,530.00 1435 $54,530.00 5 8"LIME TREATMENT 1528.2738 SY $3.25 $4,966.89 1528.2738 $4,966.89 6 HYDRATED LIME 30.5808 TN $175.00 $5,351.64 30.5808 $5,351.64 7 4"CONCRETE SIDEWALK 1520 SF $3.00 $4,560.00 1520 $4,560.00 4 8 BARRIER FREE RAMP 20 EA $1,000.00 $20,000.00 20 $20,000.00 9 FURNISH&INSTALL GROUND MOUNT SIGN 9 EA $650.00 $5,850.00 9 $5,850.00 POST AND SIGN 10 24"SOLID WHITE STOP BAR PAINT 42 LF $12.00 $504.00 42 $504.00 11 REFL RAISED MARKER 60 EA $5.00 $300.00 60 $300.00 12 STREET BARRICADE 150 LF $40.00 $6,000.00 150 $6,000.00 Sub-Total of Previous Unit $533,727.74 $533,727.74 ! i i I i i 1 i I Thursday,July 21,2016 Page 2 of 4 I 1 City Project Numbers 02641 DOL Nuinber 7500 Contract Name MORNINGSTAR SECTION 6 PHASE 1 Estimate Number I Contract Limits Payment Number I Project Type PAVING For Period Ending 7/21/2016 Project Funding Contract Information Summa►y Original Contract Amount $533,727.74 Chwige Orders Total Contract Price $533,727.74 JIXVY Date �O Total Cost of Work Completed $533,727.74 Contra Less %Retained $0.00 k Net Earned $533,727.74 Date Earned This Period $533,727.74 Insp do S pe i o Retainage This Period $0.00 Date w Less Liquidated Damages Project Manag�,r V Days @ /Day $0.00 '(/ 4Date 7 � LessPavement Deficiency $0.00 As t. ire or/TPW-Infrastructure Design anndd Construction Less Penalty $0.00 ate 0 Less Previous Payment $0.00 Direct Contracting Departnne Plus Material on Hand Less 15% $0.00 �w Balance Due This Payment $533,727.74 �A- Thursday,July 21,2016 Page 3 of 4 City Project Numbers 02641 DOE Number 7500 Contract Name MORNINGSTAR SECTION 6 PHASE I Estimate Number I Contract Limits Payment Number I Project Type PAVING For Period Ending 7/21/2016 Project Funding I Project Manager Buckley City Secretary Contract Number 117500 Inspectors LAYER / HOUSTON Contract Date Contractor CONATSER CONSTRUCTION TxLP Contract Time 80 CD 5327 WICHITA ST Days Charged to Date 271 CD FORT WORTH, TX 76119 Contract is .000000 Complete i CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded I t [r j Total Cost of Work Completed $533,727.74 i Less %Retained $0.00 Net Earned $533,727.74 Earned This Period $533,727.74 i Retainage This Period $0.00 Less Liquidated Damages 0 Days ri $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 � Balance Due This Payment $533,727.74 Thursday,July 21,2016 Page 4 of 4 FORTWORTH rev 03/05/07 TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Morningstar Section 6 Phase 1 PROJECT NO.: 02641 CONTRACTOR: Conatser Construction DOE NO.; 7500 PERIOD FROM:10/16/15 TO: 07/13/16 FINAL INSPECTION DATE: 20-Jul-16 WORK ORDER EFFECTIVE:10/16/2015 CONTRACT TIME: 80 O Wg* CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS THIS 0 0 0 0 271 271 PERIOD PREVIOUS 0 0 0 0 0 0 PERIOD TOTALS 0 0 0 0 271 271 TO DATE *REMARKS: CONTRACTOR DATE WSPECTO DATE ENGINEERING DEPARTMENT The City of Fort Worth•1000 Throckinorton Street•Fort Worth,TZ 76012-6311 =.. (817)392-7941 •Fax:(817)392-7845 CITY SECRETARY C ( FEDDCONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ CONTRACTOR ❑ TO FINAL PAYMENT SURETY ❑ Conforms with the American Institute of OTHER Architects,AIA Document G707 Bond No 0149484 PROJECT: (name, address)FortMorningstar-Section G, Phase 1 Worth,TX TO (Owner) FG ALEDO DEVELOPMENT AND THE CITY OF FORT] ARCHITECT'S PROJECT NO: WORTH CONTRACT FOR: 3045 Lackland Blvd. Morningstar-Section 6,Phase 1 -Paving Improvements Fort Wor11t TX 76116 —J CONTRACT DATE: CONTRACTOR:CONATSER CONSTRUCTION TX,L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (hero insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 , SURETY COMPANY on bond of there insert name and address of Contractor) CONATSER CONSTRUCTION TX,L.P. 5327 Wichita SI. Fort Worth TX 76119-6035 CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here Insert name and address of Owner) FG ALEDO DEVELOPMENT AND THE CITY OF FORT WORTH 3045 Lackland Blvd. Fort Worth TX 76116 OWNER, as set forth in the said Surety Company's bond, IN WITNESS,WHEREOF, the Surety Company has hereunto set its hand this 15th day of July,2016 BERKLEY INSURANCE COMPANY Surety Company Attest: 1 i` :;�&f'C.. - 77`1 « / (Seal): �`'�- ����� Signature of Authorized Representative Robbi Morales Atlorney-in-Fact Title NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Currant Edition ONE PAGE POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON, DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly _ organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made,constituted and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell; Vena DeLene Marskall;Sophinie Hunter,Robbi Morales, or Kelly A. Westbrook of Aon Risk Services Soulltwest, Inc, of Dallas, TX its true and lawful Attomey-in-Fact,to sign its name as surety only as delineated below and to execute,seal,acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars(U.S.$50,000,000.00),to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by,the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof, This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney-in-fact and revoke any power of attorney previously granted;and further - - RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the T, manner and to the extent therein stated;and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and further -: RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond,undertaking, recognizance, or other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. IN WITNESS WHEREOF, the Company has ca�e these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this Wt lay of ctltf— Attest: Berkley Insurance Company (Seal) By t B*e - � Ira S, a erman after Senior Vice President&Secretary Preside WARNING, THIS POWER INVALID IF NOT PRINTED ON BLUE"BERKLEY"SECURITY PAPER. -71 STATE OF CONNECTICUT) ss: COUNTY OF FAIRFIELD ) �� Sworn to before me, a Notary Public in the State of Connecticut, this�J(7motaryPublic, w`�' 2015, by Ira S. Lederman and Jeffrey M. Hafter who are sworn to me to be the Senior Vice President and SSenior Vice Pre `dent,respectively,of y Company, MARIA C.RUNDBAKEN �Berkle Insurance Com an NOTARY PUBLIC MY COMMISSION EXPIRES State of Connecticut APRIL 30,2019 CERTIFICATE Z. 1, the undersigned, Assistant Secretary of BERKLEY INSURANCE COMPANY, DO HEREBY CERTIFY that the foregoing is a true,correct and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded and that the authority of the Attorney-in-Fact set forth therein, who executed the bond or undertaking to which this Power of Attorney is attached, is in full force and effect as of this date. Given under my hand and seal of the Company,this 15th day of4A . ,2016 (Seal) w�I�Ir�nvrr j STAT1,' Oh'1BXAS COUNTY 01-TM ANI' Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, Vice-President of Conatser NIanagerient Group, Inc., general partner of Conatser Construction TX, LP, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in lull; and That there are no claims pending for personal injury and/or property damages; On Contract described as: i MORNINGSTAR—SEC G,PH I PAVING IMPROVEMENTS DOEM N/A City Project#: N/A CITY OF FORT WORTH STATE OF TEXAS CON TS1;R CONSTRUCTION TX, LP Brock Huggins Subscribed and sworn to before me this 18"'day of Ju , .r- Notary Public in Tarrant County,Texas BERTHA GIANULIS Notary PublIC,State of Texas My Commission Expires September 18,2019 FORTWORTH REV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR 1) CONTRACTOR&PROJECT DATA None of Contractor Project Nante Conatser Construction TX,L.P. Morningstar Section 6 Phase 1 DOE Inspector DOE Number Garey Houston 7500 DOEI nspecto• Project Manager ❑Water ❑Waste Water ❑Storm Drainage 0 Pavement Pat Buckley Initial Con tract Amount Project Diicttlly $533,727.74 O Simple OO Routine O Complex Final Contract Amount Date $533,727.74 7/15/2016 H)PERFORMANCE EVALUATION 0-Inadequate I -Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE I Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 1 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 448 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 448 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS] * 100%) 448 / 448 = 100% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector Signature Contractor� P Ae-,S� Signature DOE Inspector's Supervisor CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS n The City of Fort Worth•1000 Tlhrockmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 FG ALEDO DEVELOPMENT, L.L.C. 3045 LACKLAND RD. FORT WORTH, TEXAS 76116 July 18, 2016 Garey Houston Freese and Nichols 4055 International Plaza, Suite 200 Fort Worth, Texas 76109 I Re: Morningstar Sections 6, Phase 1 DOE No. 7500, City Project No. 02641 Dear Mr. Houston, There are no liquidated damages for Conatser Construction, DT Utilities or Bean Electrical, Inc. on the above referenced job. Sincerel , Tim H. Fleet Vice President FORTWORTHREV:0212210' TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY 1)PROJECT INFORMATION Date: 7/15/2016 Name ofConlraclor Project Name Conatser Construction TX,L.P. Morningstar Section 6 Phase 1 DOE Inspector Project Tanager Garey Houston Pat Buckley DOE Number Project Difficulty T}pe of Conlract 7500 O Simple OO Routine O Complex ❑Water ❑Waste Water ❑Storm Drainage 0 Pavement milia!Conlracl Amounl Final Conlract ilmount $533,727.74 $533,727.74 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS I Availability of Inspector 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector If 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities ti` 3 Applicability of Specifications 4 Display Of Professionalism �f 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution L� PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time ti 3 Communication 2 Timliness of Contractor Payments q 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe U III)COMMENTS&SIGNATURES COMMENTS Signature Contractor (.lam Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS la The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845